- 71.56 KB
- 7页
- 1、本文档共5页,可阅读全部内容。
- 2、本文档内容版权归属内容提供方,所产生的收益全部归内容提供方所有。如果您对本文有版权争议,可选择认领,认领后既往收益都归您。
- 3、本文档由用户上传,本站不保证质量和数量令人满意,可能有诸多瑕疵,付费之前,请仔细先通过免费阅读内容等途径辨别内容交易风险。如存在严重挂羊头卖狗肉之情形,可联系本站下载客服投诉处理。
- 文档侵权举报电话:19940600175。
'资料内容仅供您学习参考,如有不当或者侵权,请联系改正或者删除。施工组织设计目录一、编制说明··········································二、编制依据··········································三、工程概况··········································1、工程名称及规模·······································2、工程范围及内容·······································3、建筑与结构·······································4、电气工程···········································5、给排水工程·······································6、采暖工程···········································7、材料做法···········································8、工期要求···········································9、质量要求···········································10、安全及环保要求····································11、自然条件············································12、施工条件··········································13、相关单位··········································二、施工总体组织及规划·······························1、总体主导思路······································2、项目管理组织······································3、施工队伍部署及任务划分······························
资料内容仅供您学习参考,如有不当或者侵权,请联系改正或者删除。4施工准备············································5、各部门职责·······································6施工总平面布置········································7、总体施工组织方案···································8、施工工期目标规划···································9、工程质量目标规划···································10、安全、文明施工与环保目标规划·······················三、施工进度计划安排·································1、总工期计划安排·······································2、工程项目阶段性目标计划······························3、施工进度计划横道图·································四、劳动力计划安排····································五、主要施工机械设备配备······························六、主要材料(设备)供应进度计划························七、主要分部、分项工程施工方案························7.1、施工测量···········································7.2基坑(槽)土方开挖与回填······························7.3基础工程施工········································7.4模板工程············································7.5钢筋工程············································7.6砼工程···········································
资料内容仅供您学习参考,如有不当或者侵权,请联系改正或者删除。7.7砖砌体工程施工·····································7.8室内墙面、天棚装修································7.9窗安装···········································7.10普通地砖地面········································7.11外墙外保温·······································7.12脚手架工程·······································7.13屋面防水施工········································7.14卫生间防水施工·······································7.15抹灰··············································7.16乳胶漆饰面·········································7.17墙面贴瓷砖·········································7.18散水、踏步、坡道································7.19电气系统···········································7.20给排水、消防系统··································八、确保工程质量的技术组织措施························九、确保工期的技术组织措施·····························十、确保安全生产的技术组织措施························十一、确保文明施工的技术组织措施·······················十二、工程投入主要物资和施工机械设备及进场计划··········十三、劳动力安排计划·································附图、附表
