摘要空调设计主要是对室内热环境、空气品质进行设计,但这必须在充分了解建筑对暖通空调的要求和暖通空调系统及设备对建筑及其它设施的影响的基础上进行设计。本设计是xx设计,针对该宾馆的功能和特点,以及该地气象条件和空调要求,参考有关文献资料确定了设计方案。本建筑没有地下室,没有合适的地方放置较大的机组,所以不能用全空气系统;设计采用风机盘管加新风系统,每层设有新风机组,可以由同层的新风机组送入室内,风机盘管承担室内的冷热负荷。水系统采用水平同程式,竖直异程式,这种水系统具有结构简单初投资少,管路不容易产生污垢和腐蚀。关键字:空调系统,冷热负荷,水系统,风机盘管加新风系统
AbstractAirconditioningdesignismainlyforindoorthermalenvironment,airquality,therequirementsforhvacandhvacsystemsandequipmentforbuildingandotherfacilitiesinfluenceisconductedonthebasisofdesign.Thisdesignis,accordingtothecharacteristicsandfunctionsofthehotel.Aswellasthemeteorologicalconditionsandairconditioningrequirementsrefertotherelatedliteraturedeterminesthedesignscheme.Thisbuildingwithoutthebasement,nosuitableplacetoplacelargerunits,soyoucan"tusetheairsystem,designadoptfan-coilunitplusfreshairsystem.Eachlayerhasairunits,bythesameairunitsintotheinterior,fancoilundertakeindoorheatingload.Watersystemusinglevelwiththeprogram,theverticaldifferentprograms,thewatersystemhassimplestructure,initialinvestment,pipingnoteasilyproducedirtandcorrosion.Keywords:Airconditioningsystem,Heatload,Watersystem,Fancoilsystems.
目录前言第一章气象资料1.1工程名称及概况:31.2气象资料:31.3动力资料:31.4土建资料:3第二章负荷计算2.2冬季空调热负荷计算:62.3夏季空调湿负荷计算12第三章确定送风状态及送风量3.1风机盘管机组新风供给方式的确定143.2新风处理状态的确定,总风量及风机盘管风量的确定143.3夏季室内新风量的确定:153.4冬季送风状态及送风量173.5夏季空气处理方案:173.6冬季空气处理方案:183.7以一层贵宾接待室为例计算送风量、新风量,确定送风状态点193.8确定餐厅和卫生间的排风量20
第四章空气处理方案的确定第五章空气处理设备选择5.1风机盘管的选择225.2新风处理机组的选择:每层一台新风处理机组24第六章气流组织确定第七章送回风道的布置及水力计算7.1水力计算的目的277.2风管水力计算的特点287.3风管水力计算方法29第九章空调系统的消声9.1空调系统的噪声源439.3消声措施449.4空调系统中消声器消声量的确定4510.1概述4610.2减振器使用应注意的问题4610.3各种减振措施的使用要求4711.1防火、防烟分区的划分4811.2防火阀的设置4811.3自然排烟系统设计4911.4机械排烟系统设计50
第十二章空调系统的管材及附件12.1空调系统的管材5212.2空调系统的附件52第十三章空调系统的保温与防腐13.1空调系统的保温5313.2.空调系统的防腐54结论错误!未定义书签。参考文献55谢辞错误!未定义书签。附录附录一国内部分民用建筑空调冷负荷概算值附录二部分民用建筑空调冷负荷的概算指标附录三民用建筑空调系统风速的选用附录四不同噪声要求下风管推荐风速
前言本设计的课题是:XXX空调设计。设计的主要目的是通过实际的工程设计更加深刻理解学过的基础理论和专业知识,是一个理论联系实际的过程,以便在以后的实际工作中解决实际出现的各种问题。通过这一环节来增强自己的理论知识,加强我们对暖通空调设计现状和未来发展趋势的了解,方便我们以后的学习和工作。随着国民经济的发展和人民物质文化水平的不断提高,空调的应用以不再限于必要的工艺过程所需的环境控制和居住建筑室内创造舒适的环境,而是越来越普及寻常百姓家,成为提高他们生活质量的一部分。空气调节(AirConditioning)的意义在于“使空气达到所要求的状态”或“使空气处于于正常状态”。据此,一个内部受控的空气环境,一般是指在某一特定空间内,对空气温度、湿度、空气流动及清洁度进行人工调节,以满足人体舒适和工艺生产过程的要求。现代技术发展手段有时还要求对空气的压力、成分、气味及噪声等进行调节与控制。由此可见,采用技术手段创造并保持满足一定要求的空气环境,乃是空气调节的任务。本宾馆通过设计采用风机盘管加新风系统形式,给各个房间提供适宜的温度,湿度等,满足人们舒适性要求,并且可以充分利用建筑物的余热,在节能方面更为优越。在选择设备时,在满足各个指标的情况下,应选择功率相对较小的设备,以使电能消耗降低到相对较低状态。并且节能建筑是以后建筑的大趋势,而暖通设备在建筑的节能方面又占有相当大的比重,随着能源的日趋紧张,在满足建筑物用途的基础上,应尽量作到节约能源。空调负荷在建筑物的整体能耗中占有相当大的比例,约为50~70%,降低空调的能耗对建筑物的节能很重要的作用。由于建筑本身功能性房间较多,本设计除一楼大厅外的所有屋均采用风机盘管加新风机组系统。选用风机盘管系统具有以下优点:(1)布置灵活性大,节能效果好,各房间能根据室内负荷情况单独调节温湿度,房间不使用时可以关掉机组,不影响其他房间的使用;(2)各空调房间互不相通,不会相互污染;(3)节省运行费用,运行费用与单风道系统相比约低20%~30%,比诱导器低10%~20%,而综合投资费用大体相同,甚至略低;(4)可以承担80%的室内负荷,与全空气系统相比可节省空间;55
(5)只需要新风机房,机房面积小,风机盘管可以安装在空调房间内;(6)机组定型化、规格化、易于选择安装,安装投产较快;(7)使用寿命长。一楼大堂是贯穿一二层的,高十米、面积292㎡,使用侧送和下送都不能达到工作区,即使在一层单设全空气系统,下送也不能达到舒适性空调的要求并且费用很高。最终选择在大堂四面安放柜式空调,这种既美观也能达到要求。每层均设一台新风机组,房间噪声太大,舒适性就会下降,为了降低噪声,新风机组后设置消声器,水系统采用同程式系统。为了降低能源损耗,冷却水和冷冻水管道均做保温。在设计过程中,曾广泛咨询过各位专业老师,给本设计提供了宝贵意见,也得到很多同学的帮助与支持,在此一并致谢。限于实践经验的不足,本设计存在一定的缺点和错误,望各位老师指正。55
第一章原始资料1.1工程名称及概况:本设计为XXX空调设计。建筑物共八层,建筑面积6885.2㎡。1.2气象资料:1.冬季室外参数:室外计算干球温度=-26℃,室外计算相对湿度Ф=74%2.夏季室外参数:室外计算干球温度=30.5℃,室外计算相对湿度Ф=66%3.冬季室内参数值:=20℃(客房及其他功能性房间),Ф=50%,v≯0.2m/s4.夏季室内参数值:=26℃(客房及其他功能性房间),Ф=55%,v≯0.3m/s5.冬季室内参数值:=18℃(大厅、自助餐厅、卫生间、楼梯间),Ф=50%,v≯0.2m/s6.夏季室内参数值:=25℃(大厅、自助餐厅、卫生间、楼梯间),Ф=55%,v≯0.3m/s1.3动力资料:1.冷源:冷水机组进水温度7℃,回水温度12℃,温差=5℃2.热源:0.8Mpa饱和蒸汽,(由锅炉房供给)3.水源:城市自来水。4.电源:220/380v交流电1.4土建资料:1.外墙体:根据建筑条件图,按《空调负荷专计算表》7号I型墙计算2.内墙体:δ=200mm红砖抹灰3.屋面:根据建筑条件图,(见《空调冷负荷计算表》6号Ⅲ型结构)4.门窗:窗玻璃采用双层3mm厚普通玻璃,客房内遮阳类型为白布帘,双层钢窗有效面积系数0.7555
5.层高:一二楼层高5.0m,三~七楼层高3.5m,八楼层高4.8m第二章负荷计算2.1夏季空调冷负荷逐时计算:与计算热负荷同,同样每层以不同功能的典型房间为例,其他房间以次面积冷指标计算。以下叙述各项冷负荷的计算方法,然后列表计算。1.外墙冷负荷本设计墙体属《空调负荷计算表》中的7号I型墙,外墙传热系数为K=0.99W/㎡℃.由表3-3(外墙冷负荷计算温度t1表)查的不同朝向的t1值,并由表3-4(地点修正值)查得长春的地点修正值,得到修正后的温度t1。按各朝向外墙面积计算出外墙逐时冷负荷见表2-1。计算式为(1-2)式中:—外墙瞬变传热引起的冷负荷,W。—外墙的面积,㎡。—外墙的传热系数W/㎡.oC。—室内设计空调温度,oC。—外墙的冷负荷计算温度的逐时值,oC。—地点修正值,oC。本设计在计算外墙冷负荷时同样以上述房间为例计算不同朝向的外墙冷负荷。其它房间外墙冷负荷则用平均面积冷指标计算。2.屋面冷负荷本设计中屋面类型属《空调冷负荷计算表》6号III型结构,传热系数K=1.15W/㎡℃.由表(屋面冷负荷计算温度tl)查得III型的逐时值,再由表3-5查得长春的地点修正值,两者相加即为屋面冷负荷计算温度。公式同(1-2)。3.玻璃窗瞬变传热引起的冷负荷该宾馆建筑物的所有外窗均系双层钢窗,查《空调负荷计算表》该种窗的传热系数K=3.12W/m2oC.由《空调负荷计算表55
》表3-10中查得玻璃窗传热系数的修正值为1.2。由表3-11(玻璃窗冷负荷计算温度表)可查得窗玻璃的逐时计算温度值tl,再由表3-12查得长春玻璃窗的地点修正值td=-4℃,则两者相加即为玻璃窗的逐时计算温度。计算式为(1-3)式中:—玻璃窗瞬变传热引起的冷负荷,W。F—外窗的面积,㎡。—外墙的传热系数W/㎡.—室内设计空调温度,oC。—外墙的冷负荷计算温度的逐时值,oC。—地点修正值,oC。4.透过玻璃进入的日射得热引起的冷负荷玻璃窗为3mm普通玻璃,由《空调负荷计算表》表2-4中查得窗户的有效面积系数为0.75,由表2-2查得Cs=1.00,又由于有白色内遮阳窗帘,cn=0.50。因而cz=0.50×1.00=0.50,因长春的地理纬度为北区,由表2-1查得Djmax:南向为345,东向为598,北向110,西向598各朝向无内遮阳的CCL值由表2-5查得。计算式为式中:—玻璃窗日射得热引起的逐时冷负荷,W—窗玻璃的净面积,㎡—冷负荷系数,—窗玻璃的综合遮挡系数—日射得热因数的最大值,W/㎡5.人员引起的冷负荷按宾馆的性质可知人员应该属于极轻运动,查《空调负荷计算表》表4-3当室内温度为26oC时每人散发的显热和潜热分别为61W和73W,全热为134W,由于室内的人员包括男子和女子,由《空调负荷专刊》表4-4取群居系数为0.96。6.照明引起的负荷55
由《空调负荷计算表》公式4-1=式中:—照明冷负荷—镇流器耗功率系数—灯罩隔离系数—照明灯具所需的功率,KW—照明负荷指数2.2冬季空调热负荷计算:1.墙体、地面、天棚、门窗形成的负荷可按供热要求计算。=(1—1)式中:—围护结构的基本耗热量,W;—围护结构的面积,m2—围护结构的传热系数W/㎡℃—空调室外计算温度℃,见《空调负荷计算表》;—空调房间冬季设计温度,客房取20℃、其余取18℃;—计算温度修正系数,取1.00(1)本设计在计算热负荷时,以不同功能房间为例,其余房间的热负荷以整个建筑物平均面积热指标计算。(2)《暖通规范》规定宜按下列规定的数值选用不同朝向的修正系数,北0,西、东-5%,南-20%(3)本设计建筑物为市区内宾馆,故风向修正为0。(4)高度修正:当房间高度大于4m时,高出1m应附加2%,但总的附加率应不大于15%。房间高度小于4m不加修正。(5)由于室内有正压控制,可不算门窗冷风侵入和渗入。但朝向修正照常。(6)人员散热及灯光、设备散热应予以考虑。55
