- 3.40 MB
- 117页
- 1、本文档共5页,可阅读全部内容。
- 2、本文档内容版权归属内容提供方,所产生的收益全部归内容提供方所有。如果您对本文有版权争议,可选择认领,认领后既往收益都归您。
- 3、本文档由用户上传,本站不保证质量和数量令人满意,可能有诸多瑕疵,付费之前,请仔细先通过免费阅读内容等途径辨别内容交易风险。如存在严重挂羊头卖狗肉之情形,可联系本站下载客服投诉处理。
- 文档侵权举报电话:19940600175。
M,按第一类T形截面设计。,=1.0×14.3×1200×365×0.0068/300=218.31mm²,=0.2%×200×365=146mm²,故选用2φ16(As=402mm²)6.5平台板计算(1)荷载计算60mm厚钢筋混凝土板:0.06×25=1.5KN/m²108 西安工业大学毕业设计(论文)30mm厚水磨石面层:0.65KN/m²20mm厚混合砂浆底面抹灰:0.02×17=0.34KN/m²恒载:2.49KN/m²活载:2.0KN/m²总荷载设计值:g+q=1.2×2.49+1.4×2.0=5.79KN/m²,g+q=1.35×2.49+0.7×1.4×2.0=5.32KN/m²取P=5.79KN/m²(2)计算简图按单向板计算。=2000mm(3)弯矩设计值计算:取1m宽板带P=5.79×1.0=5.79KN/m,跨中=5.79×2²/8=2.895KNm(4)截面配筋计算:板截面有效高度=60-20=40mm,,=0.127,=1.0×14.3×1000×40×0.136/210=370.44mm²实配8φ8@130(As=402mm²)108 7基础设计第一章基础设计7.1设计资料:基坑开挖至自然地表以下5米,再回填砂土至-2.0米,并且压实使其满足=180Kpa,=17.5KN/m³。底层柱550×550,配有12φ20,按照组合计算,基础埋深2.0米,受力纵筋采用HRB400级钢筋,混凝土采用C25(=1.27=11.9)A柱:=1672.97KN,=33.88KNm,=21.86KNB柱:=1883.76KN,=19.64KNm,=12.49KN,C柱:=1883.76KN,=33.88KNm,=21.86KND柱:=1672.97KN,=19.64KNm,=12.49KN7.2独立基础:确定基础底面积:=180+1.5×17.5×(2-0.5)=219.38KpaA、D柱:A=(1.1~1.4)=(1.1~1.4)×1672.97/(219.38-20×2.0)=(10.26~13.06)取b=l=4.0m,验算基础承载力:A柱P<,满足要求。B、C柱做成双柱联合基础:A=(1.1~1.4)=(1.1~1.4)(1883.76+1883.76)/(219.38-20×2.0)=(23.10~29.40)取b=4m,得L≥5.8m>17.4/3=4.35,故选用条形基础更为合理。108 西安工业大学毕业设计(论文)7.3条形基础(1)荷载计算先估算条形基础的宽度为b=3.0m,基础自重=2.0×3.0×20=120KN/m,柱间墙荷载=4.28×3.6/2=7.704KN/m,柱轴力=1672.97×2+1883076×2=7113.46KN(2)确定条形基础的尺寸修正后的低级承载力:=219.38Kpa.由于荷载比较均匀,两端伸出等长度悬臂,取悬臂长度为边跨的1/4,即1.8米,则条形基础的长度为7.2×2+3+2×1.8=21米,故根据地基承载力确定基础宽度为:,取b=3.0m.(3)用倒梁法计算条形基础的基础内力①基底净反力:=(7113.46+7.704×7.2×2)/21=344.02KN/m②悬臂部分用弯矩分配法计算,其中=-344.02×1.8²/2=-557.31KNm=0.252,=0.748108 西安工业大学毕业设计(论文)③三跨连续梁用连续梁系数法计算(Ⅰ),=0.0904×7.704×7.2²=36.10KNm,=0.42525×q=0.42525×7.704×7.2=23.6KN,=-0.57475q=-31.88KN108 西安工业大学毕业设计(论文)(Ⅱ),=-0.08175×344.02×7.2²=-1457.93KNm=0.08745×344.02×7.2²=1559.58KNm=-0.0561×344.02×7.2²=-1000.49KNm=-0.08175×344.02×7.2²=-1457.93KNm=0.08745×344.02×7.2²=1559.58KNm=0.41825×344.02×7.2=1035.98KN=-0.58175×344.02×7.2=-1440.96KN=0.225×344.02×7.2=557.31KN108 西安工业大学毕业设计(论文)④将②③叠加得到条形基础的弯矩图和剪力图,假设最大弯矩发生在V=0处。⑤考虑不平衡力的调整=1003.16+1143.58=2146.74KN,=1548.56+557.31=2105.87KN,与柱荷载不等,但相差小于20%,故不用调整。⑥翼板内力分析:取1米板段分析,考虑条形基础梁宽为450mm,则有基地净反力:=344.02/2=172.01KN/m最大弯矩:Mmax=0.5×172.01×(1.55/2)²=51.66KN/m最大剪力:Vmax=172.01×1.55/2=133.31KN(4)基础配筋计算:受力纵筋采用HRB400级钢筋,混凝土采用C25(=1.27=11.9)。肋梁跨中按T形截面设计,支座处按矩形截面设计,跨中按构造要求,翼板厚度不小于200mm.正截面受弯承载力计算:取=h=200mm,翼板宽度=2000mm,肋梁高h=1300mm,=h-=1300-45=1255mm,=450mm。