'建筑工程量计算书工程名称:锦绣家园2期A1号楼本表共6页第1页序号项目名称计算公式单位数量1建筑面积一层45.84×11.34m2519.83二~六层519.83×5m22599.13雨蓬1/2×45.84×0.78m217.88小计m23136.842屋顶面积45.84×11.34m2519.83做法20厚1:2水泥砂浆找平层,1.2厚氯化聚乙稀橡胶共混防水卷材,20厚1:2水泥砂浆找平层上人孔个33基础工程土方计算式V=(B+KH+2C)(L+KH+2C)H+K2H3/3V=H/6[ab+(a+A)(b+B)+AB]土方H=3.0mk=0.33mc=0.30mVJ-1[(1.4+0.33×3+×0.3)2×3.0+0.332×33/3]×2m355.60VJ-218[(1.8+0.33×3+2×0.3)2×3.0+0.33×33/3]m3638.22VJ-39[(1.9+0.33×3+2×0.3)2×3.0+0.33×33/3]m3337.68VJ-48[(2.0+0.33×3+2×0.3)2×3+0.332×33/3]m3317.16VJ-59[(2.3+0.33×3+2×0.3)2×3+0.33×33/3]m3415.86V地梁(0.35+0.6)×0.7×(40.25+4.×4+31.85+40.25+9.75×4)=0.95×0.7×167.45m3111.35土方小计m31538.19C10垫层[1.42×2+1.82×18+1.92×9+2.02×8+2.32×9)×0.1m317.43C25独立基础VJ-1[1.22×0.3+0.2/6(0.4×0.5+1.6×1.7+1.22)]×2m31.15VJ-2[1.62×0.3+0.3/6(0.4×0.5+1.62+2.0×2.1)]×18m320.09VJ-3[1.72×0.3+0.3/6(0.5×0.5+1.72+2.1×2.2)]×9m311.27
建筑工程量计算书工程名称:底商住宅本表共6页第2页序号项目名称计算公式单位数量VJ-4[1.82×0.3+0.3/6(0.52+1.82+2.32)]×8m311.29VJ-5[2.12×0.3+0.4/6(0.62+2.12+2.72)]×9m319.14小计m352.94地梁C10垫层0.35×0.1×167.45m35.86地梁C25砼0.25×0.5×167.45m320.93±0.00以下柱0.35×0.4×(2.5×2+2.4×18+2.4×9+0.42×2.4×8+0.52×2.4×9m318.244主体结构框架柱0.35×0.4×[18.88×(2+18+9)]+0.42×(18.88×8+15×9)+0.52×3.88×9m3131.15框架梁一层[0.25×0.5×9.75×2+0.25×0.6×(5.775×4+4.275×6)]×2+0.25×0.6×5.775m320.370.25×0.5×(20.625+14.3+15.935+6.3)×2m314.29一~六层小计(14.29+20.37)×6m3207.96有梁板[4.252×0.1+0.25×0.3×4.25+4.25×2.45×0.1+0.25×0.2×2.45+0.25×0.2×1.55+3.65×1.55×0.1+(3.35×1.55×0.1+0.25×0.2×1.55)×2+(2.05×4.55×0.1+0.25×0.2×2.05)×2]×2m347.97平板[4.25×3.65×0.12+(2.35×2.45+1.85×2.35)×0.1+4.25×3.65×0.12×2+3.35×4.55×4×0.12+3.35×1.25×2×0.1+3.35×4.25×0.12]×2m332.91楼梯平板2.36×1.17×0.08×5×3m33.31屋顶楼梯平板2.36×1.17×0.10×3m30.83平屋面平板(4.25×10.95+3.55×6.05+3.35×6.05×4+39.6×4.55)×2×0.12m379.021~6层有梁板47.97×5m2239.851~6层平板32.91×5+3.31+0.83+79.02m2247.71现浇楼梯(3.63×2.36×5+1.15×1.3+1.37×2.36)×3m2142.69楼梯栏杆[(1.5+2.28×10)×1.15+1.25]×3m87.59栏杆油漆m87.59