(7)在空调设计中地带划分为两个地带。(8)现以一层西南角贵宾接待室为例,其余功能性房间计算结果见下表西南角贵宾接待室热负荷计算:西外墙面积10.1×5-(2.2×2×2)=41.7㎡,传热系数K=0.99W/㎡℃(见《空调负荷计算表》)。室外计算温度tw=-26oC,室内计算温度tn=20oC,室内外计算温差为44oC,温差修正系数a=1.0,朝向修正-5%,则耗热量Q1=1899W.西外窗面积8.8㎡,传热系数3.744W/㎡℃,室外计算温度tw=-26oC,室内计算温度tn=20oC,室内外计算温差为44oC,温差修正系数a=1.0,朝向修正-5%,耗热量Q1=1515.6W。其他外墙与外窗热负荷计算方法与此相同。该房间总耗热量Q=7262W。(8)屋面热负荷的计算传热系数取1.15W/m2oC(见《空调负荷计算表》第47页)空调热负荷计算表(一层)房间名称及方向围护结构面积传热系数室内计算温度供暖室外计算温度室内外计算温度差温差修正系数基本耗热量修正后耗热量高度修正围护结构耗热量朝向风向 修正后耗热量ktntwΔtαQ"XchXf1+Xch+XFQ""XhQ1m2w/m2.℃℃℃℃ W W W 一楼大厅(292.19m2)东外墙110.10.9918-264414794-0.100.954554.090.125100.6南外墙2280.999933-0.20.87946.047946西外墙110.10.994794-0.10.954554.094554.1东外窗13.23.7442175-0.10.952065.792313.7西外窗13.23.7442175-0.10.952065.792313.717.63.7442899-0.20.82319.482597.855
南外窗南外门11.256.43168-0.20.82534.42838.5地面Ⅰ96.50.471996011995.621995.6地面Ⅱ195.70.231980011980.381980.4小计 面积指标:108.29 31640 贵宾接待室(115.48m2)西外墙41.70.9920-264611899-0.100.951804.070.021840.1南外墙32.80.991494-0.20.81194.971218.9西外窗8.83.7441516-0.10.951439.791468.6南外窗7.23.7441240-0.20.8992.011011.9地面Ⅰ42.30.4791501914.526932.82地面Ⅱ73.180.2377401774.244789.73小计 62.89 7262 会议室(115.48m2)东外墙41.70.9918-264411899-0.100.951804.070.021840.1南外墙32.80.991429-0.20.81143.011165.9东外窗8.83.7441450-0.10.951377.191404.7南外窗7.23.7441240-0.20.8992.011011.9地面Ⅰ42.30.4791501914.526932.82地面Ⅱ73.180.2377401774.244789.73小计 61.87 7145 卫生间(48.8m2)东外墙30.50.9918-264411389-0.100.951319.520.021345.9北外墙340.991548011548.361579.363.7441033011033.34105455
北外窗地面Ⅰ28.20.4761001609.684621.88地面Ⅱ20.60.2321801217.948222.31小计 98.84 4823 杂物间(21.35m2)北外墙17.50.9918-26441762001762.30.02777.55北外窗4.83.74479101790.733790.73地面Ⅰ80.4716501165.44165.44地面Ⅱ13.350.2313501135.102135.1小计 面积指标:87.53 1869 机房(67.14m2)北外墙57.50.9918-2644125050012504.70.022554.8北外窗123.7441977011976.831976.8地面Ⅰ230.4747601475.64475.64地面Ⅱ44.140.2344701446.697446.7小计 面积指标:81.23 5454 电梯前室(22.88m2)北外墙15.150.9918-26441660001659.9340.02673.13北外门3.66.41014011013.761013.8地面Ⅰ7.50.4715501155.1155.1地面Ⅱ15.380.2315601155.646155.65小计 面积指标:87.31 1998 厨房(53.69m2)北外墙44.50.9918-2644119380011938.420.021977.2北外窗83.7441318011317.891317.9地面17.80.4736801368.104368.155
Ⅰ地面Ⅱ35.890.2336301363.207363.21小计 面积指标:74.99 4026 其余房(302.8m2)东外墙50.9918-26441218-0.100.95206.910.02211.05西外墙30.50.991329-0.10.951262.151262.2北外窗4.83.74479101790.733790.73东外门36.4845-0.10.95802.56818.61北外墙180.9978401784.08799.76地面Ⅰ102.60.472122012121.772121.8地面Ⅱ200.20.232026012026.022026小计 面积指标:26.52 8030 三层客房(32.4m2)西外墙28.350.9920-264611291-0.100.951226.5101251南外墙100.99455-0.20.8364.32371.61南外窗43.744689-0.20.8551.117562.14小计 67.43 2185 客房(31.2m2)东外墙27.30.9920-264611243-0.100.951181.0801204.7南外墙100.99455-0.20.8364.32371.61南外窗43.744689-0.20.8551.117562.14小计 68.54 2138 客房(32.4m2)东外墙28.350.9920-264611291-0.100.951226.5101251北外墙100.9945501455.4464.5155
北外窗43.74468901688.896702.67小计 74.64 2418 客房(32.4m2)北外墙100.9920-26461436001435.60435.6北外窗43.74465901658.944658.94小计 面积指标:33.78 1095 客房(32.4m2)南外墙100.9920-26461455-0.100.95432.630441.28南外窗43.744689-0.20.8551.117562.14小计 30.97 1003八层客房(32.4m2)西外墙38.880.9920-264611771-0.100.951682.070.021715.7南外墙15.20.99692-0.20.8553.766564.84南外窗43.744689-0.20.8551.117562.14顶棚32.41.151714011713.961748.2小计 141.70 4591 办公室(44.8m2)东外墙22.080.9918-264411006-0.100.95955.2470.02974.35南外墙300.991366-0.20.81092.961114.8南外窗8.43.7441447-0.20.81157.351180.5顶棚44.81.152267012266.882312.2小计 124.60 5582 管理办公室(47.2m2)东外墙28.320.9918-264411290-0.100.951225.210.021249.7北外墙30.40.991384011384.421412.1北外窗83.7441378011377.791405.3顶棚47.21.152388012388.322436.155
小计 137.78 6503 客房(33.6m2)北外墙15.20.9918-26441662001662.1120.02675.35北外窗43.74465901658.944658.94顶棚33.61.151700011700.161734.2小计 面积指标:91.32 3068 客房(32.4m2)南外墙15.20.9920-26461692-0.100.95657.5980.02670.75南外窗43.744689-0.20.8551.117562.14顶棚32.41.151714011713.961748.2小计 92.01 29812.3夏季空调湿负荷计算因为本设计为宾馆空调设计,所以室内活动认为是轻度劳动,本设计只考虑人体散湿量,据《空调负荷计算表》散湿量式中:式中:—房间总散湿量g/h;—房间一个人散湿量g/h《简明空调设计手册》;—房间人数;—群集系数。各房间负荷汇总列表如下表各房间负荷汇总表房间名称面积m2冷负荷w热负荷m2冷负荷指标w/m2热负荷指标w/m255
一层大堂292.18519583.031640.067.0108.29贵宾接待室115.488197.115262.071.0132.2厨房53.694848.24026.090.374.99机房67.145465.25453.881.481.23电梯前室37.172798.93245.375.387.31杂物间21.351460.31868.868.487.53卫生间48.83313.54613.667.994.54会议室114.5713221.46891.4115.460.15其他屋335.5221641.18898.064.526.52小计1085.90580528.781898.8 二层多功能贵宾房1158165.015203.071.0132.2配餐室27.281915.12327.070.285.3自助餐厅北191.614485.06472.275.633.78多功能贵宾房东南1159361.09341.581.481.23电梯前室37.172798.93245.375.387.31杂物间21.351460.31868.868.487.53卫生间48.83313.54613.667.994.54自助餐厅南207.6914434.56151.869.529.62小计763.8955933.249223.1 三、四层客房西南32.41441.82098.544.564.77客房东南32.41898.62133.258.665.84客房东北33.61680.02410.150.071.73客房北33.61135.01723.733.851.3客房南32.4959.71607.029.649.6其余南面241.387144.811972.429.649.6其余北面137.764656.37067.133.851.3电梯前室107.528096.39387.675.387.31杂物间845745.67352.568.487.53小计735.0632758.145752.2 五~七层客房西南32.41441.82098.544.564.77主卧室64.83797.34266.458.665.84客房东北33.61680.02410.150.071.73客厅564558.44548.981.481.23客房北33.61135.01723.733.851.3客房南32.4959.71607.029.649.6其余南面230.586825.211436.829.649.655