判断截面类型:=1.0×11.9×2000×200×(1255-100)=5497.8>M=1342.14属于第一类T形截面。AB(CD)跨跨中:=1.2×1342.14×106/(1.0×11.9×2000×1255²)=0.043=0.978,=1.2×1342.14×106/(360×0.978×108 西安工业大学毕业设计(论文)1255)=3644实配6根25(As=2945mm²)BC跨跨中:=1000.49×106/(1.0×11.9×2000×1255²)=0.027=0.986,=1000.49×106/(360×0.986×1255)=2245实配4根25(As=1963mm²)(5).①支座处均为下部受拉,支座上部只需要构造配筋,取3根25伸入支座,则As’=1473,支座下部按双筋矩形截面计算:,则A、D支座:<0,故近似取=557.31×106/(360×1210)=1279,实配420(As=1256mm²)B、C支座处:,<=90/1255=0.072,也近似按计算,=1240.49×106/(360×1210)=2848,实配625(As=2943.75mm²)②斜截面受剪承载力计算:截面尺寸复核:=0.25×1.0×11.9×450×1255=1680.13KN>1548.56KN验算可否按构造配箍:=0.7×1.27×450×1255=502.06KN,故除BC跨可以构造配置箍筋,均匀配置四肢φ10@200。其他均要计算配箍。由得:AB(CD)跨:,选四肢φ10,=4×78.5=314108 西安工业大学毕业设计(论文)S139,取S=100mm,加密区均匀布置。③翼板计算:取1米板宽段,=h-=200-45=155mm,最大弯矩:Mmax=0.5×172.01×(1.55/2)²=51.66KNm最大剪力:Vmax=172.01×1.55/2=133.31KN正截面承载力:=0.199<=0.518,=1.0×11.9×1000×155×0.199/300=1224实配φ14@100(As=1539mm²)。④肋梁加掖处,肋宽=550+2×75=700mm,加宽处配筋按构造配筋φ12@200108 8框架电算结果比较第一章框架电算结果比较采用PKPM计算程序,KJ5框架生成的计算结果和上述手算结果基本符合。个别结果相差较大,经分析是由于计算简化造成的,但是都不影响最终结构构件配筋结果。因此,本设计手算结果较为准确。108 西安工业大学毕业设计(论文)总结毕业设计是教学计划的一个重要的组成部分,它培养了我们综合运用所学基础和专业知识,提高了我们实践能力,是最后一个重要教学环节。通过几个月来紧张而有序的设计,提高了我分析和解决实际问题的能力,总结与提高了几年来所学知识的,在理论上联系了实际。我的毕业设计课题是柞水县中学办公楼,其中包括建筑设计,结构设计两部分。通过这两部分的设计使我对大学以来所学的各门课程有了更系统而全面的了解,加深了各专业课程知识的融会贯通。建筑设计是对拟建建筑物预先进行设想和规划,根据建筑物的用途和要求确定其各部分的形状和尺寸,并将各部分有机地组织到一起,创造出优美协调的建筑空间环境。设计过程中通过多次变换建筑造型,我进一步理解民用建筑设计原理和构造的基础知识,掌握建筑施工图的设计方法和步骤,提高绘制和识别建筑施工图的基本技能。我根据办公楼的特点,确定了其结构形式为钢筋混凝土框架结构。在结构设计中,根据《荷载规范》,正确计算作用框架上的荷载值;掌握了框架结构的内力分析方法进行内力组合;根据控制截面的不利内力值和截面的尺寸进行配筋和节点构造设计。同时通过PKPM结构计算软件的应用,通过比较计算结果,明白计算机结构计算出图与实际工程应用还有较大的距离,必须通过必要的修改才能运用。通过这次毕业设计我也了解了一些处理不同难题的方法,在遇到难题时不能避而远之,应该通过大量地查找资料、虚心向别人请教来解决。这一点不仅是对现在,而且对我以后的工作都有重大的指导意义。在此再次感谢在这次毕业设计中支持和帮助我的老师和同学。由于自身所学知识的局限性以及第一次独立的完成设计,设计中难免存在问题。在此,请各位老师,专家给予批评指正。108 西安工业大学毕业设计(论文)参考文献[1]建筑设计资料集(第二版).北京:中国建筑工业出版社,2002[2]房屋建筑制图统一标准(GB/T5001-2002).北京:中国建筑工业出版社,2002[3]建筑结构制图标准(GB/T50105-2001).北京:中国计划出版社,2001[4]建筑结构荷载规范(GB5009-2001).北京:中国建筑工业出版社,2002[5]建筑抗震设计规范(GB50011-2001).北京:中国建筑工业出版社,2002[6]混凝土结构设计规范(GB5010-2002).北京:中国建筑工业出版社,2002[7]建筑地基基础设计规范(GB50007-2002).北京:中国建筑工业出版社,2002[8]砌体结构设计规范(GB50003-2001).北京:中国建筑工业出版社,2002[9]周果行.工民建专业毕业设计指南.北京:中国建材工业出版社,1990[10]沈蒲生,苏三庆.高等学校建筑工程专业毕业设计指导.北京:中国建筑工业出版社,2006[11]深蒲生.混凝结构设计原理.-3版.北京:高等教育出版社,2007.[12]梁兴文,史庆轩.混凝土结构设计.北京:中国建筑工业出版社,2008.[13]东南大学,同济大学,天津大学合编.混凝土结构.中册,混凝土建筑结构设计—2版.北京:中国建筑工业出版社,2003.[14]白国良.荷载与结构设计方法.北京:高等教育出版社,2003.8.