• 1.62 MB
  • 170页

珠海网泰环保设备有限公司化工涂料生产项目环境影响报告书(报批稿)

  • 170页
  • 当前文档由用户上传发布,收益归属用户
  1. 1、本文档共5页,可阅读全部内容。
  2. 2、本文档内容版权归属内容提供方,所产生的收益全部归内容提供方所有。如果您对本文有版权争议,可选择认领,认领后既往收益都归您。
  3. 3、本文档由用户上传,本站不保证质量和数量令人满意,可能有诸多瑕疵,付费之前,请仔细先通过免费阅读内容等途径辨别内容交易风险。如存在严重挂羊头卖狗肉之情形,可联系本站下载客服投诉处理。
  4. 文档侵权举报电话:19940600175。
'珠海网泰环保设备有限公司化工涂料生产项目目录1总论..........................................................................................................................................11.1任务由来.........................................................................................................................................11.2评价目的.........................................................................................................................................21.3编制依据.........................................................................................................................................21.4评价时段.........................................................................................................................................61.5评价标准.........................................................................................................................................61.6评价工作等级...............................................................................................................................101.7评价范围.......................................................................................................................................121.8环境保护及污染控制目标...........................................................................................................131.9评价因子确定...............................................................................................................................141.10评价工作程序...............................................................................................................................142项目概况.................................................................................................................................162.1项目概况.......................................................................................................................................162.2项目建设内容...............................................................................................................................162.3产品方案及生产规模...................................................................................................................182.4主要生产设备和设施...................................................................................................................182.5总图布置及消防...........................................................................................................................192.6劳动定员及劳动制度...................................................................................................................202.7建设进度计划...............................................................................................................................212.8主要经济技术指标.......................................................................................................................213工程分析.................................................................................................................................233.1原辅材料、产品...........................................................................................................................233.2主体工程分析...............................................................................................................................253.3公用及辅助工程分析...................................................................................................................283.4物料平衡.......................................................................................................................................343.5产污分析及污染物防治措施.......................................................................................................383.6污染物排放情况汇总...................................................................................................................454自然和社会环境概况.............................................................................................................474.1自然环境概况...............................................................................................................................474.2社会经济概况...............................................................................................................................494.3项目周围居民饮用水情况...........................................................................................................521 珠海网泰环保设备有限公司化工涂料生产项目4.4项目附近污染源调查...................................................................................................................525环境质量现状调查与评价.....................................................................................................545.1海水环境质量现状评价...............................................................................................................545.2环境空气质量现状评价...............................................................................................................585.3声环境质量现状评价...................................................................................................................636施工期环境影响分析.............................................................................................................666.1施工期间噪声影响分析及防治措施...........................................................................................666.2施工期间对空气环境的影响分析及防治措施...........................................................................676.3施工期间对地表水的影响分析及防治措施...............................................................................686.4施工期间固废影响分析及防治措施...........................................................................................696.5水土流失影响分析.......................................................................................................................707运营期环境影响预测与分析.................................................................................................727.1海水环境影响分析.......................................................................................................................727.2地下水环境影响分析...................................................................................................................737.3环境空气质量影响预测与评价...................................................................................................747.4声环境影响预测与评价...............................................................................................................837.5固体废物影响分析.......................................................................................................................868环境风险影响评价.................................................................................................................888.1风险识别.......................................................................................................................................888.2生产及储运区的风险分析.........................................................................................................1068.3风险评价等级和评价范围.........................................................................................................1098.4源项分析.....................................................................................................................................1108.5风险评价.....................................................................................................................................1128.6风险事故防范措施.....................................................................................................................1178.7风险事故应急预案.....................................................................................................................1258.8高栏港突发环境事件应急预案.................................................................................................1279项目选址合理性分析...........................................................................................................1339.1产业政策符合性.........................................................................................................................1339.2规划符合性分析.........................................................................................................................1339.3环境敏感性分析.........................................................................................................................1339.4项目平面布局合理性.................................................................................................................1349.5环境风险可接受程度分析.........................................................................................................1349.6环境可行性综合结论.................................................................................................................1342 珠海网泰环保设备有限公司化工涂料生产项目10污染防治措施可行性分析...............................................................................................13510.1施工期污染控制措施.................................................................................................................13510.2运营期污染防治措施可行性分析.............................................................................................13611清洁生产...........................................................................................................................14211.1工艺和设备先进性.....................................................................................................................14211.2能源资源利用.............................................................................................................................14211.3污染物产生和排放.....................................................................................................................14311.4环境管理.....................................................................................................................................14411.5清洁生产水平判定.....................................................................................................................14412总量控制指标...................................................................................................................14612.1总量控制因子的确定.................................................................................................................14612.2污染物总量控制指标.................................................................................................................14613环境经济损益分析...........................................................................................................14713.1分析方法.....................................................................................................................................14713.2环保投资.....................................................................................................................................14713.3经济效益、环境效益和社会效益.............................................................................................14814公众参与...........................................................................................................................14914.1公众参与阶段和方式.................................................................................................................14914.2调查方式与调查范围.................................................................................................................14914.3公众调查结果分析.....................................................................................................................15014.4公众参与结论.............................................................................................................................15215环境管理和环境监测计划...............................................................................................15315.1环境管理.....................................................................................................................................15315.2环境监测计划.............................................................................................................................15415.3―三同时‖验收一览表.................................................................................................................15716结论与建议.......................................................................................................................15816.1工程概况.....................................................................................................................................15816.2工程分析结论.............................................................................................................................15816.3区域环境质量现状.....................................................................................................................16016.4环境影响预测分析结论.............................................................................................................16016.5环境风险评价结论.....................................................................................................................16316.6项目选址和理性和产业政策符合性分析.................................................................................16416.7清洁生产措施.............................................................................................................................1643 珠海网泰环保设备有限公司化工涂料生产项目16.8污染物排放总量控制.................................................................................................................16516.9公众参与调查.............................................................................................................................16516.10综合结论.....................................................................................................................................166附件:1.建设项目环境保护审批登记表;2.委托书;3.企业营业执照副本;4.广东省企业基本建设投资项目备案证5.建设用地规划许可证——珠规地字[临港]2004-001号6.关于珠海网泰环保设备有限公司申请补发选址意见书事宜的复函——珠海市住房和城乡规划建设局7.房地产权证——粤房地证字第C3954001号;8.总平面布置图;9.环境质量现状监测报告;10.公众参与调查信息汇总表11.单位公众参与调查表及个人调查表样板;12.专家评审意见13.评审会议专家名单4 珠海网泰环保设备有限公司化工涂料生产项目1总论1.1任务由来珠海网泰环保设备有限公司是一家从事研发、生产、销售电器数码产品高端机壳涂料的环保涂料公司。该公司成立于2002年,原来主要研发、生产、销售环保器材,后来成立了新材料高端机壳涂料珠海研发中心,与德国BYK公司、美国SARTOMER公司以及长兴化学工业股份有限公司、同步化学等实力企业有着稳定密切的合作关系。该公司拥有国内领先水平的工业机壳涂料研发、制备和施工技术,积极开发环保、健康、实用、节能、经济及多功能性国家政策扶持高品质的新产品。近年来,随着国内涂料生产市场的转型,绿色环保涂料已成为市场发展的主流方向。借此机会,一方面,珠海网泰环保设备有限公司优势产品已具备大规模生产的条件。另一方面,为了使企业自主开发的新工艺、功能性涂料,高性能新产品尽快转化为生产力,并及时推广和拓展市场,有必要组建较大规模的生产研发基地。因此,珠海网泰环保设备有限公司拟在广东省珠海市高栏港经济区精细化工区纬二十一路西南面投资兴建珠海网泰环保设备有限公司化工涂料生产项目。珠海网泰环保设备有限公司化工涂料生产项目主要从事紫外线光固化涂料、塑胶机壳漆,五金机壳漆,粉末涂料的研发及生产。项目地理位置图见图1-1.22厂区总占地面积为21929.20m,总建筑面积11364.71m,主要建设内容为:甲222类厂房两栋(建筑面积1515.90m和2138.60m),甲类仓库(建筑面积740.00m)22和丙类仓库(建筑面积3719.21m)各一栋,罐区占地面积为455.00m相应的配套22工程及设施如消防水池(占地面积为200.00m)、泵棚(占地面积为48.00m)和废2水收集池(占地面积为162.00m)等。本项目固定资产总投资为3000万元,设计生产规模为化工涂料约4500t/a,其中主要包括UV光固化涂料、塑胶机壳漆、五金机壳漆、粉末涂料、塑胶机壳漆配套稀释剂。根据《中华人民共和国环境影响评价法》、国务院《建设项目环境保护管理条例》(1998年11月)和《广东省建设项目环境保护管理条例》等有关法规,该建设项目必须执行环境影响报告书审批制度。因此,珠海网泰环保设备有限公司1 珠海网泰环保设备有限公司化工涂料生产项目委托株洲市环境保护研究院承担珠海网泰环保设备有限公司—化工涂料生产项目的环境影响评价工作。本院在接受委托后,即组成该项目的环评课题组,并组织有关环评技术人员赴现场进行勘察及收集有关环评资料,按国家对建设项目环境影响评价工作的要求和技术规范,结合当地的实际情况,编制了《珠海网泰环保设备有限公司—化工涂料生产项目环境影响报告书》。环境影响报告书呈报珠海市高栏港经济区环保局评审并批复后,将作为建设项目环境管理的主要技术依据之一,用于指导建设项目的建设和环境保护与环境管理工作。1.2评价目的通过对拟建项目进行环境影响评价,查清项目选址所在区域的自然环境、社会环境概况、环境敏感区及环境保护目标、主要环境问题及主要污染源的分布,掌握评价区域水环境、环境空气、声环境及生态环境现状。根据项目的工程特征,分析预测项目建设期和运营期对水环境、空气环境、声环境、社会环境、景观环境、生态环境等可能造成的影响范围和程度;分析项目拟采取的环保措施,提出合理的环保措施和防治对策,使项目对环境的不良影响降至环境可承受的程度,为环保行政管理部门进行项目决策及环境管理、项目工程设计、施工和污染防控措施的落实提供科学的依据。1.3编制依据1.3.1国家法律、法规、条例(1)《中华人民共和国环境保护法》(1989年12月);(2)《中华人民共和国环境影响评价法》(2002年10月28日);(3)《中华人民共和国水污染防治法》(2008年2月修订);(4)《中华人民共和国水污染防治法实施细则》(2008年2月修订);(5)《中华人民共和国大气污染防治法》(2000年4月修订);(6)《中华人民共和国大气污染防治法实施细则》(1991年5月);(7)《中华人民共和国环境噪声污染防治法》(1996年10月);(8)《中华人民共和国固体废物污染环境防治法》(2004年12月);(9)《中华人民共和国水法》(2002年8月修订);2 珠海网泰环保设备有限公司化工涂料生产项目(10)《中华人民共和国海洋环境保护法》(1999年12月);(11)《中华人民共和国土地管理法》(2004年8月28日);(12)《中华人民共和国水土保持法》(2011年3月);(13)《中华人民共和国水土保持法实施条例》(1993年8月);(14)《中华人民共和国清洁生产促进法》(2002年6月29日);(15)《中华人民共和国安全生产法》(1989年12月);(16)《建设项目环境保护管理条例》(国务院第253号令,1998年11月);(17)《建设项目环境保护设计规定》(国环字第002号);(18)《关于进一步加强建设项目环境保护管理工作的通知》(国家环保总局,环发(2001)19号);(19)《建设项目环境影响评价文件分级审批规定》(环境保护部令第5号,2009年3月1日起实施);(20)《建设项目环境影响评价分类管理名录》(环境保护部,2008年第2号令);(21)《关于核定建设项目主要污染物排放总量控制指标有关问题的通知》(国家环境保护总局办公厅文件环办[2003]25号);(22)《国务院关于<―十一五‖期间全国主要污染物排放总量控制计划>的批复》,(国函[2006]70号);(23)《国务院关于酸雨控制区和二氧化硫污染控制区有关问题的批复》(国函[1998]5号);(24)《国务院关于两控区酸雨和二氧化硫污染防治―十五‖计划的批复》,(国函[2002]84号);(25)《国务院关于落实科学发展观加强环境保护若干问题的决定》,(国发[2005]第39号);(26)《国务院关于发布实施<促进产业结构调整暂行规定>的决定》,国发[2005]40号;(27)《外商投资产业指导目录(2007年修订)》,国家发改委、商务部第57号令;(28)《产业结构调整指导目录》(2011年本),国家发改委2011年第9号令;(29)《当前国家鼓励发展的环保产业设备(产品目录)》(2007年修订);3 珠海网泰环保设备有限公司化工涂料生产项目(30)《建设项目环境影响评价公众参与暂行办法》(环发[2006]28号);(31)《关于加强环境影响评价管理防范环境风险的通知》(国家环境保护总局,环发[2005]152号);(32)《国家危险废物名录》(环境保护部和国家发改委,2008年1号令);(33)《危险化学品安全管理条例》(2011年3月2日发布,2011年12月1日起施行);(34)《固体废物鉴别导则(试行)》(国家环保总局、国家发改委、商务部、海关总署、国家质量监督检验检疫总局公告2006年第11号);(35)《废弃危险化学品污染环境防治办法》(国家环境保护总局,2005年10月1日);(36)《国家突发公共事件总体应急预案》(2006年1月);(37)《重大危险源辨识》(GB18218-2009)(2009年12月1日实施);(38)《危险废物污染防治技术政策》,环发[2001]199号;(39)《危险废物经营许可证管理办法》(2004年5月);1.3.2地方性法规及政策(1)《广东省建设项目环境保护管理条例》(1997年9月,2004年7月修订);(2)《广东省环境保护条例》(2005年1月1日实施);(3)《广东省建设项目环境保护管理规范》(试行)(广东省环保局,粤环监[2000]8号);(4)《关于加强建设项目环境保护管理的通知》(广东省人民政府办公厅,粤府办[1999]27号);(5)《关于进一步加强环境保护工作的决定》(广东省人民政府,粤府[2002]71号);(6)《广东省蓝天工程计划》(粤府办[2000]7号文);(7)《广东省环境保护与生态建设―十一五‖规划》(粤府办[2007]44号);(8)《广东省环境保护规划纲要(2006~2020年)》(粤府[2006]35号);(9)《珠江三角洲环境保护规划纲要》(2004~2020年);(10)《广东省珠江三角洲大气污染防治办法》(2009年2月27日广东省人民政府第十一届27次常务会议通过);4 珠海网泰环保设备有限公司化工涂料生产项目(11)《广东省珠江三角洲清洁空气行动计划》,2010年;(12)《珠江三角洲地区改革发展规划纲要(2008-2020年)》(国家发展和改革委员会,2008年12月);(13)《广东省饮用水源水质保护条例》(广东省第十届人民代表大会常务委员会第73号公告,2007年7月1日);(14)《广东省政府关于加强水污染防治工作的通知》(粤府[1999]74号);(15)《广东省固体废物污染环境防治条例》(2004年5月);(17)《广东省严控废物处理行政许可实施办法(含广东省严控废物名录)》(广东省人民政府令第135号,2009年5月1日起施行);(18)《广东省产业结构调整指导目录(2007年本)》(广东省发展和改革委员会,2008年3月17日);(19)《关于印发广东省工业产业结构调整实施方案(修订版)的通知》(粤府办[2005]15号);(20)《关于实行建设项目环保管理主要污染物排放总量前置审核制度的通知》,(粤环[2008]69号);(21)《广东省突发环境事件应急预案》(2006年12月);(22)《广东省建设项目环保管理公众参与实施意见》(粤环[2007]99号);(23)《广东省水环境功能区划》(粤环[2011]14号)(24)《珠海市环境保护条例》(2009年5月1日实施);(25)《广东省珠海市饮用水源水质保护条例》,广东省第八届人民代表大会常务委员会第二十一次会议通过,1996年6月1日实施;(26)《珠海市环境空气质量功能区划分规定》(珠府办[1999]127号1999年9月13日);(27)《珠海市城市区域环境噪声标准适用区划分》(珠府[1996]51号,1999年修订);(28)《珠海市排水条例》(2010年1月1日开始施行);1.3.3技术规范依据(1)《环境影响评价技术导则总则》(HJ/T2.1—93);5 珠海网泰环保设备有限公司化工涂料生产项目(2)《环境影响评价技术导则大气环境》(HJ2.2—2008);(3)《环境影响评价技术导则地面水环境》(HJ/T2.3—93);(4)《环境影响评价技术导则声环境》(HJ2.4—2009);(5)《环境影响评价技术导则地下水环境》(HJ601—2011);(6)《建设项目环境风险评价技术导则》(HJ/T169—2004);(7)《环境影响评级技术导则生态影响》(HJ19—2011);1.3.4项目依据(1)项目环境影响评价委托书;(2)建设单位提供的相关图纸;(3)珠海网泰环保设备有限公司化工涂料建设项目可行性研究报告(4)珠海市规划局《建设工程规划许可证》。