'分部分项工程量清单39239分部分项工程量清单计价表1#序号项目编码项目名称计量单位工程数量土石方工程110101001001平整场地m2837.03210101002001挖土方m33275.14310103001001土(石)方回填m31972.65桩与地基基础工程410201001001预制钢筋混凝土方桩m3918510201002001接桩只564砌筑工程610304001001空心砖墙、砌块外墙m3519.51710304001002空心砖墙、砌块内墙m3560.92810304001003空心砖墙、砌块内墙m3189.19910302006001零星砌砖m357.82混凝土及钢筋混凝土工程1110403001001基础梁m36.441210401003001满堂基础m3569.261310402001001矩形柱m33.481410404001001地下室直形墙m3151.941510403002001矩形梁m3259.41610403002002矩形梁m3170.311710404001002直形墙m31465.81810405003001平板m31005.191910405003002平板m3271.492010405003003平板m342.92110405003004平板m310.692210405008001雨篷、阳台板m3142.482310406001001直形楼梯m2483.842410404001003直形墙m371.21
2510407001001散水、坡道m259.32610414001001通风烟道套1532710412008001屋面风帽套122810416001001现浇混凝土钢筋(含钢筋网片)t611.3屋面及防水工程3110702001001屋面卷材防水m2953.333210702002001屋面涂膜防水m2566.343310702003001屋面刚性防水m2566.33410407001002屋面轻质混凝土m2953.333510703003001砂浆防水(潮)m2663.33610702002002屋面涂膜防水m2386.93710703003002水泥砂浆m2953.333810703004001屋面变形缝m6.33910703004002楼层变形缝m81.94010703004003外墙变形缝m75.6防腐、隔热、保温工程4110803001001保温隔热屋面m2566.34210803005001地下室顶板隔热地面m311.254310803003001保温隔热墙m353.3834410802003001外墙保温及涂料m24006.2补充45沪010201004001截、凿桩根28246沪010901009001打桩场地平整m2875.9147沪010703005001止水带m221.148沪01090101100PVC-U硬管m546.9整体面层4920101003001道渣垫层m2712.275020101003002混凝土垫层m2712.275120101001001水泥砂浆地面m2712.275210703002001涂膜防水m2785.05
5320101003003细石砼地面m2712.275420101003004细石砼楼面m272925520101001002水泥砂浆楼面m22346.445610703002002涂膜防水m22778.045720101001003水泥砂浆楼面m2635820102002001块料楼地面电梯厅m2389.525920102001001石材楼地面m2155.466020106002001块料楼梯面层m2496.86120105001001水泥砂浆踢脚线m21006.456220105003001块料踢脚线m2187.16320105002001石材踢脚线m214.816420107001001金属扶手带栏杆m145.886520107002001硬木扶手带栏杆m473.896620107001002金属扶手带栏杆m16.066720108003001水泥砂浆台阶面m217.826820109004001水泥砂浆坡道m259.36920109004002水泥砂浆零星项目m2187020107001003金属扶手带玻璃栏板m439.1墙、柱面工程7120204003001外墙块料墙面m21779.457220201001001内墙面白水泥批嵌m212812.887320201001002内墙面水泥砂浆墙面m28789.47410703002003内墙涂膜防水m28789.47520201001003内墙面粉刷m242507620507001001内墙刷白涂料m242507720507001002内墙刷喷防霉涂料m21901.767820204003002块料墙面m2142.637920507001003天棚刷白涂料m22104.018020301001001天棚抹灰m27571.258120507001004天棚刷外墙涂料m21188.98
