- 5.45 MB
- 88页
- 1、本文档共5页,可阅读全部内容。
- 2、本文档内容版权归属内容提供方,所产生的收益全部归内容提供方所有。如果您对本文有版权争议,可选择认领,认领后既往收益都归您。
- 3、本文档由用户上传,本站不保证质量和数量令人满意,可能有诸多瑕疵,付费之前,请仔细先通过免费阅读内容等途径辨别内容交易风险。如存在严重挂羊头卖狗肉之情形,可联系本站下载客服投诉处理。
- 文档侵权举报电话:19940600175。
'天顺多层办公楼建筑和结构设计毕业设计(论文)毕业设计(论文)题目:天顺多层办公楼建筑和结构设计教学院:专业名称:学号:学生姓名:指导教师:86
天顺多层办公楼建筑和结构设计毕业设计(论文)成果介绍及创新性评价(供评审专家参考)该毕业设计课题是结合湖北省教育厅重点科研项目(B200730001)进行的,该生运用国家现行办公楼设计规范和理论,对天顺多层办公楼进行了建筑和结构设计,方案先进,计算正确,成果质量高。在设计成果的基础上,综合了设计时重点设计的要点,撰写了一篇“天顺多层办公楼设计心得体会”的论文(自选内容),主要就进行建筑方案设计与结构设计时主要设计的一些内容进行了讨论;并且,对办公楼设计时的主要设计步骤进行了阐述,对类似的工程会有所帮助。指导老师:年月日86
天顺多层办公楼建筑和结构设计毕业设计(论文)目录结构计算书1设计基本资料·························································11.1初步设计资料·······················································11.2结构选型···························································22结构布置及计算简图···················································22.1结构布置及梁,柱截面尺寸的初选······································22.2框架结构的计算简图·················································53重力荷载代表值的计算·················································64框架侧移刚度的计算··················································95横向水平荷载作用下框架内力计算······································12686
天顺多层办公楼建筑和结构设计毕业设计(论文)竖向荷载作用下内力计算··············································186.1框架结构的荷载计算················································186.2框架结构的内力计算················································217框架结构的内力组合··················································308框架梁柱板的配筋计算················································458.1框架梁的正、斜截面计算·············································458.2框架柱的截面设计··················································508.3板配筋计算························································53天顺多层办公楼设计心得体会致谢参考文献附录(建筑施工图,结构施工图)86
天顺多层办公楼建筑和结构设计毕业设计(论文)天顺多层办公楼建筑和结构设计摘要:本工程为天顺多层办公楼工程,采用现浇钢筋混凝土框架结构体系,主体为五层,本地区抗震设防烈度为7度,近震,场地类别为II类场地。主导风向为夏季东南风,冬季西北风,基本风压0.35KN/㎡,基本雪压0.4KN/㎡。楼﹑屋盖均采用现浇钢筋混凝土肋型屋盖。在进行建筑设计时,需要收集必要的设计资料,例如办公楼所处地区、当地的地质、气候、办公楼的功能等,在整个设计过程中都应综合考虑所给设计资料,并结合规范、规程,以利于准确执行规范、规程,切实提高建筑施工图的设计质量。在进行结构设计时,本设计主要进行了结构方案中横向框架第4轴的设计。在确定框架布局之后,先进行了重力荷载代表值的计算,进而求出在风荷载作用下的结构内力(弯矩、剪力、轴力)。接着计算竖向荷载(恒载及活荷载)作用下的结构内力,并进行内力组合计算,找出不利的一组或几组内力组合,选取最不利的组合计算配筋。整个结构在设计过程中,严格遵循相关的专业规范的要求,参考相关资料和有关最新的国家标准规范,对设计的各个环节进行综合全面的科学性考虑。总之,适用、安全、经济、使用方便是本设计的原则。设计合理可行的建筑结构方案是现场施工的重要依据。关键词:框架结构荷载计算内力计算计算配筋86
天顺多层办公楼建筑和结构设计毕业设计(论文)ArchitecturalandstructuraldesignofTianshunmulti-officebuildingAbstract:Thisprojectismulti-storeyofficebuildingfortheSkywayproject,usingsteelreinforcedconcreteframestructuresystem,subjecttofive,theregionalseismicintensityof7degrees,nearearthquake,siteclassificationforthetypeIIsite.Dominantwinddirectionforthesummerwindsoutherlywinternorthwestwind,thebasicwindpressure0.35KN/㎡,basicsnowload0.4KN/㎡.Houseandadoptcastreinforcedconcreteroofrib-typeroof.Duringarchitecturaldesign,theneedtocollectthenecessarydesigninformation,suchasofficelocations,thelocalgeology,climate,thefunctionsofoffice,inthewholedesignprocessshouldbetakenintoaccountinthedesigndatagiven,andtheirregulationsordertofacilitateaccurateimplementationofthenorms,rules,andeffectivelyimprovethequalityofconstructiondesignplans.Whencarryingoutstructuraldesign,thestructureofthedesignofthemainframeworkoftheprogramin4-axishorizontaldesign.Indeterminingtheframeworkofthelayout,thefirstcarriedoutonbehalfofgravityloadcalculationinordertocalculatewindloadsinthestructureofinternalforces(bendingmoment,shear,axialforce).Thencalculateverticalload(deadloadandliveload)undertheactionofinternalforceandinternalforcescombinedbasis,toidentifyadverseinternalforceofagrouporseveralgroupsofcombinations,selectthemostunfavorablecombinationofcalculationofreinforcement.Thewholestructureinthedesignprocess,strictlyfollowtherequirementsofrelevantprofessionalnorms,referenceinformationandthelatestinnationalstandards,righttoconductallaspectsofthedesignofcomprehensivescientificconsiderations.Inshort,application,security,economic,easytouseisthedesignprinciple.Reasonableandfeasiblestructuraldesignprogramisanimportantbasisfortheconstructionsite.86