1.4评价时段评价时段分施工期和运营期两个阶段:(1)施工期:项目施工阶段;(2)运营期:项目投入运行生产阶段。1.5评价标准根据项目项目所在地的功能区划属性,本环评工作中所执行的环境质量标准和污染物排放标准如下。1.5.1环境质量标准(1)水环境质量标准拟建项目位于高栏港经济区精细化工区,根据1999年制定的《广东省近岸海域环境功能区划》,本项目所在地海域主要功能为港口、工业用水,水质目标为三类,执行《海水水质标准》(GB3097-1997)三类标准。拟建项目附近海域功能区划见表1.5-1,所执行的海水水质标准值见表1.5-2。1.5-1项目周边海域功能区划分功能区名称范围平均长度主要功能水质6 珠海网泰环保设备有限公司化工涂料生产项目宽度kmkm目标西区三类功能区鸡啼门以西至高栏岛东部的海域337工业、景观三高栏岛西部沿荷包岛北部、大杧珠海港口功能区532港口、工业三岛东部海域雷蛛平沙港口功能区三角岛至雷蛛岸段海域319港口、工业、景观三表1.5-2海水水质标准(GB3097-1997)三类标准(单位:mg/L)项目三类标准项目三类标准pH值6.8~8.8挥发酚≤0.01SS人为增加的量≤100石油类≤0.30DO>4硫化物≤0.10CODMn≤4汞≤0.0002BOD5≤4铜≤0.05无机氮(以N计)≤0.40铅≤0.01活性磷酸磷(以P计)≤0.030砷≤0.05铬≤0.02(2)环境空气质量根据《珠海市环境空气质量功能区划分》,珠海市高栏港地区经济区除石化基地、装备知道区及仓储物流区和金州加工区外其余范围执行二类功能区,本项目所在区为高栏港精细化工区,为二类功能区,故本项目执行《环境空气质量标准》(GB3095-1996)及其2000年修改单二级标准。环境空气质量执行GB3095-1996《环境空气质量标准》及其2000年修改单二级标准,标准限值见表1.5-2。本项目是以涂料生产为主,生产过程中的有机溶剂以甲苯、二甲苯挥发,储运过程和使用过程可能会产生少量的泄露,其环境质量标准执行《室内空气质量标准》(GB/T18883-2002)和《工作场所有害因素职业接触限值》(GBZ2-2002)具体标准限值见表1.5-3.表1.5-2环境空气质量评价执行标准3污染物名称取值时间浓度限值(mg/m)二级标准选用标准《环境空气质量标准》可吸入颗粒物年平均0.10(GB3095-1996)及其2000年修改PM10日平均0.15单8小时平TVOC0.6《室内空气质量标准》均7 珠海网泰环保设备有限公司化工涂料生产项目1小时均《大气污染物综合排放标准详非甲烷总烃2.0值解》中相关规定表1.5-3特征污染物空气质量评价执行标准3污染物名称最高允许浓度(mg/m)选用标准甲苯0.20《室内空气质二甲苯0.20量标准》1h均值时间加权平均容许浓度短时间接触容许浓度《工作场所有33(mg/m)(mg/m)害因素职业接甲苯50100触限值》二甲苯50100(3)声环境质量标准根据《珠海市城市区域环境噪声标准适用区划分》编制说明,项目所在区域属于工业区,为3类功能区,环境噪声采用《声环境质量标准》(GB3096-2008)中的3类标准,标准限值见表1.5-4表1.5-4声环境质量标准声环境质量标准类别适用区域昼间夜间(GB3096-2008)3工业区65dB(A)55dB(A)1.5.2污染物排放标准(1)水污染物排放标准项目废水包括少量初期雨水和办公生活污水、车间地面清洁废水,经化粪池处理后排入南水水质净化厂管网系统,经南水水质净化厂处理达标后排放。目前高栏港经济区的污水排放口设置在三角山岛东北面,珠海电厂对面黄茅海海域,根据《广东省近岸海域环境功能区划》,该海域主要功能为港口、工业、景观,属海洋三类功能区,本项目水污染物排放执行广东省地方标准《水污染物排放限值》(DB44/26-2001)第二时段三级标准,各标准限值见表1.5-5.表1.5-5主要水污染物排放标准(单位mg/L,pH值除外)污染物广东省《水污染物排放限值》(DB44/26-2001)第二时段三级标准pH6~9CODcr500BOD5300氨氮——8 珠海网泰环保设备有限公司化工涂料生产项目SS400石油类20苯0.5(2)大气污染物排放标准本项目大气污染物排放执行广东省地方标准《大气污染物排放限值》(DB44/27-2001)第二时段二级标准,TVOC排放标准参照《家具制造行业挥发性有机化合物排放标准》(DB44/814-2010).各标准限值见表1.5-6。表1.5-6主要大气污染物排放执行标准最高允许排放速率最高允许排无组织排放监控浓度(kg/h)污染物放浓度33(mg/m)排气筒(m)二级监控点标准值(mg/m)颗粒物18(颜料尘)150.42周界外浓度最高点肉眼不可见甲苯40152.5周界外浓度最高点2.4二甲苯70150.84周界外浓度最高点1.2非甲烷总烃120158.4周界外浓度最高点4.0TVOC302.92.0(3)噪声排放标准本项目施工期噪声执行《建筑施工场界噪声限值》(GBl2523-90);各标准限值见表1.5-7。表1.5-7拟执行的噪声排放标准限值单位:等效声级Leq[dB(A)]噪声限值施工阶段主要噪声源昼间夜间土石方推土机、挖掘机、装载机等7555施工期打桩各种打桩机85禁止施工结构振捣棒、电锯等7055装修吊车、升降机等6555执行标准《建筑施工场界噪声限值》(GB12523-90)中各阶段的噪声限值噪声限值时间昼间夜间运营期3类标准6555执行标准《工业企业厂界环境噪声排放标准》(GB12348-2008)3类9 珠海网泰环保设备有限公司化工涂料生产项目(4)危险废物控制标准危险废物执行《危险废物鉴别标准》(GB5085.1~5085.3-1996)、《危险废物焚烧污染控制标准》(GB18484-2001)和《危险废物贮存污染控制标准》(GB18596-2001)。1.6评价工作等级根据《环境影响评价技术导则》、本项目的工程特点及工程所在地区的环境特征,确定如下评价工作等级和评价范围。1.6.1海水评价等级根据本项目的生产工艺和拟采取的废水处理方式,生产过程中的废水主要来自实验室喷漆产生的废水,每天产生量约为6kg,处理方式采用集中收集,收集后委托有危废处理资质的单位回收。本项目外排废水主要是初期雨水和厂区生活污水、车间地面清洁水。生活污水由项目自建化粪池处理后排入市政污水管网后进入南水水质净化厂,由于水量3较少(8.885m/d),本项目海水环境评价按三级评价,作简要分析,详细论证项目废水进入南水水质净化厂的可行性。1.6.2大气评价等级根据本项目的生产工艺及生产设备,生产过程中投入的大量溶剂,虽有密闭设备,仍有微量溶剂挥发,为此在设计时在有机溶剂挥发的设备上安装集气罩,收集后气体经多功能净化塔及除味剂吸附过滤处理后排放,其他设备则实行密闭操作。在配料间,废气中含有少量的粉尘,为了防止粉尘污染,处理措施为经过吸尘式过滤袋过滤后,再通过多功能净化塔过滤处理并高空排放。根据项目特征污染物排放,结合《环境影响评价技术导则—大气环境》(HJ2.2-2008),大气环境影响评价工作的等级依据污染物最大地面浓度占标率Pi以及地面浓度达标准限值10%时所对应的最远距离D10%来判定。CiP100%iC0i其中,Pi——第i个污染物的最大地面浓度占标率,%;10 珠海网泰环保设备有限公司化工涂料生产项目3Ci——第i个污染物的最大地面浓度,mg/m;3Ci——第i个污染物的环境空气质量标准,mg/m。表1.6-1评价工作等级评价工作等级评价工作分级判据一级Pmax≥80%且D10%≥5km二级其他三级Pmax<10%或D10%<污染源距厂界最近距离本项目排放废气中的主要污染物为有机溶剂挥发的甲苯、二甲苯、非甲烷总烃及TVOC等,根据本项目废气污染物产生及通过防治措施的排放量(排放量分析详见本报告工程分析章节),采用估算模式计算的各污染物最大落地浓度及占标率见表1.6-2.表1.6-2各污染物最大落地浓度及占标率项目甲苯二甲苯非甲烷总烃TVOCPM103最大落地浓度mg/m0.0025590.0025590.087120.0003350.000256最大落地浓度出现距离250m3标准值mg/m0.20.20.620.45占标率%1.28%1.28%4.36%0.06%0.06%注:PM10无小时浓度均值,取日均值的三倍作为标准值。根据表1.6-2可知,各污染物最大落地浓度占标率Pmax均小于10%,根据大气环境影响评价分级表,本项目大气环境影响评价工作等级定为三级。1.6.3噪声评价等级项目位于GB3096-93规定的声环境3类功能区,距项目最近的声环境敏感点为项目东面方向530m处的铁炉(项目边界与铁炉新村边界最近距离),根据《环境影响评价技术导则—声环境》,本项目声环境影响评价等级确定为三级。1.6.4地下水评价工作等级项目位于高栏港经济区精细化工区,该地区属于填海地区,本项目生产过程不使用地下水作为生产生活水来源,各项污染物得到合理处置,根据《环境影响评价技术导则—地下水环境》,结合高栏港地区地质特征、地下水埋深、总量以及项目的各项环保措施,本项目生产中不会污染地下水产生影响,因此地下水影响评价不定级,做一般分析。11 珠海网泰环保设备有限公司化工涂料生产项目1.6.5生态环境影响评价按《环境影响评价技术导则—非污染生态影响(HJ/T19-1997)》中的有关规定,2根据工程特点以及所在区域环境状况,该工程项目影响范围远远小于20km,此外项目位于高栏港精细化工区,周围无生态自然保护区、无珍稀濒危物种,因此项目生态环境评价工作等级定为三级,简单分析厂区建设对生态环境影响。1.6.6环境风险评价依据《建设项目环境风险评价技术导则》(HJ/T169-2004)的有关规定,根据本项目所涉及的危险物质、功能单元和重大危险源判定结果,以及建设项目周边的环境敏感程度等因素,来确定项目环境风险评价等级。等级划分依据表1.6-3表1.6-3风险评价工作级别一般毒性可燃、易燃危险性物爆炸危险性物分类情况剧毒危险性物质危险物质质质重大危险源一二一一非重大危险源二二二二环境敏感地区一一一一根据第八章重大危险源辨识结果所涉及危险物品不构成重大危险源,根据表1.6-3风险评价工作等级划分,本项目风险评价等级定位二级(详见第八章)。1.7评价范围根据各环境要素的评价等级,按环评工作的技术规范要求,结合项目区周围环境情况,本项目各环境要素评价范围如下:(1)环境空气影响评价:以项目所在地为中心,南北和东西边长各6km,面2积约36km的方形区域作为环境空气评价范围。(2)海水环境影响评价:项目生活污水经过预处理后进入南水水质净化厂达标后排入黄茅海海域,本项目废水评价不设等级范围,重点分析废水纳入南水水质净化厂的可行性分析。(3)声环境:根据声环境评价等级,声环境评价范围为项目边界外200m范围。(4)生态环境影响评价:以项目所在地为中心,项目四周边界外扩1km范围。12 珠海网泰环保设备有限公司化工涂料生产项目(5)环境风险评价:以项目所在地为中心,半径3km的圆形范围。各环境要素评价范围图见图1-2。1.8环境保护及污染控制目标1.8.1污染控制目标(1)坚持污染物排放―总量控制‖,最大限度地减少项目对周围环境的影响;(2)项目建成后所有污染物均得到妥善控制,保证其符合国家及地方有关污染物排放标准的规定,尤其是苯系物有机溶剂污染应得到良好的处置和妥善控制;(3)项目建设期间,采取适当措施,防止对环境造成严重的不良影响;(4)项目工程的设计应最大限度地采用清洁工艺技术,充分发挥规模效益的优势;(5)项目投产后应建立先进的企业环境管理制度,进行清洁化生产管理;控制苯系物类有机废气的泄露对环境的影响,控制苯系物类有机溶剂风险事故对环境的影响;(6)在实施上述一系列厂内控制措施后,对废水及废气进行治理,使其对环境的影响降低到环境允许的限度。1.8.2环境保护目标和敏感点本此评价的环境保护目标是:保护项目所在区域的整体环境质量,确保项目选址周围环境质量不会因本项目的建设而发生限值改变。根据实地踏勘,本项目周围600m内无居民等易受噪声影响的声环境敏感点;3km范围内有少量居民点及集中办公区,项目的建设可能会对其造成大气环境污染的影响。本项目环境保护目标为项目附近居民区和高栏港管委会;项目附近水域水质;项目所在区域大气环境和声环境质量。项目环境保护敏感点分布见图1-2.主要环境敏感点情况详见表1.8-1。表1.8-1建设项目附近主要环境敏感点环境保护对象所处方位规模距最近厂界直线主要特征所处功13 珠海网泰环保设备有限公司化工涂料生产项目要素距离能区高栏港管委会东南约1000人约2980m办公区二类铁炉新村东约730人约600m村庄二类下金龙东北约600人约1400m村庄二类环境上金龙东北约750人约2500m村庄二类空气茂丰纺织厂宿西北约300人约350m职工宿舍二类舍楼翡翠制衣厂职西北约300人约580m职工宿舍二类工宿舍声环境铁炉新村东约730人约530m村庄二类注:该距离为本项目边界与敏感点边界最近距离茂丰纺织厂宿舍及翡翠制衣厂职工宿舍均为工厂配套宿舍,非员工长期居住1.9评价因子确定本评价工作的评价因子如表1.9-1所示。表1.9-1环境影响评价因子筛选评价要素现状评价因子影响评价因子总量控制因子——pH值、CODMn、BOD5、悬浮物、(CODcr和氨氮排放总水环境硫化物、氨氮、硝酸盐氮、亚硝酸CODcr、石油类量纳入南水水质净化厂盐氮、活性磷酸盐、石油类总量控制)大气环境PM10、甲苯、TVOC、SO2、NOxPM10、甲苯、TVOC——昼间等效连续A声级Ld昼间等效连续A声级Ld噪声—夜间等效连续A声级Ln夜间等效连续A声级Ln1.10评价工作程序本评价采用图1-4所示的评价工作程序。14 珠海网泰环保设备有限公司化工涂料生产项目公众参与图1-4环境影响评价工作程序图15 珠海网泰环保设备有限公司化工涂料生产项目2项目概况2.1项目概况2.1.1项目基本情况项目名称:珠海网泰环保设备有限公司化工涂料生产项目建设单位:珠海网泰环保设备有限公司项目地点:珠海市高栏港经济区精细化工专区内纬二十一路西南面项目性质:新建2建设规模:项目总占地面积为21292.20m,设计生产规模为化工涂料4500t/a建设项目总投资:3000万元2.1.2项目四置情况建设项目拟建于珠海市高栏港经济区精细化工区纬二十一路西南面,项目拟建厂区东北面位纬二十一路,西北面为永新路,东面为珠海市环保产业开发有限公司,西面为澳新橡胶厂区。用地现状为空地,项目四置见图2-1。2.2项目建设内容2.2.1项目组成珠海网泰环保设备有限公司根据企业经营发展所需,本项目主要为涂料研发、生产和储存,工程内容包括生产、储存系统和辅助生产及公用工程组成。本项目建设内容详见表2.2-1.表2.2-1本项目建设内容一览表序号建设内容生产储存系统涂料生产及相应设施(分散设备、调合、调色设备、计量设备等)、储罐区、厂房、1仓库区等辅助生产、公用工程和环保工程系统起重升降系统、照明及照明系统;消防水池、防火、防爆设备、消防设备等防灾2消防设施;给排水系统;废气收集系统3办公及运输车辆停放区(回车场、卸货平台等)4厂区保卫室本项目原材料和辅料从厂外采购,部分液体原料储存于埋地储罐内,桶装溶16 珠海网泰环保设备有限公司化工涂料生产项目剂储存于甲类仓库中。产品装桶储存于甲类仓库中。因此本项目建设内容主要由由2栋单层甲类厂房、1栋单层甲类仓库、1栋三层丙类仓库、事故收集池、泵棚、埋地储罐区组成。本项目公用工程及辅助工程建筑包括综合楼1栋和消防系统、停车场、门卫等。本项目各建筑物具体内容见表2.2-2表2.2-2工程项目组成一览表工程工程分类主要内容备注名称UV光固化涂料、塑胶机壳漆、五金机壳漆、粉末涂料、塑胶机壳漆配套稀释生产工程化工涂料生产剂生产厂房、生产装置新建2甲类厂房1建筑面积:2128.6m;2甲类厂房2建筑面积:2294.0m。供水珠海市高栏港经济区统一规划供水新建供热无需供热新建精细化工区市政电网统一供电;在厂内供电新建设配电房,安装一台400KVA变压器公用工程配有相应的冷冻干燥器空压站专用机房区设置空气压缩机一台和精密过滤器维修站机电维修班一个2原料储罐加泵棚占地48.0m料泵2总建筑面积3645.00m,丙类仓库2占地面积1215.0m;2总建筑面积690.00m,甲类仓库新建2占地面积690.0m;储运工程2原料埋地罐区占地面积408.2m厂内运输厂内道路新建厂外运输槽罐车或汽车公路运输23消防水池1个,占地200m,容积400m新建231个,占地40m,容积100m作为初期雨水池废水收集池23新建环保工程1个,占地122m,容积300m作为事故水池搅拌机、分散机上空设置集气罩,通过废气处理新建多功能净化塔、粉料区设置布袋除尘器17 珠海网泰环保设备有限公司化工涂料生产项目处理、车间通风系统办公及生活辅助设施综合办公楼、门卫、厕所、值班宿舍等2.3产品方案及生产规模2.3.1产品方案本项目产品为化工涂料,设计规模约为4500t/a,其中包括:UV光固化涂料约960t/a、塑胶机壳漆约720t/a、五金机壳漆约360t/a、粉末涂料约460t/a、塑胶机壳漆配套稀释剂约2000t/a。2.3.2年操作时间本项目年工作日为300天,生产车间按8h/d计算,年操作时间2400h。2.3.3产品品种及规格本项目产品主要为:UV光固化涂料、塑胶机壳漆、五金机壳漆、粉末涂料、塑胶机壳漆配套稀释剂。2.4主要生产设备和设施本项目主要生产设备为分散设备、调合、调色设备、溶剂固化剂生产设备、计量设备等。根据本项目生产工艺,主要设备见表2.5-2。表2.5-2本项目主要设备表序号设备名称规格型号数量单位材质备注1分散机FI223台组件22KW2分散机FI111台组件11KW3分散机GFS1000-5.53台组件5.5KW4卧式砂磨机SW30-12台组件30.0KW5空气压缩机V0.67/71台组件15KW6冷冻空气过滤机GSP1台组件7水帘柜SAM-00362台组件8紫外线UV机RD-GGJ-65021台组件2.0KW9试验用分散机SDF5505台组件10分散缸不锈钢15台不锈钢11三辊研磨机SW-YS2602台组件7.5KW18 珠海网泰环保设备有限公司化工涂料生产项目12电动葫芦3t1台组件6.0KW13手拉叉车EN1757-23台组件14电子地磅SCS3台组件15自流式包装机SSF-01W3台组件0.5KW16液压升降叉车NBF352台组件17数显鼓风干燥箱101A-12台组件3.0KW18喷漆枪连壶W-714个组件19高低温交变湿热试验箱GDS-501台组件20色谱仪GC-14C1台组件21电子称3台组件22埋地储罐60m³9个碳钢23发电机200kw1台组件24变压器400KVA1台组件2.5总图布置及消防2.5.1总图布置本项目总图主要参数指标见表2.6-1.表2.6-1总图主要参数指标名称单位数量2总用地面积m21929.202总建筑面积m11268.322建筑基地面积m7935.66建筑覆盖率%35.30绿地率%24.51建筑容积率0.61建筑系数%35.51建筑密度%32.45项目厂区根据不同功能,结合厂址场地的现状,总体平面布置本着生产区与生活区分置、工艺流程顺畅、最大限度降底环境污染影响与环境风险影响的原则确定。总平面布置中,建构筑物由三部分组成,即生产、贮存部分和辅助生产及生产管理部分。本项目总平面布置示意图见图2-2.厂区用2.2m高实体围墙与外界分离。本项目厂区设2个出入口,主要人流出入口和货流出入口设置在厂区北面围墙中部,为主出入口,东侧的门卫室兼作消防指挥中心;在主出入口门卫室东侧布置办公区出入口,用于人员进出,以避免人货交叉;在厂区北面围墙东段设一个次出入口。本项目工程由厂前区和生产/储存区组成。厂前区设综合楼、辅助用房、消19 珠海网泰环保设备有限公司化工涂料生产项目防泵房和消防水池,布置在厂区东北面;可能散发污染物的甲类厂房、甲类仓库和储罐区布置在厂区西南部、东南部和西北部。2.5.2竖向布置本项目采用平坡式竖向布置,场地雨水根据地形采用自然排水和设置管道排水的方式相结合。场地已基本平整,本项目土石方量平衡,无弃土产生。2.5.3绿化工程为净化空气,保护环境质量,减少对周围环境影响,消除与减轻噪声影响,调节气温,改善条件,本工程应在建筑物周边种植一些树木,采用常绿树种以提高环境质量,其中以草皮为主进行绿化,既达到安全防护要求,又有利于厂区的2美观。厂区绿地面积约7725m,绿地率约为24.51%。2.5.4消防本厂新建建筑设计耐火等级均为二级。厂房、仓库的消防采用室内、外水消火栓和室内泡沫栓消防系统,结合配置干粉灭火器的方式;甲类仓库防火分区面积不超过250平方米。本项目消防系统包括消防水池、消防水泵、消防增压稳压设备、泡沫液储罐、环状消防管网、室内外消火栓系统、室内泡沫栓系统。消防系统均采用临时高压给水系统,系统平时压力由消防增压稳压设备泵加压维持。水源:该工程从市政给水管网引入一路DN150引入管,做为消防水池补充水源,市政给水管内压力约0.28MPa。2.6劳动定员及劳动制度本项目年工作日为300天,生产车间按全日制一班倒,管理部门实行常白班制。本项目不设置食宿。本项目总定员50人,其中:生产工人30人,管理人员12人,技术人员8人。20 珠海网泰环保设备有限公司化工涂料生产项目2.7建设进度计划本工程建设周期为1年。项目实施进度安排如下:2011的11月至2012年10月进行工程建设;2012年10月至2012年12月进行试产;2013年1月正式投产。2.8主要经济技术指标本项目主要经济技术指标见表2.8-1.表2.8-1主要技术经济指标表序号指标名称单位指标备注一生产规模t/a约4500二产品方案1UV光固化涂料t/a约960生产、销售2塑胶机壳漆t/a约600生产、销售3五金机壳漆t/a约360生产、销售4粉末涂料t/a约460生产、销售5塑胶机壳漆配套开油水t/a约2000生产、销售三装置年操作时间天300四动力消耗量1电Kwh/a6600002水t/a2935五年运输量t/a9106.341年运入量t/a4558.342年运出量t/a4548六劳动定员人501管理人员人122技术人员人83生产工人人302七总用地面积m21929.2021新建建建构筑占地面积m7786.9622其他占地面积m14142.243绿化率%24.512八总建筑面积m10249.0221生产用建筑面积m8685.0021 珠海网泰环保设备有限公司化工涂料生产项目22非生产用建筑面积m1564.02行政办公及生活服务设施用地面积3%15.26所占比重4建筑容积率0.46吨标煤/九综合能耗总量81.073年吨标煤/十主要单位产品综合能耗单位产0.0216品十一工程项目总资金万元3000.00十二项目总固定投资万元3000.00十二年均利润总额万元1781.6222 珠海网泰环保设备有限公司化工涂料生产项目3工程分析3.1原辅材料、产品3.1.1原辅材料的物化性质涂料生产中主要原料包括以下部分:成膜物质(基料)、溶剂、颜料、助剂。(1)成膜物质成膜物质又称为基料,是使涂料牢固附着于被涂物体表面上形成连续薄膜的主要物质。常用的成膜物有醇酸/聚酯树脂、酚醛/氨基树脂、环氧树脂、丙烯酸树脂、聚氨酯、乙烯基树脂、纤维素类树脂、天然及合成橡胶等。(2)溶剂主要包括溶剂和水。主要作用是使基料溶解或分散成为粘稠的液体,以便涂料施工。一个涂料品种既可以使用单一溶剂,又可以使用混合溶剂。涂料常用的溶剂有烷烃为主的脂肪烃混合物、芳香烃(主要是甲苯和二甲苯)、醇类(主要是乙醇和丁醇)、醚醇类、酮类(主要是丙酮和丁酮等)、酯类(主要是乙酸乙酯和乙酸丁酯)、萜烯类及氯代烷烃和硝基烷烃。(3)颜料颜料为分散在漆料中不溶的微细固体颗粒,分为着色颜料和体质颜料,主要用于着色、提供保护、装饰以及降低成本等。本项目中所使用颜料主要为钛白粉和炭黑。(4)助剂助剂在涂料配方中所占的份额较小,但却起着十分重要的作用。各种助剂在涂料的贮存、施工过程中以及对所形成漆膜的性能有着不可替代的作用。常用的助剂有6种:流平剂、增稠剂、表面活性剂、增塑剂、催干剂、固化剂。3.1.2产品物化性质根据建设方提供资料,本项目各产品理化性质见表3.1-1.23 珠海网泰环保设备有限公司化工涂料生产项目表3.1-1项目产品理化性质一览表名类技术指标物化性质备注称别外观淡黄色透明液体由光引发剂吸收特定波长的光本产品生产过程UV(通常为10~400nm),得到一定的中固化快、无需加光酸值2~5mgKOH/g能量,产生游离基,此游离基进热、含少量挥发性固而引发光固化树脂和活性稀释剂溶剂等,环境污染非粘度:(25℃,涂#4)化分子中的双键发生连续聚合反少、能源消耗低、溶50~65s涂应,是涂料快速交联固化是目前涂料行业剂料型固含量>95%不含挥发性有机物,不易燃,生的环境友好型产产安全品。涂粉料本品为固体,无毒、无本项目所生产产品主要为热塑性该类产品无溶剂、粉末涂料,成膜物质为热塑性树涂装工序简单,粉末气味脂。利用热塑性树脂具有加热融末损失量少。涂料涂化学稳定性高、绝缘性化冷却变硬的特性生产热塑性粉行业发展方向之料好。耐磨性高末涂料并使之成膜一。有有本项目溶剂型涂料主要为塑胶机机机壳漆和五金机壳漆。两种产品生该类涂料生产过溶溶产原料基本相似,区别在于加入挥发性物≤10%程中必须使用有剂剂的色浆、消光剂等不同。固含量固含量>95%机溶剂,因此具有型型本项目溶剂型涂料主要为丙烯酸一定的挥发气味。涂涂清漆、丙烯酸底漆、丙烯酸磁漆及丙烯酸烘漆。料料由于该产品亲脂是无色透明易挥发的液体,有较性的,易与神经细稀浓的香蕉气味,微溶于水,能溶胞结合。出现神经溶主要为有机溶剂混合搅释于各种有机溶剂,易燃,主要用损害。如疲劳、记剂拌成品,无化学反应。剂作喷漆的溶剂和稀释剂。忆力下降、注意力挥发性极强,易燃易爆。不集中、失眠、头晕等。3.1.3主要原辅材料消耗、能耗本项目各生产过程中原辅材料及动力消耗见表3.1-2.表3.1-2项目生产过程原辅材料及动力消耗一览表类别序号原料名称年耗量t形态来源1.1热塑性丙烯酸树脂598液体1.2聚氨酯丙烯酸树脂144液体成1.3膜环氧丙烯酸酯432液体物1.4聚酯树脂356.3液体国质1.5内环氧树脂182.1液体购1.6氨基树脂90液体进2.1溶乙酸乙酯668液体2.2乙酸正丁酯112液体2.3丙酮246液体24 珠海网泰环保设备有限公司化工涂料生产项目2.4异丙醇113液体2.5正丁醇27液体2.6混丙醇223液体剂2.7甲苯111液体2.7乙二醇丁醚111液体2.8异丁醇33液体2.9120#溶剂油133液体2.10丙二醇甲醚醋酸酯122液体2.11二甲苯111液体助3.1UV单体(1,6-己二醇二丙烯酸酯、丙氧化甘油三丙烯酸172.8液体酯等)3.2助剂(消泡剂、流平剂、光53.04液体剂引发剂等)颜4.1颜料158.4粉状固体填4.2料填料40粉状固体5.1能电(380V/50HZ)660000度港区市政供源5.2水3000m3给3.1.4原辅材料保证条件分析本项目生产过程中所需原料均为大宗化工产品,市场供应充足,可以按照择优原则在市场中采购,国内市场能满足本项目的需求。3.2主体工程分析3.2.1工艺流程及产污环节分析3.2.1.1各产品工艺流程介绍(1)UV涂料UV涂料生产工艺,不需要三辊筒研磨,主要是一个混合过程。包括混合分散、高速分散、调粘、过滤包装四个主要生产操作阶段。①混合分散:把活性稀释剂(UV单体)、低聚物(相应树脂)计量投入分散缸中,用高速分散机先低速混合搅拌,使物料变成均匀的混合状态。由于UV涂料的产品特性,该过程处于无尘分散区。25 珠海网泰环保设备有限公司化工涂料生产项目②高速分散:把光引发剂、流平剂、消泡剂、填料等投入分散缸中,高速搅拌分散均匀,按要求进行调粘。③调粘:把经过光固化的漆料及部分活性稀释剂(UV单体)投入分散缸中,调整漆料粘度,经品质检验合格后再过滤、包装。④过滤、包装:将经过品质检验合格的调漆成品进行过滤,并根据包装规格进行包装。⑤入库:包装好的成品,经过包装检验,标识清楚、计量准确、无渗漏的成品入库存放。(2)粉末涂料粉末涂料是由树脂、颜料、填料、助剂组成。由热塑性树脂、颜料、填料、增塑剂等经过熔融混合、粉碎、过筛分级得到成品。颜料主要为钛白粉等。(3)塑胶机壳漆和五金机壳漆塑胶机壳漆和五金机壳漆主要由四部分组成:树脂、颜料、溶剂、助剂。塑胶机壳漆和五金机壳漆为溶剂型涂料。溶剂型涂料生产工艺比较简单,包括混合分散、研磨、调漆兑色、过滤包装四个主要生产操作阶段。生产不是连续的过程,大部分作业主要靠人工操作。①混合分散:把溶剂、树脂类原料按比例计量投入分散缸中,用高速分散机先低速混合搅拌,使物料变成均匀的混合状态,再高速分散。②研磨:将颜料、分散剂等物料投入砂磨机或三辊机中进行研磨,使其达到规定的细度的质量技术标准。③调漆兑色:把经过研磨并达到质量标准的漆料及流平剂、消泡剂投入调漆缸中,根据客户的颜色要求进行调色,经品质检验合格后再过滤、包装。④过滤、包装:将经过品质检验合格的调漆成品进行过滤,并根据客户要求及所需的包装规格进行包装。⑤入库:包装好的成品,经过包装检验,标识清楚、计量准确、无渗漏的成品入库存放。(4)塑胶机壳漆配套稀释剂稀释剂需要用到二甲苯异构体混合物、乙酸乙酯、乙酸正丁脂、正丁醇等溶剂;生产过程主要为将计量好的溶剂慢速混合均匀,检验包装即可。26 珠海网泰环保设备有限公司化工涂料生产项目3.2.2各产品工艺流程图及产污环节根据本项目各类产品特性,项目生产工艺流程图示意及产污环节图见图3-1.G1UV单体计量聚酯丙烯酸投高速成品预分散调粘过滤树脂或环氧入分散包装入库丙烯酸树脂NN各类助剂、酯类、酮类醇醚类稀释剂图3-1aUV光固化涂料工艺流程及产污节点图G2G1G2热固树脂性颜料计熔融分级量预分散冷却粉碎成品填料投挤出过筛包装入库入助剂WNN图3-1b粉末涂料工艺流程及产污节点图G2G3G3树脂计颜填料量高速成品研磨调色过滤溶剂投分散包装入库入助剂NN图3-1c塑胶漆、五金机壳漆工艺流程及产污节点图G3搅拌机二甲苯异构体混合物、乙酸乙酯、乙酸检验成品入库正丁脂、正丁醇等溶剂中三种包装G:废气;图3-1d稀释剂生产工艺流程及产污节点图N:噪声;27 珠海网泰环保设备有限公司化工涂料生产项目根据项目生产工艺流程介绍,结合工艺流程图及产污节点图,项目生产过程中污染物产生情况详见表3.2-1.表3.2-1项目生产工艺流程污染物产生情况一览表类编号污染物名称主要成分产生规律备注别各类助剂、酯类酮类G1有机废气TVOC阶段性产生稀释剂产生粉状原料加料时产G2粉尘粉尘阶段性产生生废塑胶漆、五金机壳漆甲苯、二甲苯、气G3有机废气阶段性产生分散、研磨过程溶剂非甲烷总烃挥发产生无组粉状原料储存区粉尘持续性产生原料入库、出库产生织排生产车间原料挥发性原料计量过有机废气持续性产生放计量区程产生废粉末涂料生产设备W设备冷却水SS间断产生水冷却水噪分散机、砂磨机、N各类设备噪声间断产生各类设备运作产生声风机等产生噪声吸附有机物产生废除味剂每12个月产生吸附有机物产生生产的废吸附液固车间生产中除尘设备产粉尘除尘设施收集每个月产生废生办公生活垃圾一般固废持续产生办公、生产人员产生人员3.3公用及辅助工程分析3.3.1供电工程本项目生产和生活照明等用电均由高栏港经济区精细化工专区市政电网统一供电。厂区外接一回路10kV高压电源,在厂内设配电房,安装一台400KVA变压器,负责给厂内用电设备供电。由于消防负荷为二级负荷,需要双电源供电,故在厂区配置200KW柴油发电机,作为消防设备的备用电源。工程所用电源均由厂区10KV变电站低压配电柜采用低压380V供给,供电线路均采用电缆直埋敷设。在厂区内设置有配电房,在各车间、仓库及综合楼、消防泵房等辅助用房均设有动力配电箱。配电房地面比厂区高+0.60m。28 珠海网泰环保设备有限公司化工涂料生产项目3.3.2供热、通风工程(1)供热系统本项目生产在常压常温条件下可完成,分散、研磨过程均不需要加热,没有化学反应,不存在高温高压。本项目生产过程不需要加热,并且根据珠海市地理条件无需热源采暖,因此本项目不设置供热系统。(2)通风系统本项目甲类厂房、仓库采用窗户自然通风外,结合轴流风机对有害气体强制通风,换气次数为12次/h。综合楼采用分体式空调作为通风设备。3.3.3辅助工程(1)维修站本项目机器设备少,拟设置机电维修班1个,设置1名维修人员和一些必要的设备和设施,用以完成生产设备的日常维修、保养,常用电器、仪表的维修、校验等工作。(2)空压站本项目在专用机房区设置空气压缩机一台,并附带配有相应的冷冻干燥器和精密过滤器,使空气露点在-23℃以下,含尘<0.01μm,含油<0.1ppm。3.3.4消防系统本项目从市政给水管网引入一路DN150引入管,做为消防水池补充水源,市政给水管内压力约0.28MPa。根据国家有关规范及厂区各建、构筑物的性质,耐火等级、建筑面积等情况,本项目设有如下主要消防灭火系统:①室外消火栓系统该系统最大用水流量以甲类仓库计,为25L/s,火灾延续时间按3小时计,3一次灭火最大用水量为270m。②室内消火栓系统采用临时高压给水系统,即管网压力平时由消防增压稳压29 珠海网泰环保设备有限公司化工涂料生产项目设备泵加压维持,火灾发生时,由设在各消火栓处、消防泵房及值班室的手动按钮启动消防水泵加压供水。该系统所需的消防用水由消防水池储存,流量与压力由消防水泵供给。③室内泡沫栓灭火系统该系统主要保护甲类厂房、甲类仓库、丙类仓库。泡沫灭火系统采用PHYM32/20型隔膜压力式泡沫液罐混合流程,泡沫灭火剂采用抗溶氟蛋白泡沫3灭火剂(6%),泡沫灭火剂储量为2m。④消防水池及配套3本项目设置消防水池有效容量为400m,设置消防泵房及消防泵。在丙类仓库西北角设一消防泵房。消防水泵由设在各消火栓处的手动按钮、消防泵房和消防值班室手动启动。消防增压稳压设备泵由设在管网上的压力开关根据管网压力自动控制启停。当工作泵出现故障无法启动时,备用泵自动投入运行。消防泵均不得设置自动停泵。所有消防泵的运行与状态均在消防值班中心显示。⑤其它主要消防设备本项目设置一台PHYM32/20型隔膜压力式泡沫液储罐作为备用。罐内储存32.0m(6%)抗溶氟蛋白泡沫灭火剂。3.3.5储运工程本项目涉及的溶剂、涂料、树脂等大部分物料为易燃、易爆危险化学品,储运方式必须严格按照有关规定执行。(1)储存系统根据产品的性质及形态,本项目危险化学品可储存于阴凉、通风仓库内。远离火种、热源。仓温不宜超过30℃,防止阳光直射。保持容器密封。不同性质的危险化学品应分开存放,不可混储混运。分装和搬运作业要注意个人防护,搬运时要轻装轻卸,防止包装及容器损坏。本项目危险化学品储运形态、规格、方式等参见表3.3-1:表3.3-1项目物料储运方式表序物料名称形态储存方式储运方式容器材质最大储存量号热塑性丙烯酸树1液态200L桶装汽车运输铁桶25桶/200L脂30 珠海网泰环保设备有限公司化工涂料生产项目聚氨酯丙烯酸树2液态200L桶装汽车运输10桶/200L脂3环氧丙烯酸酯液态200L桶装汽车运输25桶/200L4聚酯树脂液态200L桶装汽车运输10桶/200L360m储罐35乙酸乙酯液态槽(罐)车60m装360m储罐36乙酸正丁酯液态槽(罐)车地埋式卧式60m装3罐60m储罐37丙酮液态槽(罐)车材质为碳钢60m装360m储罐38异丙醇液态槽(罐)车60m装9正丁醇液态200L桶装汽车运输铁桶10桶/200L360m储罐310混丙醇液态槽(罐)车地埋式卧式60m装3罐60m储罐311甲苯液态槽(罐)车材质为碳钢60m装12乙二醇丁醚液态200L桶装汽车运输铁桶10桶/200L360m储罐313异丁醇液态槽(罐)车地埋式卧式60m装3罐60m储罐314工业庚烷液态槽(罐)车材质为碳钢60m装丙二醇甲醚醋酸15液态200L桶装槽(罐)车10桶/200L酯铁桶16二甲苯液态200L桶装汽车运输10桶/200L17助剂液态25L桶装汽车运输20桶/25L铁桶单体液态200L桶装汽车运输15桶/200L粉状150包/20KG/18颜料袋装汽车运输固体包粉状150包/20KG/19填料袋装汽车运输固体包本项目中生产过程中根据实际情况调整原材料购进计划,各类危险化学品最大储存量见表3.3-1.本项目所有产品均存放在加强机械通风的室内仓库内,储存条件符合要求。(2)工厂运输本工程年运输量为9106.34t/a,其中运入量为4558.34t/a(原材料4510.34t/a,包装物48t/a),运出量为4548t/a(产品约4500t/a,包装物48t/a)。运输方式主要采用公路运输。主要运输原料、产品、包装物及其他。主要采用储罐装和桶装运输。本项目所涉及易燃、易爆等危险化学品,采用专用的车辆运输。危险货物托运人应当委托具有道路危险货物运输资质的企业承运,严格按照国家有关规定包装,并向承运人说明危险货物的品名、数量、危害、应急措施等情况。需要添加31 珠海网泰环保设备有限公司化工涂料生产项目抑制剂或者稳定剂的,应当按照规定添加。托运危险化学品的还应提交与托运的危险化学品完全一致的安全技术说明书和安全标签。(3)装卸系统生产原料厂商将储罐储存的溶剂原料用槽罐车运输到厂区,在储罐区附近卸车口用防爆油泵将各原料分别泵入各原料储罐;桶装原料用汽车运输到厂区,在仓库进行装卸。产品以桶装的形式装车运出销售。本项目生产原料和产品为槽罐车或汽车运输,不使用管道输送。3.3.6给排水工程(1)给水本项目供水由珠海市高栏港经济区统一规划供水,厂区内日常生活用水、厂区绿化、浇洒道路用水均由市政给水管供给。生产生活及、消防采用两套给水系统。生产生活用水接入管管径DN150,水压力约0.28MPa。生产用水根据项目生产工艺和技术,本项目生产过程中用水较少,仅为部分设备冷却水、地面清洁用水及实验室中喷漆打样水帘喷漆设备所用。项目生产过程中研磨机等高速运转设备需要冷却水,作为可循环使用,蒸发2后补充。根据同行业资料类比可知该部分补充水量约为2.5m/月,折合每天约20.085m/d。2本项目生产车间实际空闲面积为约1200.00m(除各类设备占地外),按生产2计划每30天清洁一次,每平方米清洁用1L,每月所需清洁水为1.2m,折合每2天约为0.04m/d。根据项目生产制度和实验室使用频率,参考同类型企业喷漆用水量,该项目22实验室喷漆水帘设施用水量每5个月为1m,折合约为0.0067m/d。本项目分散机和研磨剂一般不需要清洁,若需要清洁则必须使用有机溶剂,而不使用清水,因此本项目不考虑生产设备清洁用水。生活用水本项目共有职工50人,按90L/人·d用水量计算,项目办公生活用水为34.5m/d。绿化用水32 珠海网泰环保设备有限公司化工涂料生产项目2旱季绿化用水采用自来水供给,厂区绿地面积约7725m,绿化用水按1升23/m·d,则旱季绿化用水为7.73m/d。33本项目旱季日常厂区内总用水量12.36m/d,雨季厂区总用水量为4.63m/d。(2)排水厂区排水实行清污分流、雨污分流。天面雨水通过立管,道路雨水通过雨水口收集,最后由暗管排往市政雨水井,最终排入附近海域。本项目分散机和研磨剂一般不需要清洁,若需要清洁则必须使用有机溶剂,而不使用清水,洗涤溶剂可回用于相应工序,而不外排。生产废水根据项目工艺过程,项目生产废水主要是实验室喷漆产生的废水,每天产生2量约为0.006m/d(6kg/d)。这部分废水属于危险废物,HW-12颜料、涂料废物,收集后定点存放,集中交给有危废资质单位处理。车间地面清洁水使用中蒸发量较高,清洁废水按用水量的75%计算,因此车2间地面清洁废水约0.03m/d,车间地面废水排入厂区化粪池预处理后外排南水水质净化厂。设备冷却水可循环使用,定期补充蒸发缺失即可,不会产生生产废水。初期雨水项目生产废水还包括厂区初期雨水,初期雨水计算采用中国建筑工业出版社发行的《给水排水设计手册—第五册—城市排水》的相关计算公式,参考珠海市暴雨强度计算公式:2510.8810.4711lgPq0.678t10.302(升/秒·公顷)其中:t——降雨历时(分钟);P——设计降雨重现期(年);根据沿海地区降雨特征,取t=10~15分钟、P=2年计算得到暴雨强度为:320.69升/秒·公顷3QFqt(m)集雨量计算公式:径流系数按城市路面及《给排水设计手册》取平均值:φ=0.8。2本项目集雨面积F为2845m(总占地面积扣除各构筑物占地面积),初期雨水33 珠海网泰环保设备有限公司化工涂料生产项目3按前12分钟降雨计,则初期雨水量约为52.55m/次,根据珠海市历史气象资料统计,珠海市多年平均降雨量1700-2300mm,平均年雨日(雨量大于0.1mm)150天,暴雨天数约占10%,由此可计算出初期雨水集水量约为788.25m³/a。3初期雨水先收集入厂区初期雨水池,初期雨水池容积为100m,收集后分10天排入厂区化粪池预处理后送入高栏港经济区南水水质净化厂统一处理。