- 378.00 KB
- 64页
- 1、本文档共5页,可阅读全部内容。
- 2、本文档内容版权归属内容提供方,所产生的收益全部归内容提供方所有。如果您对本文有版权争议,可选择认领,认领后既往收益都归您。
- 3、本文档由用户上传,本站不保证质量和数量令人满意,可能有诸多瑕疵,付费之前,请仔细先通过免费阅读内容等途径辨别内容交易风险。如存在严重挂羊头卖狗肉之情形,可联系本站下载客服投诉处理。
- 文档侵权举报电话:19940600175。
'IGENERALPRINCIPLES1.BillsofquantitiesBillsofquantitiesshallfullydescribethematerialsandworkmanshipandaccuratelyrepresenttheworktobeexecuted;workwhichbyitsnaturecannotbeaccuratelymeasuredshallbedescribedasprovisional.Provisionalitemsorsectionsshallrepresenttheworktobecarriedoutasaccuratelyasisreasonablepossible.2.PrinciplesofmeasurementThisStandardMethodofMeasurement,whilstaimingatprovidinguniformunitsofmeasurementandstandardallowances,etc.,isadefinitionofprincipleratherthananinflexibledocument.InparticularandexceptionalcasetheSurveyorisexpectedtousehisdiscretionandtoadoptspecialmethods,providedtheprinciplesofmeasurementlaiddownareobservedandtheintentioninmadecleartoEstimator.Ifitisintheinterestofaccurateandpracticalestimating,hemaygivemoredetailedinformationthanisdemandedbystrictadherencetothisdocument.3.ApplicabilityofmethodsofmeasurementThemethodsofmeasurementlaiddownshallbeapplicabletothepreparationofBillsofQuantitiesbeforetheworkincommencedequallywithmeasurementoffishedwork.4.Unitsofmeasurementa.Thefollowingunitsofmeasurementshall,exceptashereinafterprovided,beadoptedthroughout:-(1)Itemsgivenbyweight-kilograms(2)Itemsgivencube-cubicmeter(3)Itemsgivensuper-squaremeter(4)Itemsgivenrun-linearmeter(5)Itemsenumerated-numberb.Eachmeasurementshallbetakentothenearest10millimeters(i.e.5millimetersandovershallberegardedas10millimetersandlessthen5millimetersshallbedisregarded).Thisruleshallnotapplytoanydimensionsstatedindescriptions.5.DrawingsandSpecificationThedrawingsformwhichtheBillsofQuantitieshavebeenpreparedshallbelistedandreferenceshallbemadetoanySpecificationonwhichtheBillsofQuantitiesdescriptionsarebased.6.Unitsofbillinga.Wheretheunitofbillingisthemeter,quantitiesshallbebilledtothenearestwholeunit.Fractionofaunitlessthanhalfshallbedisregardedandallotherfractionsshallberegardedaswholeunits.b.Wheretheunitofbillingisthekilogram,quantitiesshallbebilledtothenearestwhole
unit.Fractionsofaunitlessthanhalfshallbedisregardedandallotherfractionsshallberegardedaswholeunits.a.WheretheapplicationofthisClausewouldcauseanentireitemtobeeliminated,suchitemshallbebilledasonewholeunit.b.Whenbillingitemsofvariationorremeasurementinadjustmentofaccounts,omissionsandadditionsofitemswheretheunitofbillingisthemetershallbebilledtothenearestonetenthofawholeunit,andwheretheunitofbillingiskilogramshallbebilledtothenearestwholeunit.7.WorkmeasurednetUnlessotherwisestated,allworkshallbemeasurednetasfixedinitsplace.8.OrderofdimensionsIngivingdimensionstheordershouldbeconsistent,andgenerallyinthesequenceoflength,widthandheight.9.CostsheldtobeincludedinitemsEachitemshall,unlessotherwisestated,beheldtoincluded:-a.Laborandallcostsinconnectiontherewith.b.Materials,goodsandallcostsinconnectiontherewith(e.g.conveyance;delivery;unloading;storing;returningpackings;handing;hoisting;lowering).c.Fittingandfixingmaterialsandgoodsinposition.d.Useofplant.e.Allcuttingandwaste.f.Establishmentcharges.Overheadchargesandprofit.10.MinimumdeductionsWhereminimumdeductionsofvoidsaredealtwithinthisdocumenttheyshallreferonlytoopeningsorwantsdetachedfromtheboundariesofshespacemeasured.Openingsandwantscausedbyprojectionsfromtheboundaryofthespacemeasuredshallalwaysbethesubjectofdeduction,irrespectiveofsize.11.GroupingofpipesizesPipesortubing(whichtermsshallbesynonymousfortheserulesofmeasurement)shallbedescribedbytheirinternaldiameterunlessotherwisestated.Whererequiredbytherulesofthisdocumentpipesshallbegroupedtogetherwithinthefollowinglimitsanddescribedas:-a.Smallpipes(pipesnotexceeding55millimetersdiameter).b.Largepipes(pipesexceeding55millimetersbutnotexceeding110millimetersdiameter).c.Pipesexceeding110millimeters(diametertobestated).12.CircularworkWherecircularworkisrequiredbyrulesofthisdocumenttobekeptseparateitshallbegroupedtogetherwithinthefollowinglimitsanddescribedasbeingto:-a.Smallradius–anyradiusnotexceeding300millimeters.