天顺多层办公楼建筑和结构设计毕业设计(论文)Keywords:framestructureloadcalculationforcecalculationcalculationofreinforcement天顺多层办公楼结构设计计算书1设计基本资料1.l初步设计资料1)工程名称:天顺多层办公楼。2)工程概况:建筑面积2876.4㎡,建筑总高为18.8m,主体大楼为五层,室内外高差为0.90m.3)温度:最高气温41℃,最低气温-4℃。4)主导风向:夏季东南风,冬季西北风。5)基本风压:0.35KN/㎡。6)基本雪压:0.4KN/㎡。7)最大降雨量:年降雨量1043.3mm,日最大降雨量317.4mm。8)水文资料:经勘探未发现地下水。9)地质条件:(1)地震烈度:本工程地震设防烈度为7度,近震,场地类型:Ⅱ类。(2)地质资料:见表1地质资料表1基底埋深(m)土层厚度(m)岩土名称地基土静荷载标准值(Kpa)2.202.20杂填土1008.005.80粉质粘土14016.208.20粘土16020.704.50中密的细砂—25.004.30基岩—笔趣阁-www.ikdzs.com-笔下文学10)材料使用:(1)混凝土:梁柱板均使用C25混凝土。86
天顺多层办公楼建筑和结构设计毕业设计(论文)(2)钢筋:纵向受力钢筋采用热轧钢筋HRB335,其余采用热轧钢筋HPB235。(3)墙体:外纵墙采用240厚灰砂砖(18KN/m3),一侧墙体为水刷石墙面(0.5KN/㎡),一侧为20㎜厚抹灰(17KN/㎡)。内隔墙采用200厚蒸压粉煤灰加气砼砌块(5.5KN/m3),两侧均为20mm厚抹灰。卫生间隔墙采用200厚蒸压粉煤灰加气砼砌块(5.5KN/m3),两侧贴瓷砖(0.5KN/㎡)。窗:均为钢框玻璃窗(0.45KN/m2)门:除大门为玻璃门(0.45KN/m2),办公室均为木门(10.2KN/m2)。1.2结构选型1)结构体系选型:采用钢筋混凝土现浇框架结构体系。2)屋面结构:采用现浇混凝土肋型屋盖,刚柔性结合的屋面,屋面板厚100mm。3)楼面结构:采用现浇混凝土肋型屋盖,板厚100mm。4)楼梯结构:采用钢筋混凝土梁式楼梯。5)天沟:采用现浇天沟。2结构布置及计算简图2.1结构布置及梁,柱截面尺寸的初选2.1.1梁柱截面尺寸初选主体结构共5层,首层层高为4.2m,其余各层层高为3.3m,内外墙的做法:内墙做法:内外墙均砌240厚空心砌块砖,门窗详见门窗表,楼层屋盖均为现浇钢筋混凝土结构。板厚取100mm:1)梁截面尺寸的估算:(1)AB跨:主梁:L=6000㎜,取500mm86
天顺多层办公楼建筑和结构设计毕业设计(论文),取200mm故框架横纵梁的截面尺寸为b×h=200mm×500mm次梁:L=6000㎜,取400mm,b取250mm故框架次梁的截面尺寸为b×h=250mm×400mm(2)BC跨:主梁:L=2100mm,取450mm,取250mm故框架梁的截面尺寸为b×h=250mm×450mm(3)10~11跨次梁:L=3300mm,取300mm,取200mm故框架次梁的截面尺寸为b×h=200mm×300mm估算梁的截面尺寸(㎜)及各层混凝土强度等级表2层数混凝土强度等级横梁(b×h)纵梁(b×h)次梁(b×h)AB,CD跨BC跨1~5C25200×500250×450200×500250×450注:10轴线和11轴线之间的次梁截面尺寸为200mm×300mm2)柱截面尺寸的估算框架柱截面尺寸根据柱的轴压比限制,按下式计算:(1)柱组合的轴压比设计值按照下式计算:86
天顺多层办公楼建筑和结构设计毕业设计(论文)(2-1)式中::为考虑地震作用组合后柱轴力压力增大系数,边柱取1.3,等跨内柱取1.2,不等跨取1.25;:为按照简支状态计算柱的负荷面积;:为折算后在单位面积上的重力荷载代表值,近似取14KN/;:为验算截面以上楼层层数;(2)框架柱验算(2-2)由计算简图2-1可知边柱和中柱的负载面积可知:中柱:(3.6+3.6)/2×(6+2.1)/2=3.6×4.05㎡边柱:(3.6+3.6)/2×6/2=3.6×3㎡边柱:中柱:根据上述计算结果,并综合考虑其他因素,取柱截面为正方形,初步估计柱的尺寸为400㎜×400㎜=160000>,为计算简便中柱和边柱的尺寸相同,均为400㎜×400㎜。故初选柱的尺寸为400㎜×400㎜。86
天顺多层办公楼建筑和结构设计毕业设计(论文)图1边柱和中柱的负荷面积简图2.1.2结构布置如图2所示梁的尺寸:=200㎜×500㎜,=250㎜×400㎜=250㎜×450㎜,=200㎜×300㎜边柱、内柱的尺寸均为:400㎜×400㎜图2结构平面布置图2.2框架结构的计算简图86
天顺多层办公楼建筑和结构设计毕业设计(论文)图3框架结构梁,柱尺寸注:室内外高差0.9m,基础埋深0.5m,h=0.9m+0.5m+4.2m=5.6m3重力荷载代表值的计算1)屋面及楼面恒荷载计算(1)屋面防水层(刚性)30厚C20细石混凝土1.0kN/㎡找平层(柔性)三毡四油油铺小石子0.4kN/㎡找平层:15厚水泥砂浆0.015m×20=0.3kN/㎡找坡层:40厚水泥石灰砂浆3‰找平0.04m×14=0.56kN/㎡保温层:80厚矿渣水泥0.08m×14.5=1.16kN/㎡结构层:100厚现浇钢筋混凝土板0.1m×25=2.5kN/㎡抹灰层:10厚混合砂浆0.01m×17=0.17kN/㎡合计6.09kN/㎡(2)各层走廊楼面:水磨石楼面:10㎜面层20㎜水泥砂浆打底0.65kN/㎡素水泥砂浆结合层一道结构层:100厚现浇钢筋混凝土板0.1m×25=2.5kN/㎡抹灰层:10厚混合砂浆0.01m×17=0.17kN/㎡合计:3.32kN/㎡(3)标准层楼面:大理石楼面大理石面层,水泥砂浆擦缝30厚1:3干硬性水泥砂浆面上撒2厚素水泥1.16kN/㎡水泥浆结合层一道结构层:100厚现浇钢筋混凝土板0.1m×25=2.5kN/㎡86
天顺多层办公楼建筑和结构设计毕业设计(论文)抹灰层:10厚混合砂浆0.01m×17=0.17kN/㎡合计:3.83kN/㎡(4)楼梯,水泥砂浆楼面构造层:0.5kN/㎡结构层:100厚现浇钢筋混凝土板0.1m×25=2.5kN/㎡抹灰层:10厚混合砂浆0.01m×17=0.17kN/㎡合计:3.17KN/㎡2)屋面及楼面活荷载计算(1)根据《荷载规范》查得:不上人屋面:0.5kN/㎡楼面:2.0kN/㎡(办公楼)走廊:2.5kN/㎡(2)雪荷载=1.0×0.4KN/㎡=0.4KN/㎡屋面活荷载与雪荷载不同时考虑,两者取大者.3)梁,柱,墙,门窗重力荷载的计算(1)梁自重:①边横梁,纵梁:b×h=200㎜×500㎜梁自重:2.5×0.2m×(0.5m-0.1m)=2.00kN/m抹灰层10厚混合砂浆:0.01m×[(0.5m-0.1m)×2+0.2m]×17=0.17kN/m合计:2.17kN/m②中横梁:b×h=250㎜×450㎜梁自重:25×0.25m×(0.45m-0.1m)=2.1875kN/m抹灰层10厚混合砂浆:0.01m×[(0.45m-0.1m)×2+0.25m]×17=0.1615kN/m合计:2.349kN/m③次梁:b×h=250㎜×400㎜梁自重:25×0.25m×(0.4m-0.1m)=1.875kN/m抹灰层10厚混合砂浆:86
天顺多层办公楼建筑和结构设计毕业设计(论文)0.01m×[(0.4m-0.1m)×2+0.25m]×17=0.1445kN/m合计:2.0195kN/㎡④基础梁:b×h=250㎜×400㎜梁自重:25×0.25m×0.4m=2.5kN/m(2)柱自重:①柱:b×h=400㎜×400㎜柱自重:25×0.4m×0.4m=4kN/m抹灰层10厚混合砂浆:0.01m×0.4m×4×17=0.272kN/㎡合计:4.272kN/㎡②构造柱:b×h=240㎜×240㎜柱自重:25×0.24m×0.23m=1.44kN/m抹灰层10厚混合砂浆:0.01m×0.24m×0.24m×2×17=0.16kN/㎡合计:1.6kN/㎡(3)外纵墙自重:标准层纵墙:0.9m×0.24m×18=3.89kN/m铝合金窗:0.35KN/㎡×1.85m=0.6475kN/m水刷石外墙面:(3.3m-1.85m)×0.5kN/㎡=0.725kN/m水泥粉刷那墙面:(3.3m-1.85m)×0.36kN/㎡=0.522kN/m合计:5.7845kN/m底层:纵墙(5.6m-1.85m-0.5m-0.5m)×0.24m×18=11.88kN/m铝合金窗:0.35kN/㎡×1.85m=0.6475kN/m水刷石外墙面:(3.3m-1.85m)×0.5kN/㎡=0.725kN/m石灰粗沙刷那墙面:(3.3m-1.85m)×0.36kN/㎡=0.522kN/m合计:13.7745KN/m(4)内隔墙自重:标准层纵墙:(3.3m-0.5m)×0.20m×9.6=5.376kN/m86
天顺多层办公楼建筑和结构设计毕业设计(论文)水泥粉刷内墙面:(3.3m-0.5m)×0.36KN/㎡×2=2.016kN/m合计:7.392kN/m底层:内隔墙:(5.6m-0.9m-2.1m-0.5m)×0.20m×9.6=4.032kN/m水泥粉刷内墙面:(5.6m-0.9m-2.1m-0.5m)×0.36kN/㎡×2=1.512kN/m合计:5.544kN/m4框架侧移刚度的计算1)框架梁柱的线刚度计算框架梁柱的相对线刚度如图4-1所示,作为计算各节点弯矩分配的依据.在框架结构中,现浇楼板的楼可以作为梁的有效翼缘,增大梁的有效翼缘,增大梁的有效刚度,减少框架的侧移。为考虑这一有利的作用,在计算梁的截面惯性矩的时候,对于中框架取I=2Io(Io为梁的截面惯性矩)(4-1)梁采用C25混凝土,。由于左跨梁=右跨梁:i边梁=EI/L=中跨梁:i中跨梁=EI/L=底层柱:(A~D轴)i底柱=EI/L=其余各层柱:(A~D轴)i余柱:=EI/L=令i余柱=1.0,则其余各杆件的相对线刚度为:i边梁=86
天顺多层办公楼建筑和结构设计毕业设计(论文)i中跨=i底柱=图4框架梁柱的相对线刚度2)梁柱的线平均刚度比(1)底层(4-2)(4-3)86