门窗工程8220402006001防盗门(1800*2400)樘38320402006002防盗门(1000*2100)樘1448420401006001木质防火门(1000*2100)樘38520401006002木质防火门(1200*2100)樘38620401006003木质防火门(1500*2100)樘28720401006004木质防火门(1000*2100)樘548820401006005木质防火门(1200*2100)樘398920401006006木质防火门(800*2000)樘849020406001001彩铝窗m21057.47其他工程9120604007001塑料装饰线m943.892沪020701004001砼明沟m1913#序号项目编码项目名称计量单位工程数量土石方工程110101001001平整场地m2524.15210101002001挖土方m32111.37310103001001土(石)方回填m3876.42桩与地基基础工程410201001001预制钢筋混凝土方桩m3553.44510201002001接桩个340砌筑工程610304001001空心砖墙、砌块外墙m3358.54710304001002空心砖墙、砌块内墙m3135.43810304001003空心砖墙、砌块内墙m338.95910302006001零星砌砖m33010沪020510001001钢丝网m21008.59混凝土及钢筋混凝土工程
1110403001001基础梁m34.321210401003001满堂基础m3333.971310402001001矩形柱m30.871410404001001地下室直形墙m3125.811510403002001矩形梁m397.721610403002002矩形梁m389.781710404001002直形墙m3901.141810405003001平板m3849.731910405008001雨篷、阳台板m393.362010406001001直形楼梯m2322.562110404001003直形墙m336.612210407001001散水、坡道m242.722310414001001通风烟道套782410412008001屋面风帽套62510416001001现浇混凝土钢筋(含钢筋网片)t398.22610417002001预埋铁件t1.5金属结构工程27沪010618002001轻钢结构t2屋面及防水工程2810702001001屋面卷材防水m2793.682910702002001屋面涂膜防水m2419.143010702003001屋面刚性防水m2381.113110407001002屋面轻质混凝土m2731.153210703003001砂浆防水(潮)m2731.153310702002002屋面涂膜防水m2374.543410703003002水泥砂浆m2731.153510703004001屋面变形缝m4.13610703004002楼层变形缝m49.23710703004003外墙变形缝m75.6防腐、隔热、保温工程
3810803001001保温隔热屋面m2381.113910803005001地下室顶板隔热地面m37.6534010803003001保温隔热墙m340.14110802003001外墙外保温及涂料m22608.2补充42沪010201004001截、凿桩根17043沪010901009001打桩场地平整m2553.5944沪010703005001止水带m165.745沪01090101100PVC-U硬管m536整体面层4620101003001道渣垫层m2431.844720101003002混凝土垫层m2431.844820101001001水泥砂浆地面m2431.844910703002001涂膜防水m2501.845020101003003细石砼地面m2431.845120101003004细石砼楼面m24842.275220101001002水泥砂浆楼面m2934.885310703002002涂膜防水m21142.725420101001003水泥砂浆楼面m2635520102002001块料楼地面电梯厅m2328.85620102001001石材楼地面m2126.525720106002001块料楼梯面层m2331.25820105001001水泥砂浆踢脚线m2554.355920105003001块料踢脚线m2115.86020105002001石材踢脚线m214.26120107001001金属扶手带栏杆m1196220107002001硬木扶手带栏杆m248.226320107001002金属扶手带栏杆m306420108003001水泥砂浆台阶面m211.886520109004001水泥砂浆坡道m242.726620101001004水泥砂浆楼地面m212
6720107001003金属扶手带玻璃栏板m225墙、柱面工程6820204003001外墙块料墙面m21169.966920201001001内墙面白水泥批嵌m28503.347020201001002内墙面水泥砂浆墙面m232007110703002003内墙涂膜防水m232007220201001003内墙面粉刷m21882.327320507001001内墙刷白涂料m21882.327420507001002内墙刷喷防霉涂料m21098.627520204003002块料墙面m2312.267620507001003天棚刷白涂料m21542.177720301001001天棚抹灰m25097.37820507001004天棚刷外墙涂料m2665.12门窗工程7920402006001防盗门(1000*2100)樘728020401006001木质防火门(1000*2100)樘28120401006002木质防火门(1200*2100)樘28220401006003木质防火门(1500*2100)樘28320401006004木质防火门(1000*2100)樘328420401006005木质防火门(1200*2100)樘288520401006006木质防火门(1500*2100)樘28620401006007木质防火门(800*2000)樘568720406004001金属百叶窗樘28820406001001金属推拉窗m2654.55其他工程8920604007001塑料装饰线m836.890沪020701004001砼明沟m134.694#