其余北面159.365386.48175.233.851.3电梯前室104.97899.09158.875.387.31小计747.6433682.745425.5 八层客房西南32.41979.64591.161.1141.7办公室东南44.83866.25533.286.3123.51管理办公室47.23596.66457.076.2136.8办公室56.84623.54613.981.481.23客房北33.61872.53068.455.791.32客房南32.41607.02981.149.692.01其余南面230.5811436.821215.749.692.01其余北面159.368876.414552.855.791.32电梯前室104.97899.09579.575.391.32小计742.0445757.772592.5 第三章确定送风状态及送风量空气调节系统一般由空气处理设备和空气输送管道以及空气分配装置组成,根据需要,它能组成许多不同形式的要求。本建筑为宾馆,各房间均为小空间结构,要求各房间能独立进行调控,因此宜采用风机盘管加新风系统3.1风机盘管机组新风供给方式的确定本设计采用单独的新风系统供给室内新风,把新风处理到室内的等焓线上,承担室内的负荷,这样就提高了该系统的调节和运转的灵活性55
3.2新风处理状态的确定,总风量及风机盘管风量的确定根据室内的in线新风处理后的相对湿度和风机温升Δt即可定出新风处理后的机械露点L点,即L点和K点重合。过室内状态点n点做热湿比线ε线与φ=90%的交线,即为送风状态点O点,因为风机盘管系统用于舒适性空调,不受送风温差限制,故可采用较底的送风温度。故房间的风量连接L,O两点到M点,使式中:——新风量。Kg/s——风机盘管风量Kg/s故房间总风量,而M即为风机盘管的出风状态点。3.3夏季室内新风量的确定:3.3.1满足卫生要求:在人员长期停留的空调房间,由于人们呼出二氧化碳气体的增加,会逐渐破坏室内空气的正常成分,给人体带来不良的影响。因此在空调系统的送风量中,必须掺入含二氧化碳少的室外新风来稀释室内空气中的二氧化碳的含量,使之符合卫生标准的要求。人体在不同状态下的二氧化碳呼出量工作状态CO2呼出量(L/h·人)CO2呼出量(g/h·人)安静时1319.5极轻的工作2233轻劳动3045中等劳动4669重劳动74111二氧化碳允许浓度表3-2房间性质CO2允许浓度(L/m3)CO2允许浓度(g/kg)小孩和病人停留的地方0.71.055
人周期性停留的地方1.251.75人短期停留的地方2.03.0人长期停留的地方1.01.5在一般的城市和农村,室外空气中二氧化碳含量为0.5~0.75g/kg根据以上条件,可利用确定全面通风量的基本原理,来消除二氧化碳所需要的新鲜空气量,可按规范确定;不论每人占用体积多少,新风量按大于等于30m3/h·人采用;对于人员密集的建筑物,每人占用的空间较小(不到10m3),但停留的时间较短,可分别按吸烟与不吸烟的情况,新风量以7~15m3/h·人计算,由于这类建筑物按此确定的新风量占总风量的百分比能达到,从而对冷量影响很大,所以在确定新风量时应十分慎重。3.3.2补充局部排风量,以防房间产生负压因为本设计的建筑的局部排风主要在厕所,还有在且其排风量大,所以在厕所内放置排气扇。当空调房间内有排风柜等局部排风装置时,为了不使空调房间产生负压,在系统中必须有相应的新风量来补尝排风量。Lw=LPm3/h《供热通风与空调工程手册》P196式中:Lw——需要的新风量,m3/h;LP——局部和全面排风量之和,m3/h;排风量的计算按换气次数计算:次/h式中:——房间的换气次数,次/h;——房间送风量,m3/h;——房间的体积,m3;3.3.3保持空调房间正压要求一般情况下室内正压在5-10pa即可满足为了防止外界环境空气渗入空调房间,干扰室内温度,湿度或破坏室内的洁净度,需要使空调房间内部保持一定的正压值,即用增加一部分新风的方法,使室内空气高于外界压力,然后再让这部分多余的空气从房间门窗缝隙等不严密处审渗出去。室内的正压值△P(PA)正常,相当于空气从房间缝隙渗出时阻力。空调房间正压值5~10Pa来计算。过大的正压不但没有必要,而且还降低了系统运行的经济性。可按下式计算从房间通过门缝、窗缝和其他缝隙渗入的风量,即需要补充的新风量Lw。55
m3/h《供热通风与空调工程手册》P233式中:——需要补充的新风量;——室内需要保证的正压值,㎜H2O取1.01972㎜H2O;a,n——与严密程度有关的系数,n取1.5;a取5;——缝隙长度,m;其取值随门窗开启形式的不同而不同根据上述三个要求取最大值;本设计房间内均为正压。3.4冬季送风状态及送风量冬季通过围护结构的温差传热往往是由内向外传递,只有室内热源向室内散热,因此冬季室内余热往往比夏季少得多。而余湿量则冬夏季一般相同。这样,冬季房间的热湿比常小于夏季,也可能为负,所以空调送风温度往往接近或高于室温,由于送风时送风温差可以比夏季小,故空调送风量一般是先确定夏季送风量,再冬季可采取与夏季相同的风量。全年采取固定送风量是比较方便的,若少于夏季,可以提高送风温度但≯450C为宜,可以节约电能,尤其对较大的空调系统减少风量的经济意更为突出。3.5夏季空气处理方案:现在以一层贵宾接待室为例来确定送风状态和送风量1.依据已知条件℃,,定出室内状态点N。2.依据计算的负荷Q=8.197KW和散湿量W=0.00056Kg/s,计算出房间的热湿比,过N点做出热湿比线3.依据房间的温度控制精度及换气次数。定出送风温差,定出送风状态点,在没有特殊要求的场合下,尽量取较大的温差,以减少送风量,从而达到经济、节能的目的,因此本设计采用露点送风。热湿比线与相对湿度线的交点,即为送风状态点O。4.画出贵宾接待室房间夏季焓湿图,在i-d图上查的=54kJ/kg,=10.5g/kg,=43.2kJ/kg,=10g/kg如下图所示空气的混合状态为55
W→LN→ML点与M点混合处理到送风状态O点,最后送至室内N点3.6冬季空气处理方案:本建筑为宾馆,冬夏采用定风量系统,因此冬季的送风量.下面以一层贵宾接待室为例来确定冬季的送风状态。冬季送风温度<45℃.1.依据已知条件℃,,定出贵宾接待室房间室内状态点。2.依据计算的负荷和散湿量=0.00056Kg/s,计算出贵宾接待室的热湿比线,过N点作出热湿比的过程线。3.由=54kJ/kg,=10.5g/kg,=0.602kg/s得==7.3g/kg4.根据g/kg在i-d图上找出送风状态点,并查得54.1kJ/kg=34.4℃55
3.7以一层贵宾接待室为例计算送风量、新风量,确定送风状态点夏季室内计算参数:tN=26±10C,φ=50±5%,房间取φ=50%,iN=54kJ/kg,室外计算参数:tw=30.4℃,φ=66%,室内余热QN=8.197Kw,余湿量W=4054.8g/h,室内20人则有(1)计算房间内热湿比ε=14637.5(2)过室内状态点N点做热湿比线ε线与φ=90%的交线,即为送风状态点O点。得io=43.8kJ/kg,do=10.1g/kg。(3)计算房间内总送风量=0.759kg/s=2277m3/h(4)计算房间内的新风量GX据《空气调节设计手册》及本建筑物性质,满足卫生要求的新风量取30m3/h·人,人员20人,故GX=20×30=600m3/h。因600>2277×10%,所以新风量取600m3/h。(5)算风机盘管处理风量=2277-600=1677m3/h。各典型房间的送风量和送风状态点及新风量各房间送风量和送风状态点汇总表夏季各房间送风状态及送风量统计表55
房间名称冷负荷kw湿负荷kg/s热湿比室内温度室内湿度送风量kg/s一层宾馆大堂19.5830.0011958326501.92贵宾接待室8.1970.000561463726500.759厨房4.8480.000222203626500.49会议室13.2210.000562360926501.36二层多功能贵宾西南8.1650.000282916126501.02配餐室1.9150.000141367826500.174自助餐厅北14.4850.000562586626501.57多功能贵宾9.3610.000283343226501.04自助餐厅南14.4350.000562577726501.52三~四层客房西南1.4420.000111310926500.124客房东南1.8990.000111726326500.17客房东北1.680.000111527326500.16客房北1.1350.000111031826500.1客房北11.2490.000111135426500.112客房南0.960.00011872826500.074客房南11.1750.000111068026500.102五~七层主卧室3.7970.000113451826500.422客厅4.5580.000281627926500.512八层客房西南1.980.000111800026500.18客房南1.6070.000111460926500.146监控室1.1040.00011921826500.079接待兼会议1.3610.00028486026500.097办公室东南3.8660.000281380726500.358办公室4.6240.000281651426500.45管理办公室3.60.000281285726500.36客房北1.8730.000111702726500.18客房北12.5090.000112280926500.2593.8确定餐厅和卫生间的排风量为了防止卫生间的气味外溢,客房一般采用卫生间排风。卫生间排风一般有以下几种形式:自然排风55
机械排风卫生间设排气扇和防火阀,屋顶设引风机,且排气扇和引风机联锁卫生间排风口设防火阀,屋顶设引风机卫生间设普通排气扇,竖井依靠自然排风卫生间设带有止回阀的排气扇本次设计采用了卫生间排风口设防火阀,屋顶设引风机。风量按新风量的85%~90%计算。风量为85%新风量=120X0.85=102m³/h。餐厅采用排气扇排风,风量为总风量的50%,风量为3000m³/h。第四章空气处理方案的确定由于各类空调房间对空气的要求各不相同,因此空调系统的种类也是多种多样。在工程设计中应按照空调对象的性质和用途,热湿负荷的特点,室内设计参数的要求,可能为空调机房及风管提供的建筑面积和空调间初投资和运行费用等许多方面的具体情况,经过技术经济的分析比较来选择合适的空调系统。本设计中宾馆大堂、营业厅、餐厅大堂等属于大空间,人员较集中,且设计参数一致。其他房间如包间、客房、会议室等空调规模较大,房间较多,室内环境较干净,且要求各个房间能单独调控,55
除了一层宾馆大堂其余采用“风机盘管机组加新风”的空调系统。大堂布置现成的柜式空调。风机盘管一般承担全部的室内负荷,新风系统则承但新风负荷。新风宜处理到与室内等焓或等湿状态。本设计新风处理到等焓线上,一般为等焓线与φ=90%线的交点。“风机盘管机组加新风”空调系统的新风送风口应单独设置,或布置在风机盘管机组送风口的旁边,不应将新风接至风机盘管机组的回风吸入口处。本设计采用风机盘加新风系统,其优点有:1.空调效果好;2.可送新风保证室外内空气新鲜度;3.投资低;4.故障少,好维修;5.设备寿命长;6.噪声小7.易与装饰配合,实现现代建筑的高档、豪华、明快、舒适之美感。第五章空气处理设备选择5.1风机盘管的选择5.1.1风机盘管机组的选型要求:满足风量、冷量与热量的要求;考虑美观装修的问题;明确所选用机组的型式、规格、风口位置等要求;55
明确风机电动机轴承是否采用含油或不含油轴承;明确所选用的机组的接水管左出或右出方向(与管道布置有关);注意出水管的保温措施;冬季通热水,水温一般不超过605.1.2风机盘管台数的确定平均20-30平方米一台风机盘管。型号不要太多,以免采购时麻烦。5.1.3风机盘管型号选择以标准层客房为例,该房间新风量为G=120m³/h,风机盘管风量为G=417m³/h,故风机盘管的热负荷为1.442Kw,选用型号为约克公司YGFC系列,04-3S。同理选择其他房间的风机盘管,具体型号详见下表。编号风量型号供冷能力供暖能力水流量水压降电机噪声m³/hKWKW(L/S)KpaWdB(A)一层贵宾接待室3278.807-3S8.249.660.5125.6912045厨房2137.107-3S8.249.660.5125.6912045会议室5888.107-3S8.249.660.5125.6912045二层多功能西南4409.107-3S8.249.660.5125.6912045配餐室751.6806-3S5.987.560.3411.059044自助北6801.608-3S9.7110.770.866911744自助南6566.408-3S9.7110.770.866911744多功能4493.2807-3S9.210.120.8666.3112045三层客房西南53704-3S3.865.070.1714.046039客房东南73404-3S3.865.070.1714.046039客房东北67204-3S3.865.070.1714.046039客房北426.403-3S2.953.680.1712.844334客房北1481.7703-3S2.953.680.1712.844334客房南31902-3S2.482.910.1711.952833客房南1441.3203-3S2.953.680.1712.84433455