天顺多层办公楼建筑和结构设计毕业设计(论文)由公式(4-2)、(4-3)可求梁柱线刚度为:①A,D梁柱线刚度为:(kN/m)②B,C梁柱的线刚度为:(kN/m)(2)标准层:(4-4)(4-5)由公式(4-2)、(4-3)可求梁柱线刚度为:①A,D梁柱的线刚度为:(kN/m)②B,C梁柱的线刚度为:(kN/m)故横向框架的侧移刚度见表3,表4。横向框架2~5层D值表3构件名称D值(KN/m)数量D(kN/m)A柱4905.455419621.82B柱7651.570415303.14C柱7651.570415303.14D柱4905.455419621.8225114.0569849.92横向框架首层D值表486
天顺多层办公楼建筑和结构设计毕业设计(论文)构件名称D值(KN/M)数量D(kN/m)A柱3920.39513920.395B柱4735.44614735.446C柱4735.44614735.446D柱3920.39513920.39517311.6825横向水平荷载作用下框架内力计算1)风荷载标准值荷载《荷载规范》规定,对于高度大于30m,且高宽比大于1.5的房屋结构,应采用风振系数未考虑风压脉动影响,本设计房屋高度H=18.8m<30m,且H/B=18.8m/14.1m=1.3<1.5,所以根据规范取=1.0。为了简化计算,作用在外墙面上的风荷载可近似用作用在屋面梁和楼面梁节点处的集中风荷载标准值:(5-1)式中::为基本风压,;:风压高度变化系数,地面粗糙度为B类;:风荷载体型系数,根据建筑物的体型查得=1.3;:下层柱高;:上层柱高,对顶层为女儿墙高度的2倍;B:迎风面的宽度,B=3.6m。计算结果见表5。集中风荷载标准值表5离地高度Z/m/m/m/kN18.81.2211.30.353.32.62.9515.51.1511.30.353.33.33.1212.21.0611.30.353.33.32.8686
天顺多层办公楼建筑和结构设计毕业设计(论文)8.91.0011.30.353.33.32.705.61.0011.30.355.63.37.292)风荷载作用下的位移验算(1)侧移刚度D见表3和表4。(2)风荷载作用下框架侧移计算水平荷载作用下框架的层间侧移可按下式计算:(5-2)式中::第j层的总剪力;:第j层所有柱的抗侧移刚度之和;:第j层的层间侧移。第一层的层间侧移值求出以后,就可以计算各楼板标高处的侧移值的顶点侧移值,各层楼板标高处的侧移值是该层以下各层层间侧移之和。顶点侧移是所有各层层间侧移之和。j层侧移(5-3)顶点侧移(5-4)框架在风荷载作用下侧移的计算见表6。风荷载作用下框架侧移计算表6层次(kN/m)52.952.9525114.050.00011/3300043.126.0725114.050.00021/1650032.868.9325114.050.00041/825022.7011.6325114.050.00051/660017.2918.9217311.680.00111/5091侧移验算:层间侧移最大值:1/5091<1/550(满足要求)86
天顺多层办公楼建筑和结构设计毕业设计(论文)3)风荷载作用下的框架结构的内力计算框架在风荷载(从左向右吹)作用下的内力用D值法(改进的反弯点法)进行计算。其步骤为:(1)求各柱反弯点处的剪力值;(2)求各柱反弯点高度;(3)求各柱的杆端弯矩及梁端弯矩;(4)求各柱的剪力和梁剪力。第i层第m柱所分配的剪力为:,,见表5。框架柱反弯点位置,,计算结果如表7,8所示。A、D轴框架柱反弯点位置表7层号53.30.5280.2510000.2610.8343.30.5280.350000.351.1633.30.5280.4010000.4011.3223.30.5280.5000-0.050.451.4915.60.890.650-0.0500.603.36B、C轴框架柱反弯点位置表8层号53.30.9670.350000.351.1643.30.9670.400000.401.3233.30.9670.450000.451.4923.30.9670.5000-0.050.451.4915.61.5780.5970-0.021100.57593.23框架各柱的杆端弯矩、梁端弯矩按下式计算,计算过程如表9,表10所示。(5-5)(5-6)中柱处的梁(5-7)86
天顺多层办公楼建筑和结构设计毕业设计(论文)(5-8)边柱处的梁(5-9)风荷载作用下A(D)轴框架柱剪力和梁柱端弯矩的计算表9层yh/m///52.9525114.054905.4550.1950.580.831.430.481.4346.0725114.054905.4550.1951.181.162.521.373.0038.9325114.054905.4550.1951.741.323.442.304.81211.6325114.054905.4550.1952.271.494.113.386.41118.9217311.683920.3950.2264.283.369.5914.3812.97风荷载作用下B(C)轴框架柱剪力和梁柱端弯矩的计算表10层yh/m52.9525114.057651.570.3050.901.161.931.040.530.5346.0725114.057651.570.3051.851.323.672.441.291.2938.9325114.057651.570.3052.721.494.934.052.012.01211.6325114.057651.570.3053.551.496.435.292.862.86118.9217311.684735.4460.2745.183.2312.2816.734.804.80注:其中,B轴的等于C轴的,B轴的等于C轴的,、、、86
天顺多层办公楼建筑和结构设计毕业设计(论文)的单位是图5框架柱节点弯矩分配框架柱轴力与梁端剪力的计算结果见表11。风荷载作用下框架柱轴力与梁端剪力表11层梁端剪力/kN柱轴力/kN边跨中跨A轴B轴C轴D轴50.330.92-0.33-0.59-0.590.590.590.3340.722.24-1.05-1.52-2.831.522.831.0531.143.51-2.19-2.37-6.342.376.342.1921.554.99-3.74-4.44-11.334.4411.333.7412.968.37-6.70-5.41-19.75.4119.76.70注:轴力压力为+,拉力为-。风荷载作用下,框架的弯矩图、梁端剪力图及柱轴力图如图6、7、8所示。86
天顺多层办公楼建筑和结构设计毕业设计(论文)图6风荷载作用下的弯矩图(kN)86
天顺多层办公楼建筑和结构设计毕业设计(论文)图7风荷载作用下的剪力图(kN)图8风荷载作用下的轴力图(kN)6竖向荷载作用下内力计算6.1框架结构的荷载计算6.1.1板传荷载计算计算单元见下图所示:因为楼板为整体现浇,本板选用双向板,可沿四角点沿线将区格分为小块,每个板上的荷载传给与之相邻的梁,板传至梁上的三角形或梯形荷载可等效为均布荷载。86
天顺多层办公楼建筑和结构设计毕业设计(论文)图9框架结构计算单元图10框架结构计算单元等效荷载1)A~B,(C~D)轴间框架梁屋面板传荷载:恒载:86
天顺多层办公楼建筑和结构设计毕业设计(论文)活载:楼面板传荷载:恒载:活载:梁自重:2.17kN/mA~B,(C~D)轴间框架梁均布荷载为:屋面梁:恒载=梁自重+板传荷载=2.17kN/m+20.239=22.409kN/m活载=板传荷载=1.687kN/m楼面板传荷载:恒载=梁自重+板传荷载=2.17kN/m+12.919kN/m=15.089kN/m活载=板传荷载=6.746kN/m2)B~C轴间框架梁屋面板传荷载:恒载:活载:楼面板传荷载:恒载:活载:梁自重:2.349kN/mB~C轴间框架梁均布荷载为:屋面梁:恒载=梁自重+板传荷载=2.349kN/m+7.993kN/m=10.342kN/m活载=板传荷载=1.256kN/m楼面板传荷载:恒载=梁自重+板传荷载=2.349kN/m+5.027kN/m=7.376kN/m活载=板传荷载=2.625kN/m3)A轴柱纵向集中荷载的计算顶层柱:顶层柱恒载=梁自重+板传荷载86
天顺多层办公楼建筑和结构设计毕业设计(论文)=2.17kN/m×(6m-0.4m)+(20.239)/2kN/m×6m=72.869kN顶层柱活载=板传荷载=(1.687/2)kN/m×6m=5.061kN标准层柱恒载=墙自重+梁自重+板自重=5.7845kN/m×(3.6m-0.4m)+2.17kN/m×(6m-0.4m)+(12.919/2)kN/m×6m=69.419kN标准层柱活载=板传荷载=(6.746/2)kN/m×6m=20.238kN4)B柱纵向集中力计算顶层柱恒载=梁自重+板传梁荷载=2.17kN/m×(6m-0.4m)+(20.239/2)kN/m×6m+6.09×1.8m×5/8×3.6m+6.09×1.05m××3.6m+(7.993/2)kN/m×2.1m=117.248kN顶层柱活载=板传荷载=(1.678/2)kN/m×6m+0.5×1.8m×3.6m×5/8+0.5×1.05m××3.6m+(1.256/2)kN/m×2.1m=10.181kN标准层柱恒载=梁自重+板自重=2.17kN/m×(6m-0.4m)+(12.919/2)×6m+3.83×1.8m×5/8×3.6m+(5.027/2)kN/m×2.1m+3.83×1.05m××3.6m=75.478kN标准层柱活载=板传荷载=(6.746/2)kN/m×6m+2.0×1.8m×3.6m×5/8+86
天顺多层办公楼建筑和结构设计毕业设计(论文)2.0×1.05m××3.6m+(2.625/2)kN/m×2.1m=38.199kN6.2框架结构的内力计算6.2.1恒荷载作用下框架的内力计算1)恒荷载作用下框架的受荷简图如图11所示:图11竖向受荷总图注:1.图中各值的单位为kN2.图中数值均为标准3.图中括号数值为活荷载86
