- 63.50 KB
- 0页
- 1、本文档共5页,可阅读全部内容。
- 2、本文档内容版权归属内容提供方,所产生的收益全部归内容提供方所有。如果您对本文有版权争议,可选择认领,认领后既往收益都归您。
- 3、本文档由用户上传,本站不保证质量和数量令人满意,可能有诸多瑕疵,付费之前,请仔细先通过免费阅读内容等途径辨别内容交易风险。如存在严重挂羊头卖狗肉之情形,可联系本站下载客服投诉处理。
- 文档侵权举报电话:19940600175。
'有线电视共用天线系统安装工艺标准CableTVshareantennasysteminstallationprocessstandard1,scopeofapplicationThisstandardissuitableforcableTV,satelliteTV,closed-circuitTVandsharingantennasysteminstallation.2,constructionpreparation,2.1materialThe2.1.1cablesystemreceivesantennaselectionrequirements:accordingtodifferentreceptionchannels,receivingsatellite,fieldstrength,receivingringTheareaandthecableTVsystemfacilitiesareselectedtoopencircuitantennasandsatelliteantennastomeettherequirementofreceivingimagequality,andshouldProductcertificate.Allkindsofironshouldbefullygalvanized.Whenthetreatmentisnotgalvanized,itshallbetreatedwithcorrosionprotection.Forexample,use8#leadwireandWireropeandvariousspecificationsofironpipe,Anglesteel,channelsteel,flatiron,roundsteel,14#bindingwire,steelcablecard,flowerbasketbolt,pullringAlloftheseshouldbetreatedwithgalvanizing.Various
specificationsofscrew,metalpipebolts,woodscrews,gaskets,springpads,etc.The2.1.3userterminalboxistheportthatthesystemconnectstotheuser"sTV,theuser"sterminalboxisdividedintobrightanddark,andtheboxisintheboxPlasticboxesandironboxes.Userterminalpanelpoints,singleanddoubleholesocketoutletsocketis75Ωimpedance,andshallhavetheproductCertificateofapproval.The2.1.4TVcableshalladoptthephysicalhighfoaminsulationcablewithbettershieldingperformance,whichiscomposedoftheinnerandouterconductorgroupsofthecoaxialshaftIs75Ω,characteristicimpedance,andshallhavethemanufacturer"scertificate.Incaseofdisturbancetothesiteenvironment,thedual-shieldcableshallbechosen.Forcablesthatneedtobesetupinthefield,theself-supportingcableshallbeused,andtheoutdoorcableshallbeblacksheathedcable.2.1.5branches,allocators,andotherpassivedevices:accordingtothedesignrequirements,theproductsshouldbechosenaccordingtothespecifications.Accordingtothedesignrequirement,theantennaamplifier,mixer,splitter,andmainlineamplifierareselectedforthe
correspondingtypeandperformance.Branchmainlineamplifier,extensionamplifier,distributionamplifier,cabinet,chassis,highfrequencyhead(LNB),receiver,modulator,Equipmentsuchasdemodulatorandpurificationpowersupply.Shouldchecktheequipment,theequipmentappearanceisintact,thefittingsiscomplete,thenproceedElectricaltest,checkthedevice,theequipmentisworkingnormally,theproductspecificationandthetechnicaldataarecomplete,andshouldhavetheproductcertificateTheimportproductsshouldprovidetheinspectioncertificate.Othermaterials:welds,waterproofelbow,solder,solder,connector,insulator,antennaePoe-mhandsoon.2.2equipment2.2.1measuringinstruments:fieldstrength,testantenna,multimeter,megatometer,monitor,compass,measuringinstrument,leadhammer,etc.2.2.2constructiontools:electricdrill,hammer,pliers,screwdrivers,electricianknives,solderingiron,weldingmachine,specialtoolforjoint,etc.