[15]胡建琴,崔岩.房屋建筑学.北京:清华大学出版社,2007[16]冷御寒.小城镇规划建设与管理.北京:中国建筑工业出版社,2005[17]王黎怡.建筑结构.北京:北京大学出版社,2007[18]董军,张伟郁,顾建平.土木工程专业毕业设计指南•房屋建筑工程分册.北京:中国水利水电出版社,2002[19]M.Wakabayash.DesignofEarthquake-ResistantBuilding,108 西安工业大学毕业设计(论文)1986[20]文龙合.工程变形缝的设置与施工改进.建材技术与应用,2006[21]R.ParkandT.Paula.ReinforcedConcreteStructrues,NewYork:JohnWileyandSonsInc.,1975[22]G.Winter.DesignofConcreteStructures,1979[23]KennethLee.ReinforcedConcreteDesign.McGraw-HillBookCompany.1982[24]徐玉野.钢筋混凝土异型柱结构性能研究与展望.建筑技术学报,2006,37(2):136—140[25]静力计算手册(第二版).北京:中国建筑工业出版社,1998年9月第二版报,2006,37(2):136—140[25]静力计算手册(第二版).北京:中国建筑工业出版社,1998年9月第二版108 西安工业大学毕业设计(论文)致谢经过几个月的查规范、整理材料、结构设计、绘图,今天终于可以完成了本人的毕业设计。设计得以完成,要感谢的人实在太多了,首先感谢我的指导老师陈翔老师,从刚开始的选题、设计的修改到最后的完成都离不开陈老师的耐心指导,他那循循善诱的教导和不拘一格的思路给予我无尽的启迪,他严谨细致的作风,将一直是我学习和工作中的榜样,陈老师要指导两个同学的设计,加上本来就有的教学任务,工作量之大可想而知,但在我遇到疑难问题时他都能及时给予解答,使我的设计能够顺利进行。给了我深刻的印象,使我在设计之外明白了做学问的态度。同时设计得以完成,也离不开其他同学的帮助,在设计过程中,他们帮助我查资料和提供有利于设计的建议,在他们的帮助下,设计得以不断的完善,最终帮助我完成了整个设计,在此尤其感谢我的室友周义玲的帮助。通过本次毕业设计,我学到了很多知识,查阅资料和搜集有关的文献,培养了我自学能力和动手能力。并且由原先被动的接受知识转换为主动的寻求知识,这可以说是学习方法上的一个很大的突破。在以往的传统的学习模式下,我们可能会记住很多的书本知识,但是通过毕业设计,我们学会了如何将学到的知识转化为自己的东西,学会了怎么更好的将理论和实践相结合的问题。108 西安工业大学毕业设计(论文)毕业设计知识产权声明本人完全了解西安工业大学有关保护知识产权的规定,即:本科学生在校攻读学士学位期间毕业设计(论文)工作的知识产权属于西安工业大学。本人保证毕业离校后,使用毕业设计(论文)工作成果或用毕业设计(论文)工作成果发表论文时署名单位仍然为西安工业大学。学校有权保留送交的毕业设计(论文)的原文或复印件,允许毕业设计(论文)被查阅和借阅;学校可以公布毕业设计(论文)的全部或部分内容,可以采用影印、缩印或其他复制手段保存毕业设计(论文)。(保密的毕业设计(论文)在解密后应遵守此规定)毕业设计(论文)作者签名:指导教师签名:陈翔日期:2013年6月108 西安工业大学毕业设计(论文)毕业设计独创性声明秉承学校严谨的学风与优良的科学道德,本人声明所呈交的毕业设计(论文)是我个人在导师指导下进行的研究工作及取得的研究成果。尽我所知,除了文中特别加以标注和致谢的地方外,毕业设计(论文)中不包含其他人已经发表或撰写过的成果,不包含他人已申请学位或其他用途使用过的成果。与我一同工作的同志对本研究所做的任何贡献均已在论文中作了明确的说明并表示了致谢。毕业设计(论文)与资料若有不实之处,本人承担一切相关责任。毕业设计(论文)作者签名:指导教师签名:陈翔日期:2013年6月108 西安工业大学毕业设计(论文)附录StructuraldesignofconcretediscussionofsomeissuesKeywords:design;structurecalculation;reinforcementstructure;protectivelayerthicknessAbstract:Toenablethestructuralbesafeandsuitable,economic,andreasonableisastructuralengineer’staskandresponsibility.Accordingtolong-termworkexperience,tointroducetheprinciplesofearthquake-resistantdesign,seismicperformancemeasurestoimprovehousingfromtheviewpointofconceptualdesign.Introducetheenvironmentalcategoriesandthedeterminationofthethicknessofprotectivelayer,thecalculationoffreesupportedbeamsettingsandtheotherissueswithengineeringpractice.1.ConceptualDesignandStructure,Inearthquake-resistantdesign,therearemanyfactorsaffecttheseismicabilityofthewholestructure