a.Mediumradius–anyradiusexceeding300millimetersbutnorexceeding1.5meters.b.Largeradius–anyradiusexceeding1.5meters.132.ProvisionalandPrimeCostSumsTheuseofthetermsProvisionalandPrimeCostSumsshallbemadeinconformitywiththefollowingdefinitionsunlessotherwiseprovidedintheconditionsofcontract.a.Theterm“ProvisionalSum”shallmeanasumprovidedforworkorcostswhichcannotbeentirelyforeseen,definedordetailedatthetimethetendingdocumentsareissued.b.Theterm“PrimeCostSum”shallmeanasumprovidedforworkorservicestobeexecutedbyaNominatedSub-ConstructororformaterialsorgoodstobeobtainedfromaNominatedSupplier.SuchsumshallbedeemedtobeexclusiveofanyprofitorattendancerequiredbytheMainContractorandprovisionshallbemadefortheadditionthereof.14.Workunderreservoir,riverorseawaterAllworkexecutedinorunderreservoir,riverorseawatershallbegivenseparatelystatingthelevelsofhighandlowwaterwhereapplicable.15.WorkincompressedairAllworkrequiredtobecarriedoutincompressedairshallbegivenseparately.16.GenerallyEachSub-SectionofaTradeshallbereadinconjunctionwiththeGeneralRulesandPrinciplesdetailedin“Clause1.Generally”ofthatTrade.
IIPRELIMINARYPRELIMINARYPARTICULARS1.Employer,ArchitectandQuantitySurveyorThenamesoftheEmployer,ArchitectandQuantitySurveyorshallbestated.2.DescriptionofworksAgeneraldescriptionoftheworkscomprisedintheBillsofQuantityshallbegiven.Thesizeofthebuildingandheightaboveandbelowgroundlevelshallbestatedtogetherwiththenumberofstories.3.Siteaninspectiona.Thepositionofthesiteshallbedescribedwithanyparticularsastoaccessandtoanylimitationsastoextentandpositionoftheworkingspace.Attentionshallbedrawntoanyadjacentorabuttingbuilding.b.Contractorstenderingshallbeadvisedtovisitthesiteandinspectholes(ifany)andshallbeinformedwherekeysmaybeobtained,iftheyarerequired,andwherethedrawingsandotherdocumentsmaybeseen.c.Anystipulationastouseordisposalofsand,gravelorrockthatmaybefoundonthesiteshallbestated.4.Divisionoftheworkintosectionsa.Wherepossessionofthesiteistobegiveninsectionsatdifferentdates,particularsshallbegiven.b.Wheretheworksaretobeexecutedinanyspecificorderorinsections,particularsshallbegiven.CONDITIONSOFCONTRACT5.Formofcontracta.TheformofcontractandconditionsshallbestatedandascheduleoftheclauseheadingstobeusedshallbesetoutintheBillsofQuantities.b.Acopyofthefullconditionsshallbesuppliedtothecontractorsormadeavailablefortheirinspection.c.Anyitemsaffectingpricewhichareincidentaltooramplificationofsuchclausesshallbefullydescribed.6.ParticularstobeinsertedinAppendixofConditionsTheparticularswhichwillbeinsertedinanyAppendixtoScheduleofConditionsshallbegivenintabulatedform.7.Sub-lettingTheconditionsunderwhichthecontractormaysub-letportionsofthework.8.ArtistsorTradesmennotSub-Contractors
PermissionforexecutionofworkbyArtistsorTradesmenwhoarenotNominatedSub-ContractorsandwhomaybeengagedbytheEmployer.7.InjurytopersonsanddamagetopropertyResponsibilityofthecontractorforinjurytopersonsanddamagetopropertyincludingpublicorprivaterode.8.Insurances,etc.a.Insuranceagainstorallowancetobemadeinrespectofthefollowing:-(1)Fireandextraneousperils.(2)Injurytopersonsandproperty.(3)Workmen’scompensation.(4)AnyotheritemsofinsuranceorguaranteerequiredbytheConditionsofContractortheEmployer.b.Specialrequirementsinrespectofminimumacceptablelimitsofliabilityandexcessesshallbestate.c.Whereinsurancesaretobeextendedtocoverprofessionalfees,particularshallbegiven.9.ProvisionalandPrimeCostssumsProvisionalandPrimeCosts(P.C.)Sumsandthemethodofadjustment.Wherethecostofcartage,unloading,storingandreturningpackingmaterialisbeaddedbytheContractoritshallbesostated.10.ConditionsofpaymentConditionsofpayment.11.SuretyorbondSuretyorbondrequiredbytheEmployer.12.WatchingCareofWorksgenerally,employmentofwatchmenandprotectivelighting.GENERALMATTERSItemsshallbegiveninrespectofthefollowingunlesstheyarealreadycoveredintheScheduleofClauseHeadinggiveninaccordancewithClause5ahereof.13.Workinghours,ratesofwages,etc.a.Anyspecialstipulationsasworkinghoursofconditions.b.Anyconditionsthatmaybeimposedastoratesofwagesandpricesofmaterial.14.Plant,tools,sheds,etc.a.Plant,tools,scaffoldingandstaging.SpecialscaffoldingsifrequiredforNominatedSub-Contractorswork.b.Offices,sheds,messrooms,accommodationandattendances,andotherwelfarefacilities.c.Sanitaryconveniences,theirmaintenanceandremoval.d.Temporaryscreen.e.Telephones.