Horizontalrule,largerope,belt,highladder,middleladder,toolbag.Heavyliftingequipment:crane,reversechain.2.3operationconditionTheembeddedsatellitereceivesthebaseoftheantennaandtheburiedpipebeforetheroofoftheconstructionissealed(theroofiswaterproofandthedecorationisdecorated).Withtheconstructionofthewall,theembeddedpipeanduserboxandtheboxhavebeencompleted.Theconstructionofthepaintslurryintheinteriorof2.3.3isfinished,thecoaxialcableinstallationandinstallationarefinished.Theinstallationoftheequipmentinthefrontroomofthefront-endroomshallbefollowedbythefollowingconditions.Theinteriorofthemachineroomisdecorated,thefloor(orantistaticfloor)isfinished.~220Vequipmentpowersupplyand~380Vequipmentpower(antennamotor)powersupplypipe,line,boxallconstructionfinished.Theboxofthedarkboxisfirmlyinstalled.Thefeederlineofthemachineroom,thelineandtheslotare
finished,andthemachinecabinetisintroduced.Theinstallationofairconditioning,lightingandmaintenanceoftheengineroomiscompleted.Specialgroundterminalsarereservedforthegroundingofmachineroomequipment.2.4preparationTheconstructionunitmustholdtheconstructionqualificationofthesystemproject.Thedesigndocumentsandconstructiondrawingsarecomplete,Theschemeisdesignedtomeettherequirementsofstate,industry,localstandardsandconstructionunitsApprovalbyrelevantindustrymanagementdepartment.Thedesignerhasadetailedtechnicalbackgroundontheconstructionpersonnel.Beforeconstruction,theconstructionsitesurveywillmeettherequirementsoftheconstructionanddrawingofthesystem.3,theoperationprocess3.1processflowSiteselection
TheantennainstallationInstallationoffrontendequipmentandmachineroomequipmentTransmissioninstallationUserterminalinstallationGroundinginthesystemSystemdebugacceptance3.2operationmethod3.2.1siteselectionThereceivingfieldshouldbesatisfiedwithopenandopenconditions,andavoidtheshieldingandsurroundingmetalinthetransmissiondirectionComponents,andavoidfactorsthatmaycauseinterference,suchashigh-voltagepowerlines,elevatormachines,airplanelanes,andmicrowavedryingDonotgettooclosetotheroad.3.2.1.2antennaheightshouldberaisedashighaspossible,avoidingtheshadowareaofthesurroundingtallbuildingsandimprovingreceptionlevel.
Improvesthenoiseratioofthesystem.3.2.1.3satellitereceivingantennainstallationlocationcanalsochoosetobeinunobstructedground,whichcanbeusedtoblockmicrowaveinterferenceThediameteralsoreducesthewindloadontheroofofthesatellitereceivingtheantennaandimprovesthesafetyofthesysteminstallation.Thelocationofthe3.2.1.4siteismoderate,choosingtobeatthecenterofthewholesystem,sothatthemainlineofthesurroundingradiationwillbereducedThetransmissionlengthofthetrunkline.Thedistancebetweenthefrontandantennareceivingstationsshouldbelessthan50meters.3.2.1.5beforeinstallingtheantenna,thetestantennaandtestinstrumentshouldbeusedtosurveythesiteandselectthebestimagequalityPositionandinstallationheight.3.2.2antennainstallation:3.2.2.1satellitereceivingantennainstallation:Principleofinstallation:strictlyfollowtheinstructionsoftheproductandbeoperatedbyprofessionaltechnicians.