序号项目编码项目名称计量单位工程数量土石方工程110101001001平整场地m2427.23210101002001挖土方m31646.87310103001001土(石)方回填m3485.84桩与地基基础工程410201001001预制钢筋混凝土方桩m3400.43510201002001接桩个242砌筑工程610304001001空心砖墙、砌块外墙m3280.736710304001002空心砖墙、砌块内墙m3105.63810304001003空心砖墙、砌块内墙m330.38910302006001零星砌砖m323.410沪020510001001钢丝网m2786混凝土及钢筋混凝土工程1110403001001基础梁m32.7831210401003001满堂基础m3222.311310404001001地下室直形墙m3130.9141410403002001矩形梁m376.6521510404001002直形墙m3667.261610405003001平板m3660.7131710405008001雨篷、阳台板m372.821810406001001直形楼梯m2242.881910404001003直形墙m328.562010407001001散水、坡道m280.1252110414001001通风烟道套522210412008001屋面风帽套42310416001001现浇混凝土钢筋t3002410417002001预埋铁件t1.5金属结构工程25沪010618002001轻钢结构t1.8
屋面及防水工程2610702001001屋面卷材防水m2619.072710702002001屋面涂膜防水m2326.922810702003001屋面刚性防水m2297.262910407001002屋面轻质混凝土m2570.33010703003001砂浆防水(潮)m2570.33110702002002屋面涂膜防水m2292.143210703003002水泥砂浆m2570.3防腐、隔热、保温工程3310803001001保温隔热屋面m2298.533410803005001地下室顶板隔热地面m36.453510803003001保温隔热墙m331.2783610802003001外墙外保温及涂料m22045补充37沪010201004001截、凿桩根12338沪010901009001打桩场地平整m2427.2339沪010703005001止水带m13840沪01090101100PVC-U硬管m310.9整体面层4120101003001道渣垫层m2336.8354220101003002混凝土垫层m2336.8354320101001001水泥砂浆地面m2336.8354410703002001涂膜防水m2391.4354520101003003细石砼地面m2336.8354620101003004细石砼楼面m239624720101001002水泥砂浆楼面m2729.24810703002002涂膜防水m2891.324920101001003水泥砂浆楼面m273.325020102002001块料楼地面电梯厅m2188.645120102001001石材楼地面m240.88
5220106002001块料楼梯面层m2242.885320105001001水泥砂浆踢脚线m2432.3935420105003001块料踢脚线m257.95520105002001石材踢脚线m275620107001001金属扶手带栏杆m85.45720107002001硬木扶手带栏杆m2615820107001002金属扶手带栏杆m56.55920108003001水泥砂浆台阶面m29.366020109004001水泥砂浆坡道m261.56120101001004水泥砂浆楼地面m2356220107001003金属扶手带玻璃栏板m171.6墙、柱面工程6320204003001外墙块料墙面m2912.576420201001001内墙面白水泥批嵌m26632.66520201001002内墙面水泥砂浆墙面m22376.196610703002003内墙涂膜防水m22376.196720201001003内墙面粉刷m21468.26820507001001内墙刷白涂料m21468.26920507001002内墙刷防霉涂料m2856.927020204003002块料墙面m244.87120507001003天棚刷白涂料m210507220301001001天棚抹灰m23975.667320507001004天棚刷外墙涂料m2351.39门窗工程7420402006001防盗门(1000*2100)樘587520401006001木质防火门(1000*2100)樘47620401006002木质防火门(1500*2100)樘17720401006003木质防火门(1200*2100)樘267820401006004木质防火门(1800*2400)樘27920401006005木质防火门(800*2000)樘84