降雨后期较清洁的雨水进过预处理截留水中的悬浮物、固体颗粒杂质后,汇入港区的雨水管网系统。生活污水3办公生活污水(3.6m/d)经化项目所建粪池处理后外排。本项目前期雨水和生活污水经厂区化粪池处理后送入高栏港经济区南水水质净化厂统一处理。3.4物料平衡3.4.1有机溶剂平衡本项目有机溶剂主要用于溶剂型涂料的生产过程及涂料稀释剂的制造,根据本项目可研和建设单位提供资料,结合表3.1-3,项目生产中有机溶剂生产涂料稀释剂2000t/a,用于UV涂料、塑胶机壳漆及五金机壳漆生产部分为191.7t/a。有机溶剂在使用过程中较易挥发,根据本港区同类型企业生产调查(珠海利澳汽车涂料有限公司,该企业年产汽车涂料约4000t/a,其中包含稀释剂500t/a。位于本项目北面3km处),涂料生产过程中有机溶剂的损耗主要为原料添加过程挥发及稀释剂存放处挥发,一般生产中挥发率约为溶剂总量0.5%,存放处挥发量按0.02%计,因此溶剂损耗量约为10.1t/a,存放处挥发量为0.4t/a。本项目溶剂平衡示意图见图3-2.34 珠海网泰环保设备有限公司化工涂料生产项目10.1生产损耗1807.8稀释剂产品溶剂原料2010191.7涂料产品生产使用0.4存放挥发图3-2项目溶剂平衡图(单位:t/a)3.4.2粉料平衡项目生产过程中颜料、填料添加过程均会产生一定的粉尘颗粒物。参考同类型企业生产现状,各产品各工段产生的粉尘不超过原材料使用总量的0.1%。本项目生产中粉料消耗量为198.4t/a,因此粉料的各种耗损总量为0.2t/a。同时粉料在搬运、储存区域会产生少量的无组织逸散,这部分量按存放总量的0.01%计算,则无组织逸散量为0.02t/a。根据建设单位提供资料,粉尘有组织逸散经布袋除尘器收集后这部分收集物有80%进行回收利用,因此生产中实际损耗量约0.04t/a。本项目粉料平衡示意图见图3-3.0.04生产损耗原材料198.4198.34各类产品0.02无组织逸散图3-3项目粉料平衡图(单位:t/a)35 珠海网泰环保设备有限公司化工涂料生产项目3.4.3助剂平衡粉末涂料生产过程中,不需要加入易挥发性溶剂,生产过程不需要加热,生产温度远低于树脂的分解温度,因此不会产生树脂的分解反应产生废气。同理对于UV光固化涂料的生产中不会产生UV单体分解产生废气。生产中加入的助剂如光引发剂、增稠剂等含有少量的挥发性有机溶剂,这些助剂在分散和配料过程会有少量的有机废气挥发产生,归为TVOC。根据同类型涂料助剂生产企业调查资料显示,分散剂、增稠剂和光引发剂等各类助剂挥发性有机物含量在200g/L,本项目助剂总用量为53.04t/a,比重约为1.2,则本项目液体原料中TVOC含量为8.8t/a.生产过程中TVOC挥发量按1%计算,则本项目所产生TVOC为0.088t/a。因此项目所使用的助剂中有0.088t/a的损耗.助剂平衡关系见图3-4.52.952进入产品原材料53.040.088以TVOC形式损耗图3-4项目助剂平衡图(单位:t/a)3.4.4物料总平衡根据以上各原料平衡,本项目各产品生产中物料总平衡见表3.4-1表3.4-1本项目各产品生产物料平衡UV光固化涂料入方t/a出方t/a环氧丙烯酸酯432UV光固化涂料959.6聚氨酯丙烯酸酯144助剂中TVOC挥发0.07有机溶剂挥发聚酯树脂960.33非甲烷总烃UV单体172.8助剂48稀释剂67.2酯类、酮类、醇类、醇醚类合计960合计96036 珠海网泰环保设备有限公司化工涂料生产项目粉末涂料入方t/a出方t/a聚酯树脂152.3粉末涂料产品459.9452环氧树脂146.1助剂中TVOC挥发0.0088助剂3.6粉尘有组织0.03颜料126粉尘无组织0.016填料32合计460合计460塑胶机壳漆入方t/a出方t/a热塑性丙烯酸598塑胶机壳漆产品719.8094有机溶剂挥发颜料21.60.5非甲烷总烃、甲苯、二甲苯助剂0.72助剂中TVOC挥发0.0046稀释剂100粉尘有组织0.004粉尘无组织0.002合计720.32合计720.32五金机壳漆入方t/a出方t/a聚酯树脂108五金机壳漆产品359.8837有机溶剂挥发丙烯酸树脂720.123非甲烷总烃、甲苯、二甲苯氨基树脂90助剂中TVOC挥发0.0046环氧树脂36粉尘有组织0.006助剂0.72粉尘无组织0.0027填料18颜料10.8稀释剂24.5合计360.02合计360.02稀释剂入方t/a出方t/a配套稀释剂乙酸乙酯6681999.5生产有组织有机溶剂挥发乙酸正丁酯11210.1非甲烷总烃、甲苯、二甲苯丙酮246存放溶剂无组织排放0.4异丙醇113正丁醇27混丙醇223甲苯111乙二醇丁醚111异丁醇33120#溶剂油133丙二醇甲醚醋酸酯122二甲苯111合计2010合计201037 珠海网泰环保设备有限公司化工涂料生产项目3.4.5水平衡根据项目给水制度、生产工艺等,项目在生产中,项目用水实现了水量的充分循环利用。结合项目排水情况,项目水量平衡图见图3-5.0.0851000.085循环冷却水池研磨机1000.00070.0067实验室喷漆危废处理单位市政自来水供给0.01旱季12.36雨季4.630.04车间清洗初期雨水旱季7.7352.55次/m³0.03旱季7.73初期绿化用水雨季0雨水池南水水质净化厂0.95.2554.5办公生活用水3.6化粪池8.8853图3-5本项目水量平衡图(单位:m/d)3.5产污分析及污染物防治措施本项目施工期间的二次扬尘、机械作业及车辆运输产生的噪声和废气等会对环境产生一定的影响;另外施工期间作业人员的生活垃圾等也是污染源之一。职工机械作业产生噪声,车辆运输产生的噪声和废气亦会对周围环境产生影响。2本项目总占地约21929.2m,其用地为高栏港精细化工区规划工业用地。项目区目前为平整土地,施工过程基本无工程挖方和填土,不会造成明显的水土流失。项目施工期较短,在建设单位做到良好的施工方案基础上,可确保优良施工。作为化工项目,本项目主要污染物为运营期所产生废气、固废等。3.5.1水污染源分析及污染防治措施(1)废水排放源及产生量38 珠海网泰环保设备有限公司化工涂料生产项目根据项目给排水工程分析及水量平衡关系可知,本项目正常生产情况无生产废水外排。少量废水来自于实验室喷漆废水、车间清洁废水、雨季初期雨水及少量生活污水等。本项目废水产生及排放情况见表3.5-1.表3.5-1项目废水产生及排放情况表处理方法及排放去废水名称废水来源产生量污染物组成废水排放量向研磨机3返回循环池回用研磨设备100m/d清净废水0冷却水定期补充实验室喷水帘喷漆3HW-12颜料、涂料送有危废处理资质0.006m/d0漆废水设备废物单位车间清洁车间地面330.03m/dSS、COD排入化粪池处理0.03m/d废水清洁先收集至初期雨水雨季33厂区集雨52.55m/次SS、COD收集池再分批排入5.255m/d初期雨水化粪池处理3COD、BOD、NH3-N3办公、生活污水整个厂区3.6m/d排入化粪池处理3.6m/d等根据表3.5-1,项目外排废水主要有初期雨水和生活污水,因此本项目废水污染物排放量见表3.5-2.表3.5-2本项目外排废水产生及排放情况水量主要污染物污水来源3排放情况m/aCODcr氨氮BOD5SS产生浓度mg/L2001530200初期雨水788.25排放浓度mg/L2001530100排放量t/a0.1580.0120.0240.079产生浓度mg/L2001530400清洁废水9排放浓度mg/L2001530100排放量t/a0.00180.00010.00030.0009产生浓度mg/L30030120150生活污水1080排放浓度mg/L2502010080排放量t/a0.2700.0220.1080.086产生量0.4820.0440.15360.3234总计1877.25排放量t/a0.4280.0330.13230.1659自身消减量0.0540.0110.0210.157标准浓度限值mg/L30020300400注:根据珠海市历史气象资料统计,珠海市多年平均降雨量1700-2300mm,平均年雨日(雨量大于0.1mm)150天,其中可产生初期雨水的暴雨日按15日计算。(2)废水处理措施本项目冷却水循环利用不外排。根据本项目可研及建设单位提供资料,项目生活污水和初期雨水、车间地面39 珠海网泰环保设备有限公司化工涂料生产项目废水经化粪池处理后达到广东省《水污染物排放限值》(DB44/26-2001)第二时段三级标准后排入南水水质净化厂污水管网。实验室喷漆废水属于危险废物,因此定期收集定点存放,交有危废处理资质单位处理。(3)地下水污染防治措施本项目在生产过程中,难免会有跑、冒、滴、漏,若该处土层或岩层又是透水的,则会下渗污染地下水。因此,项目区内各生产装置或单元,应按照化工企业要求,各种物料均需通过密闭的设备管线进行生产和输送。生产厂房、生产装置区、原料产品罐区、仓库及其它辅助生产装置均应设置一定厚度的硬化地面,尤其是地下原材料罐区,必须按要求采取严格的防渗措施,防止物料和污水下渗。并在生产厂房、生产装置区、原料产品库区及其它辅助生产装置周围设置封闭的混凝土护面的排污沟,可将偶尔泄漏的物料或冲洗水收集后回用到各生产装置工序中。特别应采取有效的防渗措施,设置必要截流工程,防止泄漏物料和冲洗水对相邻地表水体及区域地下水造成不良影响。避免雨污混排。3.5.2大气污染源分析及污染防治措施(1)大气污染物排放源分析根据项目工艺流程及图3-1和表3.1-4,结合物料平衡分析,项目生产中大气污染源主要是:①相应工序中加入粉料的粉尘排放;②稀释剂制造过程及需添加稀释剂涂料生产中各类有机溶剂挥发,其中主要为甲苯、二甲苯、非甲烷总烃等;③生产时加入的助剂挥发的有机废气TVOC;④车间及仓库各类溶剂无组织排放、粉料搬运区域的少量无组织逸散。根据可行性研究报告提供资料,结合《第一次全国污染源普查》涂料生产相关内容,则本项目大气污染源核算如下:①粉状原料加入时产生的粉尘按0.1%计算,项目生产中,粉料总用量为198.4t/a,则粉尘产生量为0.2t/a。根据项目可研设计,建设方将在粉料原料加料口设置专用布袋除尘装置(除尘效率可达95%),过滤后通过车间内强制通风,从车间屋顶高空排放,排放高40 珠海网泰环保设备有限公司化工涂料生产项目度为15m时。有组织粉尘排放量实际为0.01t/a,0.0042kg/h(其中排放周期按年生产时间为2400小时/年)。②溶剂型涂料及稀释剂生产中所挥发的气体中,其中毒性大易挥发的是甲苯和二甲苯,为该项目的主要大气污染物。根据项目物料平衡,一般情况下,生产过程中溶剂挥发量不超过溶剂使用总量的0.5%,则挥发总量为10.1t/a。此外根据大多数涂料行业中甲苯和二甲苯的挥发量不超过使用量0.25%,根据甲苯和二甲苯的使用量,项目生产中二甲苯的挥发量为0.28t/a,甲苯挥发量为0.28t/a,非甲烷总烃为9.54t/a。根据建设方提供的资料,本项目生产过程中,首先从源头上控制气体挥发,保证分散缸加盖、砂磨机尽量密封研磨等措施。再将废气集中收集进入多功能废气净化塔中进行处理,处理后通过15m高的排气筒高空排放。根据同类型企业使用多功能净化塔调查,该装置对有机废气尤其是甲苯、二甲苯等涂料生产企业及喷漆过程的废气净化效率不低于85%,因此甲苯的有组织排放量为0.042t/a(0.018kg/h,排放周期为年生产时间2400h/a),二甲苯的有组织排放量为0.042t/a(0.018kg/h),非甲烷总烃为1.43t/a(0.60kg/h)。③生产时加入的助剂挥发的有机废气TVOC,根据物料平衡,生产中加入的助剂所产生TVOC为0.088t/a。根据建设方提供资料,这部分废气处理方式同样为集中收集,使用多功能净化的净化效率为85%,因此经过滤后通过15m高的排气筒高空排放,TVOC的有组织排放量为0.0132t/a(0.0055kg/h)。④根据物料平衡,车间及存放处各溶剂废气无组织排放量按0.02%,因此车间内溶剂无组织实际排放量为0.4t/a,其中甲苯为0.01t/a,二甲苯为0.01t/a,非甲烷总烃为0.38t/a。根据物料平衡,粉状原料生产中搬运过程产生的无组织逸散按使用总量的0.01%计算,则粉尘无组织排放量为0.02t/a。3如建设方在车间各设置两套风量为60m/min的风机,则从排放口排出的各333类废气浓度最高浓度分别为:粉尘1.0mg/m,甲苯0.5mg/m,二甲苯0.5mg/m,3非甲烷总烃19mg/m。此外根据项目设计,本项目设置一台功率为200kw的发电机作为备用电源及消防动力。当进线电源失电时,则发信号启动柴油发电机,该发电机备用油箱41 珠海网泰环保设备有限公司化工涂料生产项目约为100L,计划年使用时间约为10小时。柴油发电机用0#柴油作为燃料,0#柴油含硫量<0.2%。根据环评工程师注册培训教材《社会区域》的计算参数,柴油发电机耗油率3为212.5g/kwh,则柴油发电机的耗柴油量为42.5kg/h,0.425t/a,约0.506m/a。根据《大气污染工程师手册》,当空气过剩系数为1时,1kg柴油产生的烟3气量约为11Nm。一般柴油发电机空气过剩系数为1.8,则该发电机每燃烧1kg33柴油产生的烟气量为19.8Nm,本项目发电机机组产生的烟气量为841.5Nm/h。本项目发电机年大气污染物排放量(以发电机100%满载运行计)见表3.5-3。表3.5-3发电机燃油废气污染负荷表污染物SO2烟尘NOx废气3产生系数(kg/m)40.7142.563排放速率(kg/h)0.04080.00720.00256841.5Nm/h3排放浓度(mg/m)48.488.563.04DB4427-2001《广东省地方标准大气污染物排放限值》最高允许排放浓度500120120—3(mg/m)从3.3-5可以看出本项目所设置的发电机各污染物排放浓度远低于《广东省地方标准大气污染物排放限值》中所要求得最高允许排放浓度。并且该发电机年使用次数较少,加之使用时SO2、NOx及烟尘均能达标排放,因此本项目发电机的污染排放不作为重点讨论,但是建设单位须在发电机运行时确保发电机处于室内专用空间,禁止在厂区露天使用,以确保发电机运行时废气影响降到最低程度。(2)废气治理措施建设单位选择的废气治理措施,首先考虑生产车间的有序管理,尽可能减少生产、储存过程中的跑、冒、漏、滴等。对于各类有组织排放,根据建设单位提供资料,为减少粉料加料过程的粉尘排放,项目单位在原料加料口设置专用布袋除尘装置,该装置除尘效率可达95%。过滤后通过车间内强制通风,从车间屋顶高空排放,排放高度为15m。对于有机溶剂的挥发废气,建设单位拟采取的治理措施是对存在有机溶剂挥发的设备比如搅拌机、分散剂等尽量密封加盖,再设置集气罩,将废气收集进入多功能废气净化塔中进行处理,处理后通过15m高的排气筒高空排放。对于各类无组织排放生产设备的选择上采用带盖的搅拌缸,各生产设备尽可能做到密封。根据不同种类的产品特性,专门设置无尘分散区(用于UV固化涂料分散)、无粉分散区用于色浆调配,粉料分散区用于各类粉状原料的加料。在42 珠海网泰环保设备有限公司化工涂料生产项目车间屋顶去墙上安装风机,加强通风,从而有效降低废气挥发量,降低车间废气浓度,减轻废气对员工的健康危害。3.5.3环境噪声源分析及防治措施(1)环境噪声源分析此外一些车间通风设备及叉车来往也会产生少量噪声。根据本项目所涉及到的设备表2.5-2,结合生产工艺流程图3-3基表3.1-4,本项目运营期各类噪声污染源及源强见表3.5-4.表3.5-4项目主要设备噪声源噪声强度序号噪声源名称声源强度dB(A)工作特性1分散机85~95连续2卧式砂磨机70~80连续3高速搅拌机70~85连续4三辊研磨机75~85间断5空压机85连续6轴流风机、引风机65~75连续7各类泵70~80间断8手拉叉车65~75间断9液压升降叉车65~70间断10自流式包装机65~80连续11冷空气过滤机75~90连续(2)噪声污染防治措施根据本项目各类噪声源及产噪特征,结合项目可研,建设单位在生产中,首先会选择低噪声的设备,再次对各噪声源部件采取减震、隔振、消声和隔声措施,出口与管道采用挠性链接;管道包扎隔声、设置吸声材料等。建筑上采用隔声、吸声处理,其中包括隔声门、窗以及吸声材料。同时在厂区道路两侧种植绿化带,厂内空地种植花草,以进一步削减噪声,以使厂界噪声达到《工业企业厂界环境噪声排放标准》(GB12348-2008)3类标准的要求。本项目拟采取的噪声防治措施详见表3.5-5.表3.5-5项目主要设备噪声源噪声强度治理后噪声源强声源强度序号噪声源名称降噪措施度dB(A)dB(A)1分散机85~95车间优化布置、减震、75~8543 珠海网泰环保设备有限公司化工涂料生产项目2卧式砂磨机70~80车间优化布置、减震、隔振60~703高速搅拌机75~85车间优化布置、减震、隔振65~75车间优化布置、减震、隔振、消4三辊研磨机75~8560~70声设备5空压机85专门机房、建筑隔声、基座减震70轴流风机内靠、远离厂界;引风6轴流风机、引风机65~8060~75机出气口与管道采用挠性连接7各类泵70~80进出口设置消声、减震设施60~708手拉叉车65~75优化路线、良好维护、操作合理65~709液压升降叉车65~70优化路线、良好维护、操作合理65~7010自流式包装机70~85车间优化布置、减震、隔振60~7511冷空气过滤机75~90专门机房、建筑隔声、基座减震60~753.5.4固体废物产生源分析及处理、处置措施(1)固体废物产生源分析从工艺流程示意图3-1及表3.1-4可以看出,过滤工序产生的滤液和未研磨好的颜料渣直接回用至生产,该过程无固废产生。本项目生产期的固体废物主要包括生产固废和办公生活垃圾。①生产固废本项目各类树脂、个别桶装运输溶剂所产生的废包装物一年约20个桶,根据《国家危险废物名录》(2008),这部分废包装桶属于危险废物,危废代码为HW49-900-041-49(含有或直接沾染危险废物的废弃包装物、容器、清洁杂物)在粉状原料加料时,通过布袋除尘器收集起来的粉尘颗粒物每年约0.19t,根据项目生产产品及种类所需粉料,布袋除尘器中所收集的颜填料粉尘尽可用于同批次生产,根据建设单位提供资料这部分收集物有80%进行回收利用,因此产生收集器粉尘固废约0.04t/a。根据《国家危险废物名录》(2008)这部分颗粒物属于危险废物,危废编码为HW12-900-255-12(使用各种颜料进行着色过程中产生的颜料和涂料废物)。本项目多功能净化塔中除味液每年更换一次,每次更换约1t,根据《国家危险废物名录》(2008),该废液危废编码为HW12-264-012-12(其他油墨、染料、颜料、油漆、真漆、罩光漆生产过程中产生的废水处理污泥、废吸附剂),属于危险废物。本项目设备清洁使用溶剂一般能重复使用,但重复利用一定次数后,性能变差,需要变换,另外有色洗涤溶剂一般难以重复利用,根据项目生产计划,这部44 珠海网泰环保设备有限公司化工涂料生产项目分洗涤残液产生量约为0.05t/a,根据《国家危险废物名录》这部分废溶剂属于危险废物,危废编码为HW12-900-256-12(使用酸、碱或有机溶剂清洁容器设备的油漆、涂料、染料等过程中产生的剥离物)。实验室喷漆水帘柜所产生的废水约6kg/d,根据《国家危险废物名录》喷漆废水的危废编码为HW12-900-252-12(使用油漆、有机溶剂进行喷漆、上漆过程产生的染料和涂料废物)。废渣的危废编码为HW49-900-041-49(含有或直接沾染危险废物的废弃包装物、容器、清洁杂物)。②办公生活垃圾本项目生产期共有员工50人,按每人每天产生0.4kg办公生活垃圾计算,一年生产300天,因此年产生办公生活垃圾为6.0t/a。(2)固体废物处理及处置措施根据本项目所产生的固废种类,建设单位在生产运营期首先必须对废物进行识别与分类处置。根据《国家危险废物名录》(2008),项目运营所产生的废吸附剂、除尘设备收集的颗粒物以及设备清洁废溶液、有机溶剂原材料包装桶均属于危险废物,建设单位拟对各类危险废物统一收集后,各类包装桶教会供应商回收处理,其余各类危废交有危废处理资质资质单位进行处理。办公垃圾经按类妥善存放后,交由当地环卫部门统一收集清理。3.6污染物排放情况汇总45 珠海网泰环保设备有限公司化工涂料生产项目表3.6-1本项目正常情况下“三废”排放情况汇总污染污染产生量排放量物来排放形式排放规律或类型主要污染防治措施排放去向类别(t/a)(t/a)源加料口设置专用布袋除尘装置点源间断0.010.007515m高空排放粉尘除尘效率可达95%无组织排放间断0.02车间、仓库区域良好通风设置防护距离0.015/甲苯0.0420.0375多功能净化塔除味剂吸附、过滤后15m高多功能净化塔除味剂吸点源二甲苯0.0420.0375空排放附、过滤后15m高空排放废气溶剂非甲烷总烃1.431.29挥发甲苯0.010.02无组织二甲苯0.01车间良好通风、设置防护距离0.02/面源非甲烷总烃0.380.32助剂多功能净化塔除味剂吸附、过滤后15m高多功能净化塔除味剂吸点源TVOC0.01320.0093挥发空排放附、过滤后15m高空排放循环使用、补充蒸发,无点源设备冷却水0循环使用、补充蒸发/废水外排/生产点源实验室喷漆废水1.8送有资质单位处理妥善处理、无废水外排/废水废水车间地面清洁废点源99水化粪池预处理后排入南水面源初期雨水788.25排入厂区化粪池处理水质净化厂污水管网生活1868.25点源间歇1080污水间歇废包装桶50个/年交回供应商回收处理/交回供应商处理,不外排间歇废吸附剂1/危险间歇清洁溶剂0.05/交有资质单位回收处理固体废物除尘设施收集粉交有资质单位回收处理间歇0.04/不外排废物尘间歇喷漆废水1.8/生活定点收集,环卫部门统一间歇生活垃圾6统一收集,环卫部门统一处理6垃圾处理46 珠海网泰环保设备有限公司化工涂料生产项目4自然和社会环境概况4.1自然环境概况4.1.1地理概况珠海位于广东省南部,珠江出海口西岸,濒临南海,东与深圳、香港隔海相望,南与澳门陆路相通,西连新会,北邻中山,距广州140公里。介于东经113°3′~114°18′,北纬21°48′~22°27′。本项目位于珠海市高栏港经济区内,港区地处滨海地带,东侧为珠海主要分流河口磨刀门、鸡啼门水道,东北侧有连岛大堤将高栏与南水半岛相连,西北面紧邻黄茅海河口湾湾口,向南与南海相邻。南迳湾南端现已经建成1400m长防波堤,对外海来浪起到很好的遮掩作用,南迳湾作业区目前也已有较便捷的交通条件,珠海三灶机场已开通至国内各大重要城市,正在形成发达的水陆、空立体化对外交通体系,沟通了高栏与内地及海外的交往。4.1.2气象、气候珠海处于北纬21°48"至22°27",东经113°3"至114°18"之间,属于低纬度亚热带季风区,日照充足,雨量充沛,年平均气温22.4℃。全年1、2月份气温最低,进入4月,温度渐升,5-9月天气较热亦多雨,年平均降雨量1700-2300毫米,年平均降水日数为158.9天。东风为常向风,夏以东南风为主,冬以东北风为主,夏秋季有台风侵袭。空气平均相对湿度为79%。项目所在高栏港经济区气候属南亚热带海洋气候,气候温暖,湿度大,冬季常受来自高纬度地区冷空气的影响,冷空气过境时,常伴有6~8级偏北风,气温低,空气干燥。峡秋季节常受台风影响。春季冷暖空气交错,常出现阴雨,多雾空气。本区年平均气温为21.8℃,年极端最高气温36.8℃,年极端最低气温为1.7℃。夏季平均气温27.7℃,冬季平均气温14.4℃。本区夏季雨量充沛,冬季少雨,4~9月总雨量占全年总雨量的88%。区内降雨情况具体见表4.1-1。47 珠海网泰环保设备有限公司化工涂料生产项目表4.1-1区内降雨气象数据年最大降雨量3380mm年最小降雨量1322mm多年平均降雨量2272mm日最大降雨量430mm大雨天数26.4d--当地受季风影响明显,夏季多偏S风,冬季多NE风,强风向出现在E向和NE向,最大风速30m/s和28m/s,常风向也为N向和E向,NE、NEN和E三向风频率占57.8%。每年的6~9月为台风季节。据统计资料,大于六级风(12.3m/s)的天数为47d。4.1.3地形、地貌及土壤植被珠江口是从冰后期古珠江溺谷湾的基础上由珠江水系泥沙不断堆积演变而成。而围绕港口所在的海区各岛屿均系晚冰期海面上升,经受剥蚀和侵蚀作用形成。高栏港经济区主要为花岗岩组成的丘陵地形。岛屿东南、南侧沿海海滨有海蚀地貌发育。山沟谷地分布冲击沉积物,土壤成土母质为花岗岩,山体岩石裸露,山地土壤为赤红壤,土层薄,土质含沙量较高;在低洼地、沙堤主要是浅海沉积发育成的滨海沙土。高栏港经济区原住村民生活区域还有一些水稻、蔬菜、荔枝、甘蔗、香蕉等农作物;而新填土区,为野生草灌丛植物覆盖,包括本建设项目在内主要有坡柳、猪屎豆、绊根草、加拿大飞蓬、厚藤、芒、少花龙葵、马齿苋、热痱草、三叶鬼针草等。高栏港经济区已成道路的行道树为细叶榕、小叶榄仁、芒果、椰子、美叶桉、台湾相思、木麻黄、窿缘桉、高山榕等。海滨有少量红树林秋茄、海榄雌等并不成片。各岛、半岛的丘陵生长有潺槁、山乌桕、桃金娘、山苍子、芒箕、鸭脚木、鸭咀草、纤毛鸭咀草、猪笼草、薇甘菊、蟛蜞菊等。高栏港经济区管委会等种植有庭院性的绿化美化植物,有大王椰、假槟榔、苏铁、福建茶、金叶女贞、九里香、大红花、美人蕉、印度榕、美叶针葵、南洋杉、三药棕榈等。4.1.4地震根据《中国地震动参数区划图》(GB18306-2001),本区地震动反应谱特征周48 珠海网泰环保设备有限公司化工涂料生产项目期为0.35s,地震动峰值加速度为0.10m/s2,对应的地震基本烈度为Ⅶ度。4.1.5水文特征(1)潮汛本海域潮汛属于不规则半日混合潮类型,F=1.37。日不等和半月不等现象显著,潮差较小,在台风侵袭期间,可有风暴增水现象发生。乘潮2小时保证率为90%的潮位为1.57m,乘潮3小时保证率为90%的潮位为1.49。特征潮位值见表4.1-2。表4.1-2特征潮位一览表最高潮位3.94m最大潮差3.14m最低潮位-0.31m最小潮差0.10m平均高潮位2.08m平均涨潮历时6h46min平均低潮位0.81m平均落潮历时6h36min平均潮位1.45m--(2)潮流潮流类型为不规则半日混合潮类型,潮流流经高栏岛和荷包岛之间水域,并在外部水域形成环流,涨潮流偏N。落差流偏S,项目港址位于防波堤后侧,高栏港区实测最大流速约为1.42m/s,流向358,最大涨落流速1.43m/s,流向165,航道中最大流速可达1.1m/s。(3)波浪高栏岛海域受台风影响后会出现巨浪,强浪向和常浪向多为偏南方向,东南和南向频率分别为63.2%和11.7%,波形多以风浪、涌浪叠加的混合浪为主。南迳湾南端湾口1400m长的防波堤建成后,对SE和S向大浪起到很好的遮掩作用。4.2社会经济概况珠海市是中国南部最早建立的特区之一。背靠富饶的珠江三角洲腹地,南临浩瀚南海,北接中山,南与澳门半岛相连,西与江门市毗邻,东与深圳、香港隔珠江口相望。珠海自然环境优美,山清水秀,海域广阔。城市规划和建设独具匠心,突出旅游意识,自然和谐,优雅别致,极富海滨花园情调和现代气息。1991年,珠海以整体城市形象为景观被国家旅游局评为―中国旅游胜地四十佳‖之一。49 珠海网泰环保设备有限公司化工涂料生产项目4.2.1珠海市社会经济概况2009年末全市常住人口148.11万人,比上年末增加2.67万人,增长1.8%。其中,户籍人口99.48万人,增长4.0%。全市户籍人口出生率11.61‰,死亡率2.99‰;自然增长率8.62‰。2009年珠海GDP达到1037.7亿元,增长6.6%;预计人均GDP突破1万美元达到6.98万元,增长5.3%。固定资产投资额410.5亿元,增长10.3%。社会消费品零售总额413.8亿元,增长15%。城镇居民人均可支配收入22859元,增长9.1%,近十年来首次高于GDP增速;农渔民人均纯收入8575元,增长6.6%。接待游客2087.7万人次,增长9.1%。金融机构各项存款余额2105.2亿元,增长33.6%。来源于珠海的财税总收入305.4亿元;财政一般预算收入101.4亿元,增长9.9%。4.2.2高栏港经济区社会经济概况高栏港经济区是依托华南沿海主枢纽港高栏港而设立的园区,开发总面积380平方公里。高栏港口岸为国家一类对外开放口岸,拥有珠江三角洲最大吨位的液体化工品码头泊位和建设30万吨级石化大码头的良好自然条件,主航道距国际航道(大西水道)-27米等深线仅11公里,并可通过粤西沿海高速公路、高栏港高速、广珠铁路等组成的港口集疏运体系与珠三角地区形成2小时经济圈。2008年底,《珠江三角洲地区改革发展规划纲要》明确将珠海定位为珠江口西岸核心城市,要求珠海加快建设―三区一基地‖(即高栏港工业区、航空产业园区、国际商务休闲旅游度假区、海洋工程装备制造基地)、完善珠海港现代化功能,其中高栏港工业区、海洋工程装备制造基地均落户在高栏港经济区,从国家战略的层面明确了高栏港经济区的发展战略定位和产业定位。2010年全区生产总值169.7亿元、工业总产值487.8亿元、工业增加值140.8亿元、固定资产投资82.2亿元,增长幅度均超过了16%。实际利用内资11.5亿元,增长幅度超过5成,实际利用外资达2.53亿美元,增长13.5%。此外,财政一般预算收入达11.36亿元,增长30.7%。而珠海港货物吞吐量达6056万吨,增长37.4%;单位工业增加值能耗下降10.68%,顺利完成―十一五‖节能降耗目标任务。农民人均纯收入9802元,增长9.9%。50 珠海网泰环保设备有限公司化工涂料生产项目经过多年来的发展,高栏港经济区已初步形成以精细化工、石油化工、电力能源、海洋工程装备制造、休闲旅游为主导,以港口物流业为支撑的临港产业集聚体系。BP、壳牌、三菱、香港和记黄埔以及中船、中石油、中海油、中化、中远、中冶集团等世界500强企业和央企均在高栏港经济区有投资项目。中海油深水海洋工程装备制造基地、中船珠海大型海洋工程装备制造基地、中冶东方大型设备制造、中铁集团桥梁设备制造等项目的落户,将使高栏港区具有较强的产业聚集能力;珠海发电厂5号机组项目、中海油天然气发电厂项目等能源产业项目即将动工建设。高栏港经济区未来十年的发展目标是:经过3—5年的努力,港口吞吐量达到1亿吨以上,集装箱吞吐量达到300—500万标箱,工业总产值达到1000—1500亿元;经过8—10年的努力,建成全国沿海主枢纽港,成为集群效应强、生产规模大、产业链条长、发展水平高的现代重化产业基地,成为珠海产业发展的―引擎‖和―龙头‖。高栏港经济开发区紧紧围绕打造世界级海洋工程装备制造基地、广东省先进重化产业基地、中国南方大型环保能源基地、建设中国休闲旅游度假中心和发展现代港口物流业的―3+2‖产业发展目标,大力引进和发展现代先进制造业,积极发展现代服务业、港口物流业,推进新型工业化,构建现代产业体系。(一)加快发展现代先进海洋工程装备制造产业。《珠江三角洲地区改革发展规划纲要》提出打造具有现代化技术水平的海洋工程装备制造基地,明确要求珠海要充分发挥经济特区和区位优势,把高栏港工业区建设成为海洋工程装备制造基地。按照《规划纲要》要求,珠海高栏港经济区规划了近40平方公里的海洋工程装备产业基地,中国海油深水海洋工程装备制造基地项目、中船海洋工程装备制造基地项目、中冶东方大型重工设备、中铁武桥等项目相继落户,珠海高栏港经济区海洋工程产业快速发展。(二)石化产业集群已基本形成。高栏港经济区已初步形成了以PTA和合成树脂为主线上下游延伸的石化产业集群,为广东五大化工基地之一,2009年高栏港经济区化工产业集群入选第四批省产业集群升级示范区名单。高栏石化区和精细化工区规划面积分别为28.8平方公里和10平方公里,已有珠海碧辟化工有限公司、壳牌、珠海联成化学工业有限公司、晓星氨纶等51 珠海网泰环保设备有限公司化工涂料生产项目30余家中下游石化企业及精细化工企业落户,总投资已超过150亿元。(三)电力能源产业不断壮大和升级。高栏港经济区拥有珠海电厂、BP液化气和新海能源(珠海)公司等建成投产的高产值、高效益企业。目前正在加紧推进珠海电厂5、6号机组项目、中国海油天然气发电厂项目和金湾LNG项目等。近年来大力发展清洁环保能源,不断引进大型天然气发电、风力发电项目,致力于打造超大型环保电力能源基地。(四)加快推进建设以高栏港为核心的现代化区域性物流中心。高栏港码头仓储区由集装箱及干散货作业区、油气化学品码头仓储区两部分组成,首期正在开发的面积为26平方公里。码头方面:高栏港码头及仓储区由集装箱及干散货码头区、油气化学品码头区组成。现已建成生产性泊位35个,其中万吨级以上泊位15个(包括2个5万吨级集装箱泊位和2个2万吨级的多用途泊位),拥有珠三角地区最大的8万吨级液体化工品码头和8万吨级成品油码头,港口货物吞吐量从1996年开港时的90万吨增至2009年的2829万吨。仓储物流方面:高栏港经济区已投产及在建的危险品、油品、液体化工品一次性总库容能力将达到300万立方米,其中国家海关总署批准的保税仓储库容近117万立方米,是全国最大的油气化学品仓储区,现有9家仓储企业,油的仓储量约占广东省的25%、气约占20%、液体化工品约占20%,成为广东省主要的油、气和液体化工品的集散中心之一。珠海高栏港经济区常住人口约4万人,规划占地面积120平方公里,可用建设面积70平方公里,目前已开发面积为13平方公里。经济建设规划见图4-1.4.3项目周围居民饮用水情况本项目所在区域为高栏港填海造陆区,距项目区最近的村庄为铁炉新村(东,475m),根据走访调查,铁炉新村居民饮用水为市政给水,不使用该地区地下水,同时查阅科技资料可知,珠海的地下水多为Cl-Na型咸水,不能作为生活工业用水。4.4项目附近污染源调查珠海高栏港经济区现有投产和在建企业156家,投产的主要工业企业有珠海碧阳化工有限公司、珠海发电厂有限公司、华丰纸业有限公司、珠海振戎公司、粤裕丰钢铁有限公司、南方气体产品(珠海)有限公司、阿尔塔纳绝缘材料(珠海)52 珠海网泰环保设备有限公司化工涂料生产项目有限公司、长兴化学工业(广东)有限公司、长兴化学材料(珠海)有限公司、金钱(珠海)有限公司、珠海金光油脂工业有限公司、珠海科迪石化(珠海)有限公司、珠海宝塔石化有限公司、珠海美凌达制冷科技有限公司、励联织染公司、东荣五金制品公司、珠海玻纤公司及珠海裕田化工有限公司。在建工业项目有珠海碧辟液化石油气有限公司、华润包装材料有限公司、珠海长先化工有限公司、番禺珠江钢管有限公司和珠海江海天化工有限公司等。珠海高栏港经济区现有主要废气污染源有珠海碧辟化工、珠海发电厂、粤裕丰钢铁有限公司、华丰纸业、长兴化工、珠海玻纤公司。2009年排放废气250亿标立方米,其中排放二氧化硫2.4万吨、烟尘530吨。现有主要废水污染源主要有碧辟化工、华丰纸业、长兴化工、励联织染、东荣五金制品、珠海玻纤公司、地球胶粘科技有限公司、联成化工等。2009年排放工业废水1170万吨,其中COD排放量3720吨、氨氮150吨,石油类6.9吨。根据调查,项目周围已建主要项目污染源污染物排放情况如表4.4-1所示。表4.4-1项目周围主要污染源污染物排放情况一览表废气(t/a)废水(kg/a)废气量固体废物企业名称43废水石油(t/a)10m/NOxSO2烟尘43CODCr去向10m/年类年珠海电厂390148378273911520434978290210664华联油码头————————0.36570650514066.2珠海一德石南水————————0.0051401810375.3化有限公司水质净化BP————————100120000————厂台湾联成化工1576840555051500————粤裕丰钢铁公————2365.21900.92——23.04——87.86司53 珠海网泰环保设备有限公司化工涂料生产项目5环境质量现状调查与评价5.1海水环境质量现状评价5.1.1现状监测断面布设项目产生的生活废水、初期雨水、车间地面清洁废水经过三级化粪池处理后经市政污水管网进入高栏港经济区南水水质净化厂进一步处理。实验室废水收集后委托有资质单位处理。化粪池处理后各污染物浓度均符合广东省《水污染物排放限值》(DB44/26-2001)第二时段三级标准限值,南水水质净化厂排放口位于三角山岛东北面,珠海电厂对面黄茅海海域,根据《广东省近岸海域环境功能区划》,该海域主要功能为港口、工业、景观,属海洋三类功能区。根据对项目区周围情况调查,本项目东南约2000m为长兴化学材料(珠海)有限公司,该公司污水最终排放去向与本项目大致相同,因此项目引用《长兴化学材料(珠海)有限公司二期重大变更项目环境影响报告书》中委托深圳市谱尼测试科技有限公司于2011年2月进行的黄茅海水质监测数据。具体监测点位置见表5.1-1及图5-1。表5.1-1监测断面布设情况取样点水域监测时间°W1(N2159"28.63",E113°09"15.36")2011.2.23-2011.2.24°黄茅海W2(N2157"40.88",E113°10"32.81")2011.2.23-2011.2.245.1.2监测时间及监测频率每天各采一次涨潮样和退潮样,共采4次样。采样层次:水深小于5米时,只采表层样;水深大于5米时,分表、底层分别采等量的混合样。采样方法按GB17378.3-1998《海洋监测规范》第3部分:样品采集、储存与运输进行。5.1.3监测项目水质监测项目:水温、色度、pH值、CODMn、BOD5、悬浮物、氨氮、硝酸盐氮、亚硝酸盐氮、活性磷酸盐、石油类、氰化物化物共12项。54 珠海网泰环保设备有限公司化工涂料生产项目5.1.4监测和分析方法各按GB17378.4-2007《海洋监测规范》第4部分:海水分析方法如表5.1-2。表5.1-2分析方法及最低检出限最低检出序号项目名称分析方法仪器方法来源限1水温温度计法温度计GB13195-910.1℃2色度比色法比色计GB17378.4-2007-3pHpH计法pH计GB17378.4-20070.1(pH值)4悬浮物重量法电子天平GB17378.4-20070.8mg/L5化学需氧量碱性高锰酸钾法——GB17378.4-20070.05mg/L五日生化需氧6五日培养法(BOD5)——GB17378.4-20070.5mg/L量紫外分光光度7活性磷酸盐磷钼蓝分光光度法GB17378.4-20070.01mg/L计紫外分光光度8硝酸盐镉柱还原法GB17378.4-20070.08mg/L计盐酸萘乙二胺分光光紫外分光光度9亚硝酸盐GB17378.4-20070.003mg/L度法计紫外分光光度10氨氮靛酚蓝分光光度法GB17378.4-20070.02mg/L计紫外分光光度11石油类紫外分光光度法GB17378.4-20070.0035mg/L计吡啶-巴比妥酸分光光紫外分光光度12氰化物GB17378.4-20070.0003mg/L度计计5.1.5监测结果项目附近海域海水水质监测结果统计表见表5.1-3。5.1.6海水环境质量现状评价小结(1)评价方法用单项污染指数对海水水质和底质现状进行评价。W1~W2监测断面的水质评价标准采用《海水水质标准》(GB3097-1997)中的三类水质标准。①单项水质参数i在第j点的标准指数:ci,jS(1)i,jcsi式中:Si,j为单项水质参数i在第j点的标准指数;chi,j为单项水质参数i在监测点j的浓度。55 珠海网泰环保设备有限公司化工涂料生产项目Cs,j为水质参数i的水质标准浓度。②DO的标准指数为:DODOfjSDOj≥DOs(2)DO,jDODOfsDOjSDO.j109DOj≤DOs(3)DOs468DOf(4)31.6T式中:SDOj为溶解氧标准指数;DO,j为j点溶解氧浓度。DO,f为饱和溶解氧浓度。③pH的标准指数PIpHpH(5)pHSMDs其中;PIpH为pH污染指数pH为pH值实测浓度;pHsd为海水水质标准中规定的pH值下限;pHsu为海水水质标准中规定的pH值上限。单项污染指数>1,表明该水质参数超过了规定的标准,已经不能满足使用要求。(2)评价结果项目附近海域海水水质指数统计表见表5.1-4。表5.1-3水环境质量现状监测结果监测项目单位:mg/L(pH值:无量纲)监测监测日期氨位置水温色度pH值CODMnBOD5SS氮2011.2.23(涨潮)15.4107.881.921.412.00.082011.2.23(退潮)15.6107.911.701.519.10.06W12011.2.24(涨潮)15.1107.892.151.710.30.052011.2.24(退潮)15.3107.902.091.519.20.042011.2.23(涨潮)15.387.892.051.616.00.06W22011.2.23(退潮)15.687.922.131.59.20.0856 珠海网泰环保设备有限公司化工涂料生产项目2011.2.24(涨潮)15.187.901.621.815.40.042011.2.24(退潮)15.487.912.161.521.50.06监测监测项目单位:mg/L监测日期位置硝酸盐亚硝酸盐活性磷酸盐石油类氰化物--2011.2.23(涨潮)0.060.1120.03<0.0035<0.0003--2011.2.23(退潮)0.160.0990.02<0.0035<0.0003--W12011.2.24(涨潮)0.120.1240.02<0.0035<0.0003--2011.2.24(退潮)0.150.1080.02<0.0035<0.0003--2011.2.23(涨潮)0.150.0830.02<0.0035<0.0003--2011.2.23(退潮)0.140.0720.03<0.0035<0.0003--W22011.2.24(涨潮)0.170.0740.03<0.0035<0.0003--2011.2.24(退潮)0.130.0610.03<0.0035<0.0003--表5.1-4水环境质量现状评价结果表监测项目单位:mg/L(pH值:无量纲)监测监测日期活性磷位置pH值CODMnBOD5SS无机氮石油类氰化物酸盐涨潮浓度7.88-7.891.92-2.151.1-1.710.3-12.00.252-0.2940.02-0.03<0.0035<0.0003范围2011平均值7.892.0351.411.150.2730.025<0.0035<0.0003.2.23超标率00000000至2.24(%)均值单项0.090.5090.350.1120.6820.8330.01170.003指数W1退潮浓度7.90-7.911.70-2.091.5-1.519.1-19.20.298-0.3390.02-0.02<0.0035<0.0003范围2011.