Aeriallightning:iftheantennaisintheprotectiverangeofthebuilding"slightningrod,theantennadoesnotneedtosetupalightningrod.Ifit"sintheprotectionvanInaddition,alightningrodshouldbeinstalledonthetopofthemainreflectingsurfaceandthetopofthesecondaryreflector,whichshouldcoverthewholemainreflectorFigure3.2.2.1-1);Theinstallationheightshouldensurethattheantennaisplacedwithintheprotectiverange(seechart)3.2.2.1-2).Thelightningrodgroundshouldbeindependentoftheline,anditisstrictlyforbiddentogroundthelightningrodtothegroundconnectionoftheindoorreceivingequipment.ThelightningrodThelightningrodThelightningrodLightningrodThevicereflectivesurfaceThemainreflectorBasedonthepierFigure3.2.1-1satellitereceivesanaeriallightningrodinstallationfigure1,3.2.1-2satellitereceivestheantenna
lightningrodinstallationfigure2Antennabase:accordingtotheproductdatasuppliedbytheantennamanufacturer,accordingtothedataoftheantenna"sself-gravityandwindload,thebasesnailisburiedBoltsandbasicsteelplatesshallbekeptinaccordancewiththeplaneheightofeachbasepier.Verticalsuspension:aftercalibratingthesizeandpositionofthepre-buriedbolt,theantennaismountedandfixedonthepre-buriedboltFlatwasher,springwasheranddoublemothertotighten,theboltexposedpartshouldbeevenlyspreadbuttertopreventmetalrust.Assemblyoftheantenna:accordingtotheorderofthefactory,thescrewshouldnotbefastenedonceintheprocessAftertheassemblyiscompleted,theconsolidationiscarriedouttopreventdamagetotheantennaintheinstallationprocessandtheaccuracyoftheeffect.Thewholeassemblyoftheantenna:thewholeassemblyoftheassembledantennaismountedonthemountedantennamaincolumnandboltedtothemast.inIntheprocessofassembling,weshouldpayattentiontotheweightofthesuspensionintheframeoftheantenna,soastopreventthedeflectionofthecenterduringtheloadingprocess
Leavingtheantennatotiltordamagetheantennasurface.Iftheantennadiameterisgreaterthan4m,theantennaliftingschemeshallbedevelopedTheprojectisunderconstruction.Antennadirectionselection:themaximumreceptiondirectionofthesatelliteantennaistoadjusttheelevationAngleandtheazimuthAngle,whichistheleasttomonitortheimagenoise(ornot)andpayattentiontothebalanceofimagequalityondifferentTVsatellitechannels.3.2.Generalrequirementsforinstallationof2.2openantenna:Severalopenantennascanbesetupbycommonpoles,ortheycanbeseparatelysetupseparately.TheremustbeacertaindistancebetweentheantennaeandthehorizontalbetweenthepolesFrom5metersorhigher;Theverticalbarinthesamedirectionis15metersormore.Donotusetheantennaebeforeandafter,thesamestemtwodaysThelinespacingshouldnotbelessthanthelambda/2(lambda:wavelength)ofthelongerwavelengthantennaandtheminimumspacingisonemeter,andtherightsideoftheantenna
Thelambdaisgreaterthanthewavelengthofthelongwavelengthantenna.Morethan5metersThespacingoftherightantennaLambdalambdalambda/2,ThespacingofthemastMorethan15metersThespacingoftheantennaeisthespacingoftheantennaeFigure3.2.2.2thespacingoftheantennas(2)antennaheightselection:theantennashouldnotbelessthanonewavelengthfromthegroundorroof.RadiowavesshouldbeconsideredfortransmissionIntheprocess,thereisnotonlyreflection,butalsothereflectionoftheinhomogeneityofairmediaTheimage,appropriateadjustmentlevelpositionandheight,toreceivethesignalqualityisthebest.(3)antennadirectionselection:selectthemostpowerfulantennadirection.ThemaximumreceptionoftheopenantennaisaimedattheTV
Theejectiontower(TVsource),butsometimestoavoidthesourceofthedisturbanceorbecausethereisanocclusioninfront,itcanbemadeaccordingtotheactualsituationThemaximumreceivingdirectionofthereceivingantennaisslightlytweaked.(4)pre-buryingofthebaseoftheopenantenna:theantennapedestalshouldbeconstructedwiththeconstructionoftheearth,andwhentheroofpanelismade,itispreparedtoburytheboltOrthefloorbolt.Theembeddedboltsshouldnotbelessthanthephi25mmx250mm,andthediameterofthesteelshouldnotbelessthanthediameterofthesteelPhi8mm;Thediameterofthesteelisnotlessthanthediameterofphi12mm.(also,thebaseofthebaseis4mmby25mm.Weldingwiththebaseplate;Thethicknessoftheplateshallnotbelessthan6mm.Thebaseheightshouldnotbelessthan200mm;waterThemortarwillbeflatandsmooth.Goodembeddedanchoratthesametime,threeo"clockinthe120°Angleposition,TABUSESthestraightThediameterphi8mmismadeofgalvanizedroundsteel,thebottomandstructuralsteelwelding,theweldinglengthissixtimesthediameteroftheroundsteel,andbesides