五层主卧室1822.5606-3S5.987.560.3411.059044客厅2212.407-3S9.210.120.8666.3112045八层客房西南79206-3S5.987.560.3411.059044客房南631.104-3S3.865.070.1714.046039监控室341.2802-3S2.482.910.1711.952833接待室419.9603-3S2.953.680.1712.844334办公东南1546.406-3S5.987.560.3411.059044办公室1958.406-3S5.987.560.3411.0590445.2新风处理机组的选择:每层一台新风处理机组以标准层客房为例,该房间新风量为G=120m³/h,风机盘管风量为G=417m³/h,其余屋也按这样算,最后把每个屋的风量加起来,按总风量选择新风机组。各机组型号详下表新风处理机组楼层新风量m³/h型号余压Pa冷量KW热量KW水量m³/h一层309035BD2003440.75.84二层237725XBD12034.235.25.88三层204025BD18024.729.14.24四层204025BD18024.729.14.24五层2252.325BD18024.729.14.24六层2252.325BD18024.729.14.24七层2252.325BD18024.729.14.24八层264030BD20029.934.95.1455
第六章气流组织确定气流组织是室内空调的一个重要环节,它直接影响着空调系统的使用效果,尤其是在有室温允许波动范围和洁净度要求以及高大空间的建筑中,合理的气流组织具有更重要的作用。因为只有合理的气流组织才能充分发挥送风的冷却和加热作用,均匀地消除室内热量,并能更有效的排除有害物和悬浮物在空气中的灰尘。因此,不同性质的空调房间,对气流组织计算具有不同的要求.一般的空调房间,主要湿要求在工作区域内保持比较均匀而稳定的温湿度。而工作区风速有严格要求的空调房间,主要保证工作区域内风速不超过规定的数值。我国现行的“采暖通风和空气调节设计规范”GBJ19-87规定:舒适性空调空气调节室内冬季风速不应大于0.2m/s,夏季不应大于0.3m/s。此外,对送风口的出流速度值应考虑高速气流通过风口所产生的噪声,因此在要求较高的房间应取较低的送风速度,一般的取值范围为2-5m/s,本设计由于一二层房间的高度较高,故送风速度取3m/s。回风口的风速一般限制在4m/s以下,在离人较近时应不大于3m/s。考虑到噪声因素,在居住建筑内一般取2m/s。本设计中取3m/s。本设计气流组织方案设计方案为:一二层新风管不设风口,直接送入吊顶与盘管混合。(有多功能贵宾房采用方形散流器下送)其余的送风口采用双层侧装百叶风口。卫生间排风用单层百叶风口。以二层自助餐厅北气流组织计算为例:房间尺寸:16×6×5(1)按五个方形散流器布置,每个散流器对应的F=96/5≈19.2㎡,垂直射程X=5-2=3m。(2)送风温差为△t=8℃,总送风量L=6802m/h,每个散流器的送风量为L=1360m/h。(3)散流器的出风速度选定为4m/s,则F=1360/4×3600=0.094㎡(4)检查u:根据式u=u/(X+L),式中:=1.41(《空气调节》表5-2,10)k——根据0.1L/=0.1×1.2/=0.392,查图5-13,按L/X=1.2/0.78=1.53在曲线10查得k=0.48——均取155
代入各已知值得:u=4×1.41×0.48×/(1.2+0.78)=0.7m/s(5)检查=×k/(X+L)=8××0.88×0.48×/(1.2+2.5)=0.39℃。计算检查结果说明、u均满足要求。(6)检查射流贴附长度:=0.5ze.Z=5.45u=5.45×1.41×4×=5.39K=0.35-0.62=0.35-0.62×0.326=0.15=0.5×3.74×=2.17m故贴附射流长度基本满足要求。其他房间的气流组织计算与次相同。送风形式如下:风机盘管加新风系统有侧送有下送。回风方式:均为顶回。55
第七章送回风道的布置及水力计算7.1水力计算的目的管道把供热系统、通风系统或空调系统中的设备、附件和动力装置联成一体,是暖通空调系统的重要组成部分。管道的水力计算,就是要合理组织流体流动,在保证使用效果的前提下,达到初投资和运行费用最省。因此,管道系统设计的好坏,将直接影响整个供热、通风或空调工程在建造与使用方面的技术经济性能。风道设计原则1)科学合理,安全可靠地划分系统,考虑那些房间可以合为一个系统,那些房间宜设单独系统。2)风道断面形状应与建筑结构配合,并争取做到与建筑空间完美统一;风道规格要求按国家标准。3)风道布置要尽可能短,避免复杂的局部管件。弯头、三通等管件要安排得当,与风管的连接要合理,以减少阻力和噪声;同时还要考虑便于风系统的安装、调节、控制与维修。4)风道布置要尽可能短,避免复杂的局部管件。弯头、三通等管件要安排得当,与风管的连接要合理,以减少阻力和噪声;同时还要考虑便于风系统的安装、调节、风系新风入口应选在室外空气叫洁净的地点,为避免吸入地面灰尘,进风口底部距地面不宜小于2米,(绿化地带湿不宜地域1米).当心风口与排风口同时存在时,应使新风口位于主导风向的上风侧,新风口不宜低于排风口3米以上,且水平距离不宜小于10米。5)当输送有可能在风道内凝结的气体时,风道应有不小于0.005的坡度,以利于排除积液,并应在风道或风机的最低点设置水封泻液管。风系统布置好后不要忘记在适当的地方放置风管的阀门,如一次性调节阀(插板阀、多页调节阀等)经常开关的调节阀(新风阀、一次风阀、排风阀等)电动调节阀和防火阀等,否则风系统的计算将不准确。此外还应预留测量装置如观察孔。压力表、温度计、风量测定孔和采样孔55
的位置。6)尽量减少风管系统的摩擦阻力:主要措施:a尽量减少或避免风道转弯和风道断面突然变化,如渐扩(或减缩)管的局部阻力就比突扩(突缩)管小的多,设计中尽可能采取前者;b弯头的曲率半径不要太小,一般应取风管当量直径的1-4倍,民用建筑中采用矩形直角弯头,此时弯头内侧应有倒角且弯头中应有导流叶片;c支风管与之风管连接时,应避免90ο应垂直连接,通常支管应在顺气流方向上制作一定的导流曲线或三角形切割角;d避免合流三通内出现气流引设现象,虽然流速小的直管或支管得到的能量,但流速大的支直管或支管会失去较多的能量,导致总损失增加,解决的办法是尽量使支管和干管流速相等;e风道上管件布置尽量相隔一定距离,因为两个连在一起的管件的总阻力要比同样两个管件单独设置时的阻力之和大地多。一般宜使弯头、三通、调节阀,变径管等管件之间保持5-10倍管径的直管段;f注意分管与风机入口的连接。7)较少空调系统中设备的阻力主要措施包括:a尽量采用阻力小的空气处理设备,例如能用初效过滤就不必采用中效过滤器;b.做好空气处理设备的维护,如定期清洗或更换空气过滤器,表面式换热器以及表面灰尘的清除等。7.2风管水力计算的特点空气在管内流动的压力损失,与水或蒸汽的一样,也划分为沿程损失和局部损失,但由于风管截面不都是圆形的,风管局部损失往往占较大的比重,风管材料的多样性以及空气的性质与水有较大差异等原因,使得风管的两类损失有着自身的特点,下面将针对风管的沿程损失和局部损失的计算分别加以讨论。(1)沿程损失空气在管内流动时的沿程压力损失可按下式计算:Pa单位风管长度上的沿程损失(即比摩阻)可按下式计算:Pa/m两式中:λ——沿程阻力系数;55
v——风管内空气的平均流速,m/s;——空气的密度,kg/m3;——风管的长度;D——圆形风管的内径;在通风或空调系统中,为使风道方便与建筑配合和使风管容易制作,经常采用矩形截面的管道。如果仍利用圆形风管的阻力计算公式或线图来求矩形风管的沿程损失时,就需要将矩形风管折算成相当的圆形风管,即求出矩形风管的当量直径。再由当量直径来求得矩形风管的沿程损失。(2)局部损失当气流经过阀门、三通、弯头、风口及变径等和管件时,都将产生局部阻力,从而导致局部损失。局部损失可用下式计算:Pa式中:——局部阻力系数;局部损失计算的关键是确定ξ的值,它的大小一般与管件的形状和尺寸有关。也可取沿程阻力的3~5倍。7.3风管水力计算方法本设计风道采用矩形风道,不均匀送风计算.7.3.1将各管段的风管编号,风量标于轴侧草图7.3.2据假定风速和各管段的风量,确定各管段的断面尺寸,计算各管段的沿程损失。空调系统风管内的风速:主管风速5-6.5m/s,支管风速3-4.5m/s(见《简明空调设计手册》)。本设计主管风速初步选择ν=6m/s,支管初选风速4m/s。7.3.3长度为L(m)的风管沿程压力损失ΔPm(Pa)可按下式计算(见《供热通风与空调工程设计资料大全》)式中:△Rm—单位管长沿程压力损失△Rm根据实际的流速和管道的当量直径可以查得(见《通风与空气调节工55
程》教材录6通风管道单位长度比摩阻线算图)7.3.4计算局部阻力由公式:可得出局部阻力7.3.5管段摩擦总阻力下面以一层层新风系统为例说明:计算草图如下(1)由假定风速6m/s和总风量300确定1-2段风管的尺寸为120*120,然后根据L=Fv反算出该管段的实际风速,并查出实际流速对应的比摩阻。实际流速为5.79m/s,比摩阻为4.297Pa/m。(2)根据△Pm=△Rm·L计算1-2管段的沿程阻力损失为4.297×8.7=37.38Pa(3)该管段有弯头、三通等局部阻力构件,其局部阻力系数分别为0.27、0.18、0.09,空气密度约取为1.2,根据代入各数据得该管段的局部阻力损失为29.14Pa。(4)则1-2管段的总阻力为37.42+29.1=66.52Pa。同理计算其他管段的阻力损失,最后确定最不利管路的总损失,用其他并联管路的阻力损失与其比较,二者的不平衡率应控制在15%以内,超出该范围的管段应做局部调整,以保证各管线送风符合设计55
要求。其余管段的风管水力计算见下表:风管水力计算表 送风管道水力计算 出口风压10Pa 管段编号风量L管长管宽管高流速当量管径实际流速单位沿程阻力沿程阻力局部阻力系数动压局部阻力管段总阻力(m3/h)(m)(mm)(mm)(mm)(m/s)(Pa/m)(Pa)ξ(Pa)(Pa)(Pa)12345678910111213一层 1~23008.71201201205.794.29737.381.4520.0929.1466.523~23002.71201201205.794.29711.601.320.0926.1237.722~56007.52501201625.562.76220.720.5518.5210.1930.904~5901.21201201201.740.5030.601.31.812.352.955~76903.81602501954.791.6376.220.413.785.5111.736~71201.21201201202.310.8461.021.33.224.185.197~88106.21602501955.632.76217.120.418.987.5924.728~1314102.63202502814.901.2473.240.414.385.758.9912~1324031201201204.632.798.371.312.8616.7225.0913~1416507.13202502815.731.4110.011.6519.6932.5042.51二层 1~22253.51201201204.342.5698.99111.3011.3020.292~345016.82001201505.212.6444.351.5516.2825.2369.583~611304.663202002464.901.285.960.514.437.2213.186~9178653203203204.840.8814.410.514.087.0411.459~1323775.64003203565.160.8995.031.6515.9726.3431.38三层(左) 1~21208.21201201202.310.8326.822.33.227.3914.222~636021601201375.212.9565.910.9516.2815.4621.376~96005.42001601785.212.12811.490.9516.2815.4626.959~128402.12002002005.832.2514.730.9520.4219.4024.1255