.Suchas:Thecarryingcapacityanddeformationcapacityofstructuralelements,thematerialpropertiesandtheprovisionofenergyreservesofnon-structuralelements;theconnectionstructure;structuralstability;theanti-destructivepowerofthestructure’soverallperformanceundertheactionofexperiencingforthefirsttimeearthquakeandrepeatedtheroleofaftershocks.Atpresent,onlythefirstfactorcouldbecalculated,otherfactorscouldnotbe.Onlythroughtheconceptualdesignandstructuresothatstructuralsystemcanachievethenecessarybearingcapacity,stiffness,stability,theabilityofenergyabsorptionanddissipation,thatis,sufficientductility.Ofcomplexstructure,One-thirdcalculation,sevenpartsconstructed,moreimportantly,istheconceptualdesign.(1)TheConceptualDesignMaterialproperties,componentperformance,connectionstructure,structuralsystems,canbetestedthroughexperimentsandpractice,butcannotbecalculated,isknownasconceptualdesign.Seismicdesign108 西安工业大学毕业设计(论文)shouldbeguidedbythefollowingprinciples:(1)Thebearingcapacity,stiffness,qualityofstructureshouldbesymmetrically,uniformly,continuouslyarrangedalongtheplaneandheighttoavoidthestressconcentration;(2)Shouldsetupmulti-channelseismiclineofdefense,arrangestaticallyindeterminatestructureandhigherductilitycomponents,payattentiontostrengtheningthestaticallydeterminatestructure,thekeypartsandtheweaknessesappropriately;(3)Payattentiontostructuralintegrityoftheconnection,thesamestructuralunitshouldbefirmlyconnectedwhilethedifferentstructuralunitsshouldcomplywiththerequirementsofthecompleteseparation;(4)Estimationandcontrolofplastichingeoccursextentandlocation,arrangethestructuretargetedandcontroltheprocessyieldandfinalyieldformationmechanismofthestructure;(5)Toachievestrongcolumnweak-beamandstrongshearweakbending;(6)Takeeffectivemeasurestopreventthebrittlefailuresuchasprematureshearbreakofconcrete,anchorage-sideslidingofsteelandconcretecrushingetc;(7)Thebearingcapacityandstiffnessoftheconnectednotesshouldbecompatiblewiththestructure,andthebearingcapacityshouldnotlessthanthestructure’s;(8)Theindiscriminateincreaseinsteelconsumptionshouldbeavoided,ifthedesignbearingofapartistoolargeortoolittlemayresultintherelativelyweakofstructure,theexcessiveuseofthebendingsteelofbeamend,columnendandthestrengtheningpartsofsharewallshouldbereducedwhentheycanmeettherequirementsofbearingandconstruction;(9)Considerthebeneficialandadverseeffectsofnon-structuralcomponentsonthemainstructure.