天顺多层办公楼建筑和结构设计毕业设计(论文)图12恒荷载作用下的计算简图2)恒载作用下的弯矩计算(由结构力学求解器得出)恒载作用下的弯矩如下图所示:图13恒载作用下的弯矩图(kN)3)恒载作用下的剪力计算86
天顺多层办公楼建筑和结构设计毕业设计(论文)梁:柱:(1)梁的剪力边跨:(50.039-49.482)/61/2×22.409×667.32kN(50.039-49.482)/6-1/2×22.409×6-67.134kN(52.593-27.703)/61/2×15.089×649.415kN(52.593-27.703)/6-1/2×15.089×6-41.119kN(56.321-27.168)/61/2×15.089×650.126kN(56.321-27.168)/6-1/2×15.089×6-40.408kN(51.530-30.888)/61/2×15.089×648.707kN(51.530-30.888)/6-1/2×15.089×6-41.827kN(46.778-33.623)/61/2×15.089×647.460kN(46.778-33.623)/6-1/2×15.089×6-43.075kN中跨:(2)柱的剪力边柱:﹣(50.03916.658)/3.3﹣20.211kN﹣(35.93628.367)/3.3﹣19.486kN﹣(27.95428.791)/3.3﹣17.195kN﹣(22.73923.838)/3.3﹣14.114kN﹣(22.94015.737)/5.6﹣6.907kN86
天顺多层办公楼建筑和结构设计毕业设计(论文)中柱:﹣(26.39214.874)/3.3﹣12.505kN﹣(8.92810.691)/3.3﹣5.945kN﹣(9.80510.916)/3.3﹣6.279kN﹣(11.55614.124)/3.3-7.782kN﹣(7.0473.394)/5.6=﹣1.864kN计算结果如下图所示:86
天顺多层办公楼建筑和结构设计毕业设计(论文)图14恒荷载作用下的剪力图(kN)4)恒荷载作用下的轴力计算(1)A、D轴:(2)B、C轴:计算结果如下图所示:86
天顺多层办公楼建筑和结构设计毕业设计(论文)图15恒荷载作用下的N图(单位:kN)6.2.2活荷载作用下框架的内力计算1)活载作用下的弯矩计算(由结构力学求解器得出)活载作用下的弯矩图如图16所示。图16活载作用下的弯矩图(kN)2)活载作用下的剪力计算86
天顺多层办公楼建筑和结构设计毕业设计(论文)(1)梁的剪力边跨:(6.316-1.714)/61/2×1.687×65.828kN(6.316-1.714)/6-1/2×1.687×6-4.294kN(20.459-1.714)/61/2×6.746×623.362kN(20.459-1.714)/6-1/2×6.746×6-17.114kN(21.489-15.225)/61/2×6.746×621.282kN(21.489-15.225)/6-1/2×6.746×6-19.194kN(20.818-15.826)/61/2×6.746×621.07kN(20.818-15.826)/6-1/2×6.746×6-19.406kN(19.713-16.144)/61/2×6.746×620.833kN(19.713-16.144)/6-1/2×6.746×6-19.643kN中跨:(2)柱的剪力边柱:﹣(8.6846.316)/3.3﹣4.545kN﹣(10.23211.774)/3.3﹣6.668kN﹣(11.22411.257)/3.3﹣6.812kN﹣(9.8959.594)/3.3﹣5.906kN﹣(6.6139.818)/5.6﹣2.934kN中柱:﹣(1.7473.490)/3.3﹣1.587kN﹣(7.0415.911)/3.3﹣3.925kN﹣(6.0785.918)/3.3﹣3.635kN﹣(5.7226.156)/3.3-3.599kN﹣(4.7452.1.)/5.6=﹣1.864kN计算结果如图17所示。3)活荷载作用下的轴力计算86
天顺多层办公楼建筑和结构设计毕业设计(论文)(1)A、D轴:(2)B、C轴:计算结果如图18所示。86
天顺多层办公楼建筑和结构设计毕业设计(论文)图17活荷载作用下的剪力值(kN)图18活荷载作用下的N图(kN)7框架结构的内力组合1)本设计考虑三种内力组合,分别为:(1)永久荷载效应起控制作用:(2)当楼面活载作为主要可变荷载,风荷载作为次要可变荷载时:(3)当风荷载作为主要可变荷载,楼面活荷载作为次要可变荷载时:86
天顺多层办公楼建筑和结构设计毕业设计(论文)具体计算过程见表2)框架梁的的内力组合梁的控制截面为梁端柱边及跨中。具体组合见表12,表13,表14,表15,表16。3)框架柱的内力组合柱上端控制截面在梁底,下端在梁顶,应按轴线计算简图所得的柱端内力值换成控制截面的相应值,为简化计算,采用轴线处内力值。具体组合见表17,表18,表19,表20,表21。86
天顺多层办公楼建筑和结构设计毕业设计(论文)层号跨号截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.7②1.2+1.4②+1.4×0.61.2①+1.4×0.7②+1.4×5层AB跨左端-50.039-6.3161.43-1.43-73.74-67.69-70.09-64.23-68.2467.325.828-0.330.3396.5988.6789.2286.0386.96中间51.083.730.50-0.5072.6166.9466.1065.6564.25右端-49.482-1.714-0.530.53-68.48-62.22-61.33-61.80-59.32-67.134-4.294-0.330.33-94.84-86.85-86.29-85.23-84.31BC跨左端-23.091-0.3890.53-0.53-31.55-27.81-28.70-27.35-28.8310.8591.319-0.920.9215.9514.1015.6513.0415.61中间-17.39-1.0800-24.53-22.38-22.38-21.93-21.93右端-23.091-0.389-0.530.53-31.55-28.70-27.81-28.83-27.35-10.859-1.319-0.920.92-15.95-15.65-14.10-15.61-13.04CD跨左端-49.482-1.7140.53-0.53-68.48-61.33-62.22-59.32-61.8067.1344.294-0.330.3394.8486.2986.8584.3185.23中间51.083.73-0.500.5072.6166.1066.9464.2565.65右端-50.039-6.316-1.431.43-73.74-70.09-67.69-68.24-64.23-67.32-5.828-0.330.33-96.59-89.22-88.67-86.96-86.035层框架梁内力计算表1286
天顺多层办公楼建筑和结构设计毕业设计(论文)4层框架梁内力组合表13层号跨号截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.7②1.2①+1.4②+1.4×0.61.2①+1.4×0.7②+1.4×4层AB跨左端-52.593-20.4593.00-3.00-91.05-89.23-94.27-78.96-87.3649.41523.362-0.720.7289.6191.4092.6181.1883.20中间27.7512.540.86-0.8649.7551.5850.1346.7944.39右端-27.703-15.168-1.291.29-52.26-55.56-54.40-49.91-46.30-41.119-17.114-0.720.72-72.28-73.91-72.70-67.12-65.11BC跨左端-3.901-4.2681.29-1.29-9.45-9.57-11.74-7.06-10.677.7452.756-2.242.2413.1611.2715.038.8615.13中间-0.17-2.8200-2.99-4.152-4.152-2.97-2.97右端-3.901-4.268-1.291.29-9.45-11.74-9.57-10.67-7.06-7.745-2.756-2.242.24-13.16-15.03-11.27-15.13-8.86CD跨左端-27.703-15.1681.29-1.29-52.26-54.40-55.56-46.30-49.9141.11917.114-0.720.7272.2872.7073.9165.1167.12中间27.7512.54-0.860.8649.7550.1351.5844.3946.79右端-52.593-20.459-3.003.00-91.05-94.27-89.23-87.36-78.96-49.415-23.362-0.720.72-89.61-92.61-91.4-83.20-81.1886