8020406004001金属百叶窗樘28120406001001彩铝窗m2693.64其他工程8220604007001塑料装饰线m67083沪020701004001砼明沟m1255#序号项目编码项目名称计量单位工程数量土石方工程110101001001平整场地m2583.78210101002001挖土方m32195.882310103001001土(石)方回填m3676.15桩与地基基础工程410201001001预制钢筋混凝土方桩m3608.79510201002001接桩只374砌筑工程610304001001空心砖墙、砌块外墙m3342.88710304001002空心砖墙、砌块内墙m3370.2810304001003空心砖墙、砌块内墙m3124.86910302006001零星砌砖m338.1610沪020510001001钢丝网m21453.87混凝土及钢筋混凝土工程1110403001001基础梁m34.221210401003001满堂基础m33201310404001001地下室直形墙m31151410403002001矩形梁m3172.3171510403002002矩形梁m3112.081610404001002直形墙m3982.091710405003001平板m3673.471810405003002平板m3181.898
1910405003003平板m328.7432010405003004平板m37.122110405008001雨篷、阳台板m395.462210406001001直形楼梯m22982310404001003直形墙m347.472410407001001散水、坡道m269.32510414001001通风烟道套1042610412008001屋面风帽套82710416001001现浇混凝土钢筋t412.042810417002001预埋铁件t2金属结构工程29沪010618002001轻钢结构t2屋面及防水工程3010702001001屋面卷材防水m2638.733110702002001屋面涂膜防水m2379.453210702003001屋面刚性防水m2379.423310407001002屋面轻质混凝土m2638.733410703003001砂浆防水(潮)m2444.4113510702002002屋面涂膜防水m2259.223610703003002水泥砂浆m2638.73防腐、隔热、保温工程3710803001001保温隔热屋面m2379.423810803005001地下室顶板隔热地面m37.5373910803003001保温隔热墙m335.7664010802003001外墙保温及涂料m22647.75补充41沪010201004001截、凿桩根18742沪010901009001打桩场地平整m2583.7843沪010703005001止水带m140.444沪01090101100PVC-U硬管m395.6
整体面层4520101003001道渣垫层m24874620101003002混凝土垫层m24874720101001001水泥砂浆地面m24874810703002001涂膜防水m2525.984920101003003细石砼地面m24875020101003004细石砼楼面m24662.795120101001002水泥砂浆楼面m21572.15210703002002涂膜防水m21867.995320101001003水泥砂浆楼面m247.325420102002001块料楼地面电梯厅m24805520102001001石材楼地面m2405620106002001块料楼梯面层m22985720105001001水泥砂浆踢脚线m2674.325820105003001块料踢脚线m21255920105002001石材踢脚线m25.236020107001001金属扶手带栏杆m87.46120107002001硬木扶手带栏杆m2616220107001002金属扶手带栏杆m53.66320108003001水泥砂浆台阶面m2136420109004001水泥砂浆坡道m269.36520109004002水泥砂浆零星项目m2206620107001003金属扶手带玻璃栏板m288.6墙、柱面工程6720204003001外墙块料墙面m21334.56820201001001内墙面白水泥批嵌m28969.0166920201001002内墙面水泥砂浆墙面m23600.67010703002003内墙涂膜防水m23600.67120201001003内墙面粉刷m22847.57220507001001内墙刷白涂料m22847.5
7320507001002内墙刷喷防霉涂料m21331.2327420204003002块料墙面m2149.757520507001003天棚刷白涂料m21409.77620301001001天棚抹灰m25072.747720507001004天棚刷外墙涂料m2707.72门窗工程7820402006001防盗门(1800*2400)樘27920402006002防盗门(1000*2100)樘1048020401006001木质防火门(1000*2100)樘28120401006002木质防火门(1200*2100)樘28220401006003木质防火门(1500*2100)樘28320401006004木质防火门(1000*2100)樘288420401006005木质防火门(1200*2100)樘288520401006006木质防火门(800*2000)樘568620401006007木质防火门(1100*2100)樘28720406008001钢质防火窗樘28820406001001彩铝窗m2780.55其他工程8920604007001塑料装饰线m65090沪020701004001砼明沟m1206#7#序号项目编码项目名称计量单位工程数量土石方工程110101001001平整场地m2758.76210101002001挖土方m32874.71310103001001土(石)方回填m31658.13桩与地基基础工程410201001001预制钢筋混凝土方桩m3690.18510201002001接桩个424