Removethecoatingandsmoothitwithcementmortar.3.2.2.3antennaverticalbarandpullwireinstallation:(1)theverticalbarofthemulti-sectionpole:theverticalbarofthemulti-sectionpoleshouldbemadeupfromthebottomtothebottom,andthepiecesoftheshaftshallbestrong,suchasFollowingfigure:Figure3.2.2.3daylinedrawingThecombinedlengthofDCisnotlessthanonewavelength(2.5-6m);otherwiseitwillaffectthenormalreceptionoftheantenna.SectionBisthefixedantennasection,whichisaboutthelengthofthefixedantenna,usuallyabout3m.AsegmentisAlightningrod,whichgenerallyUSESphi20mmroundsteel,whichismorethan2.5mlong(2)preventingelectricalaccidentscausedbyhighwindsandearthquakes.TheantennaisrequiredtomaintainthelineandthehighpressurelineAcertaindistance,asthetableshows:Voltageoverheadcabletypeandthedistanceofthetelevisionantenna(m)
Barewire>1Lowvoltageoverheadinsulatedwireandmulti-corecable>0.6Highvoltageinsulatedwireorlowvoltagepowersupply>0.3Barewire>1.2Highvoltageoverheadinsulatedpowerline>0.8Highvoltagepowersupply>0.4(3)verticalbar:thesiteshouldbecleanandtidy,andthecomponentsthatarenotconnectedtotheverticalbarwillbeplacedoutsidetheverticalbar.PersonnelandtoolsItshouldbeready.First,connectthetop,middleandlowerrod(welding),tightenscrew,andtieupthethreadrodHangonthestick;Thesteelcablesshouldbestrong;Centerinsulatedporcelainbeadsocket;ThebasketboltsareloosetotheproperpositionPlacethemastinthepositionoftheanchorintheanchorposition.Allready.Theon-sitecommandgivesthepasswordunifiedaction,thepolestandsup,theforceshouldbefairwhenthepoleisup,preventtheleverfromturningleftandright.then
Usethebasketbolttocorrectthetension.Use8#~10#leadwiretosealthebasketbolt.LineofpullandverticalbaroneA45°to30°~;Ifthemastistoohigh,useadoublelayer.ThewireshouldbedrawnawayfromtheantennareceivingtheelectromagneticwaveTothe.(4)theanchormustbefirmlyattachedtothebuildingandmustnotbeattachedtotheroofventpipeandwaterpipe.Installationofthe3.2.2.4antenna(1)beforetheantennaissetup,theantennashouldbecarefullyinspectedandtested.Theantenna"soscillatorshouldbeplacedhorizontallyandadjacentThesetoftheoscillatorshouldbeparallel,andthefixedpartsoftheoscillatorshouldbesecuredbythespringmat.Thefeedershouldbefixedincasethewindblows.Andmakesuretomakesurethatyouhaveawatertightinthehead.(2)assembletheantennaeoftheapprovedantennasonthecrossshoulder,andthepartsoftheantennaareinstalled,andtheropeiscarriedbyaropethroughthetoppulleyThehorizontalarmoftheassembledantennaishoisteduptothedesiredlocation,andthestaffonthepolewillattachthe
crossarmtotheantennacard.(3)eachchannelantennashallbeassembledattheappropriatepositiononthemast.Principlehighchannelantennaontop,lowchannelTheantennaisbelow,thedistancebetweenthelayerandthelayerisgreaterthanlambda/2.(4)todeterminethebestreceptionoftheantennabyobservingthereceivingimageofthemonitorandreadingthefieldstrengthmeasurementvalueFixedline.Theoutsidedeviceandequipmentshouldbewaterproof.3.2.2.2.5groundwireproduction:whenthebuildinghasalightningnet,thefourmmby25mmofflatsteelortheroundsteelof10mmwillbeusedThemainrod,thebaseandthestructureareconnectedinone.Theantennamustbewithintherangeofthelightningrodprotection.ThegroundingresistancevaluePracticeshouldbelessthan1Ω.Formoreinformationonthelightningprotectionandgroundinginstallationtechnologystandard"intherelevantsections.3.2.3frontroomequipmentinstallation:
Theoperationprocessof3.2.3.1StabilizingrackEquipmentinstallationEquipmentwiringandidentificationEquipmentgroundingpower3.2.3.2stabilizers:positiontheequipmentcabinetaccordingtothefloorplanofthemachineroom.Thepositionthatcorrespondstointhemachineark,willantistaticgroundBoardgroovestoensurethatthecableunderthefloorisbroughtintothecabinet.Whenthecabinetismorethan1.8metershigh,thenumberofinstallationsisgreaterthanthatWhentheloadoftheplateisloaded,thecabinetwillbefirmlyinstalledonthechannelsteel,anditwillbefixedwithboltsandanti-loosewashertopreventtheover-loadingofthemachineDamagetoboardandequipment.Thecabinetshouldbekeptupright.Whenthecabinetisplacedsidebyside,thegapbetweenthetwocabinetsshouldnotbegreaterthan2mm.Thecabinetpanelshallbeinthesameplaneandparalleltothebaseline,andthedeviationshouldnotbegreaterthan2mm.