天顺多层办公楼建筑和结构设计毕业设计(论文)3层框架梁内力组合表14层号跨号截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.7②1.2①+1.4②+1.4×0.61.2①+1.4×0.7②+1.4×3层AB跨左端-56.321-21.4894.81-4.81-97.09-93.63-101.71-81.91-95.3850.12621.282-1.141.1488.5388.9990.9179.4182.61中间26.3612.001.40-1.4047.3549.6147.2645.3541.43右端-27.168-15.225-2.012.01-51.60-55.61-52.23-50.34-44.71-40.408-19.194-1.141.14-73.26-76.32-74.40-68.90-65.70BC跨左端-6.671-3.3862.01-2.01-12.52-11.34-14.71-8.71-14.337.7452.756-3.513.5113.1610.2016.107.0816.91中间-2.61-2.1400-5.62-6.13-6.13-5.23-5.23右端-6.671-3.586-2.012.01-12.52-14.71-11.34-14.71-11.34-7.745-2.756-3.513.51-13.16-16.10-10.20-16.91-2.03CD跨左端-27.168-15.2252.01-2.01-51.60-52.23-55.61-44.71-50.3440.40819.194-1.141.1473.2674.4076.3265.7068.90中间26.3612.00-1.401.4047.3547.2649.6141.4345.35右端-56.321-21.489-4.814.81-97.09-101.71-93.63-95.38-81.91-50.126-21.282-1.141.14-88.53-90.91-88.99-82.61-79.4186
天顺多层办公楼建筑和结构设计毕业设计(论文)2层框架梁内力组合表15层号跨号截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.7②1.2①+1.4②+1.4×0.61.2①+1.4×0.7②+1.4×2层AB跨左端-51.530-20.8186.41-6.41-89.96-85.60-96.37-73.26-91.2148.70721.07-1.551.5586.4086.6489.2576.9381.27中间26.6912.031.77-1.7747.8250.3647.3846.3041.34右端-30.888-15.826-2.862.86-57.21-61.62-56.82-56.58-48.57-41.827-19.406-1.551.55-75.48-78.66-76.06-71.38-67.04BC跨左端-8.416-3.8372.86-2.86-15.12-13.07-17.87-9.86-17.867.7452.756-4.994.9913.168.9617.345.0118.98中间-4.35-2.3900-8.21-8.57-8.57-7.56-7.56右端-8.416-3.837-2.862.86-15.12-17.87-13.07-17.86-9.86-7.745-2.756-4.994.99-13.16-17.34-8.96-18.98-5.01CD跨左端-30.888-15.8262.86-2.86-57.21-56.82-61.62-48.57-56.5841.82719.406-1.551.5575.4876.0678.6667.0471.38中间26.6912.03-1.771.7747.8247.3850.3641.3446.30右端-51.530-20.818-6.416.41-89.96-96.37-85.60-91.21-73.26-48.707-21.07-1.551.55-86.40-89.25-86.64-81.27-76.9386
天顺多层办公楼建筑和结构设计毕业设计(论文)1层框架梁内力组合表16层号跨号截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.7②1.2①+1.4②+1.4×0.61.2①+1.4×0.7②+1.4×1层AB跨左端-46.778-19.71312.97-12.97-82.47-72.84-94.63-57.29-93.6147.46020.833-2.962.9684.4383.6388.6073.2281.51中间27.7012.434.09-4.0949.5854.0847.2151.1539.70右端-33.623-16.144-4.804.80-61.21-66.98-58.92-62.89-49.45-43.075-19.643-2.962.96-77.40-81.68-76.70-75.08-66.80BC跨左端-12.452-5.6134.80-4.80-22.31-18.77-26.83-13.72-27.167.7452.756-8.378.3713.166.1220.18-0.2823.71中间-8.39-4.1700-15.41-15.91-15.91-14.15-14.51右端-12.452-5.613-4.804.80-22.31-26.83-18.77-27.16-13.72-7.745-2.756-8.378.37-13.16-20.18-6.12-23.71-0.28CD跨左端-33.623-16.1444.80-4.80-61.21-58.92-66.98-49.45-62.8943.07519.643-2.962.9677.4076.7081.6866.8075.08中间27.7012.43-4.094.0949.5847.2154.0839.7051.15右端-46.778-19.713-12.9712.97-82.47-94.63-72.84-93.61-57.29-47.460-20.833-2.962.96-84.49-88.60-83.63-81.51-73.2286
天顺多层办公楼建筑和结构设计毕业设计(论文)5层框架柱内力组合表17层号杆件截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.7②1.2①+1.4②+1.4×0.61.2①+1.4×0.7②+1.4×5层边柱上端51.0396.3161.43-1.4373.7470.0967.6968.2464.23-140.096-10.1220.33-0.33-199.05-182.01-182.56-177.57-178.50下端16.6588.684-0.480.4831.0031.7432.5527.8329.17-140.096-10.1220.33-0.33-199.05-182.01-182.56-177.57-178.5020.2114.5450.58-0.5831.7431.1030.1329.4127.79中柱上端26.3922.1021.93-1.9337.6936.2332.9936.4331.03-195.334-16.5610.59-0.59-279.93-257.09-258.08-249.80-251.46下端14.8744.745-1.041.0424.7323.6225.3721.0423.95-195.334-16.5610.59-0.59-279.93-257.09-258.08-249.80-251.4612.5051.5870.90-0.9018.4417.9816.4717.8215.3086
天顺多层办公楼建筑和结构设计毕业设计(论文)4层框架柱内力组合表18层号杆件截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.7②1.2①+1.4②+1.4×0.61.2①+1.4×0.7②+1.4×4层边柱上端35.93611.7742.52-2.5260.0561.7257.4958.1951.13-254.782-50.5981.05-1.05-393.54-375.69-377.46-353.85-356.79下端28.36710.232-1.371.3748.3247.2149.5242.1545.99-254.782-50.5981.05-1.05-393.54-375.69-377.46-353.85-356.7919.4866.6681.18-1.1832.8433.7131.7331.5728.27中柱上端8.9286.1563.67-3.6718.0922.4116.2521.8811.61-256.597-77.7542.83-2.83-422.60-414.39-419.15-380.15-388.08下端10.6915.722-2.442.4420.0418.7922.8915.0221.85-256.597-77.7542.83-2.83-422.60-414.39-419.15-380.15-388.085.9453.9251.85-1.8511.8714.1811.0813.578.3986
天顺多层办公楼建筑和结构设计毕业设计(论文)3层框架柱内力组合表19层号杆件截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.7②1.2①+1.4②+1.4×0.61.2①+1.4×0.7②+1.4×3层边柱上端27.95411.2573.44-3.4448.7752.1946.4249.3939.76-369.468-91.0742.19-2.19-588.03-569.03-572.70-529.55-535.68下端28.79111.224-2.302.3049.8748.3352.1942.3348.77-369.468-91.0742.19-2.19-588.03-569.03-572.70-529.55-535.6817.1956.8121.74-1.7429.8931.6328.7129.7524.87中柱上端9.8055.9184.93-4.9319.0424.1915.9124.4710.66-339.82-138.9476.34-6.34-594.93-596.98-607.64-535.08-552.83下端10.9166.078-4.054.0520.6918.2125.0113.3924.73-339.82-138.9476.34-6.34-594.93-596.98-607.64-535.08-552.836.2793.6352.72-2.7212.0414.9110.3914.917.2986