砌筑工程610304001001空心砖墙、砌块外墙m3481.15710304001002空心砖墙、砌块内墙m3734.56810304001003空心砖墙、砌块内墙m393.24910302006001零星砌砖m337.610沪020510001001钢丝网m21904混凝土及钢筋混凝土工程1110403001001基础梁m321.021210401003001满堂基础m3463.261310402001001矩形柱m327.971410404001001地下室直形墙m3142.211510403002001矩形梁m3158.411610403002002矩形梁m3147.441710404001002直形墙m39301810405003001平板m3849.731910405008001雨篷、阳台板m393.362010406001001直形楼梯m22982110404001003直形墙m364.862210407001001散水、坡道m21002310414001001通风烟道套1042410412008001屋面风帽套82510416001001现浇混凝土钢筋t552.0032610417002001预埋铁件t2金属结构工程27沪010618002001轻钢结构t2.8屋面及防水工程2810702001001屋面卷材防水m2913.112910702002001屋面涂膜防水m2542.273010702003001屋面刚性防水m2514.973110407001002屋面轻质混凝土m2872.813210703003001砂浆防水(潮)m2872.81
3310702002002屋面涂膜防水m2370.843410703003002水泥砂浆m2872.81防腐、隔热、保温工程3510803001001保温隔热屋面m2514.973610803005001地下室顶板隔热地面m310.763710803003001保温隔热墙m338.9123810802003001外墙保温及涂料m23817.59补充39沪010201004001截、凿桩根21240沪010901009001打桩场地平整m2758.76沪010703005001止水带m16541沪01090101100PVC-U硬管m356.4整体面层4220101003001道渣垫层m26584320101003002混凝土垫层m26584420101001001水泥砂浆地面m26584510703002001涂膜防水m27234620101003003细石砼地面m26584720101003004细石砼楼面m26674.54820101001002水泥砂浆楼面m21885.524910703002002涂膜防水m22300.35020101001003水泥砂浆楼面m240.555120102002001块料楼地面电梯厅m24805220102001001石材楼地面m2405320106002001块料楼梯面层m22985420105001001水泥砂浆踢脚线m2847.75520105003001块料踢脚线m2135.955620105002001石材踢脚线m23.195720107001001金属扶手带栏杆m107.65820107002001硬木扶手带栏杆m228.36
5920107001002金属扶手带栏杆m306020108003001水泥砂浆台阶面m213.26120109004001水泥砂浆坡道m21006220101001004水泥砂浆楼地面m2126320107001003金属扶手带玻璃栏板m236.6墙、柱面工程6420204003001外墙块料墙面m21297.076520201001001内墙面白水泥批嵌m28180.386620201001002内墙面砂浆水泥墙面m25632.26710703002003内墙涂膜防水m25632.26820201001003内墙面粉刷m22939.356920507001001内墙刷白涂料m22939.357020507001002内墙刷喷防霉涂料m21378.847120204003002块料墙面m278.337220507001003天棚刷白涂料m21801.927320301001001天棚抹灰m26581.557420507001004天棚刷外墙涂料m2656.76门窗工程7520402006001防盗门(1000*2100)樘1047620401006001木质防火门(1000*2100)樘267720401006002木质防火门(1200*2100)樘47820401006003木质防火门(1500*2100)樘27920401006004木质防火门(1200*2100)樘328020401006005木质防火门(1800*2400)樘28120401006006木质防火门(800*2000)樘568220406004001金属百叶窗樘28320406008001金属防火窗樘28420406001001彩铝窗m21013.82其他工程8520604007001塑料装饰线m711.28