Installationof3.2.3.3equipment:theequipmentinstalledonthecabinetshouldbearrangedorganicallyaccordingtotheusagefunction(seechart3.2.3.3).Usethescrew,gasketandspringpadsthatareconfiguredwiththecabinetandattachtheequipmenttothecabinet.UpanddowneachdeviceSpaceshouldbeleftwithaspaceof1U(orgreaterthan50mm)tokeeptheairflowingandcoolingspaceonthetopandbottomoftheequipment.Thespaceisenclosedinaspecialblankpanel.Forequipmentinstalledonnon-19"standardcabinets,standardtrayinstallationsareavailable;ThecolorColormonitorshouldbeinstalledwithspecialTVspecialtrayandpanel.Program1receiverProgram1modulatorProgram2receiverProgram2modulator4modulatorProgram4receiverProgram3modulator
Program3receiverProgram6modulatorProgram6receiverProgram5modulatorProgram5receiverFrontortrunkamplifiermixerProgram7modulatorProgram7receiverSpareandspareFigure3.2.3.3equipmentlayoutschematic3.2.3.4devicewiringandidentification:(1)themachineroomusuallyadoptsthegroundlineslot,thecableisintroducedbythebottomofthemachinecabinet.Thecableshallbemadestraight,withoutanewtwist,andshallnotbefastenedMr.;Whenthecableisintheslot,itshouldbetiedupinthe
corner,andtheradiusoftheturningradiusshouldnotbebroken.(2)whenusingthecablebridge,thecableshouldbebroughtintothecabinetabovethecabinet.(3)useTVcableandtypeFspecialplugtoconnecttheequipmentaccordingtothedrawing.BringthepowersupplytothecleanpowersupplyLater,Itisalsousedinthemachineroom.ThecableandpowerlinesonthebacksideoftherackshouldbeplacedonbothsidesofthecabinetIntheslot,thebundleistiedtotheloop.Equipmentinstalledinthecabinetshallidentifythechannelsreceivedbytheequipment;TheendsofthecableshouldbeleftoverMeasureandmakepermanentmarkers.3.2.3.5equipmentground:itispossibletointroducethemachineroomequipmentaftertheexternaloverheadcableisdrawndown/intotheline.WithinthecomputerroomLightningarrester,machinecabinet/box,equipmentmetalcase,cablemetalsheath(orshieldlayer)shouldbeconnectedtothemaingroundbusinthemachineroomOn.Totalfront-endcomputerroomgroundingdeviceΩgrounding
resistanceisnotgreaterthan1.The3.2.3.6devicesareconnected.3.2.4transmissioninstallation:AnAnnwithasourcedevice(forexample,mainlineamplifier,branchmainlineamplifier,extensionamplifier,distributionamplifier)Loading:Thepositionofthemainlineamplifier,branchlineamplifier,extensionamplifieranddistributionamplifiershouldbestrictlyaccordingtotheconstructiondrawingsIntheconstruction.(2)intheMingsuit:theTVcableneedstobesetupbythemast,thefieldamplifierismountedonthemast,oraboutonemeterWithinthearea,andshouldbefixedinthecablewire,thefieldamplifiershallbesealedbysealingrubbergasketandadoptedThewell-cooledcastingaluminumcase,theoutersurfaceoftheenclosure,issuitableforthemeshmetalhighfrequencyshieldingring,whichguaranteesgoodcontactwiththeground,andtheinsertionAgoodwaterproofandanti-corrosionresistanceisneeded,and