天顺多层办公楼建筑和结构设计毕业设计(论文)2层框架柱内力组合表20层号杆件截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.②1.2①+1.4②+1.4×0.1.2①+1.4×0.7②+1.4×2层边柱上端22.7399.5944.11-4.1140.1044.1737.2742.4430.93-484.154-131.553.74-3.74-782.53-762.01-768.30-704.67-715.14下端23.9389.895-3.383.3841.8839.6245.3033.5743.03-484.154-131.553.74-3.74-782.53-762.01-768.30-704.67-715.1414.1145.9062.27-2.2724.8427.1123.3025.9019.55中柱上端11.5565.9116.43-6.4321.3927.5416.7428.6610.66-423.043-200.14111.33-11.33-767.25-778.33-797.41-687.93-719.65下端14.1247.041-5.295.2925.9722.3631.2516.4431.25-423.043-200.14111.33-11.33-767.25-778.33-797.41-687.93-719.657.7823.5993.55-3.5514.0317.3611.4017.847.9086
天顺多层办公楼建筑和结构设计毕业设计(论文)1层框架柱内力组合表21层号杆件截面内力种类荷载类别内力组合恒①活②左风③右风④1.35①+1.4×0.7②1.2①+1.4②+1.4×0.61.2①+1.4×0.7②+1.4×1层边柱上端22.9409.8189.59-9.5940.5949.3333.2250.5823.72-598.84-172.0266.70-6.70-977.02-953.82-965.07-877.81-896.57下端15.7376.613-14.3814.3827.7316.0640.225.2345.50-598.84-172.0266.70-6.70-977.02-953.82-965.07-877.81-896.576.9072.9344.28-4.2812.2015.998.8017.166.40中柱上端7.0473.49012.28-12.2812.9323.663.0329.07-5.32-506.266-261.33419.70-19.70-939.57-956.84-989.93-836.05-891.21下端3.3941.747-16.7316.736.29-7.5320.57-17.6429.21-506.266-261.33419.70-19.70-939.57-956.84-989.93-836.05-891.211.8641.2235.18-5.183.718.30-0.4010.69-3.8286
天顺多层办公楼建筑和结构设计毕业设计(论文)4)框架梁的最不利组合如下表框架梁的最不利组合表22层号跨号内力最不利组合、5层AB跨-73.7496.5972.61-68.48-94.84BC跨-31.5515.95-24.53-31.55-15.95CD跨-68.4894.8472.61-73.74-96.594层AB跨-94.2792.6151.58-55.56-73.91BC跨-11.7415.13-4.152-11.74-15.13CD跨-55.5673.9151.58-94.27-92.613层AB跨-101.7190.9149.61-55.61-76.32BC跨-14.7116.91-6.13-14.71-16.91CD跨-55.6176.3249.61-101.71-90.912层AB跨-96.3789.2550.36-61.62-78.66BC跨-17.8718.98-8.57-17.87-18.98CD跨-61.6278.6650.36-96.37-89.251层AB跨-94.6388.6054.08-66.98-81.68BC跨-27.1623.71-15.91-27.16-23.71CD跨-66.9881.6854.08-94.63-88.6086
天顺多层办公楼建筑和结构设计毕业设计(论文)5)框架柱的最不利组合如下表框架柱的最不利组合表23层号杆件截面内力种类最不利内力组合5层边柱上端73.7473.7468.24-199.05-199.05-177.57下端32.5531.0027.83182.56-199.05-177.57中柱上端37.6937.6936.43-279.93-279.93-249.80下端25.3724.7321.04-258.08-279.93-249.8086
天顺多层办公楼建筑和结构设计毕业设计(论文)框架柱的最不利组合表23(续)层号杆件截面内力种类最不利内力组合4层边柱上端61.7260.5058.19-375.69-393.54-353.85下端49.5248.3242.15-377.46-393.54-353.85中柱上端22.4118.0921.88-414.39-422.60-380.15下端22.8920.0415.02-419.15-422.60-380.153层边柱上端52.1948.7749.39-569.03-588.03-529.55下端52.1949.8742.33-572.70-588.03-529.55中柱上端24.4715.9124.47-535.08-607.64-535.08下端25.0125.0113.09-607.64-607.64-535.0886
天顺多层办公楼建筑和结构设计毕业设计(论文)框架柱的最不利组合表23(续)层号杆件截面内力种类最不利内力组合MMN2层边柱上端52.1948.7749.39-569.03-588.03-529.55下端52.1949.8742.33-572.70-588.03-529.55中柱上端24.4715.9124.47-535.08-607.64-535.08下端25.0125.0113.09-607.64-607.64-535.081层边柱上端44.1740.1042.44-762.01-782.53-704.67下端45.3041.8833.57-768.30-782.53-704.67中柱上端28.6616.7428.66-687.93-797.41-687.93下端31.2531.2516.44-797.41-797.41-687.9386
天顺多层办公楼建筑和结构设计毕业设计(论文)8框架梁柱板的配筋计算8.1框架梁的正、斜截面计算框架梁混泥土等级为C25,,纵筋强度等级HRB335,,箍筋强度等级HPB235,AB跨梁截面:200mm×500mm,h0=465mmBC跨梁截面:250mm×450mm,h0=415mm(CD跨配筋与AB跨相同)1)正截面受弯承载力计算梁AB(200mm×500mm)一层:跨中截面M=54.08max[0.2%,﹙45﹚%]=0.2%下部实配3Φ16(),上部按构造要求配筋。梁AB和梁BC各截面的正截面受弯承载力配筋计算见表24所示。86
天顺多层办公楼建筑和结构设计毕业设计(论文)框架梁正截面配筋计算表24层计算公式梁AB梁BC支座左截面跨中截面支座右截面支座左截面跨中截面支座右截面5M/()-73.7472.61-68.48-31.55-24.53-31.550.1430.1410.1330.0620.0480.0620.1550.1530.1430.0640.0490.064/571.759564.417527.527263.387201.655263.387/200200200225225225实配钢筋4164163163163163164M/()-94.2751.58-55.56-11.74-4.152-11.740.1830.1000.1080.0230.0090.0230.2040.1060.1150.0230.0090.023/752.556391.034424.23594.6537.03994.65/200200200225225225实配钢筋32022531621621621686
天顺多层办公楼建筑和结构设计毕业设计(论文)框架梁正截面配筋计算表24(续)层计算公式梁AB梁BC支座左截面跨中截面支座右截面支座左截面跨中截面支座右截面3M/()-101.7149.61-55.61-14.71-6.13-14.710.1980.0960.1080.0290.0120.0290.2230.1010.1150.0290.0120.029/822.647372.589424.235119.34749.385119.347/200200200225225225实配钢筋4203163162162162162M/()-96.3750.36-61.62-17.87-8.57-17.870.1870.0980.1200.0350.0170.0350.2090.1030.1280.0360.0170.036/771.001379.967472.192148.15569.962148.155/200200200225225225实配钢筋32031631621621621686