7.NoticesandfeesCompliancewithLaborDepartments’noticesrequiredbyanyActorOrdinanceofGovernment,RegulationsandBye-lawsofanyLocalAuthorityandanyPublicServiceCompanyorAuthorityandpayingofandindemnifyingtheEmployeragainstanyfeesorchargeslegallydemandablethereunder.8.SafetyprecautionsCompliancewithLaborDepartments’constructionSites(Safety)Regulations1973.9.IndustrialTraininglevyPaymentofthelevylegallydemandableundertheIndustryTraining(ConstructionIndustry)Ordinance.10.SettingoutSettingouttheworksandprovisionofallinstrumentsandlaborrequiredbytheArchitectforcheckingthiswork.11.ForemanGeneralForemanandhisattendanceontheworks.12.Protectionofpublicproperty,etc.MaintenanceandprotectionofpublicpropertyandthepropertyofthePublicUtilityServiceCompaniesandthemakinggoodoforpayingforthemakinggoodofalldamagethereto.13.Protectiona.Protectionoftheworkandmaterialsfromweather.b.Casingorcoveringupandprotecting.14.Treasuretrove,coins,etc.Disposalofanytreasuretrove,coinsorobjectsofantiquity.15.Variationsandmethodsofmeasuringandvaluinga.Particularsrelatingtovariationsandtheordersforandthemethodofmeasuringandvaluingthesame.b.Particularsrelatingtodayworkaccounts.16.SampleSubmissionofsamples.17.TestingofmaterialsConditionsrelativetothetestingofmaterials.18.WaterWaterfortheWorks,includingthatforNominatedSub-Contractorsandnecessarytemporaryplumbingandstorage.19.LightingandpowerLightingandpowerfortheWorks,includingthatforNominatedSub-Contractorsandanynecessarytemporarywiringandmeters.20.Attendancea.Generalattendanceofonetradeuponanother.
a.GeneralattendanceuponNominatedSub-Contractors;thisshallbegiveparticularsofanyunloading,storing,hoisting,specialsupplyofpower,placinginpositionofmaterials,clearingawayrubbishandthelike,protecting,cuttingawayforandmakinggoodafterNominatedSub-ContractorsandotherfacilitiestobeaffordedbytheContractor.AnyotherContractor’sworkinconnectionshallbemeasuredindetailorcoveredbyProvisionalSums.8.Hoardings,etc.Provisionofhoardings,fans,plankedfootways,guardrails,gantries,lightingandthelikemayberequired.Anyspecialrequirementsshallbedescribedandtheconditionsregardingadvertisingrightsshallbestated.9.WorksbyPublicAuthoritiesWorkstobecarriedbyGovernmentDepartmentsorUtilityCompanieswhichshallbedealtwithbymeansofProvisionalSums,e.g.:-(1)Takingupandrelayingthepavingofpublicroadsandfootways.(2)Formingpermanentcrossings.(3)Connectionswithwater,gas,electricmainsandthelike.10.TemporaryroadsTemporaryroadsandcrossingswhererequiredwithallrelevantparticulars.11.DryingthebuildingTheprovisionoffuelandattendancefordryingthebuilding,ifrequired.12.RemovalofrubbishTheremovalofrubbishanddebris,clearingupandcleaning.13.DefectsaftercompletionMakinggooddefectsappearingwithintheDefectsLiabilityPeriod,andextantofsuchperiod.