平均值7.911.901.519.150.3180.02<0.0035<0.00032.23超标率00000000至2.24(%)均值单项0.110.4750.3750.1920.7950.6670.01170.003指数涨潮浓度7.89-7.91.62-2.051.6-1.815.4-16.00.284-0.2930.02-0.03<0.0035<0.0003范围02011.2.平均值7.901.8351.715.70.2890.025<0.0035<0.000323超标率00000000至2.24(%)均值单项0.8980.4590.4250.1570.7220.8330.001170.003指数W2退潮浓度7.91-7.92.13-2.161.5-1.59.2-21.50.251-0.2920.03-0.03<0.0035<0.0003范围22011.2.平均值7.922.1451.515.350.2720.03<0.0035<0.000323超标率00000000至2.24(%)均值单项0.9000.5360.3750.1540.6810.01170.003指数(GB3097-1997)三类标准6.8-8.8≤4≤4≤100≤0.40≤0.030≤0.30≤0.10注:无机氮是氨氮、硝酸盐氮、亚硝酸盐氮的总和,(GB3097-1997)三类标准中,无机氮≤0.40mg/L。57 珠海网泰环保设备有限公司化工涂料生产项目5.1.7现状评价表5.1-4水质监测结果表明:°W1(N2159"28.63",E113°09"15.36")断面:①涨退潮期间的pH、CODMn、BOD5、SS、石油类、氰化物、无机氮都满足《海水水质标准》(GB3097-1997)中的第三类水质标准。°W2(N2157"40.88",E113°00"32.81")断面:①涨退潮期间的pH、CODMn、BOD5、SS、石油类、氰化物、无机氮都满足《海水水质标准》(GB3097-1997)中的第三类水质标准。②涨退潮期间的活性磷酸盐与标准值一致,虽未超标,但说明海水受活性磷酸盐影响较大。由此说明:黄茅海水环境质量一般,其中受活性磷酸盐污染比较严重,活性磷酸盐污染源主要来自黄茅海上游,黄茅海上游地区人口及工业较集中,上游污水排放至崖门口水道,然后汇入黄茅海。5.2环境空气质量现状评价5.2.1环境空气质量现状监测与评价为了解项目所在区域环境空气的主要污染问题,掌握本项目建设前工程所在地及周围地区的环境空气质量现状,对项目所在区域环境空气质量现状给予评价。5.2.2监测布点由于长兴化学材料(珠海)有限公司位于本项目的东南,直线距离为2000m,在本项目评价范围内,本项目引用《长兴化学材料(珠海)有限公司二期重大变更项目环境影响报告书》中委托深圳市谱尼测试科技有限公司于2011年2月进行的大气监测数据。并且此次监测监测点位同样为本项目环境空气敏感点,因此该监测数据引用有效。选取跟本项目相关的污染因素,根据评价区域范围内的环境空气敏感点分布以及气象特征,布设3个监测点:1#高栏港管委会、2#铁炉新58 珠海网泰环保设备有限公司化工涂料生产项目村。监测点名称、位置详见表5.2-1,监测布点图见图5-1。表5.2-1大气监测布点情况一览表序号测点监测因子11#铁炉新村PM10、TVOC、甲苯、SO2、NOx22#高栏港管委会PM10、TVOC、甲苯、SO2、NOx5.2.3监测项目参考项目于2011年2月23日~2011年3月1日对上述三个点位的PM10、TVOC、甲苯、SO2、NOx进行了监测。监测期间同时对风向、风速、气温、大气压等常规气象因素进行观测。5.2.4监测时间及频率于2011年2月23日~2011年3月1日进行现状监测采样。监测时间、频率见表5.2-2,大气监测期间的气象参数见表5.2-3。.表5.2-2监测时间和频率一览表序号监测因子监测周期和频率1PM10连续监测7天,每天采样1次,每天采样时间不小于12小时。连续监测7天,每天采样4次,每天采样时间为北京时间2:00、2TVOC8:00、14:00、20:00,每次采样45分钟以上。3甲苯每天上下午各一次,每次采样时间为1小时。连续监测7天。每天采样4次,具体每天采样时间为北京时间2:00、8:00、4SO2、NO214:00、20:004个时段采样监测表5.2-3大气监测期间的气象参数采样采样气象参数采样时间段时间地点温度(℃)大气压(Kpa)风速(m/s)风向总云低云02:00-03:0015.6101.40.8西42铁炉08:00-09:0015.5101.40.8西412011新村14:00-15:0018.5101.02.1东43年20:00-21:0016.6101.11.9东412月02:00-03:0015.5101.31.7西4223高栏08:00-09:0015.7101.31.8西52日港管14:00-15:0019.1101.02.3东北43委会20:00-21:0016.2101.13.2东41201102:00-03:0014.5101.51.5西51铁炉年08:00-09:0015.4101.40.6东北51新村214:00-15:0020.9101.02.4西5159 珠海网泰环保设备有限公司化工涂料生产项目月20:00-21:0018.1101.23.0东422402:00-03:0014.7101.42.0西51高栏日08:00-09:0015.9101.41.8东北51港管14:00-15:0021.3101.02.4西41委会20:00-21:0018.3101.23.5东4102:00-03:0015.9101.31.5东南632011铁炉08:00-09:0017.2101.31.3东53年新村14:00-15:0022.7101.02.5东42220:00-21:0018.4101.22.9东51月02:00-03:0016.2101.31.4东南63高栏2508:00-09:0017.2101.32.0东52日港管14:00-15:0022.7101.04.0东北42委会20:00-21:0018.5101.22.7东4102:00-03:0017.0101.20.9西522011铁炉08:00-09:0017.4101.21.2西43年新村14:00-15:0022.3101.02.7西53220:00-21:0019.5101.12.8东北52月02:00-03:0017.2101.31.4西52高栏2608:00-09:0017.7101.21.8西南43日港管14:00-15:0022.5101.03.0西51委会20:00-21:0019.3101.13.5东北4202:00-03:0014.8101.41.0东622011铁炉08:00-09:0016.4101.31.3东北42年新村14:00-15:0022.0101.01.9东南52220:00-21:0017.5101.22.3东42月02:00-03:0015.4101.42.0东62高栏2708:00-09:0016.3101.32.0东南42日港管14:00-15:0021.9101.03.8东南52委会20:00-21:0017.8101.23.9东5302:00-03:0014.2101.51.9东522011铁炉08:00-09:0015.4101.41.5东南31年新村14:00-15:0022.8101.02.4东南31220:00-21:0019.1101.23.0东41月02:00-03:0013.9101.51.6东52高栏2808:00-09:0015.4101.51.5西41日港管14:00-15:0022.7101.02.4东31委会20:00-21:0019.2101.12.6东4102:00-03:0014.0101.51.0西422011铁炉08:00-09:0014.5101.41.5西42年新村14:00-15:0020.3101.02.6东南51320:00-21:0018.2101.22.1东52月02:00-03:0014.1101.51.0西42高栏108:00-09:0014.5101.51.5西51日港管14:00-15:0020.1101.02.3西51委会20:00-21:0017.6101.22.1东5260 珠海网泰环保设备有限公司化工涂料生产项目5.2.5分析方法大气污染物采样、分析方法严格按照国家环境保护局颁布的《空气和废气监测分析方法》(第四版)中有关标准方法进行,有关分析方法列于表5.2-4。表5.2-4采样仪器名称、型号项目名序号分析方法仪器方法来源最低检出限称31PM10重量法电子天平GB/T15435-19950.001mg/m气相色谱质谱《空气和废气监测32TVOC气相色谱-质谱法00005mg/m联用仪分析方法》(第四版)33甲苯气相色谱法气相色谱仪GB11737-890.01mg/m盐酸萘乙二胺分TU1800分光亮4NO20.007HJ479—2009光亮度法度计甲醛吸收副玫瑰5SO2721分光亮度计0.002HJ482-2009苯胺分光亮度法5.2.6监测结果TSP、TVOC、甲苯、SO2、NO2监测现状评价结果表见表5.2-5。3表5.2-5评价区域大气环境质量平均浓度结果(mg/m)1小时平均值日平均值污染项目监超标率最大浓度超标率最大浓度值物测点浓度范围浓度范围(%)值占评价(%)占评价标准3标准(%)(%)标准值(mg/m)///0.15————#1铁炉///0.035~0.045030新村#2高栏港PM10///0.034~0.045030管委会评价///0.034~0.045030区域3标准值(mg/m)0.6//————#1铁炉0.0957~0.1410///23.5新村#2高栏港TVOC0.0918~0.1450///24.2管委会评价0.0918~0.1450///24.2区域3标准值(mg/m)0.2————————#1铁炉甲苯未检出<0.01////新村61 珠海网泰环保设备有限公司化工涂料生产项目#2高栏港未检出<0.01////管委会评价未检出////区域~<0.01#1铁炉NO20.021~0.046019.20.028~0.037030.8新村#2高栏港0.024~0.044018.30.026~0.035029.2管委会评价0.021~0.057023.80.026~0.048040区域#1铁炉SO20.016~0.0320.06.40.018~0.0240.016.0新村#2高栏港0.014~0.0310.06.20.017~0.0230.015.3管委会评价0.009~0.0450.090.017~0.0290.019.3区域5.2.7监测结果分析与评价(1)PM10(可吸入颗粒物)3评价区域内PM10的日平均浓度范围为0.034~0.045mg/m。浓度最大值为30.071mg/m,是《环境空气质量标准》中二级标准值的30%。各监测点PM10的浓度均符合《环境空气质量标准》(GB3095-1996)及其修改单中的二级评价标准。(2)甲苯监测指标小时平均浓度:评价区域内各监测点甲苯的小时平均浓度均为未检出(<30.01mg/m),在评价区域内,各监测点甲苯的小时平均浓度均未超过评价标准值。(3)TVOC监测指标小时平均浓度:评价区域内各监测点TVOC的小时平均浓度变化范围为330.092~0.145mg/m,浓度最大值为0.145mg/m,是评价标准的24.2%。在评价区域内,各监测点TVOC的平均浓度均小于评价标准值。两个监测点TVOC稍高,可能与两个监测点距离高栏港石油化工区较近有关。(4)NO2监测指标小时平均浓度:评价区域内各监测点NO2小时平均浓度变化范围为0.021~330.057mg/m,浓度最大值为0.057mg/m,是二级评价标准的23.8%。在评价区域内,各监测点NO2小时平均浓度均低于二级评价标准值。日平均浓度:评价区域内各监测点NO2日平均浓度范围在0.026~330.048mg/m之间,浓度最大值为0.048mg/m,是二级评价标准的40%,在评价62 珠海网泰环保设备有限公司化工涂料生产项目区域内,各监测点NO2日平均浓度均低于二级评价标准值。(5)二氧化硫SO2监测指标小时平均浓度:评价区域内各监测点SO2的小时平均浓度变化范围为330.009~0.045mg/m,浓度最大值为0.045mg/m,是二级评价标准的9%。在评价区域内,各监测点SO2的小时平均浓度均低于二级评价标准值。日平均浓度:评价区域内各监测点SO2的日平均浓度变化范围均0.017~30.029mg/m,是二级评价标准的19.3%。在评价区域内,各监测点SO2的小时平均浓度均低于二级评价标准值。5.2.8环境空气现状监测结论综上所述:各监测点NO2、SO2的小时平均浓度值及日平均浓度值均符合《环境空气质量标准》(GB3095-1996)及其修改单中的二级评价标准的要求。PM10日平均浓度值均符合《环境空气质量标准》(GB3095-1996)中的二级评价标准的要求。苯、甲苯、TVOC小时平均浓度均符合《室内空气质量》(GB/T18883-2002)中规定的标准值。由此说明,目前评价区域范围内空气环境质量良好。5.3声环境质量现状评价5.3.1监测分析方法、时间及频率使用型号为AWA5610B型的积分声级计进行监测。监测时间为2011年6月9日~2011年6月10日,分昼间和夜间进行。5.3.2评价标准根据《珠海市城市区域环境噪声标准适用区划分》编制说明,项目所在区域属于工业区,为3类功能区,环境噪声采用《声环境质量标准》(GB3096-2008)中的3类标准,即昼间为65dB(A),夜间为55dB(A)。详见表5.3-1。表5.3-1《声环境质量标准》(GB3096-2008)单位:dB(A)类别昼间夜间3类区655563 珠海网泰环保设备有限公司化工涂料生产项目5.3.3评价量的选取根据《声环境质量标准》(GB3096-2008)以及《环境影响评价技术导则-声环境》(HJ2.4—2009)的要求,评价量取昼间等效连续A声级Ld、夜间等效连续A声级Ld。5.3.4评价范围及监测点位布设项目边界四个方向1米包络线以内共设4个监测点,对项目所在地的声环境质量现状进行评价。噪声监测点位见图5-2。图5-2声环境监测点位布设示意图5.3.5现状监测及评价结果根据―珠海网泰环保设备有限公司化工涂料生产场地‖厂界噪声实测统计结果见表5.3-2。64 珠海网泰环保设备有限公司化工涂料生产项目表5.3-2声环境质量现状监测统计结果单位:dB(A)监测时间测点编号测点名称昼间夜间1#东边界53.345.62#南边界52.744.82011年6月9日3#西边界51.544.24#北边界53.145.31#东边界52.448.22#南边界51.345.62011年6月10日3#西边界50.245.44#北边界51.945.5评价标准值6555-5.3.6监测结果分析与评价从表5.3-2可以看出,项目四个边界噪声值均符合《声环境质量标准》(GB3096-2008)3类标准要求。5.3.7声环境质量现状评价小结声环境质量现状监测与评价表明,项目所在区域声环境质量能达到《声环境质量标准》(GB3096-2008)3类标准要求。65 珠海网泰环保设备有限公司化工涂料生产项目6施工期环境影响分析本项目施工期对影响环境的主要是修建厂房和围墙。施工期间对环境产生影响的因素主要有施工噪声、扬尘、建筑垃圾和生活垃圾等。施工期造成的影响是暂时的,随着本工程施工期的结束,其影响随之消失。6.1施工期间噪声影响分析及防治措施施工期间会产生较强的噪声。在工程施工期间将对周围声环境产生一定的影响。本工程施工期间所使用的机械设备主要有:推土机、挖掘机、搅拌机、电焊机、混凝土震捣棒、载重机等,其噪声源强及分布情况详见表6.1-1。6.1-1施工期间主要设备噪声源强及分布情况单位:dB(A)噪声预测值设备名称声源特征源强10米20米50米100米200米300米汽车、吊车流动不稳定源90827668625652翻斗车流动不稳定源90706456504440电焊机固定稳定源90706456504440推土机流动不稳定源90706456504440搅拌机固定不稳定源100807433605450木工机械固定不稳定源110908476706460载重机流动不稳定源89696355494339施工期间,各种机械设备先后进场,不同时期产生的噪声强度不同,对周围声环境的影响也有所变化。这些机械设备的噪声强度均较强烈,其中木工机械、搅拌机等对声环境有一定的影响,由于项目离居民点较远,因此施工期间的噪声主要对临近厂区100米范围内的值班人员产生一定影响。为了避免本项目施工期间噪声的超标和扰民现象出现,建议采取以下措施:1、在施工开始前,建设单位要制定包括噪声污染控制在内的―施工期环境保护方案‖;2、尽量选用低噪声系列工程机械设备;3、合理布置高噪声的施工设备,大于80dB(A)的施工设备最好将其布置在施工场地的西南侧,以远离声环境敏感点;66 珠海网泰环保设备有限公司化工涂料生产项目4、在有市电供给的情况下禁止使用柴油发电机组;5、在施工场地边界建设临时围墙,围墙必须为大于24cm的砖质墙。6、对较高噪声值的固定设备,应建设隔声间或声屏障;7、严禁在早7点以前,中午12-14点,晚21点以后启动强噪声施工设备;采取上述措施后,可有效地降低施工噪声5~15dB(A)。保证施工场界噪声达标以及避免对周边厂区造成影响。6.2施工期间对空气环境的影响分析及防治措施施工期间对环境空气造成不利影响的主要是施工扬尘,此外还有施工时机械运作或柴油的燃烧尾气。扬尘的主要来源:厂房建筑、混凝土搅拌等的过程;运送散装建筑材料少量物料洒落;车辆通过或落有较多尘土的路面时产生的扬尘。施工期扬尘是施工活动危害环境的主要因素,其危害性是不容忽视的。悬浮于空气中的扬尘被施工人员和影响范围内人群吸入(另外扬尘可能携带大量的病菌、病毒),将严重影响人群的身心健康。同时,扬尘飘落在各种建筑物和树木枝叶上,也影响景观。可采取以下措施:1、开挖基础作业时,应经常洒水使作业面土壤保持较高的湿度;对施工场地内裸露的地面,也应经常洒水防止扬尘;2、施工场地产生的多余土方应尽量用于填方,并注意填方后要随时压实、撒水防止扬尘;3、平整场地、开挖基础、拆除作业时,土方应随挖随装车运走,不要堆存在施工场地,以免风吹扬尘;4、运土及运粉状建筑材料的运输车辆应采用专用车辆或者配置防洒落装置,车辆装载不宜过满,保证运输过程中不散落;5、在施工场地边界建设临时围墙,整个施工场地只设一个供人员和车辆出入的大门,在大门入口设临时洗车场,车辆出施工场地前必须将车辆冲洗干净,然后再驶出大门;6、对运输过程中散落在路面上的泥石要及时清扫,以减少运行过程中的扬尘;7、各建、构筑物四周在施工过程要设置防护网,防护网材料和质地要密实;67 珠海网泰环保设备有限公司化工涂料生产项目8、施工过程中,应严禁将废弃的建筑材料焚烧。工地食堂应使用液化石油气或电灶具,不能使用燃油灶具;9、粉状建材应设临时工棚或仓库储存,不得露天堆放;10、建议采用水泥搅拌车进行混凝土搅拌,不采用袋装水泥,防止水泥粉尘产生。采取以上措施后,可将施工期的环境空气影响控制在最低限度,其对环境的不利影响可以忍受。6.3施工期间对地表水的影响分析及防治措施施工期废水主要是来自暴雨的地表径流,基础开挖可能排泄的地下水,施工废水及施工人员的生活污水。其中:施工废水包括泥浆水、机械设备运转的冷却水、车辆和机械设备洗涤水等。生活污水包括施工人员的盥洗水、工地食堂餐饮污水、厕所冲洗水等。由于施工活动的周期约为12个月,故施工污水的环境污染往往不被人们所重视,其实施工污水类别较多,某些水污染物的浓度可能还比较高,处置不当会对施工场地周围的水环境产生短时间的不良影响,例如:1、施工场地的暴雨地表径流、开挖基础可能排泄的地下水等,将会携带大量的泥沙,随意排放将会使纳污水体悬浮物出现短时间的超标。2、施工机械设备(空压机、发电机、水泵)冷却排水,可能会含有热,直接排放将使纳污水体受到物理污染。3、施工车辆、施工机械的洗涤水含有较高的石油类、悬浮物等,直接排放将会使纳污水体受到一定程度的污染。4、若设工地食堂则会产生数量较多的餐饮污水,其中的动植物油是主要污染物;盥洗水、厕所冲洗水则含有阴离子表面活性剂、BOD、NH3-N等,对纳污水体的水环境质量影响较大。除此之外,若施工污水不能合理排放任其自然横流,还会影响施工场地周围的视觉景观及散发臭气。因此,必须采取有效措施杜绝施工污水的环境影响问题。施工期产生的废水具体的处理措施如下:1、建设导流沟:在施工场地建设临时导流沟,将暴雨径流引至永和开发区雨水管网排放,避免雨水横流现象。68 珠海网泰环保设备有限公司化工涂料生产项目2、建设蓄水池:在施工场地建设临时蓄水池,将开挖基础产生的地下排水收集储存,并回用于施工场地裸地和土方的撒水抑尘。3、设置循环水池:在施工场地设置循环水池,将设备冷却水降温后循环使用,以节约用水。4、车辆、设备冲洗水循环使用:设置沉淀池,将设备、车辆洗涤水简单处理后循环使用,禁止此类废水直接外排。采取上述措施后,可以有效地做好施工污水的防治,不会导致施工场地周围水环境的污染。6.4施工期间固废影响分析及防治措施施工期间产生的固废主要是建筑垃圾和生活垃圾。建筑垃圾成分较复杂,主要有:废弃的沙石砖瓦、木块、塑料、废混凝土、废金属、废包装物、碎玻璃等。生活垃圾则包括残剩食物、塑料、废纸等。这些固废处置不当将会影响景观,污染土壤和水体,生活垃圾还会散发恶臭。因此,根据《中华人民共和国固体废弃物污染环境防治法》第十六条和第十七条的规定,必须对这些固废妥善收集、合理处置。1、根据《城市建筑垃圾管理规定》(建设部令第139号,2005年3月23日)有关规定,建设单位和施工单位要重视和加强建筑垃圾的管理,采取积极措施防止其对环境的污染。2、施工活动开始前,施工单位要向当地的环卫部门提出建筑垃圾处置的请示报告,经批准后将建筑垃圾清运到指定地点合理处置。3、对施工期间产生的建筑垃圾进行分类收集、分类暂存,能够回收利用的尽量回收综合利用,以节约宝贵的资源。4、同时要做好建筑垃圾暂存点的防护工作,避免风吹、雨淋散失或流失。5、在建筑工地设置防雨的生活垃圾周转储存容器,所有生活垃圾必须集中投入到垃圾箱中,最终交由环卫部门清运和统一集中处置。6、施工单位不准将各种固体废物随意丢弃和随意排放。项目切实落实以上措施后,施工期固体废物对环境的影响会很小。69 珠海网泰环保设备有限公司化工涂料生产项目6.5水土流失影响分析6.5.1水土流失影响分析珠海市高栏港区原始地貌为海滨沉积平原,90年代将港区陆域与高栏岛通过连岛大堤连起来。目前场地标高在2.98~3.89m。项目区水土流失类型为轻度水力侵蚀,属国家级和广东省水土流失重点监督区。项目拟建厂区东北面位纬二十一路,西北面为永新路,东面为珠海市环保产业开发有限公司,西面为澳新橡胶厂区。项目区现状主要为荒草地和裸地,现状水土流失主要为自然侵蚀,主要因降雨形成径流冲刷造成水土流失;项目区域整体无明显侵蚀,水土流失较轻,水土保持现状良好。6.5.2可能造成的水土流失危害本项目在建设过程中,工程建设区及影响范围内的地表将遭受不同程度的扰动、破坏,局部地貌将发生较大的改变。如不采取任何防治措施,新增的水土流失量不仅影响工程本身的建设及安全,也将对该区域的水土资源及生态环境带来不利影响,其可能产生的危害有以下几个方面:(1)对区域环境的影响在本项目建设期间,工程施工过程中对原地表造成扰动,场地开挖、回填区域,形成大量裸露地表,表层土质松散,容易随雨水流走,使得地表径流含沙量增加,并挟带泥沙流向项目区低坡处,造成该区域下游市政排水管网淤积、堵塞,影响市政管网的行洪能力。(2)对社会环境和经济发展的影响该工程的建设为进一步促进当地社会稳定和健康发展,具有重要意义。若工程建设区域可能产生的新增水土流失得不到有效防治,必将使建设区现有水土流失加剧,危及周边河流、道路和房屋,给建设区周边居民生产生活带来不利影响,将会产生或激化企业与当地群众的矛盾,直接影响企业的社会效益,不利于项目建设。(3)对项目安全运营的影响工程建设导致的水土流失与工程本身的安全息息相关。工程建设扰动地表,产生的大量土石方如不能及时有效地处理,造成水土流失将严重影响施工进度,70 珠海网泰环保设备有限公司化工涂料生产项目以及工程的安全运行,也对企业的今后的运营安全会造成一定影响。6.5.3水土流失防治措施总布局(1)本工程选址符合水土保持限制性规定,不属于生态脆弱区、崩塌滑坡危险区、泥石流易发区等易引起严重水土流失和生态恶化的区域,不占用耕地,无全国水土保持监测网络中的水土保持监测站点、重点试验区,无国家确定的水土保持长期定位观测站。(2)项目区占地为建筑用地,对植被破坏较小,为荒草地,周围主要为已运行的工业企业厂房,不属于国家划分的水土流失重点预防保护区和重点治理成果区;地质条件稳定,周围无崩塌,滑坡、泥石流等不良地质现象存在,场地水文地质条件比较简单,不会对建筑物基础产生不良影响,适宜建设。(3)本工程建设所需的砂、石料等向当地具有合法开采权的砂、石料场就近购买,不涉及到工程砂、石料等取料场选址问题,减少了由于料场开挖而造成的水土流失。料场相关的水土流失防治责任应由料场经营方承担。(4)项目区内不设弃渣场、临时堆土场等,能够有效地避免水土流失的发生。(5)项目施工工程设计中的工程布局、施工组织、施工方法等基本符合水土保持限制性规定,是合理可行的。71 珠海网泰环保设备有限公司化工涂料生产项目7运营期环境影响预测与分析7.1海水环境影响分析本项目废水经厂区自建化粪池处理后,排入南水水质净化厂统一处理,之后排入黄茅海海域。因此本项目的海水环境影响分析主要讨论南水水质净化厂接纳本项目废水的可行性。7.1.1南水水质净化厂情况南水水质净化厂总投资10798万元人民币,于2008年5月动工,现已投入3使用。近期设计处理能力为5万m/d,中期规划年限2015年,建设规模为1533万m/d;远期规划年限2020年,建设规模为20万m/d。南水水质净化厂位于高栏港经济区,现状纳污范围包括石油化工区北四路以2北片区、精细化工区、装备制造区、南水作业区及南水镇等,服务范围37km。南水水质净化厂对收集范围内的工业废水、生活污水进行集中处理,其中生活污水占的比例约为25%。污水处理工艺采取―微曝氧化沟工艺‖,详见图7-1。空气A/O氧化沟消粗泵细沉初二黄进格站格砂沉厌好沉毒出茅水栅栅池池氧氧池水池池池池海池剩余污泥沉砂外运回流污泥池深度处理栅渣外运剩余污泥污泥浓缩中水回用脱水外运图7-1珠海高栏港经济区南水水质净化厂工艺流程简图7.1.2南水水质净化厂纳污可行性分析本项目外排废水为经过三级化粪池处理的雨季初期雨水和办公生活污水。生活污水及初期雨水经隔渣、三级化粪池处理后符合广东省《水污染物排放72 珠海网泰环保设备有限公司化工涂料生产项目限值》(DB44/26-2001)第二时段三级标准,项目排水水质符合南水水质净化厂的进水要求,因此项目废水排入南水水质净化厂在水质要求上是可行。本项目在高栏港精细化工区纬二十一路西南,根据《珠海市污水工程系统规划(2006-2020)》(2008),该区域已有完善污水管网,本项目所在地临近永兴路污水管网,项目区附近污水管网的走向图详见图7-2。3南水水质净化厂目前已开始运营,本项目废水产生总量为8.885m/d,占南水水质净化厂现阶段日处理能力的0.018%,同时南水水质净化厂目前纳污总量仅占处理能力的60%,故本项目的污水排入南水水质净化厂进行处理在水量上是可行的。降雨后期污染程度较轻的雨水进过预处理截留水中的悬浮物、固体颗粒杂质后,通过港区雨水管道进入项目附近水域。通过南水水质净化厂处理后的水可达标准要求,排入黄茅海,因此本项目的废水排放对附近海域水质不会产生影响。7.1.3地下水环境影响分析本项目生产所在地区为高栏港精细化工区,项目生产中不涉及地下水使用,不会对该区域地下水储存量产生影响,也不会影响到周围居民饮用水。项目生产过程中产生的废水主要为实验室废水、厂房地面清洁废水、办公生活污水等。生活污水经隔渣、三级化粪池处理后的生活污水一同排入南区水质净化厂污水管网。实验室废水及设备清洗废溶液均得到妥善处理,生产废水无外排,项目污水排放正常情况下不会对区域地下水造成影响。同时在项目建设过程中,建设方针对项目区域地质特征,拟选择合理的防沉降、防渗漏的施工方法和材料来构筑消防水池及厂区内管线,严防跑、冒、漏、滴现象,结合恰当的设备管理方案,确保各个设施的良好运转,可杜绝生产中污水的泄露和渗漏情况,因此在确保以上措施的情况下,项目生产过程中废水排放不会对地下水水质产生影响。另一方面根据查阅资料,高栏港地区地下水以Cl-Na型咸水居多,因此本项目建设生产过程不会对区域地下水的水量和水质产生影响。73 珠海网泰环保设备有限公司化工涂料生产项目7.2环境空气质量影响预测与评价7.2.1项目所在区域气候特征项目所在地面临南海,属南亚热带季风气候。具有明显的海洋气候特点,常年气候温和湿润,日照充分,雨量充沛。冬季受偏北气流影响,夏季多受偏南气流控制。每年2~3月有不同程度的低温阴雨天气,5~9月常有台风和暴雨。根据斗门气象站近20年的地面气象资料进行统计,其结果见表7.3-1、表7.3-2。表7.3-1项目所在地气象资料统计表气象要素单位数值年平均温度℃23.0极端最高气温℃36.0极端最低气温℃3.4年平均相对湿度%80全年降雨量mm2560.0最大日降雨量mm222.1年平均风速m/s2.6最大风速m/s13.9年日照时数h1728.8表7.3-2项目所在地各月平均温度月份123456789101112温度℃15.413.819.623.726.128.128.628.627.325.320.616.4污染物在大气中的扩散和输送主要受气象条件的制约,其中直接影响大气污染物输送扩散的气象要素是空气的流动特征:风和湍流,而温度层结又在很大程度上制约看风场和湍流结构。气象要素中与大气污染物输送扩散关系最密切的是风向、风速、温度梯度和湍流强度,风向规定了污染物输送方向。风速表征大气污染物的输送速率,风速梯度与湍流脉动密切相关。温度梯度是大气稳定度的重要参数。因此,了解项目所在地区的风场、温度场等污染气象特征,对评价本区域排放的污染物对周围地区大气坏境的影响至关重要1、污染气象调查要达到弄清评价地区污染气象特征的目的,必须获得一定时间序列和空间序列的气象资料,为此,我们按地面常规气象资料调查专题来收集本地区的气象资料。地面常规气象资料调查收集的是斗门区观象台2008年的地面常规气象74 珠海网泰环保设备有限公司化工涂料生产项目资料。此气象资料在导则规定的时效范围内。2、污染气象特征分析(1)气象站的代表性分析气象代表性大体上可分为气候代表性,天气代表性与微气象学代表性三个时空层次。气候是一地区长时段气象状况的平均,例如多年或年;天气是较短时间的大气状态,通常指日或数日的天气变化;微气象学一般是指发生在一日的时段内、数十公里至百公里量级空间范围内的气象状态和过程。气候的主要支配因子是当地的地理纬度和高度,大气环流及下垫面状况。后者包括海洋或陆地,距海洋远近等。天气变化取决于以大气环流为背景的天气系统。微气象状态和过程则由天气背景、局部地形和下垫面状况所决定。表现在辐射收支、风速大小和冷暖平流等等。本项目的工作内容主要包括以污染物输送扩散为核心的微气象学特征。而业务台站的布设通常主要考虑气候和天气的代表性,要求每一个气象站的观测资料能代表所在区域的气候状况,站网密度能与天气系统的尺度相匹配。广东地区地面气象站密度约数十公里至百公里不等,而斗门区自动站资料原则上可满足本项目气候和一般天气的代表性要求。因此,本次环评以斗门区气象站为代表站进行有关的污染气象分析。(2)评价区地面风场分析决定地面风向及其日变化的因素有三个万面:一是系统风向;二是由于下垫面摩擦或地形作用而导致的系统风的风向改变,这两者决定的风向成为地面风的基本风向。三是由局地热力性质的差异而导致的风分量,此分量一般较弱。实际的地面风是由这三个分量合成的结果。表7.3-3给出珠海市香洲区观象台的年及各月各风向平均风速统计结果。表7.3-32008~2010年风向频率数据方位NNNENEENEEESESESSE风向频率(%)2.74.77.78.79.316.07.77.3方位SSSWSWWSWWWNWNWNNW风向频率(%)5.33.34.36.04.35.03.33.775 珠海网泰环保设备有限公司化工涂料生产项目图7-3项目所在地区不同季节的风频率玫瑰图图7-3是项目所在地区不同季节的风频率玫瑰图(2008~2010),由该图及表7.3-3中可以看出,就年平均来看,该区域全年以东南东(ESE)为主导风向,出现频率为16%,东(E)风为次之,频率为9.3%,东北东(ENE)、东北(NE)风、东南(SE)的频率为8.7%和7.7%,7.7%。北(N)风出现的频率最少在2.7%以下。7.2.2环境空气影响预测(1)正常工况下有组织排放预测根据工程分析,本项目产生有组织排放废气主要有①相应工序中加入粉料的粉尘排放;②溶剂型涂料及稀释剂制造过程中各类有机溶剂挥发,其中主要为甲苯、二甲苯、非甲烷总烃等;③生产时加入的助剂挥发的有机废气TVOC在正常工况下,本项目有机溶剂挥发废气、TVOC通过在设备上方设置集气罩,再多功能废气净化塔两级吸附过滤,处理后抽至室外15m高空排放,加料粉尘排放经布袋除尘器收集后抽至室外15m高空排放。本报告采用《环境影响评价技术导则-大气环境》(HJ2.2-2008)附录A提供的估算模式对各类废气污染物进行预测。预测模式所需排放源强及排放源物理参76 珠海网泰环保设备有限公司化工涂料生产项目数见表7.3-5。表7.3-5排放源参数、排放源强及敏感点位置排排放源物理参数污染物排放量敏感点方位放高度内径排气量温度东面620m铁炉新村3kg/h源mmm/s℃东北1500m下金龙村东北2600m上金龙村二甲苯0.042东南3100m高栏港管甲苯0.042排委会气150.61.1720非甲烷总烃1.43西北370m茂丰纺织筒TVOC0.0055厂职工宿舍楼西北600m翡翠制衣PM100.0042职工宿舍楼此处敏感点方位均为距项目产生污染源单元距离。根据表7.3-5,预测结果见表7.3-6。37.3-6本项目各污染物正常排放地面轴线浓度贡献值mg/m距离(m)甲苯二甲苯非甲烷总烃TVOCPM101000.0025860.0025860.088060.00033870.00025862000.0029580.0029580.10070.00038740.00029582280.0030470.0030470.10380.0003990.0003047最大落地浓度(1.52%)(1.52%)(5.19%)(0.07%)(0.07%)3000.0024380.0024380.083010.0003190.0002443700.0026220.0026220.089260.00034330.0002622茂丰纺织厂职工宿舍楼(1.31%)(1.31%)(4.46%)(0.06%)(0.06%)4000.0026410.0026410.089930.00034590.00026415000.0024980.0024980.085040.00032710.00024986000.0025190.0025190.085750.00032980.0002519翡翠制衣厂员工宿舍楼(1.26%)(1.26%)(4.29%)(0.05%)(0.06%)6200.0025010.0025010.085170.00032760.0002501铁炉新村(1.25%)(1.25%)(4.26%)(0.05%)(0.06%)10000.0022150.0022150.075410.000290.000221515000.0017950.0017950.061110.00023510.0001795下金龙村(0.9%)(0.9%)(3.06%)(0.04%)(0.04%)16000.0017060.0017060.05810.00022340.000170617000.0016220.0016220.055210.00021230.000162218000.0015410.0015410.052470.00020180.000154119000.0014650.0014650.049890.00019190.000146520000.0013940.0013940.047460.00018250.000139421000.0013280.0013280.045220.00017390.000132822000.0012670.0012670.043140.00016590.000126723000.001210.001210.04120.00015850.00012124000.0011570.0011570.03940.00015150.000115725000.0011080.0011080.037720.00014510.000110826000.0010620.0010620.036140.0001390.0001062上金龙村(0.53%)(0.53%)(1.81%)(0.02%)(0.02%)27000.0010180.0010180.034670.00013340.000101828000.0009780.0009780.03330.00012819.78E-529000.00094010.00094010.032010.00012319.401E-577 珠海网泰环保设备有限公司化工涂料生产项目30000.00090450.00090450.03080.00011849.045E-531000.00076050.00076050.025899.959E-57.605E-5高栏港管委会(0.44%)(0.44%)(1.48%)(0.02%)(0.02%)35000.0026220.0026220.089260.00034330.0002622注:括号内为落地浓度占标率根据表7.3-6可知本项目各污染物最大落地浓度出现在下风向228m,非甲3烷总烃最大落地浓度为0.1038mg/m,占标率为5.19%,尤其是有毒有害性高的3甲苯和二甲苯最大落地浓度为0.003047mg/m,占标率为1.52%。各污染物最大落地浓度均远低于评价标准。根据环境空气现状监测结果表明,该区域甲苯的背景浓度范围为未检出,预测浓度叠加背景浓度后占标率仅为1.14%(铁炉新村),0.43%(高栏港管委会);各3监测点TVOC的浓度最大值为0.0003433mg/m,是评价标准的0.07%,叠加预测浓度后占评价标准的23.56%(铁炉新村),24.22%(高栏港管委会);各测点PM103的浓度最大值为0.000256mg/m,是评价标准的0.06%,叠加本项目预测浓度后占标率为10.06%(铁炉新村),10.02%(高栏港管委会)。通过以上分析可知本项目各污染物正常排放下对铁炉新村的影响较小,对高栏港管委会的影响很小。根据茂丰纺织厂职工宿舍、翡翠制衣厂职工宿舍及上金龙村和下金龙村的污染物落地浓度,同样可以看出项目废气正常排放下对这四个敏感点影响甚微。(2)非正常工况下有组织排放预测非正常排放是指各装置在生产运行阶段的开车、停车、检修维护和一般性事故中产生的―三废‖排放。本项目重点考虑废气排放处理设备出现故障或者失效的情况废气排放预测。采用《环境影响评价技术导则-大气环境》(HJ2.2-2008)附录A提供的估算模式对各类废气污染物非正常排放进行预测。预测模式所需排放源强及排放源物理参数见表7.3-7。78 珠海网泰环保设备有限公司化工涂料生产项目表7.3-7非正常工况排放源参数、排放源强及敏感点位置排放源物理参数污染物排放量敏感点方位排烟气东面620m铁炉新村放高度内径排气量3温度kg/h东北1500m下金龙村源mmm/s℃东北2600m上金龙村东南3100m高栏港管二甲苯0.117委会排甲苯0.117西北370m茂丰纺织气150.61.1720非甲烷总烃3.98厂职工宿舍楼筒TVOC0.037西北600m翡翠制衣PM100.083职工宿舍楼此处敏感点方位均为距项目产生污染源单元距离。根据表7.3-7,预测结果见表7.3-8。