天顺多层办公楼建筑和结构设计毕业设计(论文)框架梁正截面配筋计算表24(续)层计算公式梁AB梁BC支座左截面跨中截面支座右截面支座左截面跨中截面支座右截面1M/()-94.6354.08-66.98-27.16-15.91-27.160.1840.1050.1300.0530.0310.0530.2050.1110.1400.0540.0310.054/756.245409.479516.46222.233127.578222.233/200200200225225225实配钢筋32031631621621621686
天顺多层办公楼建筑和结构设计毕业设计(论文)2)斜截面受剪承载力计算梁AB(1层):满足要求。应按计算配筋,且应验算。由上式得:选用双肢箍筋8@200,则满足计算要求及构造要求。0.252%>0.145%满足要求。梁AB和梁BC各截面的斜截面受剪承载力配筋计算见表25。86
天顺多层办公楼建筑和结构设计毕业设计(论文)框架梁斜截面配筋计算表25梁AB层5432196.5992.6190.9189.2588.60276.68276.68276.68276.68276.680.1140.0810.0650.0540.049实配箍筋8@2008@2008@2008@2008@200梁BC层5432115.9515.1316.9118.9823.71308.66308.66308.66308.66308.66<0<0<0<0<0实配箍筋8@2008@2008@2008@2008@200注:经验算,以上均满足。8.2框架柱的截面设计1)轴压比验算底层柱:轴压比:则A轴柱的轴压比满足要求。2)截面尺寸复核取,。86
天顺多层办公楼建筑和结构设计毕业设计(论文)因为,所以满足要求。3)正截面受弯承载力计算柱的同一截面分别承受正反向弯矩,故采用对称配筋。1层:A轴柱:从柱内力组合表可见:最不利组合为:,考虑偏心距增大系数。,取因为,所以取,按大偏心受压计算。根据对称配筋得:86
天顺多层办公楼建筑和结构设计毕业设计(论文)按构造配筋最小总配筋率查得:所以选用220B轴柱:从柱内力组合表可见:最不利组合为:,考虑偏心距增大系数。因为,所以取,按小偏心受压计算。根据对称配筋得:86
天顺多层办公楼建筑和结构设计毕业设计(论文)按构造配筋,最小配筋率%。所以选用2202~5层柱配筋同1层。8.3板配筋计算1)设计资料结构布置如图9.1所示,板厚选用100mm,20mm厚水泥混凝土面层,15mm厚混合砂浆天棚抹灰,楼面活荷载:,走廊活荷载:混凝土为C25,。2)荷载计算楼面:恒载:活载:合计:走廊:恒载:活载:合计:屋面:恒载:活载:合计:3)板的计算由计算简图可知,将楼板划分了A板,B板两种板块,均按照双向板计算,按塑性理论计算。主梁的h=500mm,宽度b=200mm,次梁的高度h=450mm,宽度b=250mm,走道梁h=450mm,宽度b=250mm,取板在墙上的支承长度为100mm,且两端与梁整体连接。板的尺寸支撑情况如下图所示:86
天顺多层办公楼建筑和结构设计毕业设计(论文)图19板区格板划分表(1)标准层中间区格板B楼板计算①弯矩计算计算跨度:按双向板计算则按塑性理论计算,采用分离式配筋样式,各塑性铰上总弯矩为:代入基本公式,由于区格板A四周与梁连接,内力折减系数为0.886
天顺多层办公楼建筑和结构设计毕业设计(论文)得出:②配筋计算跨中截面取,短边取,支座截面近似取。B格板四周都有整浇梁支撑,故跨中及支座面弯矩应予折减。另外板中配筋较低,故近似的取内力臂数进行计算。Y方向跨中:Y方向支座:故Y方向跨中,支座选用8@200()。X方向跨中:X方向支座:故X方向跨中,支座选用8@150()。选配钢筋8@200(2)标准层边格板A楼板计算①弯矩计算计算跨度:按双向板计算则86
天顺多层办公楼建筑和结构设计毕业设计(论文)按塑性理论计算,采用分离式配筋样式,各塑性铰上总弯矩为:代入基本公式,由于区格板A四周与梁连接,内力折减系数为0.8得出:②配筋计算跨中截面取,短边取,支座截面近似取。A格板四周都有整浇梁支撑,故跨中及支座面弯矩应予折减。另外板中配筋较低,故近似的取内力臂数进行计算。Y方向跨中:Y方向支座:故Y方向跨中,支座选用8@200()。X方向跨中:X方向支座:86
天顺多层办公楼建筑和结构设计毕业设计(论文)故X方向跨中,支座选用8@150()。B、A区格板的配筋详看下表:楼面板的配筋表26截面方向选配钢筋实配钢筋B跨中Lx方向0.6039.688@150Ly方向0.1914.368@200支座Lx方向1.2079.378@150Ly方向0.3825.138@200A跨中Lx方向1.86123.018@150Ly方向0.6448.378@200支座Lx方向3.72246.038@150Ly方向1.2884.668@200(3)屋面中间区格板B楼板计算①弯矩计算计算跨度:按双向板计算则按塑性理论计算,采用分离式配筋样式,各塑性铰上总弯矩为:代入基本公式,由于区格板A四周与梁连接,内力折减系数为0.886
天顺多层办公楼建筑和结构设计毕业设计(论文)得出:②配筋计算跨中截面取,短边取,支座截面近似取。B格板四周都有整浇梁支撑,故跨中及支座面弯矩应予折减。另外板中配筋较低,故近似的取内力臂数进行计算。Y方向跨中:Y方向支座:故Y方向跨中,支座选用8@200()。X方向跨中:X方向支座:故X方向跨中,支座选用8@150()。(4)屋面边格板A楼板计算①弯矩计算计算跨度:按双向板计算则按塑性理论计算,采用分离式配筋样式,各塑性铰上总弯矩为:86
天顺多层办公楼建筑和结构设计毕业设计(论文)代入基本公式,由于区格板A四周与梁连接,内力折减系数为0.8得出:②配筋计算跨中截面取,短边取,支座截面近似取。A格板四周都有整浇梁支撑,故跨中及支座面弯矩应予折减。另外板中配筋较低,故近似的取内力臂数进行计算。Y方向跨中:Y方向支座:故Y方向跨中,支座选用8@200()。X方向跨中:X方向支座:故X方向跨中,支座选用8@150()。86
天顺多层办公楼建筑和结构设计毕业设计(论文)B、A区格板的配筋详看下表:屋面板的配筋表27截面方向选配钢筋实配钢筋B跨中Lx方向0.6643.658@150Ly方向0.2115.878@200支座Lx方向1.3287.308@150Ly方向0.4227.788@200A跨中Lx方向2.05135.088@150Ly方向0.70553.298@200支座Lx方向4.1271.168@150Ly方向1.4193.258@20086
天顺多层办公楼建筑和结构设计毕业设计(论文)论文天顺多层办公楼设计心得体会摘要:进行办公楼设计时,主要考虑了建筑方案设计与结构设计两个方面,本文主要就进行建筑方案设计与结构设计时主要设计的一些内容进行了讨论;并且,对办公楼设计时的主要设计步骤进行了阐述,希望对类似的工程有所帮助。关键字:框架结构;办公楼;建筑方案设计;结构设计FeelingsandexperiencesofTianshunmulti-officedesignAbstract:Forofficebuilding,themainconsiderationofarchitecturaldesignandconstructiondesign,inthispaper,theconductofarchitecturaldesignandstructuraldesignofsomeofthemajordesignelementsdiscussed;and,buildingdesignonthemaindesignstepsaredescribed,hopingtohelpsimilarprojects.Keywords:Portalframeconstruction;Officebuilding;Architecturedesign;structuraldesign1引言办公楼的设计概括分为建筑方案设计、结构设计以及其他的附属设计,其中建筑方案设计与结构设计占据主导地位,只有当建筑方案基本确定,才能开始其他方面的设计,而建筑设计与结构设计又是相辅相成的,往往建筑设计完成以后,在进行结构设计时,又要对建筑设计的有些地方进行修改,在实际设计中,常常分为以下几个步骤:1)在建筑方案设计时,首先考虑的是办公楼的功能。功能定位的考虑,把它定位叫功能策略。既然是办公楼,你的办公定位是在什么人群、什么样的条件,什么样的目标就尤为重要,在设计时先要确定你所设计的办公楼是教学办公楼,还是政府办公楼,还是商业办公楼,也就是说先要确定所设计的办公楼适合什么人群,这个确定以后再考虑设计时的条件和目标。2)结构设计,就是对建筑物的结构构造进行设计,首先当然要有建筑施工图,还要能真正看懂建筑施工图,了解建筑师的设计意图以及建筑各部分的功能及做法,建筑物是一个复杂物体,所涉及的面也很广,所以在看建筑图的同时,作为一个结构师,需要和建筑,水电,暖通空调,勘察等各专业进行咨询了解各专业的各项指标。在看懂建筑图后,作为一个结构师,这个时候心里应该对整个结构的选型86