therubbercaseiswaterprooftotheoutside.AnamplifierandotherdevicesthatarenotwaterproofItshouldbeinstalledinawaterproofmetalcase.(3)indarkclothing:accordingtothedesignofthedrawing,apanelisplacedinsidethebox,andtheinsideoftheboxisfixedbymachinescrewInthebox;Thedeviceontheswitchboardisdrawnonthebackoftheboardtothefrontoftheboard.PostintheinnerdooroftheboxThesystemdiagramoftheequipmentinthebox,showingthedirectionofthecableandthesignalinputandoutputlevel,sothattheinspectionwillberepairedinthefuture.(4)thereshouldbeanoverhaulpowersupplyintheamplifierbox.3.2.4.2cableinstallation:(1)thelengthofthemaincableshallbeselectedaccordingtothelengthofthedrawingandshallbemadetoavoidthetransmissionofthemaincableCableconnection.(2)whenthecableislaidout,thepipeshallbecleared,andthecableshallbetiedwiththelineofthebeltwhichisreservedinthepipe
Pullthecableintothepipe.(3)whenthecableoverheadislaid,thecablecanbefastenedtothepolebyasplint,andthecableisattachedtothecableThemessengerwire.Thespacingofthehooksis0.5mto0.6m.Thereisacertainamountofhangingovertheclimate.(4)whenacableorcableisintroducedunderground,itshallbeprotectedbysteelpipeatadistanceof2.5mfromthegroundProtection;Thepipeshallbeburiedintheground0.3m~0.5m.(5)tosetupthecablealongthewall,thewallandtheironwillbemountedonthewall,andtheslingwillbeattachedtothecross,andthenthecablewillbeattachedHangthecableinthesling.Thewallisnotmorethan6m.(6)whenthecableisburiedinadirectway,itmustbeusedwithacablethatcanbeburieddirectlyinawire,whichshallnotbelessthan0.8m.tightThecableshallcover10cmwithfinesoil,coverandmark.Inthecoldarea,itshouldbeburiedunderthetundra.Theinstallationofthe3.2.4.3branchdispatcher:Thebranchdistributorshallbeinstalledinthebranch
distributorboxorintheamplifierbox,andshallbefixedintheboxwiththemachinescrewOn;Thesizeoftheboxshallbedeterminedaccordingtothenumberofequipmentinthebox,andtheboxbodyshallbemadeofiron,anditmayhaveasinglefanordoubledoor,whichisintheboxThegroundboltsarereserved.Theboxisequippedwithaswitchboard.3.2.5distributionnetworkinstallation:theinstallationofthedistributionamplifier,theinstallationofthebranchdistributorandthepowerofthebranchdistributorCableinstallationandinstallationofuserterminal.3.2.5.1userterminalinstallations:Inspectthemouthoftherepairbox:checktheopeningoftheboxandmakesureitissmoothandsmooth.Theoutsidemouthoftheboxshouldbeflushwiththewall.boxTheelevationshouldmeettherequirementsofthedesignspecificationwithoutspecialrequirements.TheTVuserterminalis300mmfromtheground,fromthestrongelectricaloutletThelevelis500mm.Theboxesshouldbestrong.