预埋铁件(107×3+11×3)×0.65kg230.1楼梯栏板扶手(0.95×0.1+0.1×0.16)×2.84×5×3m34.73建筑工程量计算书工程名称:底商住宅本表共6页第3页序号项目名称计算公式单位数量楼梯栏板涂料(1.05+0.06+0.3)×2.36×5×3m249.91栏板粉刷无花架2.36×5×3m35.45屋面工程GZ0.252×1.2×46m33.45GZ粉刷(0.252+0.25×4×1.2)×46m358.08栏板(0.9×0.1+0.1×0.16)×101.9m311.31栏板粉刷m101.9栏板乳胶漆(45.84+11.34)×2×1.05m2120.08沿沟(0.4+0.46+0.12)×0.09×[(45.84+11.34)×2+0.52×4m311.46沿沟粉刷(45.84+11.34)×2+0.52×4m116.44沿沟底涂料116.44×0.5m258.22沿沟外涂料(0.45+0.12)×116.44m266.37沿沟内卷材(0.22+0.37+0.4+0.36+0.25)×116.44m2186.30室外工程卷帘门洞口4.095×3.0-2+3.55×3×2+3.25×3×8m2123.87外门0.9×2.1×16m230.24120墙门(内)0.9×2.1×1.6+1.2×2.1×2m235.28二~六层进户防盗门6×5樘30洞口尺寸0.9×2.1×6×5m256.70外门(1.5×2.4×2+1.8×2.4×6)×5m2165.6内门(0.8×2.1×8+0.9×2.1×14)×5m2199.5外窗(1.52×2+1.2×1.5×6+1.8×1.5×6+2.1×1.5×2)×5m2189.00内窗0.9×0.6×6×5m216.20外门窗洞口尺寸小计123.87+30.24+56.70+189m2399.81内洞口尺寸199.50+16.20m2215.70120墙洞口小计m235.28洞口腰线[5.3×16×2+10.295×2+9.75×2+8.45×8+(6.4×2+5.8×6+7×6+7.6×2+3.4×6+6.7×2+7.0×6+5.4×8+5.5×6+5.5×14)×5]×0.3m2563.49
120腰线(5.3×16+6.2×2)×0.3m229.16小计m2592.65建筑工程量计算书工程名称:底商住宅本表共6页第4页序号项目名称计算公式单位数量门窗过梁0.24×0.4×(4.1×2+3.55×2+3.25×3)m32.400.24×1.4×0.08×(16+30)m31.240.12×1.4×0.08×16+0.12×1.7×0.11×2m30.26[0.24×20.×4×0.18+2.3×0.24×0.18×6×2+0.24×1.3×0.08×8+0.24×1.4×0.08×(14+6)+0.24×1.7×0.11×6+2-7×0.3×0.24×2m32.78小计m36.687地面工程45.36×10.86-(4.8×6+2.36×3)×0.24m2484.0080厚碎石484×0.08m338.72100厚C15砼484×0.1m348.40随捣随抹光484m2484.00楼面工程厨卫(2.36×2.46+2.46×1.56+2.16×1.56×2+2.06×1.8×2)×2×5m2237.9820厚防滑地砖m2237.98聚胺脂防水层[(2.36+2.46)×2+(2.46+1.56)×2+(2.16+1.56)×2×2+(2.06+1.8)×2×2]×0.25×2×5+237.98m2357.981:3水泥砂浆找平层20厚m2237.08楼面20厚1:2.5水泥砂浆(3.06×2.36+5.46×3.66+1.86×1.4+2.76×4.26+1.26×4.5+3.66×4.26+3.36×4.26×2+4.56×3.36×4×2.76×2.3×2)×2×5+2.36×1.17×3×5m21695.808天棚工程有梁无棚(4.252+4.25×2.45+3.65×1.55+3.35×1.55×2+2.05×4.55×2)×6×2m2758.07无梁无棚(4.25×3.65+2.35×2.45+4.25×3.65×2+3.35×4.55×4+3.35×1.25×2+3.35×4.25)×2×6+4.56×2.36×3+2.36×1.17×5×3m21704.23