12~1510805.12502002226.002.10910.760.9521.6020.5231.2815~1713203.12502502505.871.7865.540.8520.6517.5523.0917~1914401.53202502815.001.121.680.7515.0011.2512.93三层(右) 21~2812031201201202.310.8322.502.053.226.599.0928~232405.31201201204.632.7914.790.8512.8610.9325.7223~2548032001201505.563.0329.100.8518.5215.7424.8425~196003.12001601785.212.1286.600.616.289.7716.3619~2720407.73203203205.531.128.621.6518.3730.3238.94五层(左) 1~21208.21201201202.310.8326.822.33.227.3914.222~636021601201375.212.9560.000.9516.2815.4615.466~96005.42001601785.212.12817.450.9516.2815.4632.919~128402.12002002005.832.2514.500.9520.4219.4023.9012~1510805.12502002226.002.10911.390.9521.6020.5231.9115~1713203.12502502505.871.7863.750.8520.6517.5521.3017~1914401.53202502815.001.125.710.7515.0011.2516.96五层(右) 24~231203.21201201202.310.8322.6613.223.225.8823~212706.31601201373.911.72510.871.659.1615.1125.9721~197325.62501601955.081.8110.140.8515.5013.1823.3119~2521727.73203203205.891.2569.671.6520.8334.3744.04八层(左) 1~21208.21201201202.310.8326.822.33.227.3914.222~636021601201375.212.9565.910.9516.2815.4621.376~96005.42001601785.212.12811.490.9516.2815.4626.959~128402.12002002005.832.2514.730.9520.4219.4024.1212~1510805.12502002226.002.10910.760.9521.6020.5231.2815~1713203.12502502505.871.7865.540.8520.6517.5523.0917~1914401.53202502815.001.121.680.7515.0011.2512.93八层(右) 22~233005.22001201503.471.2026.251.47.2310.1316.3855
23~219002.52502002225.001.4993.750.8515.0012.7516.5021~1912003.82502502505.331.4255.420.7517.0712.8018.2219~2626407.74003203565.731.1038.491.6519.6932.5040.99一二层的分支没有太大的支路,所以不用计算不平衡率。三~四层左环路与右环路1-17与21-19两并联管线的不平衡率为25%,需用多叶调节阀调节。五~七层左环路与右环路1-17与24-19两并联管线的不平衡率为27%,需用多叶调节阀控制调节。八层左环路与右环路1-17与22-19两并联管线的不平衡率为32%,需要用多叶调节阀控制调节。第八章空调水系统的水力计算8.155
风机盘管系统中的水管设计与采暖管路有许多相同之处,例如管路同样要考虑必要的坡度以便排除空气;对于有析湿可能的二次盘管,还应设有凝水排放的管路系统。本设计中,由于建筑物较大,为了保持水力工况的稳定性,水系统设计为同程式。8.2设计的主要原则如下:1)空调管路系统应具备一定的输送能力,如,在中央空调系统中通过水系统来确保流过每台空调机组或风机盘管空调器的循环水量达到设计流量,以确保机组的正常运行;2)合理布置管路管路布置要尽可能的选择同程式系统,虽然初投资略有增加,但是易于保持环路的水力稳定性;若采用异程式系统时,设计中应注意各支管间的压力平衡问题;3)确定系统的管径时,应保证能输送设计流量,并使水流阻力和噪声较小,以获得经济合理的效果。管径大则投资多,但流动阻力小,循环泵的耗电小,使运行费用降低,因此,应当确定一种能使投资和运行费用之和为最低的管径,同时,设计中要杜绝大流量,小温差问题,这是管路系统设计的经济原则;4)设计中,应进行严格的水力计算,以确保管路之间符合水力平衡要求,使空调水系统在实际运行中由良好的水力工况和热力工况;5)空调管路系统应能满足中央空调部分负荷运行时的调节要求;6)空调管路系统设计时应尽可能多的采用节能技术措施;7)管路系统选用的管材、配件要符合有关的规范要求;8)管路系统设计中要注意便于维修、管理、操作、调节方便。空调水系统的管路计算是在已知水流量和推荐流速下,确定水管管径及水流动阻力。8.3供回水系统管径确定及水力计算8.3.1拟画系统草图。8.3.2各管段编号并确定各管段管长及流量(由盘管选择可知)8.3.3根据流量及比摩阻推荐值△Pm=100~600Pa,确定管径。由空调冷水系统水力计算表,闭式空调冷水系统管道摩擦阻力计算表可查得△Pm及水管公称直径D。(据《建筑设备专业设计技术措施》)8.3.4确定管件的局部阻力系数∑ξ55
,计算局部阻力。空调水系统在估算时,局部阻力约为直管总摩擦阻力的0.2~0.3,管路长度较大时取下限植,长度较小时取上限值。由于本设计在设计计算以及后续的设备选型中都有安全系数,故计算局部阻力时按估算值计算。8.3.5列表汇总设计管径及压力损失。8.3.6平衡管路压力,通过校核调整管径使各并连环路的压力损失差值在15%以内。沿程阻力及局部阻力计算公式同风道计算,不再赘述。总阻力包括风机盘管的管段应加上风机盘管的损失水头。一层供回水草图如下:一层供水草图55
一层回水草图各层水系统水力计算如下:水管水力计算书供水水力计算表序号流量(L/s)管径管长(m)ν(m/s)R(Pa/m)△Py(Pa)ξ动压(Pa)△Pj(Pa)△Py+△Pj(Pa)一层右环路 1~30.51DN321.10.508134.03147.4334129.032516.128663.5612~30.51DN250.470.891561.12263.7264396.9411587.761851.48843~41.02DN4010.40.773247.182570.692298.765597.5293168.22184~142.04DN5040.925249.56998.243427.8131283.442281.677514~52.21DN504.11.002290.851192.493502.0021506.012698.491一层左环路 0 0007~130.51DN321.390.508134.03186.3024129.032516.128702.42978~130.51DN320.80.508134.03107.2244129.032516.128623.35213~91.02DN408.30.773247.182051.614298.7651195.063246.66869~101.53DN504.50.694144.21648.9454240.818963.2721612.21710~112.72DN7060.749121.06726.363280.501841.5021567.861511~122.89DN703.80.796135.88516.3443316.808950.4241466.76812~53.06DN700.60.843151.5490.9244.5355.3251598.961689.884255~65.1DN801.31.002170.19221.2473502.0021506.011727.25355
二层右环路 1~20.51DN252.70.891561.121515.024396.9411587.763102.7863~20.51DN250.940.891561.12527.4534396.9411587.762115.21482~41.02DN401.50.773247.18370.7732298.765597.529968.3025~40.51DN250.940.891561.12527.4533396.9411190.821718.27434~231.53DN5010.30.694144.211485.363240.818722.4542207.81723~61.7DN504.10.771528.492166.813297.221891.6623058.4705 二层左环路 0 0007~80.51DN320.940.508134.03125.9884129.032516.128642.11628~100.51DN321.70.508134.03227.8514129.032516.128743.97910~121.02DN401.70.773247.18420.2094298.7651195.061615.267412~141.53DN501.70.694144.21245.1573240.818722.454967.61114~152.04DN708.50.925249.492120.673427.8131283.443404.102515~162.55DN7030.702107.09321.273246.402739.2061060.47616~173.93DN801.30.772103.38134.3943297.992893.9761028.3717~185.65DN803.21.11207.23663.1364.5616.052772.233435.36118~197.37DN809.61.448346.333324.7731048.353145.066469.82419~209.09DN10021.03126.52533530.451591.351844.3520~219.95DN1000.61.128150.5590.333636.1921908.581998.90621~610.81DN1003.351.225176.66591.8114.5750.3133376.413968.217256~2212.34DN1001.31.398228.22296.6863977.2022931.613228.292三层右环路 10~110.17DN2040.479239.72958.884114.721458.8821417.76211~120.34DN255.450.594260.151417.824176.418705.6722123.489512~130.68DN323.50.677230.36806.262229.165458.3291264.58913~141.02DN405.50.773247.11359.053298.765896.2942255.343514~81.19DN401.70.901331.54563.6183405.9011217.71781.3195 三层左环路 0 0001~150.17DN2040.479239.72958.884114.721458.8821417.76215~20.34DN255.60.594260.151456.844176.418705.6722162.5122~40.68DN322.550.677230.36587.4184229.165916.6581504.0764~51.02DN405.50.773247.11359.054298.7651195.062554.1085~61.36DN502.60.616115.4300.043189.728569.184869.22455
6~71.7DN505.40.771176.16951.2643297.221891.6621842.92557~82.04DN701.60.562101.8162.883157.922473.766636.6468~93.23DN703.40.889168.03571.3023395.1611185.481756.7835五层右环路 10~110.17DN202.20.479239.72527.3844114.721458.882986.26611~120.34DN256.60.594260.151716.994176.418705.6722422.66213~140.34DN250.50.594260.15130.0753176.418529.254659.32914~120.68DN256.90.677230.361589.484229.165916.6582506.14212~162.74DN703.10.754122.76380.5563284.258852.7741233.3316~152.91DN706.10.801137.68839.8483320.801962.4021802.249515~83.08DN701.10.848153.43168.7733359.5521078.661247.429 五层左环路 0 0001~150.17DN2040.479239.72958.884114.721458.8821417.76215~20.34DN255.60.594260.151456.844176.418705.6722162.5122~40.68DN322.550.677230.36587.4184229.165916.6581504.0764~51.02DN405.50.773247.11359.054298.7651195.062554.1085~61.36DN502.60.616115.4300.043189.728569.184869.2246~71.7DN505.40.771176.16951.2643297.221891.6621842.92557~82.04DN701.60.562101.8162.883157.922473.766636.6468~95.12DN803.41.006171.47582.9983506.0181518.052101.052八层右环路 10~110.34DN200.90.479239.72215.7484114.721458.882674.6311~120.68DN326.80.677230.361566.454229.165916.6582483.10615~160.34DN200.70.479239.72167.8044114.721458.882626.68616~120.68DN322.20.677230.36506.7924229.165916.6581423.4512~132.04DN502.50.925249.49623.7253427.8131283.441907.162513~172.21DN501.11.002290.85319.9354502.0022008.012327.94317~142.38DN506.81.079335.352280.384582.1212328.484608.86214~82.55DN500.51.156382.98191.493668.1682004.52195.994 八层左环路 0 0001~150.17DN2040.479239.72958.884114.721458.8821417.76215~20.34DN255.60.594260.151456.844176.418705.6722162.5122~40.68DN322.550.677230.36587.4184229.165916.6581504.07655
4~51.02DN405.50.773247.11359.054298.7651195.062554.1085~61.36DN502.60.616115.4300.043189.728569.184869.2246~71.7DN505.40.771176.16951.2643297.221891.6621842.92557~82.04DN701.60.562101.8162.883157.922473.766636.6468~94.59DN803.40.902139.06472.8043406.8021220.411693.21回水水力计算表序号流量(L/s)管径管长(m)ν(m/s)R(Pa/m)△Py(Pa)ξ动压(Pa)△Pj(Pa)△Py+△Pj(Pa)一层右环路 1~20.51DN320.50.508134.0367.0154129.032516.128583.1432~31.02DN4060.773247.181483.094298.7651195.062678.153~41.02DN404.40.773247.181087.62298.765597.5291685.12984~52.04DN509.50.925249.562370.823427.8131283.443654.25755~62.21DN704.11.002287.281177.853502.0021506.012683.854一层左环路 8~90.17DN253.90.479234.82915.7984114.721458.8821374.689~100.34DN3260.594255.531533.184176.418705.6722238.85210~141.87DN505.80.848208.361208.494359.5521438.212646.69614~153.07DN707.60.845150.41143.044357.0131428.052571.0915~63.24DN70300.892166.850043397.8321193.56197.4966~75.45DN801.41.071191.11267.5543573.5211720.561988.1155二层右环路 1~20.51DN250.560.891553.47309.9434396.9411587.761897.70522~30.51DN251.70.891553.47940.8994396.9411587.762528.6613~41.02DN401.70.773247.18420.2092298.765597.5291017.73844~51.53DN4015.41.159531.028177.713671.6412014.9210192.62955~61.7DN503.10.771173.59538.1293297.221891.6621429.7905 二层左环路 0 0008~90.86DN403.50.651175.85615.4754211.901847.6021463.0779~100.86DN400.60.651175.85105.514211.901847.602953.11210~111.72DN501.90.78177.52337.2884304.21216.81554.08811~123.44DN700.90.947187.17168.4533448.4051345.211513.666512~135.16DN803.31.014171.96567.4683514.0981542.292109.76255
13~146.88DN801.31.352300.14390.1823913.9522741.863132.03814~158.6DN1003.40.975112.34381.9563475.3131425.941807.893515~168.94DN1000.81.013121.0696.8484.5513.0852308.882405.7282516~179.11DN1007.61.032125.55954.183532.5121597.542551.71617~189.62DN1001.71.09139.48237.1163594.051782.152019.26618~1910.13DN1001.71.148154.14262.0383658.9521976.862238.89419~2010.64DN1001.71.206169.52288.1844.5727.2183272.483560.66520~610.64DN10028.21.206169.524780.463727.2182181.656962.1186~712.34DN1001.41.398226.05316.473977.2022931.613248.076三层右环路 10~110.17DN2040.479239.72958.884114.721458.8821417.76211~120.17DN205.50.479239.721318.464114.721458.8821777.34212~130.51DN253.60.891553.471992.492396.941793.8812786.37313~140.85DN325.50.847347.0919093358.7051076.112985.108514~81.19DN40170.901327.125561.043405.9011217.76778.7415 三层左环路 0 0001~20.17DN2040.479239.72958.884114.721458.8821417.7622~30.34DN255.40.594255.531379.864176.418705.6722085.5343~40.68DN402.60.515112.74293.1244132.613530.45823.5744~51.02DN405.50.773243.461339.033298.765896.2942235.32355~61.36DN502.60.616113.46294.9963189.728569.184864.186~71.7DN505.60.771173.59972.1043297.221891.6621863.76557~82.04DN5023.90.925246.255885.383427.8131283.447168.81258~93.23DN7030.889165.82497.463395.1611185.481682.9415五层右环路 10~110.17DN202.20.479239.72527.3844114.721458.882986.26611~120.17DN206.60.479239.721582.154114.721458.8822041.03412~130.34DN250.50.594255.53127.7653176.418529.254657.01913~141.36DN406.91.03422.982918.564530.452121.85040.36214~83.08DN709.20.848151.351392.423359.5521078.662471.076 五层左环路 0 0001~20.17DN209.60.479239.722301.314114.721458.8822760.1942~30.34DN252.550.594255.53651.6024176.418705.6721357.273555