(2)StructureConstructionStructuresystemsrelyonmechanicalcalculationtoensurethebearingcapacityanddeformation,whiledependonconstructionmeasurestoconnectthestructureelementsandformasystem.Reasonableconstructionscanensureaclearloadtransferofcomponents,guaranteetheabsorptionanddissipationofenergyunderrepeatedactionofforce;avoidthelossofcarryingcapacityandanti-seismiccapacityoftheentirestructuralsystemcausedbythedestructionofsomeelements;ensurethedurabilityduringdesignlife.Wecansaythatconstructionisastructuralconcreteofconceptualdesign.Wehaveacompletestructuralconstructionmeasuresforthepilotstudythroughseveral108 西安工业大学毕业设计(论文)decadesofpractice,especiallyafterlearningtheexperiencesandlessonsofTangshanearthquake.Therecognizeisconstantlyimproved,theconceptualdesigniscontinuouslydeveloped,,wenotonlyneedtotakeproperuseofthecurrentmeasuresforstructuraldesignandconstruction,butalsoneedtoconstantlysumup,enrichandimproveourability. 2.Structuralcalculation(1)TheloadmustbeaccurateLoadsincludestructuralweight,constructionmaterials,equipmentsloads(equipmentweight,pipesweight),buildingfeaturesrequiredliveload,wind,snowloads,earthquakeforces,temperaturechangescausedstress,andotherincidentalroles.Someloadsrequiredbyspecificationcanbeusedasthebasis,andsomeneedprofessionaladvancement.Buildingprofessionalsneedtoimprovenotonlytheload,butalsothepracticeofspecificmaterials;equipmentprofessionalsshouldprovidetheselectedsamples.Asconstructionpracticesandequipmentaregenerallyimplementedafterorderingwhileeverythingmaychangeduringthetime,soourdesignersshouldbeawareofitandshouldhaveappropriateprofessionalknowledgetocalculatetheloadsaccurately.Wallloadaccountsforalargerpercentageofthetotalloads.Thoughthereareawidevarietyofwallmaterials,thereisnoidealone,theloadistoolarge,thesoundproofandanti-collisionabilityaretoopooranditwillpronetocracksbetweentheplatesWhenthepartitionwallsandthewallmaterialsareidentified,thereservedloadisnecessary;however,consideringthelargepartitionwallloadswouldmakethestructuralsteelsbeexcessive,sowegenerallyuselightweightmaterialsandnotethewallmaterial,theallowedloadandthepositionintheConstructionDrawingswiththehelpofbuildingprofessionals.MissingtheloadisthemosttaboooftheStructurecalculation,itwillmakethecalculationbeinvainorhidethedangerssowemustavoidit.