86沪020701004001砼明沟m154.04地下车库序号项目编码项目名称计量单位工程数量桩与地基基础工程1沪010901009001打桩场地平整m27639.4012沪010901014001方桩m33033沪010201004001截、凿桩根404410101002001挖土方m322195.5510103001001土(石)方回填m38700砌筑工程610304001001空心砖墙、砌块墙m3139.63710302006001零星砌砖m310混凝土及钢筋混凝土工程810401003001满堂基础m32010.85910408001001后浇带m392.21010403001001基础梁m31498.2191110402001001矩形柱m3259.3791210403002001矩形梁m3444.6191310404001001直形墙m31146.431410405001001有梁板m31874.571510406001001直形楼梯m2168.4151610416001001现浇混凝土钢筋t1503.951710417002001预埋铁件t6.641810417002002零星铁件t5.3419沪010703005001止水带t6.908门窗工程2020402001001防护密闭门700*1600樘12120402001002防护密闭门800*2000樘22220402001003防护密闭门1000*2000樘142320402001004防护密闭门1200*2000樘4
2420402001005防护密闭门1500*2000樘42520402001006密闭门1000*2000樘162620402001007密闭门1200*2000樘42720402001008密闭门1500*2000樘32820402001009防护密闭门1000*2150樘32920402001010防护密闭门1200*2150樘73020402001011密闭门1000*2150樘23120402001012密闭门1200*2150樘53220402001013悬板活门500*800樘23320402001014悬板活门500*1250樘83420402001015悬板活门850*2150樘23520402007001钢质防火门800*2100樘53620402007002钢质防火门1000*2100樘123720402007003钢质防火门1200*2100樘63820402007004防火隔声门1500*2100樘33920401001001木门1000*2100樘84020401001002木门1000*2100樘104120406004001铝合金百叶窗1200*900樘54220406004002铝合金百叶窗1300*900樘24320406004003铝合金百叶窗1500*900樘54420406004004铝合金百叶窗1700*900樘14520406004005铝合金百叶窗1750*900樘24620406004006铝合金百叶窗1800*900樘24720403003001特级防火卷帘门樘34820403003002挡烟垂壁樘7金属结构工程4920107001001金属扶手带栏杆、栏板m36.55020107004001金属靠墙扶手m405110606007001钢走道、盖板t1.65210417002003车库柱角包钢角t2
防水工程5310703003001砂浆防水(潮)m27639.45410703002001外墙涂膜防水m224205510703002002平板涂膜防水m27514.55610803001001保温隔热屋面m3544.8楼地面工程5720101003001细石砼楼地面m27207.75820101001001水泥砂浆楼地面m27207.75920101003002扩散室细石砼楼地面m2546020101003003配电房细石砼楼地面m2456120101001002水泥砂浆楼地面m2456220106003001水泥砂浆楼梯面m2168.4156310407002001散水、坡道m376.356420101001003水泥砂浆楼地面m2509墙、柱面工程6520201001001内墙墙面一般抹灰m25216.326620507001001内墙刷喷涂料m25216.326720201001002台度墙面一般抹灰m22120.166820507001002台度刷喷涂料m22120.066920202001001柱面一般抹灰m24887020506001001抹灰面油漆m24887120507001003天棚刷喷涂料m29843.67220505001001金属面油漆t87320105001001水泥砂浆踢脚线m2400措施项目清单序号项目名称计量单位工程数量21#楼2.1脚手架部分2.1.1外墙脚手架m24631.092.1.2内墙脚手架
2.1.3满堂脚手架2.1.4构筑物脚手架2.1.5其他2.21#楼土建清单2.2.1砼及现浇砼模板及支架2.2.1.1基础2.2.1.1.1满堂基础模板m2115.162.2.1.2柱、梁、板2.2.1.2.1基础梁模板m252.852.2.1.2.2矩形柱模板m226.292.2.1.2.3矩形梁模板m21704.632.2.1.2.4矩形梁模板m21108.782.2.1.3墙板2.2.1.3.1地下直形墙模板m2842.922.2.1.3.2直形墙模板m210110.042.2.1.3.3平板模板m211485.402.2.1.3.4平板模板m22630.812.2.1.3.5雨篷、阳台板模板m21736.502.2.1.3.6直形墙模板m2498.472.2.1.4其他2.2.1.4.1直形楼梯模板m21038.3033#楼单体3.1脚手架部分3.1.1外墙脚手架m22629.003.1.2内墙脚手架3.1.3满堂脚手架3.1.4构筑物脚手架3.1.5其他3.23#楼土建清单3.2.1砼及现浇砼模板及支架3.2.1.1基础