天顺多层办公楼建筑和结构设计毕业设计(论文)及基本框架有了一个大致的思路了。3)当结构师对整个建筑有了一定的了解后,可以考虑建模了,建模就是利用软件,把心中对建筑物的构思在电脑上再现出来,然后再利用软件的计算功能进行适当的调整,使之符合现行规范以及满足各方面的需要。现在进行结构设计的软件很多,常用的有PKPM,广厦,TBSA等。在本设计中,采用的是PKPM。下面结合本次毕业设计,讨论一下多层框架结构办公楼设计时主要涉及的地方。2建筑的方案设计建筑方案设计的确定时,首先需要收集必要的设计资料,例如办公楼所处地区、当地的地质、气候、办公楼的功能等,在整个设计过程中都应综合考虑所给设计资料,并结合规范、规程,以利于准确执行规范、规程,切实提高建筑施工图的设计质量,少走弯路,加快工程建设进度。下面具体谈一下我在建筑方案设计中重点设计的内容。1)屋顶的选择,屋顶通常按其外形或屋面所用防水材料分类,屋顶按其外形一般可分为平屋顶、坡屋顶、其它形式的屋顶,本办公楼在设计时,对各方面进行综合考虑,选择了平屋顶。平屋顶的优点主要有:易于协调统一建筑与结构的关系,并且节约材料。在排水时,平屋顶也有一定的排水坡度,其排水坡度小于5%,最常用的排水坡度为2%~3%。平屋顶的排水坡度选择将在屋面排水设计时进行介绍。2)楼梯的设计,第一,选择楼梯的形式:因楼梯间进深较大而开间较小,本设计的楼梯间尺寸为3300×6000,所以选择平行双跑楼梯;第二,确定踏步尺寸和踏步数量:因为本设计是办公楼,所以在设计时,要考虑公共建筑的楼梯设计时需要满足的规范要求,同时要考虑行人行走时的舒适度等方面的要求,综合考虑各方面的要求,最终确定楼梯的踏步尺寸和踏步数量为:底层:踏步尺寸为168mm×295mm,踏步数量为,第一跑为12,第二跑为13,其它层:踏步尺寸为150mm×300mm,踏步数量一共22。第三,确定梯段宽度:梯井宽度取100mm,墙厚为200mm,开间尺寸为3300mm,则通过公式计算得梯段宽度为1500mm。3)屋面排水的设计,屋面排水分有组织排水和无组织排水(自由排水),有组织排水一般是把雨水集到天沟内再由雨水管排下,集聚雨水的沟就被称为天沟,天沟分内天沟和外天沟,内天沟是指在外墙以内的天沟,一般有女儿墙;外天沟是挑出外墙的天沟,一般没女儿墙。本设计采用的是有组织排水,天沟采用的是挑出外墙86
天顺多层办公楼建筑和结构设计毕业设计(论文)的天沟,即外天沟,并且未设女儿墙。在设置雨水管时,考虑到一个雨水管的汇水面积为200平方米,且两个雨水管的间距控制在18~24m,设置了5根雨水管。檐沟纵坡和屋面的坡度均取2%。以上就是我在进行建筑方案的设计时重点设计的部分,其它方面,比如门窗洞口的尺寸选择、门厅大小、办公室的尺寸确定等,在这里就不再赘述了。总而言之,要想把建筑方案设计好,就要综合考虑各个方面,且要不怕麻烦,及时的查资料及相关规范,使自己的设计在满足规范要求的同时,达到美观的效果。3建筑的结构设计我的结构设计主要进行了结构方案中横向框架第4轴的设计。在确定框架布局之后,先进行了重力荷载代表值的计算,进而求出在风荷载作用下的结构内力(弯矩、剪力、轴力)。接着计算竖向荷载(恒载及活荷载)作用下的结构内力,并进行内力组合计算,找出不利的一组或几组内力组合,选取最不利的组合计算配筋。下面就结构设计时涉及到的一些内容进行说明。1)结构选型,这次设计采用的是钢筋混凝土现浇框架结构。2)结构布置,第一,结合建筑设计方案,布置了48根柱子,每根轴线上有12根柱子,通过计算确定柱子的截面尺寸为400mm×400mm;第二,结合柱网的布置及房间的跨度和功能要求布置主次梁,其中,主梁有两种尺寸,分别为200mm×500mm和250mm×450mm,次梁也有两种尺寸,分别为250mm×400mm和200mm×300mm。3)对风荷载作用下的结构内力进行计算,在计算时,采用的是D值法,D值法又称为改进的反弯点法,是对柱的抗侧移刚度和柱的反弯点位置进行修正后计算框架内力的一种方法。具体步骤为:第一,对柱的抗侧移刚度进行计算;第二,求各柱反弯点处的剪力值;第三,求各柱反弯点高度;第四,求各柱的杆端弯矩及梁端弯矩;第五,求各柱的剪力和梁剪力。最后根据计算的结果,画出风荷载作用下的弯矩图,剪力图以及轴力图。4)对竖向荷载作用下的内力进行计算,在计算时,先进行框架结构的荷载计算,然后根据计算的结果,利用结构力学求解器计算出弯矩,结构力学求解器也可以算出轴力及剪力,但是在我的计算中,是利用弯矩求出了轴力及剪力,并且分别画出恒载及活载作用下的弯矩图,剪力图以及轴力图。5)对框架结构进行内力组合,本设计考虑了三种内力组合,第一,永久荷载效应起控制作用时,同时考虑分项系数和组合系数,可用公式进行计算,公式具体为:;第二,86
天顺多层办公楼建筑和结构设计毕业设计(论文)当楼面活载作为主要可变荷载,风荷载作为次要可变荷载时,用以下公式计算:;第三,当风荷载作为主要可变荷载,楼面活荷载作为次要可变荷载时,可用以下公式进行计算:。在计算书中,分别列表进行了计算。6)选取最不利的组合计算配筋,分别进行梁柱板的配筋。对梁进行配筋计算时,对框架梁的正、斜截面都进行了计算;板配筋计算时,采用的是双向板,双向板的荷载主要由短向板带承受,但长向板带所分配荷载却不能忽略不计。4总结毕业设计完成以后,我对框架结构有了更深的了解,框架结构由梁柱构成,构件截面较小,因此框架结构的承载力和刚度都较低,它的受力特点类似于竖向悬臂剪切梁,楼层越高,水平位移越慢,框架结构的墙体是填充墙,起围护和分隔作用,框架结构的特点是能为建筑提供灵活的使用空间,但抗震性能差。通过这次毕业设计,我系统地回顾了从大一到大四所学的所有专业知识,对所有的专业知识更加的了解了,并且通过借阅图书馆的书籍,增加了自己的知识面,对建筑这个行业也有了更加深刻全面的了解。参考文献86
天顺多层办公楼建筑和结构设计毕业设计(论文)[1]赵明华.土力学与基础工程[M].第二版.武汉:武汉理工大学出版社.2005.2[2]赵明华.混凝土结构[M].第二版.武汉:武汉理工大学出版社.2005.2[3]应惠清.土木工程施工[M].北京:高等教育出版社.2006.6[4]沈详发.建筑工程概预算[M].第三版.武汉:武汉理工大学出版社.2006.9[5]徐中玉.应用文写作[M].北京:高等教育出版社.2006.6[6]GB50010-2002,混凝土结构设计规范[S][7]GB50011-2001,建筑抗震设计规范[S][8]GB50009-2001,建筑结构荷载规范[S][9]鄂建[2003]42号:中南地区建筑标准设计结构图集[S][10]鄂建[1999]108号:中南地区通用建筑标准设计建筑配件图集[S][11]00G101:混凝土结构施工图平面整体表示方法制图规则和构造详图[S][12]GB50007-2002,建筑地基基础设计规范[S][13]蒋红英.土木工程制图[M].北京:中国建筑工业出版社.2006.8[14]丰定国等.抗震结构设计[M].第二版.武汉:武汉理工大学出版社.2003.8[15]GB50068-2002,建筑结构可靠度统一标准[S][16]GB50003-2002,砌体结构设计规范[S]参考文献86
天顺多层办公楼建筑和结构设计毕业设计(论文)[1]赵明华.土力学与基础工程[M].第二版.武汉:武汉理工大学出版社.2005.2[2]赵明华.混凝土结构[M].第二版.武汉:武汉理工大学出版社.2005.2[3]应惠清.土木工程施工[M].北京:高等教育出版社.2006.6[4]沈详发.建筑工程概预算[M].第三版.武汉:武汉理工大学出版社.2006.9[5]徐中玉.应用文写作[M].北京:高等教育出版社.2006.6[6]GB50010-2002,混凝土结构设计规范[S][7]GB50011-2001,建筑抗震设计规范[S][8]GB50009-2001,建筑结构荷载规范[S][9]鄂建[2003]42号:中南地区建筑标准设计结构图集[S][10]鄂建[1999]108号:中南地区通用建筑标准设计建筑配件图集[S][11]00G101:混凝土结构施工图平面整体表示方法制图规则和构造详图[S][12]GB50007-2002,建筑地基基础设计规范[S][13]蒋红英.土木工程制图[M].北京:中国建筑工业出版社.2006.8[14]丰定国等.抗震结构设计[M].第二版.武汉:武汉理工大学出版社.2003.8[15]GB50068-2002,建筑结构可靠度统一标准[S][16]GB50003-2002,砌体结构设计规范[S][17]DepartmentofNaturalResources(DNR),EnergyBureau,LifeCycleCostAnalysisGuidelines,2002[18]InternationalFederationofConsultingEngineers,ConditionsofContractforPlantandDesign-Build,2002[19]ZhaoJisheng.Anapproachtoevaluategroundsurfacerupturecausedbyreversefaultmovement[J].地震工程与工程振动(英文版),2006(1):29-3386
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86
天顺多层办公楼建筑和结构设计毕业设计(论文)86'
您可能关注的文档
- 铜陵市某中级人民法院设计计算书 毕业论文
- [毕业设计]5层框架中学教学楼结构设计计算书
- [学士]某4层框架结构设计计算书(含施工组织设计)
- 3×16m预应力空心板简支板桥毕业设计计算书
- 3层框架的计算书-本科毕业设计
- e江水利枢纽工程——土石坝设计说明与计算书
- 电力系统规划与发电厂设计计算书
- 钢筋混凝土大厦5#商住楼结构计算书
- 六层综合楼,框架填充墙结构毕业设计计算书
- 威海分校管理学院教学楼设计 毕业设计计算书
- 文竹大桥设计 毕业设计计算书
- 污水总泵站的设计-毕业设计计算书
- 西安航天研究院办公楼设计 毕业设计计算书
- 西安市外国语学校计算机实验中心建筑给水排水设计 毕业设计计算书
- 西铁局职大学生公寓 土木工程毕业设计计算书
- 咸阳市实验中学新校园-教学楼设计(b方案) 毕业设计计算书
- 咸阳市实验中学新校园-教学楼设计(b方案) 土木工程本科毕业设计计算书
- 现浇混凝土框架结构六层教学楼初步设计方案 毕业设计计算书