3表7.3-8本项目各污染物非正常排放时地面轴线浓度贡献值mg/m距离(m)甲苯二甲苯非甲烷总烃TVOCPM101000.0056720.0056720.1930.0017940.0040242000.0065220.0065220.22190.0020630.0046272280.0072050.0072050.24510.0022780.005111最大落地浓度(4.24%)(4.24%)(14.44%)(0.45%)(1.34%)3000.0082410.0082410.28030.0026060.0058463700.0084890.0084890.28880.0026850.006022茂丰纺织厂职工宿舍楼(3.65%)(3.65%)(12.42%)(0.39%)(1.15%)4000.0076450.0076450.26010.0024180.0054235000.0073030.0073030.24840.002310.0051816000.0073580.0073580.25030.0023270.00522翡翠制衣职工宿舍楼(3.51%)(3.51%)(11.93%)(0.37%)(1.11%)6200.0069580.0069580.23670.00220.004936铁炉新村(3.48%)(3.48%)(11.85%)(0.37%)(1.1%)7000.0070160.0070160.23870.0022190.0049778000.0069680.0069680.2370.0022040.0049439000.0066660.0066660.22680.0021080.00472910000.0061620.0061620.20960.0019490.00437215000.0055110.0055110.18750.0017430.00391下金龙村(2.5%)(2.5%)(8.5%)(0.26%)(0.79%)20000.0042930.0042930.1460.0013580.00304525000.0033710.0033710.11470.0010660.00239226000.0032240.0032240.10970.0010190.002287上金龙村(1.54%)(1.54%)(5.25%)(0.16%)(0.49%)31000.0026190.0026190.089080.00082820.001858高栏港管委会(1.22%)(1.22%)(4.13%)(0.13%)(0.38%)35000.002520.002520.085710.00079680.001788注:括号内为最大落地浓度占标率根据表7.3-8可知本项目非正常工况下(废气处理设备完全失效)各污染物最3大落地浓度出现在下风向228m,非甲烷总烃最大落地浓度为0.2888mg/m,占3标率为14.44%(Pmax>10%),甲苯和二甲苯最大落地浓度为0.008489mg/m,占标率为4.24%,虽然各污染物浓度值均未超标,但非甲烷总烃最大落地浓度占标率79 珠海网泰环保设备有限公司化工涂料生产项目已有超过10%.根据环境空气现状监测结果表明,该区域甲苯的背景浓度范围为未检出,预测浓度叠加背景浓度后最大占标率仅为3.48%(铁炉新村),1.18%(高栏港管委3会);各监测点TVOC的浓度最大值为0.002685mg/m,是评价标准的0.45%,叠加预测浓度后占评价标准的23.87%(铁炉新村),24.33%(高栏港管委会);各测3点PM10的浓度最大值为0.006022mg/m,是评价标准的1.34%,叠加本项目预测浓度后占标率为11.1%(铁炉新村),10.38%(高栏港管委会)。同时根据其余各敏感点落地浓度可以看出除非甲烷总烃外,其余各污染物排放对上金龙、下金龙以及茂丰纺织厂职工宿舍楼、翡翠制衣厂职工宿舍楼影响很小。通过以上分析可知本项目各污染物在废气处理措施失效的状况下排放虽然对各敏感点影响有较大的增加,尚处于浓度标准限值范围内。再者根据生产计划,本项目所使用的多功能废气净化设施中吸附液及布袋除尘装置均会定期更换、维护等,保证废气治理措施的良好运行,杜绝出现失效的情况,以保证本项目废气达标排放,对周边敏感点的影响很小。意外停电导致治理设施体质运转、废气事故排放,本项目配套有双回路电源,一般情况下,双回路电源同时停电的可能性很小,当一路电源突然停电,另一路电源仍正常供电,这样企业可最大限度防止停电引起废气事故性排放。(3)无组织排放影响预测①大气环境防护距离根据《环境影响评价技术导则-大气环境》(HJ2.2-2008)推荐的估算模式计算项目大气环境防护距离,具体见表7.3-9和7.3-10。表7.3-9无组织排放大气环境防护距离计算参数排放量3污染源污染物面积面积备注高度标准值mg/mt/a粉料生产2粉尘0.024432.6m生产车间面积3m0.45中搬运甲苯0.010.2车间及储二甲苯0.012生产车间及0.2存处溶剂4432.6+690m3m非甲烷总甲类仓库挥发0.382.0烃80 珠海网泰环保设备有限公司化工涂料生产项目表7.3-10无组织排放大气环境防护距离计算结果序号污染源污染物计算结果大气环境防护距离(m)1粉料生产中搬运粉尘无超标点0甲苯2车间及储存处溶剂挥发二甲苯无超标点0非甲烷总烃由表7.3-10可知,粉料搬运中生产车间外周边环境空气中粉尘浓度无超标点,车间及储存处溶剂挥发时周边环境空气中甲苯、二甲苯及非甲烷总烃浓度无超标点,因此项目厂界外无需设置大气环境防护距离。②卫生防护距离根据《制定地方大气污染物排放标准的技术方法》(GB/T3840-1991)的规定,无组织排放有害气体的生产单元(生产区、车间或工段)与居住区之间应设置卫生防护距离。本项目建成后,无组织排放污染源强见表7.3-9。卫生防护距离的计算公式Q1C20.50DcBL0.25rLCAm式中:Cm——标准浓度限值;L——工业企业所需卫生防护距离,m;r——有害气体无组织排放源所在生产单元的等效半径,m。根据该生产单2元占地面积S(m)计算;A、B、C、D——卫生防护距离计算系数,无因次,根据工业企业所在地区近五年平均风速及工业企业大气污染源构成类别选取。Qc——工业企业有害气体无组织排放量可以达到的控制水平。本项目所用的计算参数选择见表7.3-11和表7.3-12.表7.3-11卫生防护距离计算系数工业企业所卫生防护距离L(m)计算在地区近五L≤10001000<L≤2000L>20001)系数年平均风速工业企业大气污染源构成类别m/sⅠIIⅢⅠIIⅢⅠIIⅢ<2400400400400400400808080A2~4700470350700470350380250190>4530350260530350260290190140<20.010.0150.015B>20.0210.0360.03681 珠海网泰环保设备有限公司化工涂料生产项目<21.851.791.79C>21.851.771.77<20.780.780.57D>20.840.840.76注:工业企业大气污染源构成分为三类:Ⅰ类:与无组织排放源共存的排放同种有害气体的排气筒的排放量,大于标准规定的允许排放量的三分之一者。Ⅱ类:与无组织排放源共存的排放同种有害气体的排气筒的排放量,小于标准规定的允许排放量的三分之一,或虽无排放同种大气污染物之排气筒共存,但无组织排放的有害物质的容许浓度指标是按急性反应指标确定者。Ⅲ类:无排放同种有害物质的排气筒与无组织排放源共存,且无组织排放的有害物质的容许浓度是按慢性反应指标确定者。表7.3-12卫生防护距离计算系数参数值参数名称非甲烷总烃甲苯二甲苯粉尘2222生产单元占地面积4432.6+690m4432.6+690m4432.6+690m4432.6m近5年平均风速2.6m/s标准值32.00.20.20.45mg/m工业企业大气污染Ⅱ源构成类别排放源强0.380.010.010.02t/a污染源卫生防护距离计算结果见表7.3-13。表7.3-13污染源卫生防护距离计算结果卫生防护距离公式计卫生防护距离级差确定值污染源污染物算值(m)(m)粉料生产中搬运粉尘0.39850甲苯0.42350车间及储存处溶剂挥发二甲苯0.42350非甲烷总烃2.06550参照卫生防护距离标准制定方法的规定:当按两种或两种以上的有害气体的Q/Cm值计算的卫生防护距离在同一级别时,该类工业企业的卫生防护距离级别应提高一级。因此根据规定该项目卫生防护距离应设置为100m,本项目甲类厂房、甲类仓库边界100m范围内不得有人群长期居住。本项目为涂料生产,以《油漆厂卫生防护距离标准》(GB18707-2000)中的规定作为参考,油漆厂与居住区之间所需设防护距离系指产生有害因素的部门(车间或工段)的边界至居住区边界的最小距离。项目所在地区年平均风速为2.6m/s,因此本项目参考卫生防护距离为600m。根据现场实地调查,本项目所产生无组织排放各车间、仓库建筑边界距最近的居民区铁炉新村最近边界距离大于600m。距本项目厂界西北350m处为茂丰82 珠海网泰环保设备有限公司化工涂料生产项目纺织厂员工宿舍楼,该宿舍楼为茂丰纺织厂工业用地内配套宿舍,员工间歇居住,非居民固定长期居住,同时根据无组织排放最大落地浓度为下风向139m处,最大落地浓度占标率仅为0.034%(非甲烷总烃),该宿舍区受无组织排放影响甚微。因此本项目生产技术及的污染物控制水平,符合甲类厂房、甲类仓库边界600m范围无居民区的要求。因此距离本项目所产生无组织排放单元600m区域内无居民居住区,满足卫生防护距离内无居民居住区的要求。在此基础上本环评要求建设单位需做好厂区绿化,尤其是厂房周边及北边厂界至东西两边厂界一带,进一步改善厂区周边环境质量。同时本环评建议项目在生产过程中尤其要控制无组织排放源强,并在试生产期验收阶段无组织排放厂界浓度监测应针对东边及西边厂界加密监测点位及频次,以确保本项目良好运行。7.3声环境影响预测与评价7.3.1预测声源根据工程分析本项目运营期中主要的噪声源来自于生产过程中各类设备的运作及原辅材料储藏过程,因此项目的主要噪声自来于涂料加工车间及泵区。具体噪声源见表7.4-17.4-1运营期主要噪声源及发声位置一览表序数量噪声级dB(A)设备名称噪声治理措施位置号治理前治理后1分散机7套85~9575~85远离厂界、减震、2卧式砂磨机2台70~8060~70远离厂界、减震、隔振生产车间3高速搅拌机2台75~8565~75远离厂界、减震、隔振4三辊研磨机2台75~8560~70减震、隔振、消声5空压机1套8570专门机房、隔声、减震专用机房轴流风机、66台65~8060~75减震、消音生产车间引风机7各类泵1套70~8060~70消声、减震埋地溶剂罐区优化路线、良好维护、操作8手拉叉车2台65~7565~70合理液压升降叉优化路线、良好维护、操作生产车间93台65~7065~70车合理自流式包装102套70~8560~75减震、隔振机83 珠海网泰环保设备有限公司化工涂料生产项目冷空气过滤111套75~9060~75专门机房、隔声、减震专用机房机7.3.2噪声预测(1)声音从声源传播到受声点,受传播距离、空气吸收、阻挡物的反射和吸收等因素的影响而产生衰减。用A声级进行预测时,其计算公式如下:LA(r)=LA(r0)-(Adiv+Aatm+Agr+Abar+Amisc)式中:LA(r)为距离声源r处的A声级;Adiv为声波几何发散引起的A声级衰减量;Aatm为空气吸收引起的A声级衰减量;Agr地面效应引起的A声级衰减量;Abar为屏障屏蔽引起的A声级衰减量;Amisc为其他多方面效应引起的衰减量。在预测计算中主要考虑A1声波几何发散引起的A声级衰减量。点声源随传播距离增加引起的衰减公式如下:Lpn=Lp0–20lg(r/r0)式中:Lpn-参考位置r处的声级dB(A);Lp0-参考位置r0处的声级dB(A);r-预测点与点声源之间的距离(m);r0-参考声级处与点声源之间的距离(m)。(2)多声源共同叠加作用的等效声级Leq:nLpi/10Lp10lg(10)i1式中:Lp—N个噪声源在同一受声点上的合成声压级dB(A);Lpi—第i个噪声源在受声点的声压级dB(A)。(3)模式中参数的确定各声源参考距离r0米处的声压级Loi主要根据有关资料及进行实际监测结果而定。①隔声量的确定根据以往的监测资料,车间及围墙的隔声量一般采用10~20dB(A)。②衰减常数的确定参照经验资料,一般接近地面的工厂声源场地传播时,由于空气吸收等因素84 珠海网泰环保设备有限公司化工涂料生产项目影响,声级衰减系数取0.06dB/m。考虑到项目所在地周围200m范围内无噪声敏感点,故只对项目厂区四周边界进行环境噪声预测。根据《环境影响评价技术导则-声环境》(HJ2.4—2009)提供的计算模式进行预测,预测结果见表7.4-1。表7.4-1项目厂界环境噪声预测结果单位:dB(A)泵区及空时涂料车间编号监测点压机房贡背景值预测值评价标准评价结果段贡献值献值1#厂界东面51.0339.9553.355.45达标昼2#厂界南面46.1641.0952.753.81达标65间3#厂界西面50.8640.8651.554.4达标4#厂界北面52.7538.5653.156.02达标1#厂界东面51.0339.9548.253.07达标夜2#厂界南面46.1641.0945.649.56达标55间3#厂界西面50.8640.8645.452.27达标4#厂界北面52.7538.5645.553.64达标由表7.4-1中可以看出,虽然本项目的建设使对拟建厂界区域噪声值稍有增加,在合理布局生产设备、做好防震隔声的基础上本项目在运营期昼夜厂界噪声预测值均达到《工业企业厂界环境噪声排放标准》(GB12348-2008)3类标准。7.3.3预测结果分析预测结果表明,本项目建成投产后,厂区四周边界的昼间、夜间噪声均不超过《工业企业厂界环境噪声排放标准》(GB12348-2008)3类标准。项目建成后必须对强噪声源采取有效的隔声、消声、吸声和防振等措施综合治理,合理布局生产线,降低项目营运期间的噪声,使项目建成投入使用后对周围边界声环境质量不会产生明显的影响。根据现场调查结果,距本项目最近的声环境敏感点为铁炉新村(厂界东530m),本项目厂界噪声预测值昼夜均达到《工业企业厂界环境噪声排放标准》(GB12348-2008)3类标准,对于铁炉新村来讲项目运营期在厂界处即满足了《声85 珠海网泰环保设备有限公司化工涂料生产项目环境质量标准》(GB3096-2008)2类昼间噪声要求,经过530m的衰减,对铁炉新村的声环境影响很小;夜间噪声预测值稍有超过《声环境质量标准》(GB3096-2008)2类功能区夜间噪声要求,但本项目几乎不进行夜间生产,同时经过距离的衰减本项目噪声不会对铁炉新村的夜间声环境质量噪声影响。根据项目可研,本项目在建设期会在厂房和厂界边道种植乔木及灌木等绿色植物,这些绿化措施可进一步降低项目噪声对周围环境的影响。因此本评价认为项目的建设对铁炉新村的声环境不存在明显影响,不会影响周围区域的声环境功能要求。7.4固体废物影响分析7.4.1固体废物产生情况及处置情况本项目固体废物包括生产性固体废物及办公垃圾,其产生情况如表7.5-1所示。表7.5-1本项目固体废物产生情况表序号固废类型产生量t/a危废编号处理方式交由供应商回收1废包装桶20个/年HW49-900-041-49处理2废吸附剂1HW12-264-012-123废清洁溶剂0.05HW12-900-256-12交由资质的单位除尘设施收集粉回收处理30.04HW12-900-255-12尘4喷漆废水1.8HW12-900-252-125办公垃圾6.0——环卫部门处理建设单位必须按照《中华人民共和国固体废物污染环境防治法》对危险废物污染防治的特别规定,向相应的固体废物管理中心申报登记本项目产生的危险废物,并按照该中心的要求对上述危险废物进行全过程严格管理和安全处置。危险废物应委托有危险废物经营许可证的废物处理专业公司进行安全处置,应按《广东省固体废物污染环境防治条例》的有关规定办理本项目危险废物的运输转移。同时,固体废物贮存场所必须按照《危险废物贮存污染控制标准》(GB18597-2001)和《一般工业固体废物贮存、处置场污染控制标准》(GB18599-2001)中所规定的86 珠海网泰环保设备有限公司化工涂料生产项目相关标准建设。本项目所产生的各项危险废物建设单位拟委托有资质单位处理,废包装桶交相应供应商回收处理,均不会丢弃到外环境。在珠海地区珠海市环保产业开发有限公司具有处理收集、处理废有机溶剂废物、染料涂料废物、有机树脂类废物的资质。建议建设单位与该危废处理单位签订处理协议。办公生活垃圾每日由环卫部门清理运走,做到日产日清,并对堆放点进行定期的清洁消毒以免孳生蚊蝇,做到最大限度的减少对周围环境的影响。7.4.2危险废物暂存场所设置本项目产生的危险废物主要是废包装桶、废清洗溶剂及除尘设施收集粉尘等,故应设置危险废物暂存场所。2本项目危险废物暂存场位于甲类仓库内,占地约3m。暂存场做防渗、防漏处理。同时,避免雨淋、日晒。临时贮存场所的设计、管理、安全防护、应急措施等须遵循《危险废物贮存污染控制标准》(GB18597-2001)的相关规定,防止外泄。危险废物暂存场所应做危险废物识别标识,装有危险废物的容器必须贴有标签,在标签上详细标明危险废物的名称、重量、成分、特性以及发生泄漏、扩散污染事故时的应急措施和补救方法。7.4.3固体废物环境影响结论本项目产生的危险废物交给有资质的单位回收处理,废包装桶交由供应商回收处理,生活垃圾交由环卫部门处理。只要严格管理,并进行安全处置,做好危废暂存场所的保护措施,确保危废运输过程的安全,本项目产生的固体废物不会对生态环境和人体健康产生影响。87 珠海网泰环保设备有限公司化工涂料生产项目8环境风险影响评价8.1风险识别依据《建设项目环境风险评价技术导则》(HJ/T169-2004)附录A及《危险化学品名称》(2002年版)、《常用危险化学品的分类及标志》(GB13690-90)和《危险化学品重大危险源辨识》(GB18218-2009)等国家标准中规定的危险物质分类细则,对该项目的原料、产品的危险物质进行分类、确认,并按照标准对危险场所和装置、设备进行重大危险源识别。8.1.1工业涂料生产原料、产品及生产与储存的风险特征本项目建成投产后生产的主要产品包含一级易燃溶剂涂料(危规号:32198)、辅助材料、二级易燃溶剂的涂料(危规号:33646)、辅助材料等;本项目所涉及的危险化学品详见表8.1-1.项目生产主要原辅材料包括丙酮、溶剂油、甲苯、异丙醇(2-丙醇)、乙酸乙酯、乙酸正丁酯、二甲苯异构体混合物、正丁醇、异丁醇、不饱和聚酯树脂、乙二醇丁醚等。上述这些物质均属于易(可)燃、爆炸、有毒等危险也行;项目的生产、储运装置也存在一定的潜在危险性。如因管理不善、工艺指标、控制不严、操作当,物质和能量的正常运行状态遭到破坏,有可能引起火灾、爆炸、人员中毒等环境突发性事故的发生。8.1.1.1主要危险及有害物质的理化性质及特性本项目涂料生产中使用的主要溶剂、颜料、产品等物质的毒性及危险性介绍详见表8.1-1.88 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1a丙酮的理化性能指标及包装、储运技术表英文名:Acetone分子式:C3H6O相对分子质量:58.08标识危规号:31025CAS号:67-64-1UN编号:1090外观与性状无色透明易流动液体,有芳香气味,极易挥发。理相对密度(水相对密度(空熔点(℃)-94.60.802.00化=1)气=1)性沸点(℃)56.5饱和蒸汽压(kPa)53.32/39.5℃质溶解性与水混溶,可混溶于乙醇、乙醚、氯仿、油类、烃类等多种有机溶剂。车间卫生标准3中国:400前苏联:200MAC(mg/m)毒侵入途径吸入、食入、经皮吸收。性属低毒类。LD50:5800mg/kg(大鼠经口);20000mg/kg(兔经皮);及毒性LC50:无资料。健康急性中毒主要表现为对中枢神经系统的麻醉作用,出现乏力、恶心、头痛、危头晕,容易激动。重者发生呕吐、气急、痉挛,甚至昏迷。对眼、鼻、喉害健康危害有刺激性。口服后,口唇、咽喉有烧灼感,后出现口干、呕吐、昏迷、酸中毒和酮症。慢性影响:长期高浓度接触该品出现眩晕、灼烧感、咽炎、支气管炎、乏力、易激动等。皮肤长期反复接触可致皮炎。燃烧性易燃燃烧分解物一氧化碳、二氧化碳闪点(℃)-20爆炸上限%(v/v)13.0引燃温度(℃)465爆炸下限%(v/v)2.5燃烧其蒸气与空气形成爆炸性混合物,遇明火、高热极易燃烧爆炸。遇氧化剂爆危险特性能发生强烈反应。其蒸气比空气重,能在较低处扩散到相当远的地方,遇炸火源引着回燃。若遇高热,容器内压增大,有开裂和爆炸的危险。危险性建规火险分级甲稳定性稳定聚合危害不聚合禁忌物强氧化剂、强还原剂、碱。燃烧热(kJ/mol):1788.7尽可能将容器从火场移至空旷处。喷水保持火场容器冷却,直至灭火结束。灭火方法处在火场中的容器若已变色或从安全泄压装置中产生声音,必须马上撤离。灭火剂:抗溶性泡沫、二氧化碳、干粉、砂土。用水灭火无效。包装方法:(Ⅰ)类,小开口钢桶;螺纹口玻璃瓶、铁盖压口玻璃瓶、塑料瓶或金属桶(罐)外普通木箱。储存于阴凉、通风的库房。远离火种、热源。库温不宜超过26℃。保持容器密封。应与氧化剂、还原剂、碱类分开存放,切忌混储。采用防爆型照明、通风设施。禁止使用易产生火花的机械设备和工具。储区应备有泄漏应急处理设备和合适的收容材料。储运输时运输车辆应配备相应品种和数量的消防器材及泄漏应急处理设备。夏季最好早晚运输。运运输时所用的槽(罐)车应有接地链,槽内可设孔隔板以减少震荡产生静电。严禁与氧化剂、还原剂、碱类、食用化学品等混装混运。运输途中应防曝晒、雨淋,防高温。中途停留时应远离火种、热源、高温区。装运该物品的车辆排气管必须配备阻火装置,禁止使用易产生火花的机械设备和工具装卸。公路运输时要按规定路线行驶,勿在居民区和人口稠密区停留。铁路运输时要禁止溜放。严禁用木船、水泥船散装运输。89 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1b溶剂油的理化性能指标及包装、储运技术表英文名:Crudeoil分子式:/相对分子质量:/标识危规号:32004CAS号:8030-30-6UN编号:1256,2553外观与性状无色或浅黄色液体。理相对密度(水0.78~相对密度(空熔点(℃)//化=1)0.97气=1)性沸点(℃)20~160饱和蒸汽压(kPa)/质溶解性不溶于水,溶于多数有机溶剂。车间卫生标准3中国:未制定标准前苏联:未制定标准MAC(mg/m)毒侵入途径吸入、食入、经皮吸收。性LD50:无资料;及毒性LC50:16000mg/m3,4小时(大鼠吸入)。健康危蒸气可引起眼及上呼吸道刺激症状,如浓度过高,几分钟即可引起呼吸困害健康危害难、紫绀等缺氧症状。燃烧性易燃燃烧分解物一氧化碳、二氧化碳闪点(℃)-2爆炸上限%(v/v)8.7引燃温度(℃)350爆炸下限%(v/v)1.1燃烧其蒸气与空气可形成爆炸性混合物,遇明火、高热能引起燃烧爆炸。与氧爆危险特性化剂能发生强烈反应。其蒸气比空气重,能在较低处扩散到相当远的地方,炸遇火源会着火回燃。危险建规火险分级甲稳定性稳定聚合危害不聚合性禁忌物强氧化剂。燃烧热(kJ/mol):/喷水冷却容器,可能的话将容器从火场移至空旷处。处在火场中的容器若灭火方法已变色或从安全泄压装置中产生声音,必须马上撤离。灭火剂:泡沫、二氧化碳、干粉、砂土。用水灭火无效。包装方法:(Ⅰ)类,小开口钢桶;螺纹口玻璃瓶、铁盖压口玻璃瓶、塑料瓶或金属桶(罐)外普通木箱。储存于阴凉、通风的库房。远离火种、热源。库温不宜超过30℃。保持容器密封。应与氧化剂分开存放,切忌混储。采用防爆型照明、通风设施。禁止使用易产生火花的机械设备和工具。储区应备有泄漏应急处理设备和合适的收容材料。储运输时运输车辆应配备相应品种和数量的消防器材及泄漏应急处理设备。夏季最好早晚运输。运运输时所用的槽(罐)车应有接地链,槽内可设孔隔板以减少震荡产生静电。严禁与氧化剂、食用化学品等混装混运。运输途中应防曝晒、雨淋,防高温。中途停留时应远离火种、热源、高温区。装运该物品的车辆排气管必须配备阻火装置,禁止使用易产生火花的机械设备和工具装卸。公路运输时要按规定路线行驶,勿在居民区和人口稠密区停留。铁路运输时要禁止溜放。严禁用木船、水泥船散装运输。90 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1c甲苯的理化性能指标及包装、储运技术表英文名:methylbenzene分子式:C7H8相对分子质量:92.14标toluene识危规号:32052CAS号:108-88-3UN编号:1294外观与性状无色透明液体,有类似苯的芳香气味。理熔点(℃)-94.9相对密度(水=1)0.87相对密度(空气=1)3.14化性沸点(℃)110.6饱和蒸汽压(kPa)4.89(30℃)质溶解性不溶于水,可混溶于苯、醇、醚等多数有机溶剂。车间卫生标准中国:100前苏联:50MAC(mg/m3)毒侵入途径吸入、食入、经皮吸收性LD50:5000mg/kg(大鼠经口);12124mg/kg(兔经皮)及毒性LC50:20003mg/m3,8小时(小鼠吸入)健对皮肤、粘膜有刺激性,对中枢神经系统有麻醉作用。康急性中毒:短时间内吸入较高浓度本品可出现眼及上呼吸道明显的刺激症状、危眼结膜及咽部充血、头晕、头痛、恶心、呕吐、胸闷、四肢无力、步态蹒跚、害健康危害意识模糊。重症者可有躁动、抽搐、昏迷。慢性中毒:长期接触可发生神经衰弱综合征,肝肿大,女工月经异常等。皮肤干燥、皲裂、皮炎。燃烧性易燃燃烧分解物一氧化碳、二氧化碳闪点(℃)4爆炸上限%(v/v)7.0燃引燃温度(℃)535爆炸下限%(v/v)1.2烧易燃,其蒸气与空气可形成爆炸性混合物,遇明火、高热能引起燃烧爆炸。与爆危险特性氧化剂能发生强烈反应。流速过快,容易产生和积聚静电。其蒸气比空气重,炸能在较低处扩散到相当远的地方,遇火源会着火回燃。危险建规火险分级甲稳定性稳定聚合危害不聚合性禁忌物强氧化剂燃烧热(kJ/mol):3905.0喷水冷却容器,可能的话将容器从火场移至空旷处。处在火场中的容器若已变灭火方法色或从安全泄压装置中产生声音,必须马上撤离。灭火剂:泡沫、干粉、二氧化碳、砂土。用水灭火无效。储存于阴凉、通风的库房。远离火种、热源。库温不宜超过30℃。保持容器密封。应与氧化剂分开存放,切忌混储。采用防爆型照明、通风设施。禁止使用易产生火花的机械设备和工具。储区应备有泄漏应急处理设备和合适的收容材料。本品铁路运输时限使用钢制企业自备罐车装运,装运前需报有关部门批准。运输时运输车辆应配备储相应品种和数量的消防器材及泄漏应急处理设备。夏季最好早晚运输。运输时所用的槽(罐)车应有运接地链,槽内可设孔隔板以减少震荡产生静电。严禁与氧化剂、食用化学品等混装混运。运输途中应防曝晒、雨淋,防高温。中途停留时应远离火种、热源、高温区。装运该物品的车辆排气管必须配备阻火装置,禁止使用易产生火花的机械设备和工具装卸。公路运输时要按规定路线行驶,勿在居民区和人口稠密区停留。铁路运输时要禁止溜放。严禁用木船、水泥船散装运输。91 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1d异丙醇(2-丙醇)的理化性能指标及包装、储运技术表英文名:2-propanol;分子式:C3H8OUN编号:1219标isopropylalcohol识危险货物编号:32064分子量:60.10CAS号:67-63-0外观与性状无色透明液体,有似乙醇和丙酮混合物的气味。理熔点(℃)-88.5相对密度(水=1)0.79相对密度(空气=1)2.07化性沸点(℃)80.3饱和蒸气压(kPa)4.40/20℃质溶解性可溶于水、醇、醚、苯、氯仿等多数有机溶剂。侵入途径吸入、食入、经皮吸收。毒LD50:5045mg/kg(大鼠经口),12800mg/kg(免经皮)性毒性LC50:无资料及接触高浓度蒸气出现头痛、倦睡、共济失调以及眼、鼻和喉咙刺激症状。口服健健康危害可致恶心、呕吐、腹痛、腹泻、倦睡、昏迷甚至死亡。长期皮肤接触可致皮肤康干燥、皲裂。危皮肤接触:脱去污染的衣着,立即用流动清水彻底冲洗。眼睛接触:立即提害急救措施起眼睑,用流动清水或生理盐水冲洗;就医。吸入:脱离现场至空气新鲜处,保持呼吸道通畅;必要时进行人工呼吸;就医。食入:洗胃,就医。燃烧性易燃燃烧分解物一氧化碳、二氧化碳。闪点(℃)12爆炸上限(v%)12.7燃引燃温度(℃)399爆炸下限(v%)2.0烧爆建规火险分级甲稳定性稳定聚合危害不聚合炸禁忌物强氧化剂、酸类、酸酐、卤素危险易燃,其蒸气与空气可形成爆炸性混合物。遇明火、高热能引起燃烧爆炸。与性危险特性氧化剂接触发生化学反应或引起燃烧。在火场中,受热的容器有爆炸危险。其蒸气比空气重,能在较低处扩散到相当远的地方,遇明火会引着回燃。灭火方法:尽可能将容器从火场移至空旷处。喷水保持火场容器冷却,直至灭灭火方法火结束。处在火场中的容器若已变色或从安全泄压装置中产生声音,必须马上撤离。灭火剂:抗溶性泡沫、干粉、二氧化碳、砂土。储存于阴凉、干燥、通风处。远离火种、热源。防止阳光直射。库温不宜超过30℃。保持容器密封。应与氧化剂、酸类、卤素等分开存放,切忌混储。分装和搬运作业要注意个人防护。搬运时要轻装轻卸,防止包装和容器损坏。运输时运输车辆应配备相应品种和数量的消防器材及泄漏应急处理设备。夏季最好早晚运输。运输时储所用的槽(罐)车应有接地链,槽内可设孔隔板以减少震荡产生静电。严禁与氧化剂、酸类、卤素、食运用化学品等混装混运。运输途中应防曝晒、雨淋,防高温。中途停留时应远离火种、热源、高温区。装运该物品的车辆排气管必须配备阻火装置,禁止使用易产生火花的机械设备和工具装卸。公路运输时要按规定路线行驶,勿在居民区和人口稠密区停留。铁路运输时要禁止溜放。严禁用木船、水泥船散装运输。92 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1e乙酸乙酯(醋酸乙酯)的理化性能指标及包装、储运技术表英文名:Ethylacetate分子式:C4H8O2UN编号:1173标识危险货物编号:32127分子量:88.1CAS号:141-78-6外观与性状无色透明水样液体,易挥发;有水果香味。理熔点(℃)-83.6相对密度(水=1)0.90相对密度(空气=1)3.04化性沸点(℃)77.15饱和蒸气压(kPa)13.33/27℃质溶解性与乙醇、丙酮、氯仿、乙醚混溶。侵入途径吸入、食入、经皮吸收。LD50:5620mg/kg(大鼠经口);4940mg/kg(免经口)毒性3毒LC50:5760mg/m,8小时(大鼠吸入)性对眼、鼻、咽喉有刺激作用。高浓度吸入可引起进行性麻醉作用,急性肺水肿,及肝、肾损害。持续大量吸入,可致呼吸麻痹。误服者可产生恶心、呕吐、腹痛、健康危害健腹痛、腹泻等。有致敏作用,因血管神经障碍而致牙龈出血;可致湿疹样皮炎。康慢性影响:长期接触本品有时可致角膜混浊、继发性贫血、白细胞增多等。危皮肤接触:脱去被污染的衣着,用肥皂水和清水彻底冲洗皮肤。害眼睛接触:提起眼睑,用流动清水或生理盐水冲洗。就医。急救方法吸入:迅速脱离现场至空气新鲜处。保持呼吸道通畅。如呼吸困难,给输氧。如呼吸停止,立即进行人工呼吸。就医。食入:饮足量温水,催吐,就医。燃烧性易燃燃烧分解物一氧化碳、二氧化碳。闪点(℃)-4爆炸上限(v%)11.5燃引燃温度(℃)426爆炸下限(v%)2.0烧爆建规火险分级甲稳定性稳定聚合危害不聚合炸危禁忌物强氧化剂、碱类、酸类。险性易燃,其蒸气与空气可形成爆炸性混合物。遇明火、高热能引起燃烧爆炸。与危险特性氧化剂接触会猛烈反应。在火场中,受热的容器有爆炸危险。其蒸气比空气重,能在较低处扩散到相当远的地方,遇明火会引着回燃。灭火剂:抗溶性泡沫、二氧化碳、干粉、砂土。用水灭火无效,但可用水保持灭火方法火场中容器冷却。储存于阴凉、通风的仓间内,远离火种、热源。保持容器密封;应与氧化剂、酸类、碱类分开存放,切忌混储。储搬运时应轻装轻卸,防止包装和容器损坏。运输时所用的槽(罐)车应有接地链,槽内可设孔隔板以减运少震荡产生静电。严禁与氧化剂、酸类、碱类、食用化学品等混装混运。装运该物品的车辆排气管必须配备阻火装置,禁止使用易产生火花的机械设备和工具装卸。公路运输时要按规定路线行驶,勿在居民区和人口稠密区停留。铁路运输时要禁止溜放。严禁用木船、水泥船散装运输。93 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1f乙酸正丁酯(醋酸正丁酯)的理化性能指标及包装、储运技术表英文名:butylacetate;分子式:C6H12O2UN编号:1123标butylethanoate识危险货物编号:32130分子量:116.16CAS号:123-86-4外观与性状无色透明液体,有果子香味。理熔点(℃)-73.5相对密度(水=1)0.88相对密度(空气=1)4.1化性沸点(℃)126.1饱和蒸气压(kPa)2.00/25℃质溶解性微溶于水,溶于醇、醚等多数有机溶剂。侵入途径吸入、食入、经皮吸收。LD50:13100mg/kg(大鼠经口);毒性毒LC50:9480mg/kg(大鼠经口);性对眼及上呼吸道均有强烈的刺激作用,有麻醉作用。吸入高浓度本品出现流泪、及健康危害咽痛、咳嗽、胸闷、气短等,严重者出现心血管和神经系统的症状可引起结膜健炎、角膜炎,角膜上皮有空泡形成。皮肤接触可引起皮肤干燥。康皮肤接触:脱去被污染的衣着,用肥皂水和清水彻底冲洗皮肤。危眼睛接触:立即提起眼睑,用大量流动清水或生理盐水彻底冲洗至少15分钟。害就医。急救方法吸入:迅速脱离现场至空气新鲜处。保持呼吸道通畅。如呼吸困难,给输氧。如呼吸停止,立即进行人工呼吸。就医。食入:饮足量温水,催吐,就医。燃烧性易燃燃烧分解物一氧化碳、二氧化碳。闪点(℃)22爆炸上限(v%)7.5燃引燃温度(℃)370爆炸下限(v%)1.2烧爆建规火险分级甲稳定性稳定聚合危害不聚合炸危禁忌物强氧化剂、碱类、酸类。险性易燃,其蒸气与空气可形成爆炸性混合物。遇明火、高热能引起燃烧爆炸。与危险特性氧化剂能发生强烈反应。其蒸气比空气重,能在较低处扩散到相当远的地方,遇明火会引着回燃。灭火剂:抗溶性泡沫、二氧化碳、干粉、砂土。用水灭火无效,但可用水保持灭火方法火场中容器冷却。储存于阴凉、通风的仓间内,远离火种、热源。保持容器密封;应与氧化剂、酸类、碱类分开存放,切忌混储。搬运时应轻装轻卸,防止包装和容器损坏。铁路运输时应严格按照铁道部《危险货物运输规则》中的储危险货物配装表进行配装。运输时所用的槽(罐)车应有接地链,槽内可设孔隔板以减少震荡产生静电。运严禁与氧化剂、酸类、碱类、食用化学品等混装混运。装运该物品的车辆排气管必须配备阻火装置,禁止使用易产生火花的机械设备和工具装卸。公路运输时要按规定路线行驶,勿在居民区和人口稠密区停留。铁路运输时要禁止溜放。严禁用木船、水泥船散装运输。94 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1g二甲苯异构体混合物的理化性能指标及包装、储运技术表英文名:xylenemixedisomers分子式:C8H10UN编号:1307标识危险货物编号:33535分子量:106.2CAS号:/外观与性状无色透明液体,有强烈芳香味。理熔点(℃)/相对密度(水=1)0.86相对密度(空气=1)/化性沸点(℃)/饱和蒸气压(kPa)质溶解性不溶于水,溶于乙醇、乙醚等多数有机溶剂。侵入途径吸入、食入、经皮吸收。毒性LD50:/LC50:/毒性对眼及上呼吸道有刺激作用,高浓度时对中枢神经系统有麻醉作用。急性中毒:短期及内吸入较高浓度本品可出现眼及上呼吸道明显的刺激症状、眼结膜及咽充血、头晕、健健康危害恶心、呕吐、胸闷、四肢无力、意识模糊、步态蹒跚。重者可有躁动、抽搐或昏迷,康有的有癔病样发作。慢性影响:长期接触有神经衰弱综合征,女工有月经异常,工人危常发生皮肤干燥、皲裂、皮炎。高浓度的二甲苯蒸气甚至造成肺水肿而死亡。害皮肤接触:脱去被污染的衣着,用肥皂水和清水彻底冲洗皮肤。眼睛接触:提起眼睑,用流动清水或生理盐水冲洗。就医。吸入:迅速脱离现场至空气新鲜处。保持呼吸道急救方法通畅。如呼吸困难,给输氧。如呼吸停止,立即进行人工呼吸。就医。食入:饮足量水,催吐。就医。燃烧性易燃燃烧分解物一氧化碳、二氧化碳闪点(℃)25爆炸上限(v%)7.0燃引燃温度(℃)/爆炸下限(v%)1.0烧爆建规火险分级甲稳定性稳定聚合危害不聚合炸危禁忌物强氧化剂险性易燃,其蒸气与空气可形成爆炸性混合物。遇明火、高热能引起燃烧爆炸。与氧化剂危险特性能发生强烈反应。流速过快,容易产生和积聚静电。其蒸气比空气重,能在较低处扩散至相当远的地方,遇明火会引着回燃。喷水冷却容器,可能的话将容器从火场移至空旷处。灭火剂:泡沫、二氧化碳、干粉、灭火方法砂土。储存于阴凉、通风的库房。远离火种、热源。库温不宜超过30℃。保持容器密封。应与氧化剂分开存放,切忌混储。采用防爆型照明、通风设施。禁止使用易产生火花的机械设备和工具。储区应备有泄漏应急处理设备和合适的收容材料。储本品铁路运输时限使用钢制企业自备罐车装运,装运前需报有关部门批准。运输时运输车辆应配备相应品种和运数量的消防器材及泄漏应急处理设备。夏季最好早晚运输。运输时所用的槽(罐)车应有接地链,槽内可设孔隔板以减少震荡产生静电。严禁与氧化剂、食用化学品等混装混运。运输途中应防曝晒、雨淋,防高温。装运该物品的车辆排气管必须配备阻火装置,禁止使用易产生火花的机械设备和工具装卸。公路运输时要按规定路线行驶,勿在居民区和人口稠密区停留。铁路运输时要禁止溜放。严禁用木船、水泥船散装运输。95 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1h正丁醇的理化性能指标及包装、储运技术表英文名:butylalcohol;分子式:C4H10OUN编号:1120标1-butanol识危险货物编号:33552分子量:74.12CAS号:71-36-3外观与性状无色透明液体,具有特殊气味。理熔点(℃)-88.9相对密度(水=1)0.81相对密度(空气=1)2.55化性沸点(℃)117.5饱和蒸气压(kPa)0.82/25℃质溶解性微溶于水,溶于醇、醚等多数有机溶剂。侵入途径吸入、食入、经皮吸收。毒性LD50:4360mg/kg(大鼠经口),3400mg/kg(免经皮);毒性3及LC50:24240mg/m4小时(大鼠吸入)。健有刺激和麻醉作用。主要症状为眼、鼻、喉部刺激,在角膜浅层形成半透明的康健康危害空泡,头痛,头晕和嗜睡,手部可以生接触性皮炎。危皮肤接触:脱去污染的衣着,立即用流动清水彻底冲洗。眼睛接触:立即提起害急救措施眼睑,用流动清水或生理盐水冲洗;就医。吸入:脱离现场至空气新鲜处,保持呼吸道通畅;必要时进行人工呼吸;就医。食入:饮足量温水,催吐,就医。燃烧性易燃燃烧分解物一氧化碳、二氧化碳。闪点(℃)35爆炸上限(v%)11.2燃烧引燃温度(℃)340爆炸下限(v%)1.4爆炸建规火险分级乙稳定性稳定聚合危害不聚合危险禁忌物强酸、酰基氯、酸酐、强氧化剂。性易燃,其蒸气与空气可形成爆炸性混合物。遇明火、高热能引起燃烧爆炸。与危险特性氧化剂接触会猛烈反应。在火场中,受热的容器有爆炸危险。用水喷射逸出液体,使其稀释成不燃性混合物,并用雾状水保护消防人员。灭灭火方法火剂:抗溶性泡沫、干粉、二氧化碳、雾状水、砂土。储存于阴凉、干燥、通风处。远离火种、热源。防止阳光直射。保持容器密封,应与氧化剂、酸类等分开存放,切忌混储。分装和搬运作业要注意个人防护。搬运时要轻装轻卸,防止包装和容器损坏。运输时所用的槽(罐)车应有接地链,槽内可设孔隔板以减少震荡产生静电。严禁与氧化剂、酸类、食储用化学品等混装混运。运输途中应防曝晒、雨淋,防高温。中途停留时应远离火种、热源、高温区。运装运该物品的车辆排气管必须配备阻火装置,禁止使用易产生火花的机械设备和工具装卸。公路运输时要按规定路线行驶,勿在居民区和人口稠密区停留。铁路运输时要禁止溜放。严禁用木船、水泥船散装运输。96 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1i异丁醇的理化性能指标及包装、储运技术表英文名:Isobutylalcohol;分子式:C4H10O相对分子质量:74.12标2-methylpropanol识危规号:33552CAS号:78-83-1UN编号:1112外观与性状无色透明液体,微有戊醇味。理熔点(℃)-108相对密度(水=1)0.81相对密度(空气=1)2.55化性沸点(℃)107.9饱和蒸汽压(kPa)1.33(21.7℃)质溶解性溶于水,易溶于醇、醚。车间卫生标准中国:未制定3前苏联:10毒MAC(mg/m)标准性及侵入途径吸入、食入、经皮吸收。健LD50:2460mg/kg(大鼠经口);3400mg/kg(兔经皮);康毒性LC50:无资料。危害较高浓度蒸气对眼睛、皮肤、粘膜和上呼吸道有刺激作用。眼角膜表层形成健康危害空泡,还可引起食欲减退和体重减轻。涂于皮肤,引起局部轻度充血及红斑。燃烧性易燃燃烧分解物一氧化碳、二氧化碳闪点(℃)27爆炸上限%(v/v)10.6燃引燃温度(℃)415爆炸下限%(v/v)1.7烧爆易燃,其蒸气与空气可形成爆炸性混合物,遇明火、高热能引起燃烧爆炸。炸危险特性受热分解放出有毒气体。与氧化剂能发生强烈反应。在火场中,受热的容器危有爆炸危险。险建规火险分级乙稳定性稳定聚合危害不聚合性禁忌物强酸、强氧化剂、酸酐、酰基氯。燃烧热(kJ/mol):2667.7用水喷射逸出液体,使其稀释成不燃性混合物,并用雾状水保护消防人员。灭火方法灭火剂:抗溶性泡沫、干粉、二氧化碳、雾状水、1211灭火剂、砂土。包装方法:(Ⅲ)类,小开口钢桶;螺纹口玻璃瓶、铁盖压口玻璃瓶、塑料瓶或金属桶(罐)外普通木箱。储存于阴凉、通风的库房。远离火种、热源。库温不宜超过30℃。防止阳光直射。保持容器密封。储应与氧化剂分开存放。采用防爆型照明、通风设施。禁止使用易产生火花的机械设备和工具。储区运应备有泄漏应急处理设备和合适的收容材料。注意轻装轻卸,防止容器破损;不可受日光曝晒;与氧化剂隔离储运。