3~40.68DN405.50.515112.74620.074132.613530.451150.524~51.02DN402.60.773243.46632.9963298.765896.2941529.28955~61.36DN505.40.616113.46612.6843189.728569.1841181.8686~71.7DN501.60.771173.59277.7443297.221891.6621169.40557~82.04DN503.40.925246.25837.253427.8131283.442120.68758~93.23DN7030.889165.82497.463395.1611185.481682.9415八层右环路 10~110.17DN200.90.479239.72215.7484114.721458.882674.6311~120.17DN206.80.479239.721630.14114.721458.8822088.97812~130.34DN250.70.594255.53178.8714176.418705.672884.54313~140.51DN322.20.508131.46289.2124129.032516.128805.3414~151.87DN502.50.848208.36520.93359.5521078.661599.55615~82.55DN507.91.156378.722991.894668.1682672.675664.56 八层左环路 0 0001~20.17DN209.60.479239.722301.314114.721458.8822760.1942~30.34DN252.550.594255.53651.6024176.418705.6721357.27353~40.68DN405.50.515112.74620.074132.613530.451150.524~51.02DN402.60.773243.46632.9963298.765896.2941529.28955~61.36DN505.40.616113.46612.6843189.728569.1841181.8686~71.7DN501.60.771173.59277.7443297.221891.6621169.40557~82.04DN503.40.925246.25837.253427.8131283.442120.68758~93.23DN7030.889165.82497.463395.1611185.481682.9415供回水左右环路不平衡率不大于15%,有不满足的用水量调节阀调节。8.4凝结水管水力计算风机盘管机组、整体式空调器、组合式空调机组等运行过程中产生的冷凝水,必须及时予以排走。8.4.1沿水流方向,水平管道应保持不小于千分之一的坡度(本设计采用的坡度为百分之一);且不允许有积水部位。8.4.2当冷凝水盘位于机组内的负压区段时,凝水盘的出水口处必须设置水封,水封的高度比凝水盘处的负压(相当于水柱高度)大50%左右。水封的出口,应与大气相通。8.4.3水管采用聚氯乙烯塑料管。55
8.4.4冷凝水立管顶部,设通向大气的透气管。8.4.5冷凝水管的公称直径DN(mm),应根据通过冷凝水的流量计算确定。各种空调设备在夏季运行时,应对空气进行冷却除湿处理,产生的凝结水必须及时排走。排放凝结水的管路设计,应注意以下要点。1)凝结水管宜采用聚氯乙烯塑料管和镀锌钢管,不宜采用水煤气管。2)机组水盘的泄水支管坡度,不宜小于0.01;其他水平支、干管,沿水流方向,应保持不小于0.002的坡度,且不允许有集水部位;如无坡敷设时,管内流速不得小于0.25m/s。3)当凝结水盘位于机组内的负压区段时,凝结水盘的出水口处必须设置水封,以防凝结水回流;通气口长约50mm,存水弯前应有50mm高度的短管。4)采用金属管作为凝结水管时,管外应保温,以防管外结露。5)凝结水管的顶部,应设计通向大气的透水管。6)设计和布置凝结水管时,必须考虑定期冲洗的可能性;也就是说,运行中要定期冲洗水盘,防止凝结水管堵塞和溢流;若在凝结水管内产生藻类,应采取化学水处理方法。7)凝结水水管管径的选取,根据经验,每千瓦的冷负荷每小时产生0.4kg的凝结水;在湿负荷高的地区,每千瓦的冷负荷每小时产生0.77kg的凝结水;一般情况下,凝结水管的管径应按通过的凝结水量计算确定。设计中,可以根据机组的冷负荷来确定,即按《民用建筑空调设计》P263表8-20选用。55
第九章空调系统的消声空调系统的消声和隔振是空调设计中的重要一环,它对减少噪声和振动,提高人们的舒适感和工作效率,延长建筑物的使用年限有着及其重要的意义。对于设有空调等建筑设备的现代建筑,都可能从室外及室内两方面受到噪声和振动源的影响。一般而言,室外噪声源是经围护结构穿透进入的,而建筑物内部的噪声、振动源主要是由于设置空调、给排水、电气设备后产生的,其中以空调制冷设备产生的噪声影响最大。除通风机噪声由风道传入室内之外,设备的振动和噪声也肯能通过建筑结构传入室内。9.1空调系统的噪声源空调系统中的主要噪声源是通风机。通风机噪声的产生和许多因素有关,尤其与叶片型式、片数、风量、风压等参数有关。风机噪声是由叶片上紊流而引起的宽频带的气流噪声以及相应的旋转噪声,后者可由转数和叶片数确定其噪声的频率。空调系统的噪声源除风机外,还有由于风管内气流压力变化引起钢板的振动而产生的噪声。尤其当气流遇到障碍物(如阀门)时,产生的噪声较大。在高速风管中这种噪声不能忽视,而在低速系统中,由于管内风速的选定已考虑了声学因素所以可不必计算。此外,由于出风口风速过高也会产生噪声,所以在气流组织中都适当限制出风口的风速。在空调系统中,降低噪声的最有效的办法是降低风机运转所带来的噪声。因此使用高效节能、低噪声风机,且在满足系统风量、风压的前提条件下,适当降低风机的转速,以降低其空气动力噪声,保持风机叶轮的支平衡以降低风机运行的机械噪声。必要时在空调系统中添加消声器来降低风机产生的空气动力噪声,阻止噪声传到空调房间内。9.2空调系统噪声自然衰减风管输送空气到房间的过程中有各种衰减,这种噪声衰减的机理是很复杂的,例如噪声在直管段中可被管材吸收一部分,还可能有噪声透射到管外。从而引起噪声的衰减。噪声的自然衰减包括以下几方面:1)直管的噪声衰减——可采用《空气调节》表8-3的数值,当风管粘贴有保温材料时低频噪声的减声量可增加一倍。55
1)弯头的噪声衰减——可采用《空气调节》图8-7所示的数值。2)三通的噪声衰减——当管道分支时,声能基本上按比例地分给各个支管。自主管到任一支管的三通噪声衰减量可按《空气调节》8-11式计算。3)变径管的噪声衰减——可按《空气调节》8-12式计算4)风口反射的噪声衰减风机的声功率并非全沿着管道由末端摄入房间内,在从风口到房间的突扩过程中,有一部分声功率是反射回去的,反射回去的声功率与风口的尺寸和频率有关,可按《空气调节》图8-10查出。5)空气进入室内噪声的衰减通过风机声功率级的确定和上述自然衰减的计算,可以算得从风口进入室内的声功率级,但是室内的允许标准是以声压级为基准的。室内的声压级必须由于建筑物内壁、平顶、家具设备等的吸声程度不同而有相当大的差异,换句话说,声音进入房间后再一次被衰减。9.3消声措施9.3.1降低风机的运行噪声,要以从几个方面来考虑:采用高效率低噪声风机,尽可能采用叶片后倾的离心式风机,此时风机运行产生的噪声功率级最低;风机尽量采用直联型或联轴器传动,对于采用皮带传动的风机,应经常检查皮带的松紧程度并进行必要的处理,以避免由于传动皮带过松时打滑而产生的摩擦噪。事实证明,由于传动皮带过松时打滑而产的的噪声比正常运转时产生的噪声力要大4-5dB左右,因此定时的巡视检查设备的运行状况和进行必要的处理是很重要的。9.3.2风机进出口的柔性接头应做好维护,其长度一般为100~150mm,且不宜超过150mm,如果发现破损、穿孔老化变硬等到现象应及时更换,以免由于穿孔处漏风而造成的哨声增加了噪声和由于软接头硬化而失去其隔振作用后,使系统运行噪声增加,同时增加振动噪声通过管道的传播。9.3.3做好风道、电机及其他运转设备的减振台座的正常维护,如发现减振台座力不平衡或其中某一个或几个减振器损坏则应对其进行调整或修理或更换,以减少由于风机、电机的振动而产生的噪声.9.3.4如果在运行中发现送、回管路(由以送风管路为多见)发生喘振时应及时采取措施予以消除,以减少振动造成的噪声。9.3.5对空调系统中使用的消声器应定期检查、清洗。尤其对于内壁微穿孔的如阻性消声器和阻、抗复55
合式消声器,由于运行时间较长或失去消声效果,此时则应考虑清洗、维护修理或更换部分部件,直至更换整个消声器。9.3.6如发现风路中的风阀叶片松动时应及时固定好,阻止气流冲击叶片发生振动的噪声。9.4空调系统中消声器消声量的确定在空调系统中,对于已不能再使用,且已无修复人价值的消声器的更换原则上应该购置或制做原型号、规格的消声器。如果缺乏原消声器的有关资料时,应对常用的阻性、抗性、共振性、宽频程复合式消声器的特点进行分析比较后,根据系统情况重新选定消声器的型号、规格。具体设计步骤如下:1)根据房间用途确定房间的允许噪声值的NR评价曲线。2)计算通风机的声功率级。3)计算管路系统各部件的噪声衰减量,并计算风机噪声经管路衰减后的剩余噪声。4)求房间内某点的声压级。5)根据NR评价曲线的各频带的允许噪声值和房间内某点各频率的声压级,确定各频带所必须的消声量。6)根据必须的消声量,选择消声器。对于噪声有严格要求的房间,或风管系统中风速过大时,则应对气流噪声进行校核计算。55
第十章空调系统的减振10.1概述空调系统中的运转设备,如风机、水泵、制冷压缩机等,在运行中由于其本身在制造中材料的不均匀,加工装配时的误差等到原因,使质量分布不均匀和转动中心之间存在着偏心,在作旋转运动时就产生惯性力,这种不平衡的惯性力是机器设备产生振动的根本原因。运转设备的振动除了以噪声的形式通过空气传播到空调房间,还要通过设备的支承结构(如楼板或基础)或连接管道进行传播。如运转中的风机所产生的振动可能传给基础,再以弹性波的形式从风机基础沿建筑结构传到其他房间,又以噪声的形式把能量传给空气,这种传声被称为固体声。这些振动有时会影响人的身体健康,或者影响产品的质量,有时还会危及支承结构和设备本身的安全。因此必须采取必要的减振措施。在处理设备的减振时一般均采用防振基础,防振基础有生软木、玻璃纤维、防振橡胶和金属弹簧等。10.2减振器使用应注意的问题10.2.1一般当设备运转n>1500r/min时,宜使用橡胶,软木等弹性材料垫块或橡胶减振器设备转速≤1500r/min时宜使用弹簧减振器。10.2.2减振器承受的荷载应大于允许荷载的5%~10%,但不应超过允许工作荷载。10.2.3如果使用橡胶减振器时,应考虑环境温度对减振器压缩变形量的影响,计算压缩变形量宜按制造厂提供的极限压缩量的1/3-1/2考虑。设备旋转频率f与橡胶减振器垂直方向的自振频率f0之比应大于3。橡胶减振器应有尽尽量避免太阳直射或与油类接触。10.2.4使用弹簧减振器时,设备的旋转频率f与弹簧减振器垂直方向的自振频率f0之比应≥2.0。如果其共振振幅较大时,宜与阻尼比大的材料联合使用。10.2.5使用减振器时设备重心不宜太高,否则易发生摇晃。如果设备重心偏高时或设备重心偏离几何中心较大且不易调整时或减振要求严格时,可以加大减振台座的重量及尺寸,使形体重心下降,以确保设备运转平稳。10.2.6减振器的使用数量。在一个减振台座上不得少于4个。55
10.2.7为了减少设备的振动通过管道的传递量,水泵、风机的进出口必须使用隔振软接头。10.2.8在自行加工制作减振器时,为了保证稳定,对于压缩性弹簧,弹簧的自由高度≯直径的两倍。橡胶、软木类的减振垫,其静态压缩量δ一般在10mm以内,不宜过大。10.3各种减振措施的使用要求10.3.1以生软木作减振的方法已不常见。10.3.2预压的玻璃纤维衬垫,能提供9~15Hz的因有频率,经久耐用,一般在需要6mm或更小挠长的地方。10.3.3橡胶减振器可用于通风机、冷冻机和水泵的基础上,具有一定的减振作用。10.3.4钢弹簧是一种较好的减振材料,具有耐高、低温、材质均匀,力学性能稳定,承载能力高和耐久特点。用它装置的减振系自振频率低,减振效果好,加工又简便,所以被国内外广泛应用于减振场合。在选用钢弹簧减振器时,首先要了解弹簧所受的荷载,然后将荷重分配在几个支承点上,根据每个支承点的荷载选用弹簧减振器,弹簧减振器的种类很多,在选用时可以参考生产厂家的具体资料采用,一般用于风机的水泵上。10.3.5当采用金属弹簧阻尼不足,而采用橡胶减振又满足不了减振要求时,可使用金属弹簧与橡胶组合减振器,有串联和并联两种,介在具体工程中很少采用。55