CablesheathCableshieldinglayerCableinsulatedmediacablecoreLinecardFigure3.2.5.1userterminalpressurediagram(2)connectthecableintheboxtothelengthof100~150mmfirst,andtheninsulatethe25mmcableThesheathisstrippedoff,andtheouterwireisscatteredandthenwovenintoabundle.The3mminsulationand12mmcorearesetasideTerminal,withΩpress-fittingcoppernetwork.Asshowninfigure:(3)fixedliftedthelid,theimpedanceoftheuseroutletis75Ω,usemachinescrewstofixthepanel.3.2.6systemground3.2.6.1shieldingandmetalgrounding:inordertoreducetheinterferenceofdeviceswithinthecablesystem(includinghighfrequencyinterferenceAcinterference)andpreventlightning,themetalenclosureofthedeviceisrequiredtobegrounded,fullyconnectedandwell
grounded.3.2.6.2metalpipingshallbegroundforthewholeasawhole.Themaintenancepersonnelof3.2.6.3areregulargroundcheck.3.2.7systemtests3.2.7.1antennadebugging(1)whentheantennaissetup,itshouldcheckthelocationofthereceptionchannel.SatelliteTVantennaepitchandThepositionofazimuthisnormal.(2)usingthefieldstrengthinstrumenttomeasuretheleveloftheantennareceivingsignal,andthedirectionoftheantenna,thelevelindicatorofthefieldstrengthisthemostBig.Atthesametime,observethequalityofthetelevisionimageandthequalityofthesound,noshadow,nosnow,nonoise(oroccasionalnoise,Whenyoudon"thateit,fixtheantennaandtietheantenna"ssignaltothefeedline.3.2.7.2frontenddevicedebugging(1)thechannel"sTVsignalisconnectedtothemixer,thetestofthemixeristestedbythefieldstrengthinstrument,andtheoutputofeachchannelisadjusted
Theleveloftheoutputlevelofthechannelisbelow2dB.Theadjustmentknobofthemixercannotreach2dBWhentheadjustmentispoor,thechannelwithhighlevelvalueincreasestheattenuator.(2)adjustthereceptionfrequencyandotherparametersofthesatellitereceiverandadjusttheoutputlevelofthemodulatortotheequipmentThenominallevelvalueiscalled,andthechanneltuningknobandamplifierofthemixerareadjustedproperlythroughtheoutputtestofthemixerTheoutputlevelofthemixeristheoutputlevelofthemixer,theoutputlevelofthemixerisatplusorminus1dB,andthelevelofthelevelisinaccordancewiththedrawingdesignrequirement(ifnodrawingissetupThemeasuresshouldbecarriedoutbeforeconstruction,whichshallbecalculatedandmeasured,andtheleveloftheactiveequipmentshallbecalculated.(3)debuggingofthefrontamplifier(ormainlineamplifier)ofthecomputerroom:adjusttheoutputleveloftheamplifieraccordingtothedrawingdesignrequirementKnobs,equalizerknobs(orinterpolationofappropriateattenuationvalues)tothelevelofthedrawingdesign,usuallybytheamplifier
Theoutputlevelshouldnotbegreaterthan100dB(forthelargersystem,thetransmissionlinklengthsystemrecommendslowerlevel),phaseTheleveloftheadjacentchannelislessthan0.75dB,theleveldifferencebetweenthechannelsislessthan2dB.(4)afterthefront-endequipmentisdebugged,thesignalistransmittedtothemainlinesystem.3.2.7.3-lineamplifierdebugging:adjusttheoutputlevelandoutputleveloftheoutputlevelaccordingtothelevelofthedrawingdesignSlope.Iftheimageisgeneratedandintermodulationinterferes,theoutputleveloftheamplifierishigherthanthatofthesystemindexFlatshouldberedistributed,adjustedaccordingtothedesignvalueofthereproducingamplifieroutputlevel.3.2.7.4distributionnetwork:adjusttheoutputlevelandtheslopeofthedistributionamplifieraccordingtothedrawingdesignrequirement.InthesystemTheuserterminalistestedtoseeiftheuserterminallevelhasmetthedesignrequirementsofthesystem,ifthedesignrequirementsarenotmetTheoutputlevelandtheslopeofthedistributionamplifier
areadjustedtomeetthedesignrequirementsofthedrawing.systemTheuserterminallevelcontrols64++4dBandUSESacolormonitortoseeifthequalityoftheimageisclearandwhethertherearesnowflakesorbarsLines,alternatingcurrent,etc.3.2.8systemacceptance:fieldtest,fillinfront-endtestrecord,amplifierleveltestrecord,userterminallevelmeasurementRecordandcheckintherelevantadministrativedepartment.4,finishedproductprotectionWheninstallingtheantenna,mainpoleandsatelliteantennaontheroof,nodamagetothebuilding,roofwaterproof,anddecorationshallbemaintainedSiteclean.Theboxandboxsetintheceilingshallnotdamagethekeelandtheceilingwhenthepartsareinstalled.Thesurfaceofthedeviceshallnotbedirtyandthewatershallnotbeenteredintothedevice.Whenusingaladder,theWindowsandwallsshallnotbetouched.