97 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1j不饱和聚酯树脂的理化性能指标及包装、储运技术表英文名:Unsaturatedpolyester分子式:无资料相对分子质量:无资料标resinsforgeneralpurpose识危规号:33645CAS号:无资料UN编号:1866外观与性状白色粘稠的液体。理熔点(℃)无资料相对密度(水=1)无资料相对密度(空气=1)无资料化性质沸点(℃)无资料饱和蒸汽压(kPa)无资料溶解性不溶于水。车间卫生标准3中国:无资料前苏联:无资料毒MAC(mg/m)性及侵入途径无资料健康毒性无资料危害健康危害无资料燃烧性无资料燃烧分解物无资料闪点(℃)无资料爆炸上限%(v/v)无资料燃引燃温度(℃)无资料爆炸下限%(mg/m3)无资料烧爆不饱和聚酯树脂的危险性能取决于所用添加剂,如树脂的溶剂苯乙烯和催化剂炸危险特性有机过氧化物。苯乙烯闪点31℃。遇明火、高热、氧化剂易引起燃烧。在火场危高温下能聚合放热,使容器爆破。蒸气和液体能刺激眼睛、皮肤和呼吸系统。险性建规火险分级无资料稳定性无资料聚合危害无资料禁忌物无资料燃烧热(kJ/mol):无资料用泡沫、雾状水、干粉、二氧化碳、砂土灭火;大面积泄漏周围应设雾状水幕灭火方法抑爆。包装方法:(Ⅲ)类,铁桶。储储存条件:储存于阴凉通风的仓间内。远离火种、热源,防止阳光直射。运运输条件:与氧化剂隔离储运。搬运时轻装轻卸,防止容器渗漏。运输时防止雨淋、日光曝晒,避免碰撞,并应符合交通部门的有关规定。98 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1k乙二醇丁醚的理化性能指标及包装、储运技术表英文名:2-butoxyethanol分子式:C6H14O2相对分子质量:118.17标ethyleneglycolmonobutylether识危规号:61592CAS号:111-76-2UN编号:2369外观与性状无色液体,略有气味理熔点(℃)-74.8相对密度(水=1)0.90相对密度(空气=1)4.07化性沸点(℃)170.2饱和蒸汽压(kPa)40.00(140℃)质溶解性溶于水、乙醇、乙醚等多数有机溶剂车间卫生标准3中国:无资料前苏联:无资料毒MAC(mg/m)性及侵入途径吸入、食入、经皮吸收健LD50:2500mg/kg(大鼠经口);1200mg/kg(小鼠经口)康毒性LC50:无资料危害吸入本品蒸气后,导致呼吸道刺激及肝肾损害。蒸气对眼有刺激性。皮肤接触可致皮健康危害炎。燃烧性易燃燃烧分解物一氧化碳、二氧化碳闪点(℃)71爆炸上限%(v/v)10.6(180℃)引燃温度(℃)244爆炸下限%(v/v)1.1(170℃)燃烧遇明火、高热可燃。与氧化剂可发生反应。在空气中或在阳光照射下容易生成爆炸性爆危险特性的过氧化物。其蒸气比空气重,能在较低处扩散到相当远的地方,遇火源会着火回燃。炸若遇高热,容器内压增大,有开裂和爆炸的危险。危险建规火险分级丙稳定性稳定聚合危害不聚合性禁忌物强氧化剂、强酸、酰基氯、酸酐、卤素燃烧热(kJ/mol):无资料消防人员须佩戴防毒面具、穿全身消防服,在上风向灭火。尽可能将容器从火场移至空旷处。喷水保持火场容器冷却,直至灭火结束。处在火场中的容器若已变色或从安灭火方法全泄压装置中产生声音,必须马上撤离。灭火剂:雾状水、泡沫、干粉、二氧化碳、砂土。储存于阴凉、通风的库房。远离火种、热源。包装要求密封,不可与空气接触。应与氧化剂、酸类等分开存放,切忌混储。不宜大量储存或久存。配备相应品种和数量的消防器材。储区应备有泄漏应急处理设备和合适的收容材料。运输前应先检查包装容器是否完整、密封,运输过程中要确保容器不泄漏、不倒塌、不坠落、不损坏。严储禁与酸类、氧化剂、食品及食品添加剂混运。运输时运输车辆应配备相应品种和数量的消防器材及泄漏应运急处理设备。运输途中应防曝晒、雨淋,防高温。公路运输时要按规定路线行驶,勿在居民区和人口稠密区停留。储存于阴凉、通风的库房。远离火种、热源。包装要求密封,不可与空气接触。应与氧化剂、酸类等分开存放,切忌混储。不宜大量储存或久存。配备相应品种和数量的消防器材。储区应备有泄漏应急处理设备和合适的收容材料。99 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1l丙烯酸清漆的理化性能指标及包装、储运技术表英文名:Acrylicvarnishs分子式:/相对分子质量:/标识危规号:32198CAS号:/UN编号:/外观与性状由甲基丙烯酸共聚树脂、增韧剂、混合有机溶剂组成。理熔点(℃)无资料相对密度(水=1)无资料相对密度(空气=1)无资料化性质沸点(℃)无资料饱和蒸汽压(kPa)无资料溶解性无资料车间卫生标准3中国:无资料前苏联:无资料毒MAC(mg/m)性及侵入途径无资料健康危毒性无资料害对眼及上呼吸道黏膜有刺激作用,长期接触可出现皮炎或皱裂。吸入高浓度蒸气健康危害会中毒。燃烧性易燃燃烧分解物无资料闪点(℃)23爆炸上限%(v/v)无资料燃自燃温度(℃)无资料爆炸下限%(v/v)无资料烧爆炸危险特性遇高热、明火易燃。吸入高浓度蒸气可引起麻醉症状。危险建规火险分级甲稳定性稳定聚合危害不聚合性禁忌物氧化剂燃烧热(kJ/mol):无资料灭火方法用泡沫、干粉、二氧化碳灭火,小面积可用雾状水扑救。包装方法:(Ⅱ)类,铁听或铁桶。储储存于阴凉通风的库房内。远离热源、火种,避免阳光直射。包装应密封,与氧化剂隔离储运。运搬运时轻装轻卸,防止包装破损。100 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1m丙烯酸底漆的理化性能指标及包装、储运技术表英文名:Acrylicprimer分子式:相对分子质量:标识危规号:33646CAS号:UN编号:以高级丙烯酸树脂、有机硅树脂、颜料、助剂和溶剂等组成的单组份快外观与性状干底漆。理相对密度相对密度熔点(℃)无资料无资料无资料化(水=1)(空气=1)性质沸点(℃)无资料饱和蒸汽压(kPa)无资料溶解性不溶于水,溶解于酯、酮、醇、苯类溶剂。车间卫生标准3中国:无资料前苏联:无资料毒MAC(mg/m)性及侵入途径吸入、食入、经皮吸收。健康毒性无资料危害对眼及上呼吸道黏膜有刺激作用,长期接触可出现皮炎或皱裂。吸入高健康危害浓度蒸气会中毒。燃烧性易燃燃烧分解物一氧化碳、一氧化氮、二氧化氮。闪点(℃)无资料爆炸上限%(v/v)无资料燃自燃温度(℃)无资料爆炸下限%(v/v)无资料烧爆炸危险特性遇高热、明火易引燃。危险建规火险分级乙稳定性稳定聚合危害不聚合性禁忌物氧化剂燃烧热(kJ/mol):无资料灭火方法用泡沫、二氧化碳、干粉灭火。小面积可用雾状水扑救。包装标志:易燃液体。包装方法:铁听或铁桶。储储存条件:储存于阴凉通风的仓间内。远离火种、热源,防止阳光直射。运运输条件:与氧化剂隔离储运。搬运时轻装轻卸,防止容器渗漏。运输时防止雨淋、日光曝晒,避免碰撞,并应符合交通部门的有关规定。101 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1n丙烯酸磁漆的理化性能指标及包装、储运技术表英文名:Acrylicenamel分子式:相对分子质量:标识危规号:33646CAS号:UN编号:以高级丙烯酸树脂、有机硅树脂、颜料、助剂和溶剂等组成的单组份快外观与性状干面料。理相对密度相对密度熔点(℃)无资料无资料无资料化(水=1)(空气=1)性质沸点(℃)无资料饱和蒸汽压(kPa)无资料溶解性不溶于水,溶解于酯、酮、醇、苯类溶剂。车间卫生标准3中国:无资料前苏联:无资料毒MAC(mg/m)性及侵入途径吸入、食入、经皮吸收。健康毒性无资料危害对眼及上呼吸道黏膜有刺激作用,长期接触可出现皮炎或皱裂。吸入高健康危害浓度蒸气会中毒。燃烧性易燃燃烧分解物一氧化碳、一氧化氮、二氧化氮。闪点(℃)无资料爆炸上限%(v/v)无资料燃自燃温度(℃)无资料爆炸下限%(v/v)无资料烧爆炸危险特性遇明火、高热源引起燃烧爆炸。遇强氧化剂、强酸物质能发生强烈反应。危险建规火险分级乙稳定性稳定聚合危害不聚合性禁忌物氧化剂燃烧热(kJ/mol):无资料灭火方法用泡沫、二氧化碳、干粉灭火。小面积可用雾状水扑救。包装标志:易燃液体。包装方法:铁听或铁桶。储储存条件:储存于阴凉通风的仓间内。远离火种、热源,防止阳光直射。运运输条件:与氧化剂隔离储运。搬运时轻装轻卸,防止容器渗漏。运输时防止雨淋、日光曝晒,避免碰撞,并应符合交通部门的有关规定。102 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1o丙烯酸烘漆的理化性能指标及包装、储运技术表英文名:Acrylicbakingpaint分子式:相对分子质量:标识危规号:33646CAS号:UN编号:外观与性状不透明状液体,有芳香气味。理相对密度相对密度熔点(℃)无资料无资料无资料化(水=1)(空气=1)性质沸点(℃)无资料饱和蒸汽压(kPa)无资料溶解性不溶于水,溶解于酯、酮、醇、苯类溶剂。车间卫生标准3中国:无资料前苏联:无资料毒MAC(mg/m)性及侵入途径吸入、食入、经皮吸收。健康毒性无资料危害健康危害对眼及上呼吸道黏膜有刺激作用,长期接触可出现皮炎或皱裂。燃烧性易燃燃烧分解物一氧化碳、一氧化氮、二氧化氮。闪点(℃)无资料爆炸上限%(v/v)无资料燃自燃温度(℃)无资料爆炸下限%(v/v)无资料烧爆炸危险特性遇明火、高热源引起燃烧爆炸。遇强氧化剂、强酸物质能发生强烈反应。危险建规火险分级乙稳定性稳定聚合危害不聚合性禁忌物氧化剂燃烧热(kJ/mol):无资料灭火方法用泡沫、二氧化碳、干粉灭火。小面积可用雾状水扑救。包装标志:易燃液体。包装方法:铁听或铁桶。储储存条件:储存于阴凉通风的仓间内。远离火种、热源,防止阳光直射。运运输条件:与氧化剂隔离储运。搬运时轻装轻卸,防止容器渗漏。运输时防止雨淋、日光曝晒,避免碰撞,并应符合交通部门的有关规定。103 珠海网泰环保设备有限公司化工涂料生产项目表8.1-1p配套稀释剂的理化性能指标及包装、储运技术表英文名:Acrylicpaintthinner分子式:相对分子质量:标识危规号:32198CAS号:UN编号:外观与性状无机械杂质,透明。理相对密度相对密度熔点(℃)无资料无资料无资料化(水=1)(空气=1)性质沸点(℃)无资料饱和蒸汽压(kPa)无资料溶解性不溶于水,溶解于酯、酮、醇、苯类溶剂。车间卫生标准3中国:无资料前苏联:无资料毒MAC(mg/m)性及侵入途径吸入、食入、经皮吸收。健康毒性无资料危害蒸汽能刺激眼睛和黏膜。吸入蒸汽能产生眩晕、头痛、兴奋等症状。吸健康危害入高浓度蒸汽能造成急性中毒。燃烧性易燃燃烧分解物一氧化碳、一氧化氮、二氧化氮。闪点(℃)-18≤闪点<23爆炸上限%(v/v)无资料燃自燃温度(℃)无资料爆炸下限%(v/v)无资料烧爆炸危险特性遇明火、高热即燃烧。吸入高浓度蒸汽会中毒。危险建规火险分级甲稳定性稳定聚合危害不聚合性禁忌物氧化物,强碱或强酸。燃烧热(kJ/mol):无资料灭火方法用泡沫、二氧化碳、干粉灭火。包装标志:易燃液体。包装方法:(II)类。玻璃瓶或铁听装外木箱。储储运条件:储存于阴凉、通风的库房中,远离明火与高热。与氧化剂隔离储运。运泄漏处理:首先切断一切火源,带好消毒面具与手套。用沙土吸收,倒至空旷地方深埋。污染地面用肥皂或洗涤剂洗刷,经稀释后的废水放入废水系统。104 珠海网泰环保设备有限公司化工涂料生产项目从上述特性表中可以看出,该项目涉及的危险化学品包括有易燃液体、和毒害品,上述危化化学品具有易燃易爆、易蒸发、滞留积聚性、易产生静电、毒害性等危险特性。根据《建筑设计防火规范》(GBJ16-87)(2007年修订本)、《常用危险化学品的分类及及标志》(GB13690-1992)对拟建项目生产、使用的化学品进行危险性分类见表8.1-2.表8.1-2项目设计各类危险化学品危险性分类物质名称危险类别火灾危险性分类丙酮第3.1类低闪点液体甲类溶剂油第3.2类中闪点液体甲类甲苯第3.2类中闪点液体甲类异丙醇(2-丙醇)第3.2类中闪点液体甲类乙酸乙酯第3.2类中闪点液体甲类原乙酸正丁酯第3.2类中闪点液体甲类料二甲苯异构体混合物第3.3类高闪点液体甲类正丁醇第3.3类高闪点液体乙类异丁醇第3.3类高闪点液体乙类不饱和聚酯树脂第3.3类高闪点液体乙二醇丁醚第6.1类毒害品丙类丙烯酸清漆第3.2类中闪点液体甲类丙烯酸底漆第3.3类高闪点液体乙类产丙烯酸磁漆第3.3类高闪点液体乙类品丙烯酸烘漆第3.3类高闪点液体乙类配套稀释剂第3.2类中闪点液体甲类根据《工作场所有害因素职业接触限值化学有害因素》(GBZ2.1-2007),该项目涉及的化学物质在工作场所空气中容许浓度如表8.1-3所示。105 珠海网泰环保设备有限公司化工涂料生产项目表8.1-3工作场所空气中有毒物质容许浓度表最高容许浓度时间加权平均容许浓度短时间接触容许浓度名称333(mg/m)(mg/m)(mg/m)丙酮—300450溶剂汽油—300—甲苯—50100丙醇—200300异丙醇—350700乙酸乙酯—200300乙酸丁酯—200300二甲苯(全部异—50100构体)8.2生产及储运区的风险分析根据本项目安全评价对该建设项目存在的主要危险有害因素分析如表8.2-1106 珠海网泰环保设备有限公司化工涂料生产项目表8.2-1项目潜在各类危害及发生场所一览表危险危险因素分析存在危险场所类型涂料生产装置和溶剂储罐的火灾危险类别均为甲类。原料树脂、溶剂从购进、储存、生产、输送等过程以及产品油甲类厂房、甲类仓库、丙漆涂料、稀释剂的储存、输送过程都存在由于泄漏并遇到明火发生火灾的可能。类仓库、埋地储罐区以及火灾电气设备尤其是电机故障易引起火灾。电机的主要起火部位是绕组、引线、铁芯、电刷和轴承。电气设备如果没有配套管线系统等、配电房、采取漏电、短路、过载等保护措施或保护措施失效,可能引发触电,甚至火灾、爆炸事故。消防泵房、综合楼。在综合楼等办公生活场所用电不当,也可能引发电气火灾。涂料生产工艺过程各工序均存在易燃易爆物料,且大多数工序都在非密封容器中进行,易燃易爆蒸气容易挥发、扩散,与空气混合成爆炸性气体,如果达到爆炸下限,遇明火、高温物体等点火源有发生爆炸事故的可能。此外,厂房或仓库内通风不畅,排风系统(如排风扇)故障,均可能导致易燃易爆气体积聚引发爆炸事故。溶剂在卸车、输送过程中,若管道与槽车连接不好,容易引起泄漏,可能引起中毒和火灾爆炸事故。若静电接地设甲类厂房、甲类仓库和埋施失效,易造成静电积聚,可能造成爆炸事故。地储罐区(包括罐区卸料爆炸原料溶剂、涂料及稀释剂在储存过程中,若储罐、包装物(如铁桶)、管道出现泄漏,容易引起中毒和火灾爆炸事故。点、泵棚等处)。若储罐、建构筑物和相关设备、管道未采取防雷、防静电装置或装置失效,可能因雷击、静电聚集等引发爆炸事故。点火源是引发火灾、爆炸三要素之一,本建设项目中,除可能存在的明火(如吸烟、违章动火等)外,高温物体(如电机表面)、摩擦和撞击、电气火花、静电火花、雷击和光热射线等均是引起燃烧和爆炸的点火能源。对这些点火源都应引起充分的注意,采取措施严格控制。本项目各原材料均具有毒性,如果相关作业场所有毒有害气体浓度超标,且人员未穿戴相应的个体防护用具,可能引发人员中毒事故。甲类厂房、甲类仓库和埋中毒在发生泄漏、火灾爆炸事故时,人员会因过量吸入有毒有害气体而发生窒息和中毒事故。溶剂在正常的储存过程中,地储罐区(包括物料泵、管和也会通过通气管排出一定数量的蒸气。相关人员长时间接触有毒有害液体的蒸气可能导致职业健康危害(毒性危害)。线、阀门等)。窒息另外,储罐在检修、维护时,如果没有检测有毒有害气体浓度、氧气浓度,并采取相关防护措施和监护措施,进罐的作业人员可能会因为缺氧而引起人员中毒和窒息,甚至造成人员伤亡。甲类厂房、泵棚、消防泵建设项目的动设备主要有搅拌机、砂磨机、研磨机、物料泵、消防水泵、风机(排风系统)、柴油发电机组及空气压缩机械房和配电房(柴油发电机机等存在着高速运转的部件,如果机械传动设备防护装置(如防护罩、隔板、安全围栏)不完善或失效,安装质量不符伤害组)。合要求,或检修后未安装还原,均有可能造成机械伤害。低压电器设备外露,导电部分未与接地线可靠连接,或电线绝缘老化失效,未设漏电保护装置,以及操作人员的误甲类厂房、甲类仓库、丙触电操作都存在触电伤害的危险。类仓库、泵棚、配电房、107 珠海网泰环保设备有限公司化工涂料生产项目建设项目的配电房有配电装置及柴油发电机组,其他地方也有电气设备(如电机电气控制柜、照明系统等),如果这些消防泵房、综合楼。电气设备接地不良或受损,电工违章作业(或无证操作),均可能会发生触电事故。此外,生活用电不当,也可能发生触电事故。建设项目设有甲类仓库和丙类仓库,如果仓库内的物品堆放不稳、装卸时操作不当,都可能会引发物体打击,导致物体甲类厂房、甲类仓库和丙作业人员受伤或邻近的物品受损。此外,人员在甲类厂房高处作业(如维护保养设备等)时,如果操作不慎,工具有掉打击类仓库。落、飞出击伤他人或击破其他物品的可能。高处建设项目甲类厂房内涂料的生产工艺装置存在高度大于2m的作业平台。如果平台的防护措施和装置(如防护栏杆等)甲类厂房坠落设计不合理、安装不恰当,人员在日常作业及维修保养过程中,均存在高处坠落的危险。车辆伤害主要包括机动车辆对人员伤害、车辆对建筑物或设备的损坏两类。伤害类型以辗压、碰撞(与人员的碰撞、车辆与建构筑物、设施或设备的碰撞)、倾翻、火灾、腐蚀(蓄电池溢出电解液)等为主。引发事故的原因主要有司机无证厂区道路伤害驾驶、注意力不集中、有关人员违章操作、误操作、引导信号错误、作业环境差、气候条件恶劣、路况缺陷、视线不良、车况不好、安全规章制度不全或执行不严、行人违章等。如果建设项目的搅拌机、砂磨机、研磨机、物料泵、消防水泵、风机(排风系统)及空气压缩机等动设备润滑不良,不噪声但会造成设备发热,输送易燃物料时导致火灾、爆炸事故的发生,而且还会产生较强的噪声。噪声能引起职业性噪甲类厂房、泵棚、配电房危害声聋和神经衰弱、心脏病、消化系统疾病。如果劳动防护不周,人员长期在高噪声环境作业,会影响听力,严重者和消防泵房会罹患职业病。此外,由于噪声的掩蔽效应,人们往往不易察觉一些危险信号,从而容易造成工伤事故。粉尘建设项目生产工艺中常要使用一些粉末状的填料、颜料,它们具有一定的粉尘危害性。如果人员在装卸或投料时没甲类厂房和丙类仓库危害有采取有效的防护措施,可能发生粉尘危害,导致作业人员罹患职业病。高温建设项目所在地夏季、秋季气温较高,在储罐区露天作业时,因气温高、作业时间长导致作业者大量出汗,如果防埋地储罐区、配电房和厂作业暑降温措施不当,可引起人员中暑等高温危害。此外,长期在运行的柴油机发电组旁工作,也有发生高温作业危害区道路危害的可能。108 珠海网泰环保设备有限公司化工涂料生产项目根据表8.2-1分析可知本项目最主要的危险有害因素是火灾、爆炸、中毒和窒息,主要危害所发生的场所是涂料生产甲类厂房、仓库及埋地储罐区。8.3风险评价等级和评价范围8.3.1重大危险源分析广东省安全生产监督管理局于2004年12月13日发布了《关于危险化学品安全生产许可有关问题的说明》,其中对重大危险源的判断标准是:①根据物质辨识按照《危险化学品重大危险源辨识》(GB18218-2009)规定进行辨识;②根据工艺设备辨识按照《关于开展重大危险源监督管理工作的指导意见》(安监管协调字[2004]56号)进行辨识。《危险化学品重大危险源辨识》(GB18218-2009)中指出:重大危险源是指长期地或临时地生产、加工、搬运、使用或储存危险物质,且危险物质的数量等于或超过临界量的单元。危险物质是指易导致火灾、爆炸或中毒危险的一种或若干种物质的混合物。单元内存在的危险物质为单一品种,则该物质的数量即为单元内危险物质的总量,若等于或超过相应的临界量,则定为重大危险源;单元内存在的危险物质为多品种时,则按下式计算,若满足下面公式,则定为重大危险源:qqq12n.........1QQQn12式中:q,q……q-------每种危险物质实际存在量。12nQ,Q……Q与各危险物质相对应的生产场所或储存区的临界量。12n根据《危险化学品重大危险源辨识》(GB18218-2009),本项目列入重大危险源辨识范畴的危险物质是乙酸乙酯、甲苯、异丁醇等这些物质的生产场所、储存区的临界量见表8.3-1:表8.3-1本项目各危险化学品临界量表序实际存在量对应临界量危险化学品名称q/Q备注号(q)t(Q)t1.丙酮43.25000.0864——易燃2.甲苯46.985000.09396——液体3.乙酸乙酯48.65000.0372——109 珠海网泰环保设备有限公司化工涂料生产项目高度易燃液体:闪点溶剂油、异丙醇、混丙其<23℃的液体(不包括极4.18010000.18醇、乙酸正丁酯、丙烯他易燃液体);液态退敏爆酸清漆、配套稀释剂易炸品燃丙二醇甲醚醋酸酯、二液易燃液体:23℃≤闪点甲苯异构体混合物、正5.107.4650000.021492体<61℃的液体丁醇、异丁醇、不饱和聚酯树脂、丙烯酸漆∑qi/Qi0.419052从上表可知,∑qi/Qi<1,该建设项目不构成危险化学品重大危险源。8.3.2评价等级及范围按《建设项目环境风险评价技术导则》(HJ/T169-2004)所提供的方法,根据项目的物质危险性和功能单元重大危险源判定结果,以及环境敏感程度等因素确定项目风险评价工作级别。风险评价工作级别按下表8.3-2划分。表8.3-2风险评价工作级别项目剧毒危险性物质一般毒危险性物质可燃、易燃危险性物质爆炸危险性物质重大危险源一二一一非重大危险源二二二二环境敏感地区一一一一根据表8.3-2可见,本项目风险评价按二级进行。因此风险评价范围为以甲类厂房、甲类仓库及埋地罐区为中心半径3km的圆形范围。8.4源项分析8.4.1事故概率根据有关火灾、爆炸事故统计资料---《世界石油化工企业近30年100起特大型火灾爆炸事故汇编(11版)》的统计,引起油罐区火灾爆炸事故的原因分布情况见表8.4-1。表8.4-1油罐区火灾爆炸事故的原因分布事故原因事故件数比例(%)位序操作失误1515.63泵设备故障1818.22阀门管道泄漏3435.11雷击引起火灾爆炸88.26仪表电器设备失灵1212.44其他1010.45110 珠海网泰环保设备有限公司化工涂料生产项目合计97100根据《石油化工企业设计防火规范》编制组对我国炼厂油罐火灾的统计,每年在10000个油罐中发生火灾的可能油罐数为4.7个。本项目溶剂储罐的危险程度较油罐要大一些,因为它还存在蒸气云爆炸的风险。蒸气云的爆炸原因主要为管道、附件、阀门泄漏(60%)和容器泄漏(21%)。根据《环境风险评价实用技术与方法》中统计数据,目前国内化工装置典型事故风险概率在1×10-5/年左右。本项目装置工艺较为成熟,同时在生产中采取严格的安全防护措施,极大的降低了有毒有害物料泄漏事故的发生概率,故本评价确定项目有机溶液中有毒有害性较-5-5大的物质甲苯泄漏概率为1×10、二甲苯泄漏事故概率为1×10。-4-5本项目危险水平应在10~10数量级之间,为操作危险性中等。表8.4-2各种风险水平及可接受程度风险值(死亡/年)危险性可接受程度-3操作危险性特别高,相当于人的自然死亡10数量级不可接受,必须立即采取措施改进率-410数量级操作危险性中等应采取改进措施-510数量级与游泳和煤气中毒事故属同一数量级人们对此关心,愿意采取措施预防-610数量级相当于地震和天灾的风险不担心此类事故发生-7-810~10数量级相当于陨石坠落伤人没有人愿投资预防此类事故8.4.2最大可信事故及源强确定最大可信事故是指,在所有预测的概率不为零的事故中,对环境(或健康)危害最严重的重大事故。最大可信事故确定的目的是针对典型事故进行环境风险分析,并不意味着其它事故不具环境风险。在项目生产、贮存、运输等过程中,存在诸多事故风险因素,风险评价不可能面面具到,只能考虑对环境危害最大的事故风险。根据项目生产储运危险性因素的分析及最大可信事故出现概率,确定本项目最大可信事故为储罐区及运料运输过程有机溶剂的泄露,尤其是甲苯、二甲苯的泄露。其中由有机溶剂泄露发生的危险性因素主要表现在火灾爆炸和中毒这两方面。111 珠海网泰环保设备有限公司化工涂料生产项目8.5风险评价8.5.1火灾事故环境影响评价(1)火灾爆炸事故后果评价当溶剂、助剂等泄露后,泄漏物可能扩大至较大区域,如排风不畅,可能形成可燃性气体混合物,经过一段延滞时间后,可被点燃,由于存在某些特殊原因和条件,火焰加速传播,产生危险的爆炸冲击波超压,发生爆炸。爆炸不仅对处于爆源中的人员、建筑物及设备等造成严重伤害和破坏,爆炸发生时所产生的爆炸波也将对爆炸源周围的人员、建筑物及设备等产生危害。(2)评价方法及结果结果讨论本项目的安全评价采用道化学公司(DOW)火灾、爆炸危险指数评价法确定火灾、爆炸的影响范围。下面所有参数取值均来本项目的安评参数取值和计算结果。本项目安评选取储罐区有机溶剂甲苯作为特征评价对象,结论如下:①火灾、爆炸指数F&EI的和爆炸影响半径计算:火灾、爆炸危险指数F&EI是工艺单元危险系数和物质系数MF的乘积。本项目计算出若甲苯储罐发生火灾、爆炸事故,则以甲苯2储罐主要泄漏点为中心,半径22.7m,方圆1625.9m区域内的财产将有55.74%遭受损失。②安全措施补偿系数为0.78,经过安全措施补偿后,实际最大可能财产损失降低为基本最大可能财产损失的78%,即甲苯储罐一旦发生火灾、爆炸事故,采取补救措施后,影响半2径为17.7m最大影响半径为983.73m,一定程度上降低了发生火灾爆炸的危险的影响范围。8.5.2有机溶剂泄露事故环境风险评价(1)有机溶剂泄露量确定本项目各类有机溶剂直接通过管道从储液罐区输送至生产装置,事故排放主要发生在阀门、管道破损的情况下,液体从破损处向外泄露,泄露率按《建设项目环境风险评价技术导则》(HJ/T169-2004)附录A中所提供的方法计算。期源强见表8.5-1.表8.5-1甲苯、二甲苯泄漏量源强确定破损孔径释放泄露物质事故环节2事故概率m速率(g/S)-5阀门破裂0.00027.121×10二甲苯-5管道破裂0.000517.81×10112 珠海网泰环保设备有限公司化工涂料生产项目-5管道破裂0.00135.61×10-5管道破裂0.00271.21×10阀门破裂0.00027.121×10管道破裂0.000517.81×10甲苯管道破裂0.00135.61×10-5管道破裂0.00271.21×10有机溶剂泄露事故预测因子:二甲苯、甲苯。根据项目生产工艺水平及管理方案,若出现泄漏情况,全厂会立即做出反应,并迅速修复破损处,考虑最不利的情况下,本评价以1小时为泄漏量来估算有机溶剂泄漏的影响。泄漏事故情况下的二甲苯、甲苯排放量分别为25.6kg/h,64.08kg/h,128.16kg/h。(2)预测方法甲苯和二甲苯在泄漏事故情况下在大气中的扩散,采用多烟团模式或分段烟羽模式,当事故排放源项持续时间较长时(几小时至几天),可采用分段烟羽模式,本评价考虑到泄漏时间较短,因此采用多烟团模式。①多烟团模式在事故后果评价中采用下列烟团公式:2222QxxoyyozoCx,y,o3/2exp2exp2exp22xyz2x2y2z式中:x.y.ox,yC--下风向地面坐标处的空气中污染物浓度(mg.m-3);x,y,zooo--烟团中心坐标;Q--事故期间烟团的排放量;σX、、σy、σz——为X、Y、Z方向的扩散参数(m)。常取σX=σy对于瞬时或短时间事故,可采用下述变天条件下多烟团模式:2QH2(xxii)2(yy)2iewwCwwxyot,,,3/2exp(2)exp222xeff,yeff,zeff,2xeff,2xeff,2yeff,式中:iCwwxyot,,,--第i个烟团在tw时刻(即第w时段)在点(x,y,0)产生的地面浓度;QQQt;Q--烟团排放量(mg),为释放率(mg.s-1),t为时段长度(s);x,eff、y,eff、z,eff--烟团在w时段沿x、y和z方向的等效扩散参数(m),113 珠海网泰环保设备有限公司化工涂料生产项目可由下式估算:w22j,effj,k(jx,y,z)k1式中:222()tt()jk,jk,kjk,k1iixyw和w--第w时段结束时第i烟团质心的x和y坐标,由下述两式计算:w1ixwux,w(ttw1)ux,k(tktk1)k1w1iywuy,w(ttw1)uy,k(tktk1)k1各个烟团对某个关心点t小时的浓度贡献,按下式计算:nCxy(,,0,)tCxyi(,,0,)ti1式中n为需要跟踪的烟团数,可由下式确定:nCni1(,,0,)xytfCxy(,,0,)ti1式中,f为小于1的系数,可根据计算要求确定。(3)泄漏事故情况下环境空气影响预测结果分析表8.5-2至表8.5-5为泄漏事故排放情况下,二甲苯、甲苯排放量分别为25.6kg/h,64.08kg/h,128.16kg/h,256.32kg/h是各大气稳定度,下风向地面轴线浓度增值的预测结果。表8.5-2泄漏情况下甲苯挥发量为25.6kg/h时下风向3地面轴线浓度增值预测结果(mg/m)气象条件有风小风距离(m)B类稳定度D类稳定度E类稳定度B类稳定度D类稳定度E类稳定度500.0620.0620.0600.1651.4652.2201000.0820.1030.1100.1882.3834.0111500.0900.1360.1610.1581.4852.5362000.0920.1610.2060.1110.8671.5432500.0900.1760.2400.0750.5621.0243000.0860.1830.2620.0520.3930.7254000.0740.1780.2750.0290.2230.4165000.0630.1610.2620.0190.1430.2696000.0510.1420.2380.0130.1000.188114 珠海网泰环保设备有限公司化工涂料生产项目8000.0350.1080.1930.0070.0560.10610000.0250.0850.1580.0050.0360.06812000.0190.0690.1330.0030.0250.04715000.0130.0530.1060.0020.0160.03020000.0080.0370.0780.0010.0090.01725000.0060.0280.0630.0010.0060.01130000.0040.0220.0520.0010.0040.00835000.0030.0180.0440.0010.0030.00640000.0030.0150.0380.0000.0020.004表8.5-3泄漏情况下甲苯挥发量为64.08kg/h下风向3地面轴线浓度增值预测结果(mg/m)气象条件有风小风距离(m)B类稳定度D类稳定度E类稳定度B类稳定度D类稳定度E类稳定度500.1560.1560.1490.4143.6685.5561000.2040.2590.2760.4705.96510.0411500.2250.3420.4020.3963.7176.3482000.2310.4030.5150.2782.1703.8622500.2260.4410.6010.1881.4082.5633000.2150.4580.6570.1310.9851.8154000.1860.4450.6900.0740.5581.0415000.1570.4040.6550.0470.3590.6736000.1280.3540.5960.0330.2490.4708000.0880.2710.4830.0190.1400.26510000.0630.2130.3970.0120.0900.17012000.0470.1720.3330.0080.0630.11915000.0330.1320.2670.0050.0400.07620000.0210.0920.1950.0030.0220.04325000.0140.0690.1570.0020.0150.02830000.0100.0540.1310.0010.0100.01935000.0080.0440.1110.0010.0070.01440000.0060.0370.0960.0010.0060.011表8.5-4泄漏情况下甲苯挥发量为128.16kg/h下风向3地面轴线浓度增值预测结果(mg/m)气象条件有风小风距离(m)B类稳定度D类稳定度E类稳定度B类稳定度D类稳定度E类稳定度500.3130.3130.2990.8287.33611.1131000.4090.5180.5520.93911.92920.0811500.4500.6830.8050.7927.43312.6972000.4610.8061.0290.5564.3397.724115 珠海网泰环保设备有限公司化工涂料生产项目2500.4520.8821.2020.3762.8165.1253000.4310.9151.3140.2631.9703.6314000.3730.8911.3790.1471.1162.0835000.3140.8071.3100.0950.7181.3466000.2560.7091.1920.0650.4990.9398000.1760.5420.9650.0370.2810.53110000.1260.4250.7930.0230.1790.34112000.0950.3450.6660.0170.1260.23715000.0670.2640.5330.0100.0810.15120000.0410.1830.3910.0060.0450.08625000.0280.1380.3140.0040.0290.05530000.0210.1090.2610.0030.0190.03835000.0150.0880.2220.0030.0140.02840000.0130.0740.1920.0010.0120.022表8.5-5泄漏情况下甲苯挥发量为256.32kg/h下风向3地面轴线浓度增值预测结果(mg/m)气象条件有风小风距离(m)B类稳定度D类稳定度E类稳定度B类稳定度D类稳定度E类稳定度500.6250.6250.5971.65614.67222.2261000.8181.0361.1051.87923.85840.1631500.9001.3661.6101.58414.86725.3942000.9231.6122.0581.1128.67915.4482500.9051.7632.4040.7515.63110.2503000.8611.8302.6270.5253.9407.2624000.7461.7812.7580.2952.2334.1655000.6281.6152.6200.1901.4352.6916000.5131.4172.3840.1310.9971.8798000.3511.0841.9300.0740.5611.06110000.2510.8511.5870.0460.3590.68212000.1900.6901.3330.0330.2510.47415000.1330.5281.0660.0210.1610.30220000.0820.3670.7820.0130.0900.17225000.0560.2770.6280.0080.0590.11030000.0410.2180.5230.0050.0380.07735000.0310.1770.4430.0050.0280.05640000.0260.1490.3840.0030.0230.044从预测结果可以看出,泄漏事故发生后:对于本评价估计的4种破损孔径在1小时的溶剂挥发量,无论是年平风速还是日平均风116 珠海网泰环保设备有限公司化工涂料生产项目速条件下,甲苯和二甲苯的地面浓度均低于《工作场所有害因素职业接触限值化学有害因素》32(GBZ2.1-2007)中时间加权平均容许浓度50mg/m。当破损孔径为20cm时,小风时E稳定度33下甲苯和二甲苯的最大浓度为40.163mg/m,快接近时间加权平均容许浓度50mg/m。根据现场调查,甲类厂房及溶剂罐区100m范围内无居民居住,本项目风险敏感保护目标各点浓度3值均远远小于时间加权平均容许浓度50mg/m。同时本环评建议在发生险情时,100m范围内除佩戴防毒面具的救险人员外,其余人员应立即撤到该距离以外的区域。此外该项目建成运行后,应防止甲苯和二甲苯及其他有机溶剂泄露事故的发生,并切实做好泄漏事故的预防方案和事故发生时的应急措施,减少溶剂挥发量,将事故影响的程度分为降低到最小程度。8.6风险事故防范措施8.6.1选址、总图布置及建筑安全防范措施8.6.1.1选址本项目位于高栏港精细化工区,该建设项目用地不属于基本农田保护区,也不属于水源保护区。项目四周空旷,根据目前的珠海市高栏港经济区土地利用规划,本项目占地使用土地性质属于工业用地。并且本项目的厂址选择,已经城建规划等相关部门的批复同意,符合城建规划的要求。区域规划与总图布置应严格执行相关部门的具体意见以及《工业企业总平面设计规范》(GB50187-93)、《建筑设计防火规范》(GB50016-2006)和《涂料生产企业安全技术规程》(AQ5024-2008)的规定。建设项目大门外为纬二十一路和永兴路,路面较为宽敞,过往车辆不多,消防通道畅通。建设项目区域与外界有围墙相隔。8.6.1.2总图布置和建筑防火、防爆要求(1)对于建筑物的采光照明、通风等情况应严格执行《工业企业设计卫生标准》并结合工程的特点综合考虑,合理安排。(2)厂区道路应设置交通标志,跨越厂区道路的管线应有限高标志。(3)根据《建筑设计防火规范》(GB50016-2006)第3.2.1条规定,甲类厂房(多层)的防火分区最大允许占地面积为2000m2,二期工程生产场所的扩建应予以注意,不应超过规定的面积。(4)根据《建筑设计防火规范》(GB50016-2006)第3.2.10条规定,厂房内甲、乙类物品的117 珠海网泰环保设备有限公司化工涂料生产项目放置量不宜超过一昼夜的用量。(5)根据《建筑设计防火规范》(GB50016-2006)第3.4.2、3.4.3条规定,有爆炸危险的甲类23厂房,应设置必要的泄压设施,厂房的泄压面积与厂房体积的比值(m/m)宜采用0.05~0.22;最小应不低于0.03。(6)根据《建筑设计防火规范》(GB50016-2006)第3.4.6条规定,散发较空气重的可燃气体,可燃蒸气的甲类厂房,应采用不发生火花的地面。(7)根据《建筑设计防火规范》((GB50016-2006)第3.4.8条、第4.2.12条规定,有爆炸危险的甲、乙类厂房、仓库内不应设置办公室、休息室。(8)根据《建筑设计防火规范》(GB50016-2006)第3.5.4条规定,厂房每层的疏散楼梯、走道、门的各自总宽度,应按0.80m/百人的宽度指标计算,当各层人数不相等时,其楼梯总宽度应分层计算,下层楼梯总宽度按其上层人数最多的一层人数计算,但楼梯最小宽度不宜小于1.10m。底层外门的总宽度,应按该层或该层以上人数最多的一层人数计算,但疏散门的最小宽度不宜小于0.90m;疏散走道的宽度不宜小于1.40m。(9)根据《建筑设计防火规范》(GB50016-2006)第4.2.1条规定,储存易燃液体的二级耐火2等级甲类单层仓库的防火墙间的最大允许建筑面积为250m;二级耐火等级的乙类单层仓库2的防火墙间的最大允许建筑面积为500m;二级耐火等级的丙类单层仓库的防火墙间的最大2允许建筑面积为1000m;拟建项目的仓库应按要求合理间隔。(10)根据《建筑设计防火规范》(GB50016-2006)第4.4.6条规定,甲、乙类液体的地上储存区,应设置非燃烧材料的防火堤,防火堤内的有效容量不应小于储存区最大容器的容量;防火堤的高度宜为1~1.6m,其实际高度应比计算高度高出0.2m。含油污水排水管在出防火堤处应设水封设施,雨水排水管应设置阀门等封闭装置。(11)根据《建筑设计防火规范》(GB50016-2006)第7.4.7条规定,甲类厂房的疏散用门应向疏散方向开启。(12)根据《建筑设计防火规范》(GB50016-2006)第7.5.1条规定,天桥、跨越房屋的栈桥,应采用非燃烧体。(13)根据《建筑设计防火规范》(GB50016-2006)第7.5.3条规定,封闭天桥、栈桥与建筑物连接处的门洞,宜设有防止火势蔓延的保护设施。118 珠海网泰环保设备有限公司化工涂料生产项目(14)根据《建筑设计防火规范》(GB50016-2006)第8.3.2条规定,甲、乙类液体储存区的消火栓,应设在防火堤外。(15)根据《建筑设计防火规范》(GB50016-2006)第8.3.4条规定,消防水池的容量应满足3在火灾延续时间内室内外消防用水总量的要求,消防水池容量如超过1000m时,应分设成两个。(16)根据《建筑抗震设计规范》(GB50016-2006)1.0.2条的规定,抗震设防烈度为6度以上地区的建筑必须进行抗震设计;拟建项目所在地区地震烈度为7度,项目的建筑抗震设计应达到相应的抗震等级。8.6.2工艺装置安全防范措施对于该涂料生产项目。针对针对项目特点,对工艺装置的要求如下:(1)尽可能实现机械化、遥控或隔离操作。尽可能减少操作人员在生产过程中直接接触可能产生危险因素的设备、设施、物料,防止因此而造成人员伤害。(2)尽可能采取自动化监测、报警、排除故障和安全联锁保护装置,优先选用自动化装置、设备,提高装置的本质安全度,降低因人员操作失误而带来的危险性。(3)建设项目主要生产装置、设备及其安全附件均应采用有资质的生产厂家制造的合格产品,并有产品质量合格证、产品质量证明书和相应的试压、试漏检测报告。(4)建设项目如需配套电梯、叉车、压力容器等特种设备,应由有资质的单位设计、制造、安装,投入使用前还必须经当地质量监检部门检测合格、注册登记。不得使用属于国家明令淘汰的设备,如简易吊篮等。