第十一章空调系统的防火排烟11.1防火、防烟分区的划分防火分区的划分方法l水平防火分区用防火墙、防火卷帘或防火门将各楼层在水平方向分成若干防火分区。l垂直防火分区一般宜每层划分,用耐火楼板和窗间墙将上下层隔开,当上下层设有走廊、自动扶梯、传送带等开口部位时,应将相连通的各层作为一个防火分区考虑,即连通部分各层面积之和不应超过允许的水平防火分区的面积。l所有通过楼板的竖井,如电缆井、排烟井、管道井(或者相隔2~3层楼板)之间的缝隙处应用耐火材料充填作为防火分隔。防烟分区的划分方法l每个防烟分区的建筑面积不宜超过500㎡,且防烟分区不应跨越防火分区。l当走道按规定应设排烟设施而房间不设时,若房间与走道相通的门为防火门,可只按走道划分防烟分区;若房间与走道相通的门不是防火门,则防烟分区的划分还应包括房间面积。l当房间按规定应设排烟设施而走道不设时,若房间与走道相通的门为防火门,可只按房间划分防烟分区;若房间与走道相通的门不是防火门,则防烟分区的划分还应包括走道面积。l当房间和走道按规定均应设排烟设施时,可根据具体情况分设或合设排烟设施,按分设或合设的情况分别划分防烟分区。11.2防火阀的设置下列情况之一的通风、空调系统的风管上应设防火阀:l风管穿越防火分区的隔墙处。l穿越通风、空调机房及变配电等重要的或火灾危险性大的房间隔墙和楼板处。l垂直分管与每层风管交接处的水平管段上应设防火阀,但当多层建筑的每个防火分区的通风、空调系统均独立设置时,则该防火分区内的水平风管和垂直风管的交接处可不设防火阀。l穿越变形缝隔墙的两侧风管上各设一个。l厨房和卫生间的垂直排风管道上,可采取防止回流措施代替支管上的防火阀。l当建筑物内设有消防控制室时,风管上宜采用电信号输出装置的防火阀,并将信号引入至消防控制室;当建筑物内不设消防控制室时,风管上可采用不带电信号输出的防火阀,防火阀自动关闭温度宜为70℃。55
l通风与空调系统的风管及通风机等,应采用不然材料制作。但柔性接头和接触腐蚀性介质的风管,可采用难燃材料制作。l管道和设备的保温、消声材料和粘结剂,应采用不燃材料和或难燃材料。但穿越防火墙和变形缝处两侧各2m范围内,应采用不燃材料制作。11.3自然排烟系统设计11.3.1自然排烟的方式1)利用建筑的阳台、凹廊或在外墙上设置便于开启的外窗或排烟窗进行无组织的自然排烟。2)竖井排烟在防烟楼梯间前室、消防电梯间前室、合用前室或其他需要排烟的房间内设置专用的排烟竖井,利用热压和风压进行有组织的自然排烟。11.3.2可以自然排烟的部位及开窗面积规定一类高层建筑和建筑高度超过32m的二类高层建筑的下列部位若符合下列条件,宜采用自然排烟方式。1)长度超过20m,但不超过60m的内走廊,其可开启外窗面积或排烟口面积不应小于走廊面积的2%。2)面积超过100㎡且经常有人停留或可燃物较多的地上房间,其可开启外窗面积或排烟口面积不应小于该房间面积的2%。3)经常有人或可燃物较多的地上房间,其可开启外窗面积或排烟口面积不应小于该房间面积的2%。4)除建筑高度超过50m的一类公共建筑和建筑高度超过100m的居住建筑外,靠外墙的防烟楼梯间及前室、消防电梯间前室和合用前室,宜采用自然排烟,具体规定如下:l防烟楼梯间前室、消防电梯间前室可开启外窗面积不应小于2㎡;合用前室可开启外窗面积不应小于3㎡.l靠外墙的防烟楼梯间,每五层内可开启外窗总面积之和不应小于2㎡。l防烟楼梯间前室或合用前室,利用敞开的阳台、凹廊或前室内有不同朝向的可开启外窗自然排烟时,该楼梯间可不设防烟设施。11.3.3自然排烟设计要点1)自然排烟口应设于房间净高的1/2以上,最好设置在距顶棚800mm以内,设有挡烟垂壁,排烟口最好高于挡烟垂壁的下沿。2)内走廊和房间的自然排烟口至该防烟分区最远点的水平距离应在30m以内。55
11.4机械排烟系统设计11.4.1机械排烟的方式1)局部排烟在每个房间内设置风机直接进行排烟。2)集中排烟利用排烟风机将若干个防烟分区内的烟气通过风道集中排至室外。11.4.2机械排烟的部位当自然排烟条件不满足时,则应进行机械排烟。此外一类高层建筑和建筑高度超过32m的二类高层建筑的下列部位应设置机械排烟设施。1)无直接自然通风,且长度超过20m的内走廊或虽有直接自然通风,但长度超过60m的内走廊。2)面积超过100㎡且经常有人停留或可燃物较多的地上无窗房间或设固定窗的房间。3)除了可利用窗井或开窗进行自然排烟的房间外,各房间总面积超过200㎡,或一个房间超过50㎡,且经常有人停留或可燃物较多的地下室。4)带裙房的高层建筑防烟楼梯间几其前室、消防电梯间前室或合用前室,当裙房以上部分利用可开启外窗进行自然排烟,群房部分不具备自然排烟条件时,其前室或合用前室应设置局部机械排烟设施或者设置机械加压送风设施。考虑前一种方式容易把烟气引入安全区域,因此不推荐采用;而后一种方式效果较好,但应注意其加压风量的计算要考虑裙房以上窗户引起的空气泄漏量。11.4.3机械排烟系统排烟量的确定排烟量确定总的原则如下。1)当排烟风机只负担一个防烟分区或净高不大于6m的不划分防烟分区的房间时,应按每平方米面积不小于60m3/h计算系统排烟量,此时单台风机最小排烟量不应小于7200m3/h.2)当排烟风机担负两个或以上防烟分区时,应按最大防烟分区面积每平方米不小于120m3/h计算系统排烟量,系统排烟量的最大值为60000m3/h。3)排烟风道风量的确定原则如下。l当排烟风道只负担一个防烟分区时,应按每平方米不小于60m3/h计算该风道排烟量。l当排烟风道担负两个或以上防烟分区时,应按最大防烟分区面积每平方米不小于120m3/h计算风道排烟量。按照规定和上述规范及本建筑特点,建筑采用自然排烟。电梯前室与楼梯间前室需设加压送风来满足防火要求。55
一般建筑发生火灾后,烟气在室内外温差引起的烟囱效应、燃烧气体的浮力和膨胀力、风力、通风空调系统、电梯的活塞效应等驱动力的作用下,会迅速从着火区域蔓延、传播到建筑物内其他非着火区域,甚至疏散通道,严重影响人员的逃生和灭火,因此有效的烟气控制是保护人们生命财产安全的重要手段。因此防排烟系统的设计对于建筑物具有重要作用。55
第十二章空调系统的管材及附件12.1空调系统的管材1)空调管路中,送、回、排风管均采用镀锌钢板制作,排烟风道采用混凝土风道;2)采暖及空调水管道<100mm采用焊接钢管,管径≤32mm为螺纹连接。管径>32mm为焊接。3)管径≥100mm,采暖及空调水管道采用无缝钢管,焊接连接。12.2空调系统的附件1)新风管道、送风、排风管道上均装设70℃防火阀。排烟风道上装280℃防火阀。2)新风入口装电动保温阀。新风机组后装一个风量调节阀,每个新风支管上安装一个相应规格的风量调节阀。3)所有的新风口和风机盘管送风口均使用方形散流器风口,风机盘管回风口、停车场排风口和排烟口均使用单层百叶风口,停车场送风口使用双层百叶风口。4)卫生间排风道上安装止回阀,停车场的送排风总管道上也各安装一个止回阀。每层水管的供回水总干管上安装一个截止阀,以便于控制该层管路。5)每层水路的末端在供回水干管上安装一个自动排气阀,供回水立管的最高点安装自动排气阀。6)风机盘管的供水支管上安装一个Y型过滤器。55
第十三章空调系统的保温与防腐在空调系统中,为提高冷热量的利用率,避免不必要的冷热损失,保证空调运行参数,应对空调风道进行保温。此外,当空调风道送冷风时,其表面温度可能低于或等于周围空气露点的温度,使其表面结露,加速传热,同时对风道造成一定腐蚀,基于此也应对风道进行保温。空调水路的金属表面容易被腐蚀,因此要涂防护漆进行防腐。13.1空调系统的保温13.1.1空调系统保温的目的1)为了减少管道系统的热损失(或冷损失)。2)防止冷管路表面结露。13.1.2设置保温的原则具有下列情况之一的管道,设备及其附件,必须经行保温1)外表面温度高于50℃的管道和设备;2)需要经常操作维修而又容易引起烫伤的部位;3)当需要限制介质在输送过程中的温度以及防冻、结露时,必须从控制介质温度角度进行保温设计;4)用在由于表面温度过高会引起瓦斯、蒸汽、粉尘爆炸起火等危险场合的管道。13.1.3保温材料的选择原则1)材料的导热系数低,保温性能好。导热系数一般不超过0.23W/m.K2。2)耐热度高。3)可燃物和水分含量低,吸水性能好,对金属无腐蚀作用。4)材料密度小。⑸耐振动,具有一定的机械强度。5)易于加工成型,便于施工,成本廉价。经过比较,送风管道采用泡沫塑料类PVC难燃橡胶保温管件,密度:40-50(kg/m3)导热系数<0.043(W/m.℃)适应温度35—80℃.抗压强度>180pa,该材料具有密度小,导热系数小,施工方便,,难燃,耐高温,用于60℃乙以下的低温管道保温,聚氯己烯可现场发泡浇筑成型,强度高,但成本也高,此类材料可燃,防火性差。回(排)风管道采用PVC难燃橡胶保温管件材料,密度:<80(kg/m3),导热系数<0.052(W/m.℃),适应温度200℃,抗压强度500-1000pa。其特点是密度轻,导热系数小,化学稳55
定性好,不燃,不腐蚀,产量大,资源丰富,适应广泛。13.2.空调系统的防腐13.2.1常用的耐腐蚀涂料耐腐蚀涂料是一种有机高分子混合物的有机涂料。将其至于物体表面形成连续的薄膜,干燥后成为坚硬的固态漆膜即涂层,可起到屏蔽作用、缓腐蚀作用和电化学保护作用。13.2.2管道防腐措施不保温管道(含煤气等其他工业管道)的不保温管道防腐措施见《民用建筑空调设计》P282,表8-39。保温管道在保温前需要进行防锈处理,并涂刷一层防锈漆(铁红酚醛防锈漆或者铁红环氧底漆)。保温热力管外护层防腐措施见《民用建筑空调设计》P282,表8-40。55
参考文献[1]赵荣义、范存养.《空气调节》.中国建筑工业出版社.1994.11[2]长春工程学院.《空调负荷计算表》[3]马最良、姚杨.《民用建筑空调设计》.化学工业出版社.2006.3[4]《暖通空调设计规范》中国电子工业出版社.简称《规范》[5]张治江.《供热通风与空调工程设计资料大全》.吉林科学技术出版社.1996.7[6]建筑工程常用数据系列手册编写组.《暖通空调常用数据手册》.中国建筑工业出版社.2002.2[7]北京市建筑设计研究院.《建筑设备专业设计技术措施》.中国建筑工业出版社.1998.6[8]贺平、孙刚《供热工程(第三版)》.北京:中国建筑工业出版社,1993[9]陆耀庆.《实用供热空调设计手册(第二版)》.北京:中国建筑工业出版社,2008[10]赵荣义.《简明空调设计手册》.北京:中国建筑工业出版社,1998[11]王汉青.《通风工程》.北京:机械工业出版社,2005.2[12]邵宗义主编.《建筑通风空调工程设计图集》.机械工业出版社,2006.1[13]《高层民用建筑设计防火规范(GB50045-95).1997(修订版)》.北京;中国计划出版社,1997[14]张治江.《供热通风与空调工程设计资料大全》.吉林:吉林科学技术出版社,199655'
您可能关注的文档
- 某高层建筑中央空调系统毕业设计全
- 空调系统毕业设计
- 武汉某医院门诊楼空调系统毕业设计
- 毕业设计(论文)-水源热泵空调系统毕业设计
- 郑州某大厦中央空调系统毕业设计说明书
- 南京市某办公楼中央空调系统毕业设计secret
- [学士]某办公楼空调系统毕业设计
- 空调系统毕业设计计算说明书_图文
- 某办公楼中央空调系统毕业设计全文精品word
- 南京市某办公楼中央空调系统毕业设计
- 北京市某公司办公楼中央空调系统毕业设计说明书
- 西安市某办公楼中央空调系统毕业设计内容说明书.doc
- 南京市某办公楼中央空调系统毕业设计.pdf
- 武汉某医院门诊楼空调系统毕业设计.doc
- 空调系统毕业设计摘要中英文.doc
- 上海生产综合楼中央空调系统毕业设计.doc
- 成都市某大厦暖通空调系统毕业设计说明书.doc
- 某高层建筑中央空调系统毕业设计全文