3.2.1.1.1满堂基础模板m263.563.2.1.2柱、梁、板3.2.1.2.1基础梁模板m234.933.2.1.2.2矩形柱模板m212.763.2.1.2.3矩形梁模板m21119.223.2.1.2.4矩形梁模板m21028.293.2.1.3墙板3.2.1.3.1地下直形墙模板m2690.773.2.1.3.2直形墙模板m26393.893.2.1.3.3平板模板m27182.883.2.1.3.4雨篷、阳台板模板m21170.023.2.1.3.5直形墙模板m2256.273.2.1.4其他3.2.1.4.1直形楼梯模板m2528.5944#单体4.1脚手架部分4.1.1外墙脚手架m22103.204.1.2内墙脚手架4.1.3满堂脚手架4.1.4构筑物脚手架4.1.5其他4.24#土建清单4.2.1砼及现浇砼模板及支架4.2.1.1基础4.2.1.1.1满堂基础模板m259.074.2.1.2柱、梁、板4.2.1.2.1基础梁模板m211.884.2.1.2.2矩形梁模板m2903.064.2.1.3墙板4.2.1.3.1地下直形墙模板m2839.44
4.2.1.3.2直形墙模板m25011.044.2.1.3.3平板模板m26066.584.2.1.3.4雨篷、阳台板模板m2926.264.2.1.3.5直形墙模板m2199.924.2.1.4其他4.2.1.4.1直形楼梯模板m2522.3855#单体5.1脚手架部分5.1.1外墙脚手架m23241.765.1.2内墙脚手架5.1.3满堂脚手架5.1.4构筑物脚手架5.1.5其他5.25#土建清单5.2.1砼及现浇砼模板及支架5.2.1.1基础5.2.1.1.1满堂基础模板m268.225.2.1.2柱、梁、板5.2.1.2.1基础梁模板m235.405.2.1.2.2矩形梁模板m21137.875.2.1.2.3矩形梁模板m2742.795.2.1.3墙板5.2.1.3.1地下直形墙模板m2698.775.2.1.3.2直形墙模板m26773.735.2.1.3.3平板模板m27695.215.2.1.3.4平板模板m21762.655.2.1.3.5雨篷、阳台板模板m21218.775.2.1.3.6直形墙模板m2332.295.2.1.4其他5.2.1.4.1直形楼梯模板m2539.57
66#7#单体6.1脚手架部分6.1.1外墙脚手架m24167.986.1.2内墙脚手架6.1.3满堂脚手架6.1.4构筑物脚手架6.1.5其他6.26#7#土建清单6.2.1砼及现浇砼模板及支架6.2.1.1基础6.2.1.1.1满堂基础模板m2116.126.2.1.2柱、梁、板6.2.1.2.1基础梁模板m262.106.2.1.2.2矩形柱模板m2209.816.2.1.2.3矩形梁模板m21119.226.2.1.2.4矩形梁模板m21028.296.2.1.3墙板6.2.1.3.1地下直形墙模板m2856.396.2.1.3.2直形墙模板m26923.016.2.1.3.3平板模板m27182.886.2.1.3.4雨篷、阳台板模板m21170.026.2.1.3.5直形墙模板m2454.026.2.1.4其他6.2.1.4.1直形楼梯模板m2539.577地下车库7.1地下车库土建7.1.1砼及现浇砼模板及支架7.1.1.1基础7.1.1.1.1满堂基础模板m2395.897.1.1.2柱、梁、板7.1.1.2.1基础梁模板m24208.44
7.1.1.2.2矩形柱模板m21973.967.1.1.2.3矩形梁模板m22551.007.1.1.3墙板7.1.1.3.1直形墙模板m25654.667.1.1.3.2有梁板模板m27319.157.1.1.4其他7.1.1.4.1后浇带模板m212.487.1.1.4.2直形楼梯模板m2337.547.1.2脚手架m2835.39'
您可能关注的文档
- 【7层】4574.57㎡七层学生公寓施工招标文件编制(含工程量清单及组价)
- 清单 第400章 桥梁(工程量清单与定额对应关系)
- 1组商住楼任务书与工程量清单 (2)
- 2013工程量清单计价规范
- 川建价发(2010)20号关于泸州市等12个市、州《四川省建设工程工程量清单计价定额》人工费调整幅度及计日工人
- 关于《建设工程工程量清单计价规范》有关问题解释答疑
- 《杭州市建设工程工程量清单计价实施细则》(2009年修订)
- 工程量清单控制价(拦标价)
- 分部分项工程量清单
- 钻探设备研发中心工程量清单及投标书概预算毕业设计
- 工程量清单与计价表示范格式
- 第五章 、电气设备安装工程工程量清单项目设置及计价课件
- 公路养护工程量清单及计量规范编制
- 建筑工程工程量清单计价模拟题及答案
- 工程量清单与图纸不一致,价款如何确认
- 附录d 市政工程工程量清单项目及计算规则 小麟
- 湘潭天易示范区消防大队应急及救援指挥中心 工程量清单
- 建设工程工程量清单计价规范释疑1