进入爆炸危险区域的叉车等必须为防爆型。(5)在爆炸危险环境中(如储罐区、甲类仓库等),应根据安装地点的危险等级、危险物质的组别和级别、电气设备的种类和使用条件采取防爆措施,选用符合安全要求的电气设备和供电线路。电气系统的设置和电器设备的选型应符合《爆炸和火灾危险环境电力装置设计规范》(GB50058-92)和《爆炸性环境用防爆电器设备》(GB3836.1~4-2000)的要求。(6)在爆炸性气体环境内不应使用便携式或移动式电气设备,尽量少装插销座和局部照明灯。(7)建设项目的溶剂储罐应采用卧式钢制储罐并埋地设置,严禁设在室内或地下室内。储罐的设计、制造及安装均应由有资质的单位负责,储罐的选材、厚度、强度等应能满足储罐使用要求。119 珠海网泰环保设备有限公司化工涂料生产项目(8)储罐的各种接合管、仪表、安全附件的选型、设计、安装等均应满足储存介质和使用条件的要求。(9)物料泵、管道等应根据工艺要求选用相应的材质和附件,采用合理、规范的施工、焊接工艺,以满足结构强度、刚度、变形以及耐温、耐压、防腐蚀等方面的要求。(11)应做好储罐及相关管线的防腐工作,埋地储罐及管道外表面防腐设计应符合国家现行标准《钢质管道及储罐腐蚀控制工程设计规范》SY0007的有关规定,并应采用不低于加强级的防腐绝缘保护层。(12)埋地储罐的人孔,应设操作井。储罐的顶部覆土厚度不应小于0.5m。储罐的周围,应回填干净的沙子或细土,其厚度不应小于0.3m。(13)储罐宜设带有高液位报警功能的液位计。(14)储罐通气管的设置,应符合下列规定:各储罐的通气管应分开设置;管口应高出地面4m及以上;通气管管口应安装阻火器。(15)槽罐车卸车时宜采用卸油(料)油气回收系统,卸油油气回收系统应符合下列规定:槽罐车上的油气回收管道接口处,应装设手动阀门;密闭卸油管道的各操作接口处,应设快速接头及闷盖;宜在厂内油气回收管道接口前设手动阀门;厂内的卸油管道接口、油气回收管道接口宜设在地面以上。(16)槽罐车卸车时用的卸油连通软管、油气回收连通软管,应采用导静电软管或内附金属丝、网的导电橡胶管。连通软管的公称直径不应小于50mm。(17)固定工艺管道采用无缝不锈钢管。钢管的连接应采用连续焊接(除特殊工艺要求外)。工艺管道不得穿越无关的建构筑物,当工艺管道与管沟、电缆沟和排水沟相交叉时,应采取相应的防渗漏措施。埋地工艺管道应采用不低于加强级的防腐绝缘保护层。架空架设时应保留足够的净高,不得妨碍车辆的通行。(18)机械的高速转动、旋转部位和电气设备裸露部位均应采用加装防护罩、防护屏、挡板等防护隔离装置。通过这些安全防护措施,防止机械和电气设备、设施在运行时产生各种对人员的接触伤害。(19)对噪声较大的装置、设备应采用相应的防噪减振措施,如采用隔声、消声、吸音等综合技术措施降低噪音。优先选用低噪音的电气设备以及坚固的设备基础,以降低作业场所的噪声。在易产生噪声的作业场所,应根据国家相关标准、规范,采用防护措施。选择合理的装置和设备,同时设备的布局也要满足需要满足各类防火、防泄露规范,具120 珠海网泰环保设备有限公司化工涂料生产项目体要求如下:(1)设备间的净距应首先遵照防火间距的要求,能够满足《建筑设计防火规范》(GB50016-2006)和《涂料生产企业安全技术规程》(AQ5024-2008)等规范、标准的规定。(2)非防火因素决定的或防火规范中未加规定的设备间距应按《化工装置设备布置设计工程规定》(HG20546.2-1992)的规定执行,生产场所中,两个容器之间的最小净距应为1.5m,立式容器基础至墙的最小净距应为1m。(3)生产装置区内操作通道一般宽度为0.8m~1m,不常通行的局部地方最小为0.65m。(4)在设备、设施、管线上有发生坠落危险的部位,应配置便于人员操作、检查和维修的扶梯、平台、围栏和安全系挂装置等附属设施。扶梯、平台和栏杆的设置应符合GB4053.1~4的规定。(5)钢质扶梯、平台等应覆盖耐火层。涂有耐火层的构件,其耐火时间不应低于1.5h。当耐火层选用防火涂料时,应采用有利于防烃类火灾的防火涂料。8.6.3消防及火灾报警系统8.6.3.1经济区消防系统珠海高栏港经济区的区域安全评价已于2003年12月通过政府评审。现区内设立3个消防站和1个消防指挥中心,配备一艘专业的海上消防船,以及各种消防车辆、云梯车和抢救车等近20台,消防人员近200人,为区内企业服务。8.6.3.2项目消防系统根据可研设计,本项目消防系统包括消防水池、消防水泵、消防增压稳压设备、泡沫液储罐、环状消防管网、室内外消火栓系统、室内泡沫栓系统。消防系统均采用临时高压给水系统,系统平时压力由消防增压稳压设备泵加压维持。消防规范要求(1)消防、安全设施的设计、设置执行《建筑设计防火规范》(GB50016-2006)、《涂料生产企业安全技术规程》(AQ5204-2008)、《火灾自动报警系统设计规范》(GB50116-1998)以及其他相关标准、规范的规定。(2)整个厂区应设计火灾消防报警和通讯系统,以便发生火灾事故时,能及时报警,处理和控制事故,防止事故扩大。消防报警系统宜与区域的相关部门联网。火灾报警系统的设置必须符合《火灾自动报警系统设计规范》(GB50116)的相关规定。121 珠海网泰环保设备有限公司化工涂料生产项目(3)可燃气体和有毒气体检测和自动报警系统的设置应符合《石油化工可燃气体和有毒气体检测报警设计规范》(GB50493-2009)的相关规定。(4)厂房(仓库)灭火器配置按严重危险等级场所配置,其他建筑配置灭火器材应符合现行国家标准《建筑灭火器配置设计规范》(GB50140-2005)的规定。(5)甲类车间、仓库的排风系统应采用防爆型的通风设备,且应有导除静电的接地装置。易燃易爆场所可燃气体、蒸气的密度比空气重,排风扇、排风管管口应安装在不燃烧实体墙墙体的下侧。(6)建设项目的供配电系统应按《供配电系统设计规范》(GB50052)及其他相关规范的规定综合配置、系统设计。(7)供配电系统宜采用TN-S系统,供电系统的电缆金属外皮或电缆金属保护管两端均应接地,在供配电系统的电源端应安装与设备耐压水平相适应的过电压(电涌)保护器。(8)易燃易爆作业场所使用的电动机、低压变压器、低压开关和控制器(开关、断路器,控制开关及按钮,配电盘,控制箱,操作箱等)、照明灯具、信号报警装置应使用防爆型电气设备,其电气套管应采用低压流体输送镀锌焊接钢管,不应采用绝缘导线或塑料管明设。(9)电源总进端应设置有防感应雷的避雷装置(SPD),供电线路应安装过载、短路保护装置和漏电保护器。用电设备正常不带电的金属外壳均进行接地保护。(10)在甲类厂房、甲类仓库及埋地储罐区等重点防火、防爆区的入口处,应设置人体静电消除装置(接地裸露金属体如栏杆、金属支架等)。(11)地上或管沟敷设的易燃液体输送管道的始、末端和分支处应设防静电和防感应雷的联合接地装置,其接地电阻不应大于30Ω。(12)在爆炸危险区域内的工艺管道上的法兰、胶管两端等连接处应用金属线跨接。当法兰的连接螺栓不少于5根时,在非腐蚀环境下,可不跨接。(13)生产区建筑物(如甲类厂房、甲类仓库)的安全疏散门应采用向疏散方向开启的平开门,不应采用推拉门、卷帘门,通道和出入口应保持通畅。厂房(仓库)的安全疏散门应为防火门,消防泵房的安全疏散门应为甲级防火门。甲类厂房、甲类仓库应采用不发生火花的地面。(14)对物料物质泄漏可能造成重大事故的设备和工作场所,必须设计可靠的事故处理装置和应急防护设施。甲类仓库必须设计防止液体流散的设施。(15)建设项目甲类仓库内宜使用低温照明灯具,并应对灯具的发热部件采取隔热等防火保护措施;不应设置卤钨灯等高温照明灯具。配电箱及开关宜设置在仓库外。122 珠海网泰环保设备有限公司化工涂料生产项目(16)根据有毒物质的性质、有毒作业的特点和防护要求,在有毒作业工作环境中应配置事故柜、急救箱和个体防护用品(防毒服、手套、鞋、眼镜、过滤式防毒面具、长管面具、空气呼吸器等)。生产储存区应设置淋浴器和洗眼器等卫生防护设施,其服务半径应小于15m。(17)在厂区的各出入口、车道设置车辆限速标志、通行或禁行指示标志。按规范要求在储存场所与各作业地点设置事故应急照明灯具,各紧急通道和紧急出入口均应设置明显的疏散标志和指示箭头。安全疏散门应向外开启。(18)建设项目的生产储存区应设置永久性如―严禁烟火‖等安全警示标志。在有较大危险因素的设施、设备上,设置明显的安全警示标志。配电房、消防泵房等地方应设置相应的安全、警示、指示标志。8.6.3.3消防水池本项目当消防用水由工厂水源直接供给时,工厂给水管网的进水管不应少于两条。当其中一条发生事故时,另一条应能满足100%的消防用水和70%的生产、生活用水总量的要求。消防用水由消防水池供给时,工厂给水管网的进水管,应能满足消防水池补充水和100%的生产、生活用水总量的要求。本项目拟建设消防水池一个,根据《建筑设计防火规范》(GB50016-2006),本项目拟设3置的消防水池总有效容积400m,位于甲类厂房二西面20m处,丙类仓库西北面南部15m处,消防水池设置DN200补水管一条及消防泵房一座。消防水池容量按一次灭火最大需水量的甲类仓库计(室内消火栓用水量+室外消火栓用水量+配置泡沫枪泡沫混和液用水量33=270+108+15),最大需水量为393m,消防水池有效容量为400m。消防水泵由设在各消火栓处的手动按钮、消防泵房和消防值班室手动启动。消防增压稳压设备泵由设在管网上的压力开关根据管网压力自动控制启停。当工作泵出现故障无法启动时,备用泵自动投入运行。消防泵均不得设置自动停泵。所有消防泵的运行与状态均在消防值班中心显示。8.6.3.4事故水池本项目甲类仓库、甲类厂房外围均设置隔水围堰,若一旦发生泄漏或火灾事故,溢出围堰的物料以及消防废水应第一时间则泵入事故池。由于本项目多种原料溶剂毒性较大,泄露或火灾的事故废水应同危险废物对待,交由有资质的单位处理。3本项目在厂区西南厂界初步设置事故废水收集池一座,容积为400m。根据《化工建设项目环境保护设计规范》(GB50483-2009),废水防治中事故应急措施相关规定,应急事故水123 珠海网泰环保设备有限公司化工涂料生产项目池的最大容量应包括以下内容:最大一个容量的设备或储罐物料量;在装置区或储罐区一旦发生火灾爆炸时的消防用水量,包括扑灭火灾所需用水量和保护临近设备或储罐(最少3个)的喷淋水量;当地的最大降雨量。33本项目最大一个容量的储罐为60m,储罐区发生火灾所需的消防水量为129m,本地区33的最大降雨量为222.1mm(罐区可收集最大降雨时水量55.25m),由上述分析可知,60m+1293333m+55.25m=244.25m<400m,因此本项目所设置的事故废水收集池可满足《化工建设项目环境保护设计规范》(GB50483-2009)中要求。根据《化工建设项目环境保护设计规范》(GB50483-2009)中要求,本项目事故收集池应3大于244.25m,由于事故收集池的特殊要求须保持闲时空置,不能被占用,因此本环评建议33将原设计事故收集池分割为二,一个为容积300m的事故收集池,一个为容积100m的初期3雨水池,两池可做隔断性连通。同时300m的事故收集池在容积上满足《化工建设项目环境保护设计规范》(GB50483-2009)要求,状态上满足事故收集池在无事故条件下的空置要33求;100m的初期雨水池可满足初期雨水的收集需求(52.55m/次)。8.6.4安全管理措施(1)企业领导和生产管理人员必须重视安全生产管理工作,认真贯彻执行―安全第一,预防为主‖的安全生产方针。制定和认真贯彻各级安全生产责任制、各项规章制度、岗位安全操作规程和生产安全事故报告制度,实行全面安全管理。(2)严格执行安全设施―三同时‖制度,建设项目中的安全设施应与主体工程同时设计、同时施工、同时投入生产和使用。(3)建立健全职业安全健康的教育培训制度,配备必要的培训设备和师资,保证从业人员具备必要的安全生产知识,熟悉有关的安全生产规章制度和安全操作规程,掌握本岗位的安全操作技能。对新来的职工和调换岗位的职工,必须坚持三级安全教育培训,培训合格后才能上岗。对全体员工进行经常性的安全教育,以提高员工的技能和在异常情况下的应变能力。特种作业人员应持证上岗,上岗证应按有关规定进行复审。(4)从事储存、运输、使用危险化学品或者处置废弃危险化学品活动的人员必须接受有关法律、法规、规章和安全知识、专业技术、职业卫生防护和应急救援知识的培训,并经考核合格,方可上岗作业。(5)加强设备、安全装置、压力容器和监测系统等的维护保养,建立主要设备档案,确保124 珠海网泰环保设备有限公司化工涂料生产项目生产正常运作。(6)建立健全安全检查制度,编制岗位或重要设备的安全检查表,并定期或不定期地进行安全检查,发现问题要及时整改。8.7风险事故应急预案8.7.1应急计划区本项目的危险目标主要为甲类厂房、甲类仓库区、甲类液体储罐区等。主要环境保护目标为高栏港管委会、铁炉新村。8.7.2应急机构厂内应急组织机构:成立事故现场抢险指挥中心,总指挥由公司总经理陈请金担任,副总指挥由副总经理担任,成员由公司安全、运营、生产、保卫等部门领导组成。具体见图8-1。总指挥副总指挥联络员现场指挥伤灭生现亡火产场救作指抢援战挥修组组组组图8-1应急组织机构8.7.3预案分级响应条件企业根据风险火灾事故的大小建立二级分级响应报告机制,以便事故的分级管理。本项目分级响应程序按预防、准备、基本应急、专项应急响应、恢复和重新进入等程序125 珠海网泰环保设备有限公司化工涂料生产项目实施。在事故现场的救援中,由现场指挥部集中统一指挥,灾情和救援活动情况由指挥部各向指挥领导小组报告。如事故影响较大,本单位抢险抢救力量不足或有可能危及社会安全时,则由指挥领导小组向安监局和环保局报警,接到报警后,按《国家突发性环境污染事件应急预案(试行)》规定启动应急预案。8.7.4应急环境监测、抢险、救援及控制措施(1)泄漏控制措施迅速撤离泄漏污染区人员至安全区,并进行隔离,严格限制出入。切断火源。建议应急处理人员戴自给正压式呼吸器,穿防静电工作服。尽可能切断泄漏源。防止流入下水道、排洪沟等限制性空间。(2)火灾事故应急控制措施发生火灾时,现场人员应立即找最近的泡沫灭火器灭火,用消防栓灭火前应切断起火区域的电源。8.7.5应急检测、防护措施、清除泄漏措施和器材事故处理过程中,应急指挥部需指派专人,负责对事故现场的保护,以便政府部门及公司内部对事故调查取证,找出事故原因,查清责任及采取预防再次发生的对策。在政府部门同意后,才能进行事故现场的最后清理。清理需由指挥部指派专人负责,必要时请专业机构进行,以确保清理工作的安全进行。8.7.6人员救护规定事故发生后,事故现场抢险指挥部总指挥发出救助和治疗的指令,负责对事故现场撤离出来的伤员进行现场救治和抢救,根据伤者的实际情况进行相应的急救护理,并与当地医疗机构保持密切联系,必要时立即将重伤员送往医疗卫生部门抢救,并作救治记录。8.7.7事故应急救援关闭程序与恢复措施(1)应急终止的条件①事件现场得到控制,事件条件已经消除;②污染源的泄漏或释放已降至规定限值以内;126 珠海网泰环保设备有限公司化工涂料生产项目③事件所造成的危害已经被彻底消除,无继发可能;④事件现场的各种专业应急处置行动已无继续的必要;⑤采取了必要的防护措施以保护公众免受再次危害,并使事件可能引起的中长期影响趋于合理且尽量低的水平。(2)应急终止的程序①现场救援指挥部确认终止时机,或事件责任单位提出经现场救援指挥部批准;②现场救援指挥部向所属各专业应急救援队伍下达应急终止命令。(3)应急终止后的行动①有关部门及突发环境事件单位查找事件原因,防止类似问题的重复出现。②参加应急行动的部门负责组织、指导环境应急队伍维护、保养应急仪器设备,使之始终保持良好的技术状态。(4)恢复生产事故现场清理、洗消完毕,不存在危险源;防止事故再次发生的安全防范措施已落实到位;受伤员得到治疗,情况基本稳定;设备、设施检测符合生产要求后,恢复生产。8.7.8应急培训计划建设单位根据本项目的风险防范措施和应急计划制定相应的培训计划,对单位内义务消防员和其他员工进行定期培训,具体如下:①厂区义务消防员在入职时接受三个月消防知识培训,具体包括发生风险事故的应急程序、厂区设施的操作方法、各化学物质的灭火方法等;②义务消防员每月进行技术考核一次,考核通过后上岗。8.7.9公众教育和信息建设单位每季度向周边居民、厂家发布本场储运设施的安全情况和具体应急、疏散和联络方式,信息发布形式主要以发放信息传单为主。8.8高栏港突发环境事件应急预案为规范和强化全区突发性环境事件的应急处置工作,建立健全突发环境事件应急处置体系,提高政府预防和应对突发性环境事件的应急能力和处置水平,高栏港经济区也制定了突发环境事件应急预案。127 珠海网泰环保设备有限公司化工涂料生产项目(1)建立突发环境事件应急领导小组环境应急领导小组是全区突发环境事件应急管理工作的专项领导机构,环境事件发生时,专项领导机构转换为专项指挥机构。领导小组由组长一名、副组长两名、协调人一名、新闻发言人一名及相关成员单位组成。组长由市政府分管领导担任,副组长由区管委会主任、分管副主任担任。协调人由领导小组办公室主任(区环保局局长)担任,负责领导小组各组之间的协调,现场信息的汇总报告和领导小组指令的传达。新闻发言人由领导小组组长指定,负责应急事件的对外新闻发布。成员由其他主要相关部门领导担任。区环境应急领导小组下设办公室,办公室设在区环保局,由环保局长担任主任,环保、公安、安监等主要成员单位的分管副局长担任副主任,环保、安监、建设、三防、海事等相关部门负责人为小组成员。根据实战需要,区环境应急领导小组转换为现场应急指挥部。现场应急指挥部下设应急策划组、应急行动组、监察监测组、警戒警备组、应急疏散组、后勤保障组、善后处理组7个工作小组和环境应急专家组组成。(2)预防工作与能力建设①开展危险源调查。区环境应急领导小组办公室负责组织区环保、安监、公安消防等部门开展对生产、贮存、运输、销毁废弃化学品情况的普查,掌握全区存在环境污染风险的污染源和危险物,强化日常风险管理;筛选和控制对环境构成主要危害的重点污染源。②加强环境事件风险评价和信息库建设。区环境应急领导小组办公室应加强突发环境事件风险评价管理及应急技术的科学研究,加强事故防范、处置的宣传教育。③应急监测能力建设。区环境应急领导小组办公室应做好环境监测技术、人员、装备等应急准备工作,本着―以人为本,快速反应‖的原则,加强区环境应急监测的能力建设。④应急监察能力建设。区环境应急领导小组办公室应加强环境监察队伍的软、硬件建设,提高应对和处置突发环境事件的能力。建立和完善环境应急值班制度、信息报送制度、案件调查制度,强化突发环境事件应急处置所必需的装备、车辆。(3)预测区环境应急领导小组办公室应认真执行区政府政务值班制度,整合信息监测、预测资源,依托政府办公业务资源网及相关网络,建立健全突发环境事件监测、预测、预警系统,收集在本行政区域内外和境外对本行政区域可能造成重大影响的突发环境事件信息,加强风险分析和动态监测、预测,对突发环境事件做到早发现、早报告、早处置。128 珠海网泰环保设备有限公司化工涂料生产项目(4)预警①高栏港经济区各机关、企事业单位、社会团体和公众一旦掌握环境突发事件征兆或发生环境突发事件的情况,应迅速通过电话等形式向区环保局、区应急办有关部门报告环境突发事件信息。②区环境应急领导小组办公室应通过监测、预测、预警支持系统,对报警事件的风险系数、发展趋势等及时分析,科学预测,提出一般处置或启动相应应急预案的建议,并按照职责程序及时向区政府报告。③区环境应急领导小组应根据对环境突发事件的分析结果,及时向区政府提出预警建议。预警信息按规定及时向社会公布。④信息发布以新闻发言人、网络群发、电视播放、电台广播、报纸刊登等渠道进行,必要时采取人工手段传递预警信息。为快速告知受环境突发事件影响的社会群体,区各传媒应配合做好预警信息发布工作,免费及时发布相关预警信息。⑤进入预警状态后,区环境应急领导小组应当采取以下措施:◊立即启动相关应急预案。◊发布预警公告。◊转移、撤离或者疏散可能受到危害的人员,并进行妥善安置。◊针对突发环境事件可能造成的危害,封闭、隔离或者限制使用有关场所,终止可能导致危害扩大的行为和活动。◊调集环境应急所需物资和设备,确保应急保障行动。(5)信息报送发生突发环境事件后,区环保局、事发地镇(村)等有关部门应在立即采取先期处置措施,控制事态发展的同时,按区委、区政府紧急信息报送的有关规定,及时如实报告区政府应急管理办公室和区委,不得迟报、漏报、瞒报和谎报。必须在第一时间内初报事件的有关情况,2小时内书面续报基本情况,并在事件处理完毕后立即上报处理结果。对初步判定属于一般以上级别的突发环境事件,应在30分钟内初报,并实行态势变化进程报告和日报告制度。初报可用电话直接报告,主要内容包括:环境事件的类型、发生事件、地点、污染源、主要污染物质、人员受害情况、捕杀或砍伐国家重点保护的野生动植物的名称和数量、自然保护区受害面积及程度、事件潜在的危害程度、转化方式趋向等初步情况。续报可通过网络或书面报告(传真),在初报的基础上报告有关确切数据,事件发生的原因、129 珠海网泰环保设备有限公司化工涂料生产项目过程、进展情况及采取的应急措施等基本情况。处理结果报告采用书面报告(传真),处理结果报告在初报和续报的基础上,报告处理事件的措施、过程和结果,事件潜在或间接的危害、社会影响、处理后的遗留问题,参加处理工作的有关部门和工作内容,出具有关危害与损失的证明文件等详细情况。区应急管理办公室、区委、区政府信息科接到信息报告后,要按照市委、市政府紧急信息报送的有关规定,及时上报事故情况。区环保局随后向市环保局报告。(6)处置①突发环境事件发生后,事故单位、事发地镇政府(街道办事处)要立即启动本单位应急预案,开展警戒、疏散群众、救护、抢险工作等先期处置工作,控制事态发展。②区环保局作为第一响应责任单位,在接到报告后应快速做出综合分析,通知相关单位,立即组织专业人员前往事发现场,组织开展应急救援工作。(7)分级响应①一般环境突发事件由区环境应急领导小组按照有关规定启动区级突发环境事件应急预案,并组织指挥辖区各方面力量处置。③较大以上突发环境事件按照有关程序报请上级政府,启动相应级别的突发环境事件应急预案。③启动高级别应急预案时,低级别应急预案应先期启动。区突发环境事件应急预案启动后,有关部门、单位应同时启动具体行动方案。(8)响应程序区政府应急管理办公室和区环境应急领导小组办公室接到一般以上突发环境事件报告,启动本预案,按以下程序响应:①开通与环境应急领导小组、现场应急指挥部的通信联系,随时掌握事态进展情况。②立即向区环境应急领导小组领导报告。③及时向区政府及市环保局报告事件基本情况和应急救援的进展情况。④组成专家咨询组,进行情况分析,并根据专家的建议,通知相关应急救援力量集结待命,随时准备为应急领导小组提供技术支持。⑤派出相关应急救援力量和专家赶赴现场,成立现场应急救援指挥部,各工作组按照职责要求开展应急救援。(9)扩大应急130 珠海网泰环保设备有限公司化工涂料生产项目①因突发环境事件次生或衍生出其他突发公共事件、已有的应急救援能力不足以控制事件发展态势,需要实施扩大应急行动,区环境应急领导小组应及时向区政府报告,提请区政府启动其他专项应急预案,或请求驻区大工程企业单位,驻区武警、部队实施增援。②已采取的处置措施无法控制和消除其严重危害,事件有可能往较大以上级别发展、或有可能危及邻区(市),区环境应急领导小组应提请市政府请求市环境应急领导小组启动市级应急预案,或请求邻区(市)应急领导小组增援。(10)应急结束按照―谁启动、谁结束‖的原则,由相应级别环境应急领导小组决定应急结束,并通知相关单位和社会公众。一般突发环境事件由区环境应急领导小组决定应急结束。符合下列条件之一的应急结束:①事件现场得到控制,事件条件已经消除。②污染源的泄漏或释放已降至规定限值以内。③事件所造成的危害已被消除,无继发可能。④事件现场的各种专业应急处置行动已无继续的必要。⑤采取了必要的防护措施已保证公众免受再次危害,并使事件可能引起的后期影响趋于合理且尽量低的水平。(11)善后处理善后处理工作由区环境应急领导小组办公室牵头,相关部门参与。对突发环境事件造成伤亡的人员及时进行医疗救助或按规定给予抚恤,对造成生产生活困难的群众进行妥善安置,对紧急调集、征用的人力物力按规定给予补偿;高度重视和及时采取心理咨询、慰问等有效措施,努力消除突发环境事件给人们造成的精神创伤。(12)应急行动评估①由区环境应急领导小组办公室牵头,组织有关部门实施。②评价的基本依据:一是环境污染事件应急过程记录;二是现场各专业应急救援队伍的总结报告;三是应急救援指挥部掌握的应急情况;四是环境应急救援行动的实际效果及产生的社会影响;五是公众的反映等。③得出的主要结论应涵盖以下内容:一是环境事件等级;二是环境应急总任务及部分任务完成情况;三是是否符合保护公众、保护环境的总要求;四是采取的重要防护措施与方法是否得当;五是出动环境应急队伍的规模、仪器装备的使用、环境应急程度与速度是否与任131 珠海网泰环保设备有限公司化工涂料生产项目务相适应;六是环境应急处置中对利益与代价、风险、困难关系的处理是否科学合理;七是发布的公告及公众信息的内容是否真实,时机是否得当,对公众心理产生了何种影响;八是需要得出的其他结论等。132 珠海网泰环保设备有限公司化工涂料生产项目9项目选址合理性分析9.1产业政策符合性根据中华人民共和国国家发展和改革委员会《产业结构调整指导目录(2011年本)》,本项目的建设不属于其限制类和淘汰类,项目的建设符合国家产业政策和发展方向。根据珠海市发展和改革局发布的《珠海市产业发展导向目录(2010年本)》要求,本项目的建设属于―优先发展类中-先进制造业-2石油化工产品-(10)环保型涂料和各类专用涂料生产‖的政策及优先发展区域,因此本项目建设属于优先发展类。本项目的建设符合《珠海市产业发展导向目录(2010年本)》要求,项目的建设符合珠海市产业政策和发展方向。9.2规划符合性分析本项目生产过程为将化工涂料生产。根据《珠海市城市总体规划条例》第47条―港区新城:重型化工工业用地集中在填海区布置;加工工业用地在现南水镇西北部布置;油气储运区在高栏岛西南侧布置。‖(注:港区新城包括南水、临港工业区和珠海港高栏港区。承担以海洋运输为主的大型储运、化工等临海产业职能;是区域性的专业功能区之一。)本项目属于化工工业,且选址位于珠海市高栏港经济区精细化工区内,因此,本建设项目符合《珠海市城市总体规划条例》。2本项目位于珠海高栏港精细化工区,占地约2.2hm,珠海石化基地区域环评已获广东省环保局批准。随着《珠江三角洲地区改革发展规划纲要》的实施,高栏的发展被提升到国家发展战略高度,将发挥出更加优越的核心优势,加速向建设―世界级的船舶和海洋工程装备制造基地、国家级的石油化工和清洁能源基地、区域性港口物流中心、国际休闲旅游度假区‖目标进发。故本项目与该区域规划的协调性相符合。9.3环境敏感性分析本项目位于珠海高栏港经济区精细化工区,交通方便。该建设项目用地不属于基本农田保护区,也不属于水源保护区。项目四周空旷,周边500m内没有聚集的居民区。根据目前的珠海市土地利用规划,本项目占地使用土地性质属于工业用地。本项目远离居民区、商业中心、公园等人口密集区域;远离学校、医院、影剧院、体育场(馆)等公共设施;远离供水水源、水厂及水源保护区;远离机场以及铁路、水路交通干线;不属于基本农田保护区、畜牧区、渔业水域和种植、养畜、水产苗种生产基地;远离河流、湖泊、风景名胜区和自然保护区;不属于军事禁区、军事管理区等区域,符合相关规范的要133 珠海网泰环保设备有限公司化工涂料生产项目求。建设项目大门外为纬二十一路,路面较为宽敞,过往车辆不多,消防通道畅通。建设项目区域与外界有围墙相隔。西北面为永新路,东面为珠海市环保产业开发有限公司,西面为澳新橡胶厂区该项目建成后正常生产时对周边影响不大。9.4项目平面布局合理性项目厂区根据不同功能,结合厂址场地的现状,总体平面布置本着生产区与生活区分置、工艺流程顺畅、最大限度降底环境污染影响与环境风险影响的原则确定。总平面布置中,建构筑物由三部分组成,即生产、贮存部分和辅助生产及生产管理部分。各功能区相对集中布置,既方便管理,又有利于安全,同时实行集中控制,达到减少系统管线长度、便于管理、方便检修,重视安全和有利生产的目的。本项目厂区设2个出入口,主要人流出入口和货流出入口设置在厂区北面围墙中部,为主出入口,东侧的门卫室兼作消防指挥中心;在主出入口门卫室东侧布置办公区出入口,用于人员进出,以避免人货交叉;在厂区北面围墙东段设一个次出入口。主次分流,便于交通和消防通道的通畅。厂前区设综合楼、辅助用房、消防泵房和消防水池,布置在厂区东北面,在最小频率风向的下风方向;可能散发污染物的甲类厂房、甲类仓库和储罐区布置在厂区西南部、东南部和西北部,处于全年较小频率风向的上风向侧,可适当减小项目废气排放对厂界外的影响。消防水池布置在厂房附近,与各保护点的距离较近,便于及时赶赴救活,迅速扑灭初期火灾。9.5环境风险可接受程度分析根据风险评价,本项目主要的环境风险为甲类厂房、甲类液体罐区及甲类仓库,根据风险分析,本项目发生火灾或泄漏事故后的影响程度在可控制范围内,在采取风险防范措施后,能够将事故的影响程度降到最低。9.6环境可行性综合结论综上所述,本项目工程建设符合国家、地方相关产业政策,符合《珠海港珠海市城市总体规划》,项目突发性环境风险可控制,厂区内布局合理。本项目应充分落实各项环保措施、严格实施环境风险预案、加强管理和运营,从环境保护的角度看项目建设具有环境可行性。134 珠海网泰环保设备有限公司化工涂料生产项目10污染防治措施可行性分析10.1施工期污染控制措施10.1.1施工期废水防治措施(1)建设导流沟:在施工场地建设临时导流沟,将暴雨径流引至永和开发区雨水管网排放,避免雨水横流现象。(2)建设蓄水池:在施工场地建设临时蓄水池,将开挖基础产生的地下排水收集储存,并回用于施工场地裸地和土方的撒水抑尘。(3)设置循环水池:在施工场地设置循环水池,将设备冷却水降温后循环使用,以节约用水。(4)车辆、设备冲洗水循环使用:设置沉淀池,将设备、车辆洗涤水简单处理后循环使用,禁止此类废水直接外排。10.1.2施工期废气防治措施(1)开挖基础作业时,应经常洒水使作业面土壤保持较高的湿度;对施工场地内裸露的地面,也应经常洒水防止扬尘;(2)施工场地产生的多余土方应尽量用于填方,并注意填方后要随时压实、撒水防止扬尘;(3)平整场地、开挖基础、拆除作业时,土方应随挖随装车运走,不要堆存在施工场地,以免风吹扬尘;(4)运土及运粉状建筑材料的运输车辆应采用专用车辆或者配置防洒落装置,车辆装载不宜过满,保证运输过程中不散落;(5)在施工场地边界建设临时围墙,整个施工场地只设一个供人员和车辆出入的大门,在大门入口设临时洗车场,车辆出施工场地前必须将车辆冲洗干净,然后再驶出大门;(6)对运输过程中散落在路面上的泥石要及时清扫,以减少运行过程中的扬尘;(7)各建、构筑物四周在施工过程要设置防护网,防护网材料和质地要密实;(8)施工过程中,应严禁将废弃的建筑材料焚烧。工地食堂应使用液化石油气或电灶具,不能使用燃油灶具;(9)粉状建材应设临时工棚或仓库储存,不得露天堆放;(10)建议采用水泥搅拌车进行混凝土搅拌,不采用袋装水泥,防止水泥粉尘产生。135 珠海网泰环保设备有限公司化工涂料生产项目10.1.3施工期固废防治措施(1)根据《城市建筑垃圾管理规定》(建设部令第139号,2005年3月23日)有关规定,建设单位和施工单位要重视和加强建筑垃圾的管理,采取积极措施防止其对环境的污染。(2)施工活动开始前,施工单位要向当地的环卫部门提出建筑垃圾处置的请示报告,经批准后将建筑垃圾清运到指定地点合理处置。(3)对施工期间产生的建筑垃圾进行分类收集、分类暂存,能够回收利用的尽量回收综合利用,以节约宝贵的资源。同时要做好建筑垃圾暂存点的防护工作,避免风吹、雨淋散失或流失。(4)在建筑工地设置防雨的生活垃圾周转储存容器,所有生活垃圾必须集中投入到垃圾箱中,最终交由环卫部门清运和统一集中处置。施工单位不准将各种固体废物随意丢弃和随意排放。10.1.4施工期水土流失防治措施本项目选址位于高栏港精细化工区纬二十一路南面,项目有建设地目前为平地,土石方施工量很小,针对项目建设,主要水土流失防治措施为:(1)尽量做到土石方平衡,建设中做好必要的防护坡。(2)合理安排施工计划,施工程序,雨季尽量减少开挖面,在暴雨期,停止作业并采取应急措施进行覆盖,防止冲刷和坍塌。(3)工地内需构筑相应容积的积水沉砂池和排水沟,以收集地表径流和施工过程产生的泥浆水,废水和污水,经过沉砂、除渣和隔油等处理后,用于工地洒水降尘。(4)对不布设厂房设施的空地,施工期间即使种树,种植草皮以绿化。10.2运营期污染防治措施可行性分析10.2.1废气处理措施10.2.1.1有组织废气处理措施1、集气方案本项目有组织废气主要来自于生产过程中的有机气体的挥发,产生源为各种搅拌机和研136 珠海网泰环保设备有限公司化工涂料生产项目磨机等,设备在运行时均为密闭状态,通过排气管道调节设备内气体压力,防止出现气压增大导致危险,采用设备盖子作为吸气罩,工作时吸气效率可达到100%,各设备盖子的吸气管道均与缓冲过滤箱相连,通过风机提供吸气动力。2、废气吸收处理措施本项目废气主要组成为颗粒物和有机气体,且有机气体种类较多,量较大,针对甲苯、二甲苯等类有机气体,本项目采用国内较为成熟工艺喷淋吸附有机废气的方式进行吸收去除。有机废气处理工艺流程如图10-1所示。洁净气体化学吸附填料层充分接触喷淋有机废气除味工作液图10-1有组织废气处理流程示意图本项目生产中产生的有机废气主要为苯类,酯类、酮类等,废气处理过程主要为:①废气通过收集进入净化塔,采用专用的除味剂作为吸收液进行喷淋,将废气上行,喷淋液下行。喷淋液体通过循环水泵在液体池及喷淋口循环。②喷淋液体经球形多边填料层多边流动,增加表面积及表面能,同时与废气充分接触,进行化学吸附达到吸收净化效果。多功能净化塔样式及内部构造详见图10-2.137 珠海网泰环保设备有限公司化工涂料生产项目储液槽图10-2多功能废气净化塔填料塔洗涤塔3、技术经济可行性(1)技术可行性净化塔中除味剂是专门针对喷涂废气的一种天然植物除味剂。该专用除味剂是利用森林反应自然净化废气的仿生学原理,采用进口原材料和日本最新废气净化技术处理的高效天然植物提取液,是专为多配方针对不同废气成份的气体净化而开发的最新研究成果。经国家安全生产上海危险化学品分类检测检验中心(MSDS)认证,为无爆炸危险性,不属易燃危险品;无氧化剂危险性,不属腐蚀品;不属毒害品。根据市场调查及业务咨询,该除味剂及使用特种除味剂的广泛应用于涂装行业的众多企业。如富士康科技集团、东莞漫步者科技有限公司等。以上两家企业主要用喷涂车间主要使用同本项目生产相类似的塑胶机壳漆及五金机壳漆,因此本项目使用此净化吸附方法已有成熟运行的先例,在技术上市可行的。(2)经济可行性本项目总投资3000万元,其中预留环保投资部分约200万元,根据企业的总投资和环保投资,建设单位有能力配套净化塔设备及除味剂的运行费用,采用净化塔吸附的方式去除废138 珠海网泰环保设备有限公司化工涂料生产项目气中有机气体,一次性投资额相对于催化氧化去除有机废气较小,相对于一般的水喷淋吸收方法可免除二次污染,同时由于大多数有机气体不溶于水,采用该方法可大大提高净化效率。目前净化塔喷淋吸收已成为国内较为普遍采用的有机废气处理方式,同时除味剂的使用也有丰富的运行示例,保证企业可以节省大量管理维护培训时间及费用,同时净化塔装置需要看管人数较少,一般2人左右,节省了人力消耗,吸附装置运转稳定,维护简单,每年更换一次吸收液,一般为设备原料供应商上门更换。因此,从一次性投资和运行维护的人力、物力。资金等方面分析,结合建设单位经济实力,本环评认为采取多功能净化塔喷淋除味剂的方式吸附有机废气的措施治理本项目废气具有经济可行性。10.2.1.2无组织废气污染防治方案本项目无组织排放主要为原料存放区的有机溶剂挥发和生产车间有机气体挥发和少量粉尘,针对无组织排放本环评建议采用以下方式以减少无组织排放点和排放强度,同时削减无组织排放的污染物对环境的影响。1、操作规范无论是原辅材料的存放、转移还是生产操作一定按照相关规范进行,尽可能减少跑、冒、滴、漏现象存在,设备维修可以集中定期进行,以减少无组织排放的几率,同时在维修应尽可能选在一个流程完成、设备中无存料的时段进行。原辅材料特别是有机溶剂应该密闭存放。2、增强车间通风,降低无组织排放浓度当车间内和仓储区内出现无组织排放时应加强车间通风,以达到降低污染物在车间或仓储的局部区域的浓度,减少对职工的健康安全和环境的影响。3、设置卫生防护距离,降低对车间周围环境和敏感点影响根据大气环境影响分析,本项目卫生防护距离为600m,距离本项目所产生无组织排放单元600m区域内无居住区等敏感目标。综上所述,本环评认为该项目所采取的废气防治措施在经济技术上均是可行的。10.2.2废水防治措施根据工程分析中废水污染物产生及防治措施的论述,本项目运营期产生的废水废水主要为冷却循环水、实验室喷漆废水、车间地面清洁废水、雨季初期雨水及生活污水。生活污水及初期雨水、车间地面清洁废水经隔渣、三级化粪池处理后符合广东省《水污染物排放限值》(DB44/26-2001)第二时段三级标准,项目排水水质符合南水水质净化厂的进水139 珠海网泰环保设备有限公司化工涂料生产项目要求,排入南水水质净化厂处理后排放。生产废水中冷却水可循环利用不外排,实验室喷漆废水交有危废处理资质单位处理,不会外排。本项目车间地面清洁废水最初设计中拟沉淀、隔渣上清液作为消防水池消防补充水回用,但是由于这部分水经简单处理后无法达到《城市污水再生利用、城市杂用水水质》(GB/T18920-2002)中规定城市杂用水用于消防的标准,氨氮小于10mg/L,BOD小于15mg/L,因此本项目所产生厂房清洁废水回用于消防用水是不行的,应将其排入厂区化粪池后进入南水水质净化厂。根据生活废水及初期雨水、地面清洁废水纳入南水污水处理厂的可行性分析,本环评认为项目拟采取的废水防治措施在环保的角度是可行的。10.2.3噪声防治措施在建设时对主要噪声源采取以下措施:(1)设备的质量直接造成设备本身的差异,在有条件时尽量选择噪声较低的设备。(2)在各种泵、压缩机、分散剂和砂磨机采购时等选用防震、隔声效果好的规格。通过以上措施,本项目厂界1m处噪声可达到《工业企业厂界环境噪声排放标准》(GB12348-2008)3类标准。本项目建成投产后不会对该边界声环境产生明显的影响。因此,本评价认为建设单位采取的噪声治理措施是可行的。10.2.4固体废物的处理处置本项目建成投入使用后,固体废物主要是属于危废的实验室喷漆废水、废吸附液、除尘设施收集粉尘等,一般固废生活垃圾等。对于生活垃圾本项目拟进行分类处置,能回收的尽量回收利用,不能回收的可由厂内垃圾站集中存放,交由环卫部门统一处理。按有关规范要求,对实验室喷漆废水、废吸附液、除尘设施收集粉尘等,必须设置防渗、防漏、避免雨淋、日晒的场所进行存放,并交由有危废处理资质的单位回收处理,废包装物交回供应商处理。危险废物转移运输途中应采取相应的污染防范及事故应急措施。这些措施主要包括:①装载固体废物和危险废物的车辆必须做好防渗、防漏、防飞扬的措施。②有化学反应140 珠海网泰环保设备有限公司化工涂料生产项目或混装有危险后果的固体废物和危险废物严禁混装运输。③装载危险废物车辆的行驶路线须绕开人口密集的居民区和受保护的水体等环境保护目标。建议建设单位与具有处理收集、处理废有机溶剂废物、染料涂料废物、有机树脂类废物的资质的单位签订处理协议。本项目的危险废物处理措施必须在本项目建成试生产前落实(如:签署危险固废处理处置协议、办理危险废物转移手续等)。141 珠海网泰环保设备有限公司化工涂料生产项目11清洁生产国务院《建设项目环境保护管理条例》规定:―工业建设项目应当采用能耗物耗小、污染物产生量少的清洁生产工艺,合理利用自然资源,防止环境污染和生态破坏‖。清洁生产的基本内涵是在计划、生产建设活动中用预防污染的策略来减少污染物的产生,其实质是选用先进的生产建设工艺或工序,尽可能减少对原材料、能源和水等资源的消耗,循环使用或回收各种资源,最大限度减少污染物的产生。因此,本评价将遵循清洁生产的理论定性分析评估项目的清洁生产水平。11.1工艺和设备先进性(1)输送泵本项目生产所用原料和产品涂料多为易燃、易爆、易挥发液体,为了避免泄露,保护环境和改善劳动条件,便于维修和采用统一的备品备件,均选用屏蔽泵。屏蔽泵时一种特殊泵,结构上只有静密封无轴密封,能做到不漏,安全可靠等优点。适宜于易燃易爆,腐蚀性及贵重液体。(2)自流式包装机为了保证涂料灌装的安全性,卫生性及准确性,本项目选用专门为灌装化学危险品液体而设计的防火、防爆型的自流式包装机。(3)可燃气体警报系统溶剂罐区及各类仓库内可燃气体易聚集处均设有气体浓度检测探头,与设在控制室的控制器组成浓度报警系统。(4)消防报警联动系统控制中心设有智能型火灾报警控制屏。各类仓库、厂房等按消防贵发要求均设有火灾探测器和手动报警按钮,实现自动与手动双重报警功能。所有室内消防栓旁均安装破玻按钮和警铃,一旦人工触发,报警控制屏上即可显示出报警部位。同时可自动启动消防水泵。11.2能源资源利用11.2.1原材料消耗本项目部分原辅材料,经过物理过程,绝大部分进入产品,少量的在生产、存储过程中以气态形式挥发和逸散等。原材料挥发逸散占总物料的0.132%。142 珠海网泰环保设备有限公司化工涂料生产项目11.2.2能耗、水耗本项目的能耗主要是生产用电能耗。本项目建成投产后,按项目设计规模,年产量达到34500吨时,耗电约66万kW·h,耗新鲜水约2517m,因此项目的单位产品(1t)能耗指标为:3耗电:146.67kW·h;耗新鲜水:0.56m;单位产品耗水很小的,耗电水平较低。