9墙体及粉刷一层240墙内墙面积4.595×6×3.40+1.86×3×3.40m2112.71建筑工程量计算书工程名称:底商住宅本表共6页第5页序号项目名称计算公式单位数量外墙面积9.75×3.5×2+15.935×2.5×2+41.3×3.4m2288.345外墙裙(面砖)(288.345-41.3×3.4)×1.1-0.9×2.1×16-1.18×2.1×2m2129.00外墙粉刷(砂浆)(41.3×3.4-123.87)×1.1m218.21二~六层240墙外墙面积[6.252×2.5+2.72+15.625×2.5+1.225×3×2.4+4.5×2.6+(7.2+6.8+3.25)×2.5]×2×5m21255.60内墙面积{[(.225+2.68+4.405×3+6.075+1.56×3+1.645×2+5.775×2+8.705)×2.4+(11.015+3.36+14.14+5.16)×2.5]×2+5.775×2.4}×5m22169.26120墙面积1.105×2.4×2×5m226.52阳台拦板砼(0.95×0.10+0.10×0.16)×(4.1+3.25×2+1.105+2.225+0.855)×2×5m316.41栏板粉刷(4.1+3.25×2+1.105+2.225+0.855)×2×5m147.85栏板乳胶漆(1.05+0.6)×147.85m2243.95顶粉刷147.85×0.3m244.36构造柱(0.242×4+0.03×0.24×4+0.03×0.24×2)×2×15m33.024M5.0混合砂浆多孔砖240墙外墙(288.345+1255.60-399.81)×0.24m3274.59内墙(112.71+2169.26-215.70)×0.24m3495.90小计274.59+495.90-3.024-6.68m3760.79M5.0混合砂浆120墙(多孔砖)(472.86+26.52-35.28)×0.115m353.37厨卫面砖墙裙(1.8m高)[(2.36+2.46)×2-0.8+(1.8×2+2.16)+(1.56+2.46)×2-0.8+(2.16+1.56)×2×2-0.8×2]×2×5×1.8m2632.16
外墙外粉刷1144.135×1.11-129m21140.99外墙乳胶漆m21140.99外墙内粉刷m21144.14建筑工程量计算书工程名称:底商住宅本表共6页第6页序号项目名称计算公式单位数量内墙粉刷2066.27×2+464.1×2-632.16m24428.58内墙涂料1144.14+5060.74-632.16m25572.72单独梁柱面粉刷(0.75×2×6+0.43×23+0.48×4+0.88×4+0.78×7+1.04×2)×18.9+[1.05×9.75×2+1.25×(5.775×4+4.275×6)]×2×5+1.25×5.775×6+1.05(20.625+14.3+15.935+0.63)×2×5+0.55×9.75+9.75×0.8+5.775×1.05×1+4.525×3×1.0+10.05×1×3m22063.3811空调搁板(0.7×0.9×6+1.4×0.9×2)×5m231.5空调搁板粉刷m231.5
'
您可能关注的文档
- EXCEL含计算式工程量计算书设置方法.doc
- 《建筑工程计量与计价》课程设计工程量计算书.doc
- 消防工程量计算书.doc
- 毕设说明+施工组织设计正文+致谢+参考文献+工程量计算书.doc
- 母山基地污水处理改造工程量计算书.doc
- [分享]5层厂房土建工程量计算书(含钢筋工程量计算及图纸).doc
- 再修改版附录D工程量计算书.doc
- 工程量计算书hb.docx
- 市幼儿园工程量计算书.doc
- 某水电站副厂房工程量计算书.doc
- 龙海模塑工业厂区项目1#楼单位工程施工组织设计工程量计算书.doc
- 《工程量计算书》word版.doc
- 堤防工程工程量计算书.docx
- 推荐方案工程量计算书8.13.doc
- 工程量计算书.docx
- 安装工程工程量计算书.docx
- 施工现场签证工程量计算书.docx
- 止水螺杆工程量计算书