(2)TheresultsshouldbeanalyzedWegeneralneedtwodifferentcellmodelstoanalyzeandcomparetheproceduresforComplexormajorprojects,andshouldchooseaappropriateprogramforspecialprojects.Themodel,boundaryandsupporting108 西安工业大学毕业设计(论文)conditionsallshouldberealistic.Sinceit’sessentialtoimprovethedesignquality,weshouldclarifytheconceptandreasonsforourinputdata.(3)ThedeterminationofEnvironmentalcategoriesandprotectivelayerThe3.4.1stipulationprovidetheprinciplesfordurabilitydesignandtheclassificationforenvironmentintheCodefordesignofconcretestructures.Insection9.2.1showstheminimumthicknessofprotectionlayerforlongitudinalreinforcementsinvarioustypesofenvironment.Allofthesearespecificmanifestationofgreatimportancetothedurabilityissueinspecification.Asthespecificationisbasedontheenvironmentalcategoriestodeterminetheminimumthicknessofprotectivelayerofverticalreinforcement,andthesideatthejunctionofthetwocomponentsofenvironment,suchasthebasementwalls,thepositivesideofwallsaregenerallythesecond-classwhileitsinteriorsideisgenerallythefirst-class,theminimumthicknessofprotectionlayerofbothsidesshouldalsobedifferent.SoIthink,forthecomponentatthejunctionofthetwoenvironmentcategories,weshoulddependonthemostadverseenvironmentalcategoryofthejunctioninselectingthelowestlevelandmixingproportionofconcreteorinotherbasicrequirementsofthedurability(3.4.2~3.4.8ofspecification).However,weshoulddeterminethethicknessofprotectionlayeraccordingwiththedifferentcategoriesofenvironment.Otherwise,forfoundationslabsandthebasementwalls,whenweusethecommercialconcretetheprobabilityofearlycontractionwillincreaseastheincreaseofthicknessofprotectivelayer.Therefore,thethicknessofprotectivelayerisnotthebiggerthebetteranditshouldbeselectedbytheenvironmentalcategoryofthecomponents’surfacesexposed.(4)ThesettingofupperstructuralsteelinthebeamendwhencalculatedasfreebeamItprovidesthesupperstructurereinforcementofthebeamendinarticle10.2.6CodefordesignofconcretestructureAtthispointtheendofbeamisboundbysomeconstraints,ifweanalyzeitaccordingtothepracticalconstraintsbyelasticitytheory,themomentwegetisnotonlyassociatedwiththeloadsbutalsowiththebeamconstraintsandtheirrelative108 西安工业大学毕业设计(论文)stiffness.First,itonlyreflectstheloadsonbeambutdoesn’ttaketheactualrestraintsofbeamendintoaccount,ifweassociatethereinforcementareawiththerequireduseofverticalsteelforthelowerpartofthebeam.Iftheactualconstraintsareveryweakandclosetosimplysupported,theactualmomentwillbeverysmalleveniftheloadisverygreat,soweneednotconfiguretoomanyreinforcements.Second,thecomponentspartlybindtheendofthebeamusuallyreferstothestructuralcolumnofbrick-concretestructure,theedgebeamofframeworkandsystemofprimaryandsecondarybeam.Iftheactualreinforcementofbeamendislargeaswellasthenegativemomentsofthebeam,withabalance,thetorqueofstructuralcolumnoredgebeamsaregreat.Whenthebindingcomponentisastructuralcolumn,itsreinforcementissmaller,usually4φ12,islikelytoresultininadequate;whenthebindingcomponentistheedgebeaminaframeworkorsystemofprimaryandsecondarybeam,althoughthetorqueoftheedgebeamscalculatedbyelastictheoryaregreat,theforeignexperimentaldatashowsthat,iftheedgebeamcrackedthetorsionalstiffnessisequaltoabout1/10ofthatofelastical.Theresultofthere-arrangedplasticinternalforcemakesthetorqueofedgebeamandthemomentofbeamendareverysmall,soweneedn’ttoconfiguretoomanyreinforcements.Theactualreinforcementofbeamendconnectedwiththeedgebeamis2φ12(4φ12forlimbshoop),someprojectsinsixtiesandseventieson20thcenturyevenuse2φ10or2φ8andtheyarenormallyusedformorethanthirtyyears.Inaword,thestrategygivenbythespecificationisstillquestionable.References:[1]CodeforDesignofConcreteStructure(GB50010-2002).2002[2]ChineseAcademyofBuildingResearch.DesignofConcreteStructure.PressofChineseBuildingIndustry,.2003[3]High-riseBuilding(secondedition).PressofWuhanTechnologyUniversity.2003.[4]PKPMEngineeringDepartment.SATWEUserManualandTechnicalConditionsof108 西安工业大学毕业设计(论文)SATWE.2003.[5]TechnicalSpecificationforConcreteStructuresoftallbuilding(JGJ3-2002).2002108 西安工业大学毕业设计(论文)对混凝土结构设计中一些问题的讨论关键词:概念设计;结构计算;配筋构造;保护层厚度摘要:使结构安全适用、经济合理、是结构工程师的任务和责任。根据长期工作体会从概念设计的观点出发,介绍抗震设计中遵循的原则,提高房屋抗震性能的措施。结合工程实际介绍了环境类别和保护层厚度的确定、按简支梁计算构造钢筋的设置等问题。一、概念设计和结构构造抗震设计中,影响整个结构抗震能力的因素很多,如:结构构件的承载力和变形能力;非结构构件的材料性能及提供的强度储备;结构的连接构造;结构的稳定性;结构的整体性能在经受第一次地震后多次余震反复作用下的抗破坏能力。目前只对第一种因素作了计算,其它因素尚无法进行计算,靠概念设计和结构构造做到结构体系具备必要的承载力、刚度、稳定性、能力吸收及耗能能力,也就是具有足够的延性。对复杂结构,七分计算三分构造,更重要的是概念设计。 (一)概念设计 材料性能、构件性能、连接构造、结构体系通过实验、实践检验,但还不能计算,称为概念设计,抗震设计中应遵循以下原则:(1)结构的承载力、刚度、质量在平面内和沿高度应均匀、对称和连续分布,避免应力集中:(2)应尽可能设置多道抗震防线,布置超静定结构及延性较高的耗能构件,注意适当加强静定结构部位、关键部位和薄弱环节;(3)注意结构的连接整体性,相同结构单元应采用牢固连接,不同结构单元应遵守彻底分开的要求;(4)估计和控制塑形铰区出现的范围和部位,有针对性的进行构造布置,掌握结构的屈服过程以及最后形成的屈服机制;(5)做到强柱弱梁、强剪弱弯;(6)采取有效措施防止过早的混凝土剪切破坏,钢筋锚固滑移和混凝土压碎等脆性破坏;(7)构件和节点连接的承载力和刚度要与结构的承载力和刚度相适应,节点连接的承载力不低于构件的承载力;(8)应该避免盲目增加钢筋,某一部分结构设计承载力超强或不足,都可能造成结构的相对薄弱,梁端、柱端及抗震墙的加强部位受弯配筋在满足承载力和抗震构造要求的条件下,应减少钢筋超配;(9)考虑非结构性部件对主体结构抗震产生有利和不利的影响。 (二)结构构造 108 西安工业大学毕业设计(论文) 结构体系靠力学计算保证构件的承载力及变形,又靠构造措施将构件连接在一起,形成结构体系,合理的构造保证构件传力明确;保证在力的多次作用下能力的吸收及耗散;避免因部分构件破坏而使结构体系丧失承载能力及抗震能力;保证在设计使用年限内的耐久性。