11.2.3节能措施①在保证产品质量前提下,生产工艺和设备选型选择节能新工艺和节能型设备,例如采用新型搅拌器、高效过滤装置。国产配套机电设备选用国家推荐的节能型产品。②在生产装置和辅助生产装置机电设备的选型上,要严格把关,积极选用合理用能的高效设备,在价格合理的情况下尽量采用技术先进、材料优良、结构合理、机械强度高、使用寿命长的节能型机电设备,以有效降低产品的能耗。③在总图布置中,在确保安全距离的前提下,尽量考虑紧凑,按流程顺序合理布置,以节省流体输送的动力和减少能量的损失。另外,将公用工程和辅助生产系统尽量布置在负荷中心,减少管线长度,有利于降低能耗。④建筑运行能耗很大,为减少能耗,将按照节能型建筑的要求,在建筑上采用保温墙,保温屋顶,保温隔热新型门窗,选用新型的保温节能型建筑材料。⑤所有电气设备在满足经济合理、安全可靠的基础上均选用节能型或低能耗产品,如变压器、电动机、整流设备、开关元器件、照明灯具等。合理选择变压器容量及电缆截面,优化变压器负载率和电缆载流量,以降低损耗。低压变电所进行合理的无功补偿,提高运行功率因数至0.92及以上,降低无功损耗。对于装置照明的控制采用照明电脑控制设备,合理控制照明电压,降低能耗,延长灯泡(管)使用寿命。11.3污染物产生和排放本项目生产工艺非常简单,均为树脂、溶剂和颜料、助剂混合装配和储存过程。三废产生量很小,行业性质决定了生产过程的轻污染。生产过程种有少量溶剂挥发和粉尘逸散,其泄漏量为不可避免的泄漏量,属于行业正常水平。挥发性溶剂经多功能净化塔吸附过滤,颜料粉尘经袋式除尘器过滤。在正常生产情况下,粉尘及有机废气的组织散逸排放将显著减少。生活污水产生量小,经过化粪池处理后,排入南水水质净化厂处理,生产废水可实现零143 珠海网泰环保设备有限公司化工涂料生产项目排放。对震动较大的设备,项目采取减震措施,防治震动传播。废包装桶被供应商回收,废吸附剂、喷漆废水妥善交由有危废处理资质的单位处理,不外排。11.4环境管理本项目通过建设污水预处理设施、减振降噪等设施,使项目废水、噪声、固废等污染物排放达到国家和地方排放标准、总量控制指标和排污许可证的要求。同时,项目建成后建设单位将采用IS014001的环境管理体系进行生产全过程管理,进一步提高清洁生产的水平。11.5清洁生产水平判定根据《涂料制造行业清洁生产评价指标体系》(试行)(国家发展和改革委员会发布)中指标考核评分标准,由于本项目为新建项目无充足资料描述定性评价指标,因此本次评判主要对照定量考核评分标准,本项目的清洁生产定量考核水平详见表11.5-1.权评价基准本项目评价一级指标重二级指标单位权重值值实际值值原材料消耗t/t产品111.0151.002资源与能tce/t产产品综合能耗60.170.16源消耗指21品标新鲜水耗t/t产品40.200.01溶剂型涂废水量t/t产品20.150.002料无生产废水废水中COD量mg/L340外排污染物指二甲312mg/m35.02.31标废气浓苯3度甲苯mg/m25.01.573粉尘mg/m24.01.57资源综合8水重复利用率%895.080利用指标144 珠海网泰环保设备有限公司化工涂料生产项目21原材料消耗t/t产品111.0151.001资源与能tce/t产源消耗指产品综合能耗60.170.17品标粉末型涂新鲜水耗t/t产品40.200.01料污染物指1废水量t/t产品20.150.002标2废气中粉尘含量mg/L124.02.31资源综合8水重复利用率%895.080利用指标以上表格中新鲜水消耗是指生产工艺用水(包括循环冷却水的新鲜水补充水)和车间清洁用水(不包括生活用水)污染物产生指标中废水的相关指标取废水经末端处理之后排口数据,废气指标取生产现场环境的相关数据(本项目取生产现场无组织排放量)根据上表所得权重值及个评价指标的单项评价指数,并对溶剂型涂料机粉末涂料的清洁水平根据产量得以加权,本项目生产过程中定量评价考核总分值为37.25(总分41),说明根据跟项目的设计及污染物防治措施的选择,本项目在资源与能源消耗指标、污染物指标、资源综合利用指标清洁生产考核中处于中上水平。由表可知,本项目所耗水量较占优势,污染物产生量水平较评价基准值良好,能耗方面与评价基准值相当,废气产生水平较基准值占优势。此外项目在生产过程中严格执行国内相关行业强制标准、保证产品合格率、保证产品达标情况及取得消防安全生产许可证以及确保生产中的良好管理杜绝发生火灾和爆炸及负伤事件的出现等可促使本项目进一步达到国内清洁生产企业的要求。145 珠海网泰环保设备有限公司化工涂料生产项目12总量控制指标12.1总量控制因子的确定结合广东省总量控制要求并根据项目排污特征因子,建议总量控制因子如表12.1-1。表12.1-1总量控制因子污染源项目总量控制因子项目生产废水CODCr项目生活污水CODCr、氨氮固体废物工业固体废物排放量12.2污染物总量控制指标12.2.1水污染物总量控制建议指标本项目生活污水和初期雨水经化粪池处理后符合广东省《水污染物排放限值》(DB44/26-2001)中的第二时段三级标准后汇入市政污水管网,进入南水水质净化厂统一处理。3本项目外排污水放量1877.25m/a,其中CODcr:0.428t/a,氨氮:0.033t/a.建议纳入南水水质净化厂总量控制指标。12.2.2大气污染物总量控制建议指标本项目无列入国家总量控制指标的环境空气污染因素,但本根据本项目特点,建议对本项目生产工厂内有机废气进行总量控制,指标建议为非甲烷总烃排放量:1.43t/a,甲苯排放量为0.042t/a,二甲苯的排放量为0.042t/a,TVOC排放量0.0132t/a。12.2.3固体废物总量控制建议指标本项目产生的固体废物主要有废包装桶、废吸附液、喷漆废水、废清洗溶剂,以上均属于危险废物,废包装桶交回供应商处理,其余危废交有危废处理资质单位处理,不外排。此外生活垃圾由环卫部门统一处理,因此,工业固体废物外排总量控制建议为0。146 珠海网泰环保设备有限公司化工涂料生产项目13环境经济损益分析13.1分析方法以资料分析为主,在详细了解项目的工程概况和污染物影响程度和范围的基础上,运用费用-效益分析方法对环境经济损益进行定性或定量的估算和分析评价。费用-效益分析是最常用的建设项目环境经济损益分析方法和政策方法。利用该方法对建设项目进行分析将有利于正确分析项目的可行性。费用是总投资的一部分,而效益包括经济效益、社会效益和环境效益,即:费用=生产成本+社会代价+环境损害;效益=经济效益+社会效益+环境效益。13.2环保投资本项目的环保设施见表13.2-1。本项目总环保投资为154万元,占项目总投资的5.13%。表13.2-1环境保护投资估算类别设施名称投资(万元)备注污水处理设施生活污水8——隔渣设施、化粪池等布袋式过滤器12生产废气有机废气净化塔30环通风设备5保生产设备噪声工减振降噪设施6及震动程危险废物危险废物处理费用25——生活垃圾一般固体废物处理费用3——废气及噪声绿化20小计109占总投资费用3.63%防爆搬运及辅助设备5安全消防设施、废水收集池25消防防泄漏、防爆零件及杂品5设施泄漏检测设备10小计45占总投资费用1.5%合计154——本项目建设总投资为3000万元,环保工程占其比例约为3.63%。本项目主要为物理方法生产各类涂料,生产设备密封性好,污染产生量少,相应的环保投资比例较小。项目风险事147 珠海网泰环保设备有限公司化工涂料生产项目故保证安全生产,和发生环境突发性危害事故的有效处理显得尤为重要,因此风险防范中的消防安全措施可纳入环保投资中。综合以上可知,本项目环保投资占总投资比例为5.13%13.3经济效益、环境效益和社会效益13.3.1经济效益本项目总投资3000万元,年均销售收入可达8265万元,年均利润总额为5265元,其投资利润率达到53.2%,投资利税率31.37%。因此,项目的经济效益较好。13.3.2环境保护措施的环境效益该项目环境保护措施的环境效益,主要体现在采取环境保护措施后,使环境质量得到一定程度上的保护,取得良好的生态环境效益。由于项目产生的废水排入南水水质净化厂进一步进行处理,可使废水中的各种污染物指标能达标,从而消除了对纳污海域环境的污染;而固体废物经过合理的处置措施处理后,在很大程度上保护了周围的环境和陆地生态。13.3.3社会效益本项目符合国家和广东省的化学工业产业政策,是广东省和珠海市大力发展化学工业。项目的实施,可为社会提供50人的就业机会。可见,本项目具有良好的社会效益。148 珠海网泰环保设备有限公司化工涂料生产项目14公众参与14.1公众参与阶段和方式按照《建设项目环境影响公众参与暂行办法》(环发[2006]28号)、《广东省建设项目环保管理公众参与实施意见》(粤环[2007]99号)的要求,本项目进行了三个阶段的公众参与。(1)第一阶段:项目信息公示本项目于2011年6月1日~6月14日在珠海视窗网站(http://www.zhuhai.gd.cn/)上进行了第一次信息公示,详见图14-1,并在敏感点张贴公告,详见图14-2。(2)第二阶段:报告书编制阶段公众参与在报告书编制过程中,采取发放公众参与调查表、与企业、管委会沟通交流等方式进行了公众参与。(3)第三阶段:报告书简本公示环评报告书初步完成后,于2011年7月1日~7月14日在珠海视窗网站(http://www.zhuhai.gd.cn/)进行了第二次信息公示及报告书简本,详见图14-3。14.2调查方式与调查范围(1)调查方式公众调查于2011年7月16日进行,主要采取问卷调查、现场询问等方式。同时根据实际情况,于2011年9月又对周边的公众进行了补充调查。(2)调查范围调查范围为扩建项目所涉及的周边的工厂及铁炉新村居委会等。主要是直接受到影响的人或直接受到影响团体的代表,包括预期要得到收益的人、承担风险的团体和利益相关的团体。(3)调查对象公众参与调查表的发放对象为建设项目周边的工厂企业及所在地相关一般政府机关等部门的工作人员,主要是直接受到影响的人或直接受到影响的团体的代表。(4)调查人数两次调查共发放调查表60张,回收54张,回收率为90%。同时记录被调查者的姓名、职业、年龄、性别、居住地点等。149 珠海网泰环保设备有限公司化工涂料生产项目14.3公众调查结果分析14.3.1公众参与总体调查结果公调个人信息汇总详见附件10,汇总的公众调查意见结果表见表14.3-1表14.3-1公众参与调查结果统计表占调查样本比例问卷项目答案统计数量(%)满意1833.33%(1)您对目前当地的环境状况是否满意?比较满意3055.56%不满意611.11%空气3055.56%(2)你最关心当地的环境问题是什么?水1629.63%噪声814.81%赞成3462.96%(3)本项目在采取环保措施并达到相关环保要求不赞成0.00%后,您是否接受本项目的建设?无所谓2037.04%尚可接受4379.63%(4)你认为本项目的环境影响属于什么程度?影响较大814.81%不可接受35.56%非常担忧712.96%(5)你对本项目环境保护担忧吗?比较担心2750.00%不担心2037.04%很大1629.63%较小2037.04%(6)本项目对当地社会经济发展有什么作用?很小1324.07%无作用59.26%有利影响1731.48%(7)本项目对你的生活和工作有什么影响?不利影响712.96%无影响3055.56%影响人体健康59.26%污染空气2648.15%污染水体814.81%(8)你认为本项目建设会造成哪些问题?产生噪声59.26%影响环境卫生47.41%其他611.11%(9)您对本项目在环境保护措施有什么意见或建议?150 珠海网泰环保设备有限公司化工涂料生产项目14.3.2公众调查个人意见分析在两次回收的54份调查表中,有62.96%的公众表示在本项目所采取的各项环保措施达到相关要求后,对本项目的建设是持赞成态度的,有37.04%的公众对本项目的建设表示无所谓,无人表示不赞成态度。在2011年7月的首次调查中有两位被访者持反对意见,在2011年9月的补充调查中,调查小组更深入地介绍项目的情况及完善的污染防治措施,尤其是对之前反对者加深沟通,经多次互相了解被访者中均表示在本项目保证各项环保措施良好运行的情况下,不会反对该项目的建设。通过两次调查,有33.33%的公众对目前的环境状况满意,55.56%的公众对目前的环境状况比较满意,11.01%的公众对目前的环境状况不满意。55.56%的公众最关心当地的空气问题,29.63%的公众最关心当地的水问题,14.81%的公众最关心当地的噪声问题。79.63%的公众认为本项目的建设尚可接受,14.81%的公众认为本项目的建设为影响较大,5.56%的公众表示对项目的环境保护非常担忧,50%的公众表示对项目的环境保护比较担心,37.04%的公众表示对项目的环境保护不担心。29.63%的公众表示本项目对当地经济发展作用很大,37.04%的公众表示本项目对当地经济发展作用较小。55.56%的公众表示本项目对其的生活和工作无影响。9.26%的公众表示本项目的建设会带来影响人群健康的问题,48.15%的公众表示本项目的建设会带来空气污染的问题,14.81%的公众表示本项目的建设会带来水体污染的问题,9.26%的公众表示本项目的建设会带来噪声问题,7.41%的公众表示本项目的建设会影响环境卫生。此外在调查过程中,公众口头表达对本项目的建议和意见主要是:①希望在建设过程中合理施工降低影响。②做好环保措施,落实环保措施,生产中保护环境。③生产中确保各类环保措施的有效使用。14.3.3公众调查单位意见分析本项目公众参与社会调查单位调查表共发出5份,收回4份,比例为80%。团体调查共对珠海地球粘胶科技有限公司、珠海市南水镇铁炉经济联合社及珠海桦泽工业有限公司、珠海环保产业开发有限公司进行了调查。其中项目周边最近的居民区——铁炉经济联合社表明对项目的建设持赞成态度,并且希望建设单位在施工过程中能按工程施工要求对扬尘及噪音进行处理和防护,并且对生产中产生的废气、噪音等按环保要求进行处理;与项目相邻的环保产业开发公司厂区负责人对本项目建设态度为无所谓,希望在生产中151 珠海网泰环保设备有限公司化工涂料生产项目能有废气处理措施;地球粘胶科技有限公司对本项目达到环保措施要求后赞成本项目的建设。并且提出在施工中尽量控制噪声、粉尘,生产过程中做好污染物的处理措施,减少排放。14.3.4其他建议和要求由公众意见调查可知,公众对工程产生的环境影响,具体的建议和要求主要集中在:(1)强调施工过程中要注意废气、废水的处理。(2)严格按国家有关规定进行设计、施工,确保工程质量,加强工程监理,严格监督工程施工管理,消除事故隐患。(3)项目建成投产后,应加强全过程的环境监督和管理,确保环保设施正常运行和固体废物的处理处置,杜绝一切污染事故的发生。(4)强调建设单位营运期应采取措施,严格实施废水、生态等各项污染治理措施并认真落实,做好建设项目的风险防范措施,并做好企业本身的环保管理队伍建设,采用各种手段减少项目建成后对环境的影响,争取项目所涉及区域群众的支持和理解。此外报告书简本公示期间没有收到公众意见。14.4公众参与结论(1)本项目个人调查共发放调查表60张,回收54张,回收率为90%,各种参与人分别来地球粘胶有限公司、环保产业发展有限公司及铁炉村委会等。(2)调查问卷统计结果显示:有62.96%的公众对本项目的建设持赞成态度,有37.04%的公众对本项目的建设表示无所谓。(3)本次公众调查征求了项目周边4家单位的意见,各家单位都在一定的了解基础上提出了对本项目建设的态度。(4)公众对本项目的建议和意见主要是:①强调施工过程中要注意废气、废水的处理。②严格按国家有关规定进行设计、施工,确保工程质量,加强工程监理,严格监督工程施工管理,消除事故隐患。③项目建成投产后,应加强全过程的环境监督和管理,确保环保设施正常运行和固体废物的处理处置,杜绝一切污染事故的发生。企业接受以上公众意见,并承诺营运期严格实施废水、废气、噪声等各项污染治理措施,做好建设项目的风险防范措施,并做好企业本身的环保管理队伍建设,采用各种手段减少项目建成后对环境的影响。152 珠海网泰环保设备有限公司化工涂料生产项目15环境管理和环境监测计划15.1环境管理15.1.1设立环境保护管理机构为了做好生产全过程的环境保护工作,减轻本项目外排污染物对环境的影响程度,建设单位应高度重视环境保护工作。建议设立内部环境保护管理机构,专人负责环境保护工作,实行定岗定员,岗位责任制,负责各生产环节的环境保护管理,保证环保设施的正常运行。环境保护管理机构(或环境保护责任人)应明确如下责任:(1)保持与环境保护主管机构的密切联系,及时了解国家、地方对本项目的有关环境保护的法律、法规和其它要求,及时向环境保护主管机构反映与项目有关的污染因素、存在的环境问题、采取的污染控制对策等环境保护方面的内容,听取环境保护主管机构的批示意见。(2)及时将国家、地方与本项目环境保护有关的法律、法规和规定向单位负责人汇报,及时向本单位有关机构、人员进行通报,组织职工进行环境保护方面的教育、培训,提高环保意识。(3)及时向单位负责人汇报与本项目有关的污染因素、存在的环境问题、采取的污染控制对策、实施情况等,提出改进建议。(4)负责制定、监督实施本单位的有关环境保护管理规章制度,负责实施污染控制措施、管理污染治理设施,并进行详细的记录,以备检查。(5)按本报告提出的各项环境保护措施,编制详细的环境保护措施落实计划,明确各污染源位置、环境影响、环境保护措施、落实责任机构(人)等,并将该环境保护计划以书面形式发给相关人员,以便于各项措施的有效落实。15.1.2健全环境管理制度按照ISO14000的要求,建立完善的环境管理体系,健全内部环境管理制度,加强日常环境管理工作,对整个生产过程实施全程环境管理,杜绝生产过程中环境污染事故的发生,保护环境。加强建设项目的环境管理,根据本报告提出的污染防治措施和对策,制定出切实可行的环境污染防治方法和措施;做好环境教育和宣传工作,提供各级管理人员和操作人员的环境保护意识,加强员工对环境污染防治的责任心,自觉遵守和执行各项环境保护的规章制度;153 珠海网泰环保设备有限公司化工涂料生产项目定期对环境保护设施进行维护和保养,确保环境保护设施的正常运行,防止污染事故的发生;加强与环境保护管理部门的沟通和联系,主动接受环境主管部门的管理、监督和指导。15.2环境监测计划15.2.1监测计划本项目的环境管理、环保监督及监测计划见表15.2-1、表15.2-2、表15.2-3。表15.2-1项目环境管理计划环境问题减缓措施实施机构负责机构1设计阶段1.1方案选择充分利用地形和现有植物,以尽量减少土石方量和破坏植被。1.2空气污染考虑到扬尘和其他问题对环境敏感地区(如居民区)的影响。设计单位建设单位1.3噪声污染对评价范围的敏感点,根据超标情况设计减噪措施。环评单位1.4水污染严格采用雨污分流制。2施工期(1)施工现场经常洒水,以降低施工期空气污染浓度;2.1空气污染(2)料堆和贮料场遮盖或洒水以防止尘埃污染,运送建筑材料的卡车须用帆布遮盖,以减少路漏。严格执行噪声标准,防止建筑工人受噪声侵害,靠近强声源2.2噪声污染的工人应戴耳塞并限制工作时间。(1)采取水土措施,减少施工场地的水土流失;(2)分片施工,尽快植草,减少表土裸露时间。水土流失、(3)修筑排水沟,出水一侧设置沉淀池,防止泥沙进入附近水2.3承包商建设单位水环境污染域。(4)工人的生活污水要收集处理,并排入施工地附近的纳污水体或设施。在施工驻地设置垃圾箱和污水处理设施,生活污水、施工机2.4施工驻地械产生的含油污水不可直接排放到水体中,防止生活污水和固体废物污染水体。施工期间,为降低事故发生率,施工区域应设置有效的安全2.5施工安全和警告措施。3营运期生活污水进入三级化粪池处理后进入南水水质净化厂处理达有关物业3.1水质污染标后排放。公司甲苯、二甲苯由多功能净化塔+除味剂吸附设施处理有关环保3.2大气污染粉尘由袋式除尘器处理公司安装有关物业生活垃圾集中收集后由环卫部门定时清运;公司建设单位有资质3.3固废污染危险废物交由有资质的单位回收处理。单位相关供废包装桶交由供应商回收处理应商按照环境监测技术规范及国家环保局颁布的监测标准、方法有资质4环境监测执行。单位154 珠海网泰环保设备有限公司化工涂料生产项目表15.2-2环境保护监督计划阶段监督机构监督内容监督目的1、保证环评内容全面、专题设置得当,可行重点突出;性研环境行政2、保证本项目可能产生的重大的、潜审核环境影响报告书究阶主管部门在的环保问题都已得到了反映;段3、保证减缓环境影响的措施有具体可靠的实施计划。1、严格执行三同时;1、审核环保初步设计;2、确保环保投资;2、核查环保投资是否落实;设计3、确保这些场所满足环保要求;3、检查料场、灰土搅拌站场所是否合适;和建环境行政4、减少建设对周围环境的影响,执行4、检查粉尘和噪声污染控制,决定施工时间;设阶主管部门相关环保法规和标准;5、检查施工场所生活废水的排放和处理;段5、确保地表水不被污染;6、检查环保设施三同时,确定最终完成期限;6、确保三同时;7、检查环保设施是否达到标准要求。7、验收环保设施。1、检查营运期环保措施的实施;2、检查监测计划的实施;3、检查有必要采取进一步的环保措施(可能出1、落实环保措施;现原未估计到的环境问题);2、落实监测计划,切实保护环境;营运环境行政4、检查环境敏感区的环境质量是否满足其相3、加强环境管理,切实保护人群健康;阶段主管部门应质量标准要求;4、确保其污水、尾气排放满足排放标5、检查污水处理效果;准,噪声环境满足功能区要求。6、检查噪声处理效果。7、检查大气污染物处理效果。表15.2-3环境监测计划监监测监测监测测负责阶段监测地点监测项目要素频率时间机机构构每月一次,每次两天,施工期铁炉新村等效声级必要时可适当增加不定昼夜噪声期的监测各测项目东、南、西、每年冬、夏各监测一次,一次营运期等效声级北四个边界每次两天SS、COD、BOD、施工生活污水排每年冬、夏各监测一次,有施工期石油类、氨氮、入污水管处每次连续三天根据资动植物油建设废水需要质单位监测单DO、SS、COD、项目生活污水排每年冬、夏各监测一次,位营运期BOD、氨氮、石入污水管处每次连续三天油类、TP、LAS铁炉新村;项目每季度一次,每次一天,连续施工期施工营地;项目TSP、PM10必要时可适当增加不定监测空气东、西边界期的监测12小项目厂界、纬二甲苯、二甲苯、每季度一次,每次连续营运期时十一路主入口处非甲烷总烃三天155 珠海网泰环保设备有限公司化工涂料生产项目为了及时了解和掌握建设项目营运期主要污染源污染物排放状况,建设单位应定期委托有资质的环境监测部门对本项目主要污染源排放的污染物进行监测。(1)大气污染源监测监测点布设:项目厂界监测项目:甲苯、二甲苯、非甲烷总烃监测频次:每季度监测一次监测采样及分析方法:《环境监测技术规范》和《空气和废气监测分析方法》。(2)噪声源监测监测点位:建设项目主要噪声源附近1米处监测因子:等效连续A声级监测频次:每半年一次监测采样及分析方法:《环境监测技术规范》。(3)厂边界噪声监测监测点布设:项目辖区厂区四周布设4个监测点(与声环境质量现状监测点位相同)。监测时间和频次:监测时间为每年2次,每次分昼间和夜间进行。监测采样及分析方法:《环境监测技术规范》。15.2.2规范排污口根据国家标准《环境保护图形标志—排污口(源)》和国家环保总局《排污口规范化整治要求(试行)》的技术要求,企业所有排放口,包括水、气、声、固体废弃物,必须按照―便于计量监测、便于日常现场监督检查‖的原则和规范化要求,设置与之相适应的环境保护图形标志牌,绘制企业排污口分布图,同时对污水排放口安装流量计,对治理设施安装运行监控装置。排污口的规范化要符合环境监理所的有关要求。(1)废气排放口本建设项目不设有烟囱,具有15m高的废气排放口,其采样口按《污染源监测技术规范》要求,设置便于采样、监测的排放口,如果不能满足要求的,与环境监测部门共同确认。(2)固定噪声源156 珠海网泰环保设备有限公司化工涂料生产项目按规定对固定噪声源进行治理,并在边界噪声敏感点,且对外界影响最大处设置标志牌。(3)固体废物储存场一般工业固体废物和办公垃圾设置专用堆放场,采取防止二次扬尘措施;危险固废必须设置专用堆放场地,有防扬散、防流失、防渗漏等措施。(4)设置标志牌要求环境保护图形标志牌由环保主管部门统一定点制作,并由环保主管部门根据企业排污情况统一向环保主管部门订购。企业排污口分布图由环保主管部门统一绘制。排放一般污染物排污口(源),设置提示标志牌。标志牌设置位置在排污口(采样点)附近且醒目处,高度为标志牌上缘离地面2米。排污口附近1米范围内有建筑物的,设平面式标志牌,无建筑物的设立式标志牌。规范化排污口的有关设置(如图形标志牌、计量装置、监控装置等)属环保设施,排污单位必须负责日常的维护保养,任何单位和个人不得擅自拆除,如需变更的须报环保主管部门同意并办理变更手续。15.3“三同时”验收一览表本项目―三同时‖验收一览表见表15.3-1。表15.3-1“三同时”验收一览表序项目拟采取措施要求号生活污水1化粪池处理厂房地面清洁出水水质达到《广东省水污染物排放限值》2废水(DB44/26-2001)中的第二时段三级标准。先收集至厂区初期雨水池,再3初期雨水分批排入厂区化粪池布袋式除尘器净化粉尘、多功甲苯、二甲苯及非甲烷总烃最高浓度可满足《工业企4废气能塔吸附有机废气设备、业设计卫生标准GBZ1-2002》,粉尘无组织排放监控车间通风设备浓度满足《大气污染物排放限值》(DB44/27-2001)厂区边界噪声达到《工业企业厂界环境噪声排放标5厂界噪声设备降噪措施准》(GB12348-2008)3类标准。暂时存放废吸附剂、喷漆废水、危险废物贮存场按照《危险废物贮存污染控制标准》6危废临时堆场除尘设施收集粉尘等各类危险(GB18597-2001)的要求建设和维护使用。废物7废气及噪声厂区绿化净化空气、隔声全部回收,无外排8消防扑救水事故水池事故水池无事故状况下空置157 珠海网泰环保设备有限公司化工涂料生产项目16结论与建议16.1工程概况珠海网泰环保设备有限公司化工涂料生产项目位于广东省珠海市高栏港经2济区精细化工区纬二十一路西南,厂区总占地面积为21929.20m,总建筑面积211364.71m,总投资为3000万元。项目主要生产与储存设备为分散设备、调和设备、各类涂料生产设备及计量设备等。项目建设完成后产品方案及生茶规模为为化工涂料约4500t/a,其中主要包括:UV光固化涂料、塑胶机壳漆、五金机壳漆、粉末涂料约、塑胶机壳漆配套稀释剂。16.2工程分析结论16.2.1水污染源及污染防治措施本项目产生的主要有生产废水和办公生活污水及厂区地面初期雨水、车间地面清洁水等。生产废水产生及治理情况:实验室喷漆产生的废水每天产生量约为20.006m/d,这部分废水属于危险废物,HW-12颜料、涂料废物,收集后定点存放,集中交给有危废资质单位处理。33本项目前期雨水52.55m/次和生活污水(3.6m/d)、车间地面清洁废水3(0.03m/d)经厂区化粪池处理后送入高栏港经济区南水水质净化厂统一处理。16.2.2大气污染源及污染防治措施粉状原料加料粉尘产生约0.2t/a;生产中有机溶剂挥发产生量:二甲苯约为0.28t/a,甲苯约为0.28t/a,非甲烷总烃约为9.54t/a,各类助剂产生的TVOC为0.088t/a。对于无组织排放:车间及存放处各溶剂废气无组织排放量中甲苯为0.01t/a,二甲苯为0.01t/a,非甲烷总烃为0.38t/a;粉状原料生产中搬运过程产生的无组织排放量为0.02t/a。本项目产生的粉尘,通过加料口设置的专用布袋除尘装置(除尘效率可达158 珠海网泰环保设备有限公司化工涂料生产项目95%),过滤后通过车间内强制通风,从车间屋顶高空排放,排放高度为15m时。有组织粉尘排放量实际为0.01t/a,0.0042kg/h。项目生产过程中产生的甲苯、二甲苯、非甲烷总烃及TVOC等,通过集中收集,多功能净化塔及除味液吸附的的方法来处理,吸附效率不低于为85%。过滤后通过15m高的排气筒高空排放。因此甲苯的有组织排放量为0.042t/a,二甲苯为0.042t/a,非甲烷总烃为1.43t/a,TVOC为0.0132t/a。16.2.3噪声污染及防治措施本项目生产过程中产生噪声环节主要是分散机的高速搅拌、研磨机的运作、三辊研磨机机的搅拌、各类泵等。本项目各类设备的噪声源强在65~95dB(A)之间。本项目采取选择低噪声的设备,对各噪声源部件采取减震、隔振、消声和隔声措施;考虑建筑上采用隔声、吸声处理,其中包括隔声门、窗以及吸声材料。同时在厂区道路两侧种植绿化带,厂内空地种植花草,以进一步削减噪声,以使厂界噪声达到《工业企业厂界环境噪声排放标准》(GB12348-2008)3类标准的要求。16.2.4固体废物产生及处置措施本项目生产期的固体废物主要包括生产固废和办公生活垃圾。本项目产生的生产固废包括废包装物20个桶/a,废除味吸附液1t,布袋除尘器收集起来的粉尘颗粒物0.04t/a,洗涤残液约为0.05t/a,实验室喷漆水帘柜所产生的废水约1.8t/a。办公生活垃圾为6.0t/a。根据本项目所产生的固废种类,建设单位在生产运营期首先必须对废物进行识别与分类处置。项目运营所产生的废吸附液、除尘设备收集的颗粒物以及设备清洁废溶液、有机溶剂原材料包装桶均属于危险废物,建设单位拟对各类危险废物统一收集后,各类包装桶教会供应商回收处理,其余各类危废交有危废处理资质资质单位进行处理。办公垃圾经按类妥善存放后,交由当地环卫部门统一收集清理。159 珠海网泰环保设备有限公司化工涂料生产项目16.3区域环境质量现状16.3.1海水环境质量现状本项目引用《长兴化学材料(珠海)有限公司二期重大变更项目环境影响报告书》中于2011年2月进行的黄茅海水质监测数据。根据对南水水质净化厂排污口所在海区——黄茅海海域的监测结果表明,所有监测指标均符合《海水水质标准》(GB3097-1997)中的第三类水质标准。涨退潮期间的活性磷酸盐与标准值一致,虽未超标,但说明海水受活性磷酸盐影响较大。黄茅海水环境质量一般,其中受活性磷酸盐污染比较严重,活性磷酸盐污染源主要来自黄茅海上游,黄茅海上游地区人口及工业较集中,上游污水排放至崖门口水道,然后汇入黄茅海。16.3.2环境空气环境质量现状本项目引用《长兴化学材料(珠海)有限公司二期重大变更项目环境影响报告书》中2011年2月进行的大气监测数据。在以厂址为中心边长6km矩形范围内,对铁炉村和高栏港管委会布点监测,结果表明,各监测点NO2、SO2的小时平均浓度值及日平均浓度值均符合《环境空气质量标准》(GB3095-1996)及其修改单中的二级评价标准的要求。各监测点PM10日平均浓度值均符合《环境空气质量标准》(GB3095-1996)中的二级评价标准的要求。苯、甲苯、TVOC小时平均浓度均符合《室内空气质量》(GB/T18883-2002)中规定的标准值。由此说明,目前评价区域范围内空气环境质量良好。16.3.3声环境质量现状评价区域内各测点昼间、夜间噪声值均满足《声环境质量标准》(GB3096-2008)3类标准要求,表明建设项目所在地声环境质量状况满足区域功能需要。16.4环境影响预测分析结论16.4.1施工期环境影响分析结论本项目施工过程工程挖方和填土较小,造成水土流失影响也较小。项目施工160 珠海网泰环保设备有限公司化工涂料生产项目期间的二次扬尘、机械作业及车辆运输产生的噪声和废气等会对环境产生影响;另外,施工期间作业人员的生活污水、生活垃圾等也是污染源之一。施工机械作业产生噪声,车辆运输产生的噪声和废气亦会对周围环境产生影响。相对其它污染因素,施工机械作业产生的噪声及车辆运输噪声对周围环境影响比较明显,通过采取有效的防范措施,施工期基本不会给周围环境带来不良影响。16.4.2运营期海水环境影响分析本项目产生废水主要为冷却循环水、实验室喷漆废水、车间地面清洁废水、雨季初期雨水及生活污水。建设单位拟对冷却水进行循环使用,定期补充蒸发损耗即可,不会产生废水外排。实验室喷漆废水属于危险废物,建设单位会定期收集定点存放,交有危废处理资质单位处理。本项目生活污水及初期雨水、车间地面清洁水废水经隔渣、三级化粪池处理后符合广东省《水污染物排放限值》(DB44/26-2001)第二时段三级标准,项目排水水质符合南水水质净化厂的进水要求,项目废水排入南水水质净化厂在水质要求上是可行。通过南水水质净化厂处理后的水可达标准要求,排入黄茅海。本项目的废水排放对附近海域水质不会产生影响。16.4.3运营期地下水环境影响分析本项目生产所在地区为高栏港精细化工区,项目生产中不涉及地下水使用,不会对该区域地下水储存量产生影响,也不会影响到周围居民饮用水。项目生产过程中产生的废水主要为实验室废水、厂房地面清洁废水、办公生活污水等。生活污水经隔渣、三级化粪池处理后的生活污水一同排入南区水质净化厂污水管网。实验室废水及设备清洗废溶液均得到妥善处理。项目污水排放正常情况下不会对区域地下水造成影响。同时在项目建设过程中,建设方针对项目区域地质特征,拟选择合理的防沉降、防渗漏的施工方法和材料来构筑消防水池及厂区内管线,严防跑、冒、漏、滴现象,结合恰当的设备管理方案,确保各个设施的良好运转,可杜绝生产中污水的泄露和渗漏情况,因此在确保以上措施的情况下,项目生产过程中废水排放161 珠海网泰环保设备有限公司化工涂料生产项目不会对地下水水质产生影响。另一方面根据查阅资料,高栏港地区地下水以Cl-Na型咸水居多,因此本项目建设生产过程不会对区域地下水的水量和水质产生影响。16.4.4运营期大气环境影响预测结论正常生产情况下,各污染物最大落地浓度均远低于评价标准。同时环境空气敏感点,尤其是铁炉村处甲苯预测浓度叠加背景值后占标率仅为1.14%,高栏港管委会出为0.43%,远低于评价标准。本项目各污染物正常排放下对环境敏感点影响较小。本项目非正常工况下(废气处理设备完全失效),铁炉村处甲苯的预测浓度叠加背景浓度后占标率为3.81%(铁炉新村),高栏港管委会处为1.18%,可知本项目各污染物在废气处理措施失效的状况下排放虽然对各敏感点影响有较大的增加,尚处于浓度标准限值范围内。再者根据生产计划,本项目所使用的吸附剂吸附装置及布袋除尘装置均会定期更换、维护等,保证废气治理措施的良好运行,杜绝出现失效的情况,以保证本项目废气排放对周边敏感点的影响水平。本项目所产生无组织排放各车间、仓库建筑边界距最近居民区铁炉新村最近边界距离为大于600m,卫生防护距离内无居民居住区。16.4.5运营期声环境影响评价结论预测结果表明,本项目建成投产后,厂区四周边界的昼间、夜间噪声均不超过《工业企业厂界环境噪声排放标准》(GB12348-2008)3类标准。项目建成后必须对强噪声源采取有效的隔声、消声、吸声和防振等措施综合治理,合理布局生产线,降低项目营运期间的噪声,使项目建成投入使用后对周围边界声环境质量不会产生明显的影响。16.4.6运营期固体废物环境影响分析结论本项目产生的危险废物主要是废包装桶、废清洗溶剂、废吸附液及少量除尘162 珠海网泰环保设备有限公司化工涂料生产项目设施收集粉尘等,各类危险废物交给有资质的单位回收处理,废包装桶交由供应商回收处理,生活垃圾交由环卫部门处理。只要严格管理,并进行安全处置,做好危废暂存场所的保护措施,确保危废运输过程的安全,本项目产生的固体废物不会对生态环境和人体健康产生影响。16.5环境风险评价结论本项目建成投产后生产的主要产品包含一级易燃溶剂涂料(危规号:32198)、辅助材料、二级易燃溶剂的涂料(危规号:33646)、辅助材料等;项目生产主要原辅材料包括丙酮、溶剂油、甲苯、异丙醇(2-丙醇)、乙酸乙酯、乙酸正丁酯、二甲苯异构体混合物、正丁醇、异丁醇、不饱和聚酯树脂、乙二醇丁醚等。上述这些物质均属于易(可)燃、爆炸、有毒等危险也行;项目的生产、储运装置也存在一定的潜在危险性。如因管理不善、工艺指标、控制不严、操作当,物质和能量的正常运行状态遭到破坏,有可能引起火灾、爆炸、人员中毒等环境突发性事故的发生。通过风险源辨识结果,本项目已构成危险源,属于非重大危险源,风险评价-4-5工作等级为二级。项目危险水平应在10~10数量级之间,为操作危险性中等。2222本评价估计的4种管道破损孔径(2cm、5cm、10cm、20cm)在1小时的溶剂挥发量,无论是年平风速还是日平均风速条件下,甲苯和二甲苯的地面浓度均低于《工作场所有害因素职业接触限值化学有害因素》(GBZ2.1-2007)中时间加32权平均容许浓度50mg/m。当破损孔径为20cm时,小风时E稳定度下甲苯和33二甲苯的最大浓度为40.163mg/m,快接近时间加权平均容许浓度50mg/m。根据现场调查,甲类厂房及溶剂罐区100m范围内无居民居住,本项目风险敏感保3护目标各点浓度值均远远小于时间加权平均容许浓度50mg/m。本项目依照国家和行业的有关法律法规、标准和规范,从总图布置和建筑防火、防爆要求、工艺和设备装置、消防系统、防雷、防静电措施、防毒措施、电气系统、综合安全管理等方面采取了完善的风险防范措施。根据《化工建设项目环境保护设计规范》(GB50483-2009)中要求,本项目3事故收集池应大于244.25m,由于事故收集池的特殊要求须保持闲时空置,不3能被占用,因此本环评建议将原设计事故收集池分割为二,一个为容积300m3的事故收集池,一个为容积100m的初期雨水池,两池可做隔断性连通。同163 珠海网泰环保设备有限公司化工涂料生产项目3时300m的事故收集池在容积上满足《化工建设项目环境保护设计规范》(GB50483-2009)要求,状态上满足事故收集池在无事故条件下的空置要求;33100m的初期雨水池可满足初期雨水的收集需求(52.55m/次)。本项目在采取风险防范措施、环境风险削减措施、制定事故应急预案与计划后可将本项目环境风险降低到最低程度,并且不会对周围环境产生重大影响。16.6项目选址和理性和产业政策符合性分析16.6.1项目选址合理性分析本项目位于珠海高栏港经济区精细化工区,交通方便。该建设项目用地不属于基本农田保护区,也不属于水源保护区。项目四周空旷,厂界周边500m内没有聚集的居民区。根据目前的珠海市土地利用规划,本项目占地使用土地性质属于工业用地。项目选址符合珠海高栏港经济区用地规划和产业发展规划,因此本项目选址合理。16.6.2产业政策符合性分析根据中华人民共和国国家发展和改革委员会《产业结构调整指导目录(2011年本)》,本项目的建设属于不属于其限制类和淘汰类,项目的建设符合国家产业政策和发展方向。根据珠海市发展和改革局发布的《珠海市产业发展导向目录(2010年本)》要求,本项目的建设属于―优先发展类中-先进制造业-2石油化工产品-(10)环保型涂料和各类专用涂料生产‖的政策及优先发展区域,因此本项目建设属于优先发展类。因此本项目的建设符合《珠海市产业发展导向目录(2010年本)》要求,项目的建设符合珠海市产业政策和发展方向。16.7清洁生产措施本项目涉及到的化工原料绝大部分是易挥发的有机物,本项目在设计过程中,充分考虑了清洁生产的各个方面。本项目拟采取的工艺和设备方面的清洁生产措施主要有:选用屏蔽泵,在溶剂传输过程中不漏,安全可靠;选用专门为灌装化学危险品液体而设计的防火、164 珠海网泰环保设备有限公司化工涂料生产项目防爆型的半自动灌桶机。本项目采取的节能措施主要表现在:高速搅拌机、砂磨机、各类泵、压缩机等均采用先进的高效率设备,匹配的电动功率小;照明采用节能性灯具。本项目污染物产生和排放方面属于轻污染型,生产废水可实现零排放,生产中少量溶剂挥发和粉尘逸散通过相应的环保措施可将其影响降到最低,固废中各类危险废物交有资质单位处理,得到妥当处置。根据本项目与同行业、同地区的国内先进水平企业清洁生产水平对照得出,本项目耗水量极具优势,污染物产生量水平较对照企业低,电耗与对照企业相当,因此本项目在改进电耗的情况下可达到国内同类先进水平。16.8污染物排放总量控制3本项目外排污水放量1877.25m/a,其中CODcr:0.428t/a,氨氮:0.033t/a.建议纳入南水水质净化厂总量控制指标。建议为非甲烷总烃排放量:1.43t/a,甲苯排放量为0.042t/a,二甲苯的排放量为0.042t/a,TVOC排放量0.0132t/a。工业固体废物外排总量控制指标建议为0。16.9公众参与调查本次调查共发放调查表60张,回收54张。调查问卷统计结果显示:有62.96%的公众表示在本项目所采取的各项环保措施达到相关要求后,对本项目的建设是持赞成态度的,有37.04%的公众对本项目的建设表示无所谓。本次公众调查征求了项目周边4家单位的意见,各家单位都在一定的了解基础上提出了对本项目建设的态度。公众对本项目的建议和意见主要是:①强调施工过程中要注意废气、废水的处理。②严格按国家有关规定进行设计、施工,确保工程质量,加强工程监理,严格监督工程施工管理,消除事故隐患。③项目建成投产后,应加强全过程的环境监督和管理,确保环保设施正常运行和固体废物的处理处置,杜绝一切污染事故的发生。企业接受以上公众意见,并承诺营运期严格实施废水、废气、噪声等各项污染治理措施,做好建设项目的风险防范措施,并做好企业本身的环保管理队伍建165 珠海网泰环保设备有限公司化工涂料生产项目设,采用各种手段减少项目建成后对环境的影响。16.10综合结论综上所述:本项目建设符合国家产业政策,项目选址符合珠海高栏港经济区规划,建设单位必须认真贯彻―清洁生产‖、―总量控制‖,并遵守有关的环保法律法规,在项目建设和营运中严格执行―三同时‖制度,落实本环评中提出的环保措施和建议,建立和落实各项风险预警防范措施、环境风险削减措施和事故应急计划,杜绝重大安全事故和重大环境污染事故的发生,可使项目建成后对环境影响减少到最低限度。在此基础上,本环评认为从环境保护的角度来看,本项目对环境的影响是可以接受的,项目建设是可行的。166'