Payattentiontoqualityissues5.1nosignalMeasures:(1)failureofthefront-endpowersupplyorthefailureofactiveequipment.Checkthesupplyvoltageormeasuretheinputsignal.(2)receivingantennasystemfailure.Shouldcheckshortcircuitandopencircuittransmissionline,connectplug,front-endfrequencyconverter,frontendantennaamplificationAndetc.(3)powerfailureoflineamplifier.Checktoseeiftheinputplugisopen,checkthepowersupply,powersupply,etcTochecktheoutputsignalofeachamplifierandwhetherthepowersupplyisnormalattheendofthesignal.(4)trunkcablefailure,checkwhetherthecablebetweenthefirstandalllevelsofamplifierisopenorshortcircuit,andcheckallkindsofcableplugsHead.5..2signalisweak,allsignalhassnowflake,thisphenomenonissignallevelisnotmetstandardlevel.
Measures:(1)theantennareceivesasystemfailure,andtheimageofthereceivingsignalinthefrontendisclear,andtheorientationoftheantennaisdeviated.(2)thefrontenddevicehasafault,seetheinputofthesourcedevice,theoutputisnormal,iftheequipmentisnormal,watchthecablefeederandsoonNoshortcircuitphenomenon.(3)transmissionlinefailure,whichisdirectedbythefaultsourcetothetargetsourcetochecktheoutputsignalofeachamplifierandthepowersupplyoftheamplifierThepowersupplyisnormal.(4)whetherthepassivedeviceinthenetworkhasashortcircuitandthecableisdamaged.5.3imageghostingProcessing:theproblemofantennareceiving.Useamonitortoobservethequalityoftheimagereceivingthetelevisionsignal.Becausethefieldofreceptionofthelocalreceptionisstrong,itmustbetransferredtothesignaltransferchannelonthefrontend.Ifit"sashadow,it"sbecause
Thereceivingsignalofthefrontendisreflectedbythesurroundingbuildings,adjustthepositionoftheantennaappropriately,andavoidthereimagecausedbyreflection.The5.4imagesshowstreaksandcrosschannelinterference:Processing:theoutputlevelofactivedevicessuchasamplifiersistoohigh,exceedingthemaximumoutputleveloftheamplifier,ormorethanthatIndicatorsofsourceallocation.Lowerthelevelproperly.SomeimageshavestripesandsomeareclearTreatment:thelevelofthechannelistoolarge,causingthechanneltointerferewiththelowlevelchannels.Theelectricityshouldbelevelledoff.The5.6imageshowsthecommunicationscrollingthroughtheinterferenceProcessing:thesystem"sshieldearthingisnotwelldone,inthefaultareaandinthepreviousamplifierandtheshieldofthebranchandcableBeabody,reliableground.'
您可能关注的文档
- 普通混凝土现场拌制工艺标准(418-1996)
- ybt 182-2000 冶金企业热缩型电缆头制作工艺标准
- 手工电弧焊施工工艺标准
- 硬质阻燃型塑料管(pvc)暗敷设工艺标准
- 综合布线pvc线槽走线施工方法及工艺标准
- 第二十一节 木工工艺标准
- 地基与基础工程施工工艺标准
- 灰土垫层施工工艺标准
- 1 风管制作施工工艺标准1
- 河南新石器雕塑艺术有限限公司eps装饰线条构件安装工艺标准(新石器)
- 石材地面工程施工工艺标准
- 木料表面施涂混色磁漆磨退施工 工艺标准(930-1996)
- 聚合物水泥基防水涂膜施工工艺标准
- 风管系统安装施工工艺标准
- 室外贴面砖施工工艺标准
- sgbz-0344大理石、花岗石干挂施工工艺标准
- 建筑分项工程施工工艺标准--木地(楼)板施涂清漆打蜡施工工艺标准(937-1996)
- 细石混凝土地面施工工艺标准