可以说结构构造是概念设计的具体化。我国经过几十年的实践,特别是唐山地震所总结的经验教训,后来试验研究都有完整的结构构造措施。但是认识在不断提高,概念设计在不断发展,结构设计除正确运用目前的构造措施,同时还需要不断总结、充实、提高。二、结构计算 (一)荷载要准确 荷载包括结构自重,建筑材料做法,设备荷载(设备自重、管道重),建筑功能需要的活荷载,风、雪荷载、地震力、温度变化产生应力以及其它偶然作用等。有的荷载规范有所规定,可作依据,有的需要各专业提高。建筑专业提高的不仅仅是荷重,而应该是具体的材料做法,设备专业则应提供所选用的样本。由于建筑做法和设备一般要到订货时才能落实,在这以前变换的可能性很大,结构设计人员应该意识到这一点,并要求有相关的知识,准确计算所采用的荷载。 隔墙荷载占总荷载的比例较大,隔墙材料品种繁多,但尚无十分理想的隔墙材料,不是荷重偏大就是隔音差、抗撞击差或板块之间易出现裂缝。当隔墙位置固定且隔墙材料确定时,预留荷载是必要的,但考虑过重的隔墙会使结构用钢量过大。一般可与建筑专业配合,易采用轻质材料并在施工图中说明隔墙材料,允许荷载值及位置。结构计算最忌讳漏掉荷载,它将使计算白费或使结构存在隐患,应引以为戒。 (二)应分析计算结果 对复杂或重大工程一般需要用两种不同单元模型的程序进行分析和比较,对特殊工程应选择适当的计算程序。建立的模型,边界、支撑条件应尽量符合实际。程序中的输入数据应弄明其缘由,弄清其概念,对提高设计质量是不可缺少的。 (三)环境类别与保护层的确定问题 108 西安工业大学毕业设计(论文) 混凝土设计规范第3.4.1条规定了耐久性设计的原则及构件环境类别的分类标准。规范第9.2.1条给出了各类环境条件下的构件纵向受力筋保护层最小厚度。这是新规范重视耐久性问题的具体体现。由于规范是依据构件所处的环境类别来确定纵向受力筋保护层最小厚度的,对于处在两种环境交界部位的构件,如地下室墙,迎水面侧一般为二类环境,而其室内一侧一般为一类环境,两侧面的受力筋保护层最小厚度也应有所区别。因此笔者认为,对于处在两种环境交界部位的构件,在选用最低混凝土级别、确定混凝土配合比等耐久性基本要求(规范第3.4.2~3.4.8条)时应按照交界面上两种环境类别中的最不利环境类别确定,在确定受力筋保护层最小厚度时,则应按构件表面所处的环境类别分别考虑。否则,对于基础底板、地下室外墙,随着保护层厚度的增大,采用商品混凝土时,构件表面出现早期收缩缝的机率也随之增大,而构件表面开裂后,反而影响构件的耐久性。所以保护层厚度不是越大越好,而应构件表面所处的环境类别有针对性地选用。(四)按简支计算的梁端部上部构造钢筋设置问题 混凝土结构设计规范第10.2.6条对实际受约束的简支梁端上部构造筋作了规定。此时梁端实际受到部分约束,如按梁端的实际约束条件采用弹性理论进行整体内分析,计算所得的实际弯矩除与梁上承受的荷载大小有关外,更与梁端的约束构件即边梁或构件柱的相对刚度有关。将梁端构造钢筋的截面面积与梁跨中下部纵向受力钢筋计算所需截面面积相关联,只体现了梁上承受荷载的大小,而没有考虑梁端实际约束程度,如果梁端实际约束程度很弱,非常接近于简支,即使梁上承受的荷载很大,梁端实际弯矩仍很小,因而没必要配置太多钢筋,这是其一。其二,条文所指部分约束梁端的构件通常是指砖混结构的构造柱、框架和主次梁体系中的边梁,如果梁端实际配筋较大,梁承受的负弯矩也较大,与之平衡的构造柱弯矩或边梁的扭矩也较大,当约束构件是构造柱时,由于构造柱配筋较小,一般为4φ12,很可能造成构造柱的配筋不足;当约束构件是框架或主次梁体系中的边梁时,虽然按弹性理论计算边梁有较大的扭矩,但国外的试验资料表明,边梁开裂后,其抗扭刚度约相当于弹性抗扭刚度的1/10。塑性内力重分的结果使得边梁扭矩和梁端实际弯矩值都很小,没必要配置太多的钢筋。新的混凝土结构设计规范实施前,我院设计的大部分工程中与边梁相交的梁端实际配筋统一为2φ12(四肢箍为4φ12),20世纪六七十年代设计的部分工程甚至为2φ10或2φ8这些工程已正常使用了30年。综上所述,规范所给的这种配筋策略是否合适值得商榷。参考文献:[1]混凝土结构设计规范(GB50010-2002).2002 [2]中国建筑科学研究院.混凝土结构设计.中国建筑工业出版社.2003 [3]吕西林。高层建筑设计(第二版).武汉理工大学出版社.2003。 [4]PKPM工程部。SATWE用户手册及技术条件.2003。 [5]高层建筑混凝土结构技术规程(JGJ3-2002).2002108'
您可能关注的文档
- 乙醇水精馏塔设计计算书
- 五层大学教学楼框架结构计算书_毕业设计
- 五层现浇框架结构毕业设计计算书
- 全隐框玻璃幕墙 显竖隐横玻璃幕墙石材幕墙设计计算书
- 全隐框玻璃幕墙显竖隐横玻璃幕墙石材幕墙设计计算书_
- 南山路五标民大隧道边坡基坑计算书_毕业设计
- 南昌教育局机关办公楼_毕业设计计算书--110812597
- 南昌教育局机关办公楼_毕业设计计算书
- 南海天地小区二期1-8#楼方案设计毕业设计计算书
- 唐山建设集团公司办公楼设计_大学土木工程毕业设计计算书
- 唐山建设集团有限公司办公楼设计大学土木工程毕业设计计算书
- 商住楼工程模板专项方案含高支模_计算书_图
- 土木工程中某社区居民楼毕业设计计算书
- 土木工程毕业设计工业厂房计算书
- 宁村水库重力坝初步设计水工建筑物计算书
- 宁道高速公路瓢勺洞大桥施工图设计_毕业设计计算书
- 宿舍楼设计毕业设计计算书
- 州市新城区朝阳建设集团办公楼设计_土木工程办公楼设计计算书