资料内容仅供您学习参考,如有不当或者侵权,请联系改正或者删除。施工组织设计一、编制说明首先十分感谢贵业主提供的这次投标机会,我们以对业主真诚负责的态度和对工程尽善尽美的追求,经过认真的现场踏勘,标书评审等工作,针对工程实际编制了本施工组织设计。本施工组织设计编制的目的是从施工全局出发,根据各种具体的施工条件,为投标阶段提供较为完整的纲领性文件,一旦中标,将在此基础上进行深化,用以指导工程施工与管理,并做好以下几项工作。二、编制依据1、国家、某市建设工程的有关文件。2、某建工建筑设计研究院设计的该工程的施工图纸及有关图集。3、国家、省、市现行施工规范及验收规范。GBJ202-83《地基与基础工程施工及验收规范》JGJ79-91《建筑地基处理技术规范》GB50203-98《砌体工程施工及验收规范》JGJ68-90《多孔砖(KP1型)建筑设计抗震及验收规范》GB50204-92《混凝土结构工程施工及验收规范》GB50207-94《屋面工程技术规范》JGJ73-91《建筑装饰工程施工及验收规范》GB50209-95《建筑地面工程施工及验收规范》GBJ301-88《建筑工程质量检验评定标准》
资料内容仅供您学习参考,如有不当或者侵权,请联系改正或者删除。GBJ300-88《建筑安装工程质量检验评定统一标准》JGJ/T98-96《砌筑砂浆配合比设计规范》JGJ/T55-96《混凝土配合比设计规程》GB50026-93《工程测量规范》JGJ/T8-97《建筑变形测量规程》GBJ119-88《混凝土外加剂应用技术规范》JGJ18-96《钢筋焊接及验收规程》GBJ242-82《采暖与卫生工程施工验收规范》GB50268-97《给排水管道工程施工及验收规范》GB50254-96《电气装置安装工程低压电器施工及验收规范》GB50259-96《电气装置安装工程电气照明装置工程施工及验收规范》GBJ303-88《建筑电气安装工程质量检验评定标准》JGJ27-86《钢筋焊接接头试验方法》GBJ107-87《混凝土强度检验评定标准》GB50164-92《混凝土质量控制标准》JGJ52-92《普通砼用砂质量标准及检验方法》JGJ53-92《普通砼用碎石和卵石质量标准及检验方法》5、国家、省、市现行安全生产、文明施工的规定。⑴GB50194-93《建设工程施工现场供用电安全规范》⑵JGJ59-99《建筑施工安全检查评分标准》⑶JGJ46-88《施工现场临时用电安全技术规范》
资料内容仅供您学习参考,如有不当或者侵权,请联系改正或者删除。⑷JGJ80-91《建筑施工高处作业安全技术规范》⑸JGJ33-86《建筑机械使用安全技术规程》6、本公司质量手册、程序文件、工程施工管理手册等有关文件。7、我公司现有技术机械装备与施工力量。8、我公司有关该工程的标书评审会议精神与记录。三、工程概况1、工程名称及规模本工程为**住宅小区一期工程。工程地点位于:****。建筑规模:(1)建筑面积:住宅建筑面积:10.70万平方米。1#,13#楼建筑面积5771.60M2,2#,3#,4#建筑面积4656.96M2,5#楼建筑面积7215.23M2,6#建筑面积6159.42M2,7#建筑面积4583.02M2,8#建筑面积3638.20M2,9#建筑面积4337.39M2,10#,11#,14#,15#建筑面积4741.20M2,12#建筑面积4268M2,16#建筑面积4298.70M2,17#建筑面积2727M2,18#建筑面积4826.95M2,19#,20#建筑面积5883M2,21#,22#,23#,建筑面积2914.15M2。(2)建筑层数:地上六层。(3)建筑层高:2.8米(4)建筑檐高:17.85米(5)本工程室内外高差450mm。
资料内容仅供您学习参考,如有不当或者侵权,请联系改正或者删除。2、工程范围及内容本工程为1#—23#楼的室内、外建筑安装工程。(1)建筑工程1#—23#楼的土建工程。其中含:①基础及主体结构;②墙体保温及楼地面;③门窗工程;④屋面工程,等。(2)安装工程①给排水工程(5个系统):室内冷水系统;中水系统;废水系统;污水、排水系统;阳台雨水排水系统。②采暖通风工程(2个系统):室内普通采暖系统;通风系统。③电气工程(6个系统):220V/380V配电系统;建筑物防雷、接地系统及安全措施;有线电视系统;电话配线系统;网络布线系统;多功能访客对讲系统。3、建筑与结构本工程为六层砌体结构房屋,无地下室。建筑总高度为16.800米。基础形式为条形基础。砌体施工质量控制等级要求达到B级。本工程地下部分及屋面钢筋混凝土的环境为二a类,其余为一类。建筑结构安全等级:二级设计使用年限:50年结构抗震设防类别:丙类地基基础设计等级:乙类各层梁、板、楼梯、构造柱、混凝土强度等级为C30'
您可能关注的文档
- 住宅施工安全检查.doc
- 新农村住宅施工合同.doc
- 年陡高层住宅施工组织设计(框剪、管桩)_secret.docx
- 新水城高层住宅施工测量施工方案.doc
- 泰逸美景9栋住宅施工组织设计.doc
- 药品监督管理局职工住宅施工组织设计.doc
- 白鹤B-2楼高层框架结构住宅施工组织设计封面.doc
- 六层框架结构住宅施工组织设计方案.docx
- 多层住宅施工的质量与安全管理论文.doc
- 杭州绿园花园高层住宅施工组织设计.docx
- 某住宅施工组织设计.docx
- 某混合结构多层住宅施工组织设计.docx
- 住宅施工的质量控制.doc
- 高层住宅施工测量施工组织设计.doc
- 高层住宅施工组织设计范本
- 高层住宅施工组织设计模板
- 钢筋混凝土框架结构住宅施工组织设计.docx
- 住宅施工现场防中毒措施范本