IIIDEMOLITIONSANDALTERATIONSGENERAL1.Generallya.Thelocationofdemolitionsandalterationsshallbegiveninthedescriptionoftheitems.b.Shoringandscaffoldingincidentaltothedemolitionsandalterationsshallbegiveninthedescriptionoftheitems.Othershoring(e.g.tooldbuildingleftstanding)shallbegiveninaccordancewithClause10hereof.c.OldmaterialsarisingformthedemolitionsandalterationsshallbecomethepropertyoftheContractorunlessotherwisestated.Clearingawaysucholdmaterialsshellbeheldtobeincludedwiththeitems.ProvisionsshallbemadeintheBillsofQuantitiesforcredits.d.OldmaterialsrequiredtoremaintothepropertyoftheEmployershallbesodescribed.Settingasideandstoringsucholdmaterialsshallbegiveninthedescriptionoftheitems.e.Oldmaterialspermittedtobere-usedinworkmeasuredasnewshallbesodescribed.Noadjustmentshallbemadetothemeasuredquantitiesofnewworkinwhichsuchmaterialsarere-used.DEMOLITIONS2.Demolitionsa.Demolitionsindividualstructure(orpartthereof)shallbegivenasitems,exceptthatclearingthesiteofallstructuremaybegivenasanitem.Thelowestlevelofdemolitionshallbestated(e.g.downtothetopsurfaceofconcreteatthelowestfloorlevel).b.Wherewholestructureshallbedemolished,adescriptionofthestructureshallbegiven,statingtheoveralldimensions,numberofstoreys,natureofthegeneralconstructionandanyotherrelevantdetails.c.Leavingpartsofoldwallstemporarilyinpositiontoactbuttressesshallbegivenindescriptionofdemolitionitems.ALTERATIONS3.Alterationsgenerallya.Alterationworkwhichwouldbemostconvenientlypricedonthesiteshallbegroupedtogetherandgivenunderanappropriatesubheading.b.Alterationworkshallbedescribedorgroupedaccordingtolocation.4.Cuttingopenings
Cuttingopeninginoldstructuresshallbegivenasitemsstatingthenominalfinishedsizeoftheopening,thetypeandthicknessoftheoldstructureandthetreatmentaroundtheopening(e.g.insertingtrimmers,lintels,arches,sillsandthelike;quoiningupjambs).Extendingfinishingsandmakinggoodallworkdisturbedshallbegiveninthedescription.Newdoors,windowsandthelikeshallbemeasuredindetailinaccordancewiththeappropriaterules.5.BlockingupopeningsBlockingupopeningsinoldstructuresshallbegivenasitemsstatingthesizeofopeningandthenatureandthicknessofthenewwork.Takingoutthresholds,arches,sillsandthelike,bondingorotherwisesecuringthenewworktotheoldstructure,extendingfinishingsonthenewworkandmakinggoodallworkdisturbedshallbegiveninthedescription.6.PullingdownpartsofstructurePullingdownwalls,partitions,floors,roofs,staircasesandotherpartsofoldstructureshallbegivenasitems.Wherepracticablequantitiesanddimensionsshallbegiveninthedescription.7.TakingdownfittingsandfixturesTakingdownfittingsandfixtures(e.g.doors,windows,sanitaryappliances,counters,cupboards)shallbegivenasitemsstatingthesize.Thoserequiredtobesetasideforrefixingshallbesodescribed.8.RefixingfittingsandfixturesRepairing,adaptingandrefixingoldfittingsandfixturesshallbegivenasitemsstatingthesize.SUNDRIES9.TemporaryscreensandtemporaryroofsTemporaryscreensandtemporaryroofsshallbegivensuperorenumeratedasmaybeappropriate.Weatherproofscreensanddustproofscreensshallbesodescribed.Temporaryarrangementfordealingwithrainwater,temporarydoors,temporarywindowsandthelikeinscreensshallbegiveninthedescription.Thedescriptionshallincludeforerection,maintenance,alterationandadaptationasnecessaryduringtheContractandthesubsequentclearingawayandmakinggoodofallworkdisturbed.10.ShoringTimbershoring(otherthanthatincidentaltodemolitionsandalterations)shallbegivencubestatingthepositionandtypeofshoringandthenatureofthestructuretobeshored.Erecting,maintaining,clearingaway,cuttingholesinthestructureandmakinggoodallworkdisturbedshallbeincludedinthedescription.Obtaininglicencesandpayingfeesandprovidingallnecessarynails,wedgesandboltsshallbeheldtobeincludedwiththeitems.
IVPILINGANDCAISSONSGENERALLY1.Generallya.Thefollowinggenerallyinformation,whereavailable,shallbegiven:-(1).GroundlevelinrelationtohighandlowwaterbablesandOrdinanceDatum.(2).Soilinvestigationreports,natureofstrataanddetailsofanyboretests.(3).Thevariouslevelsformwhichpilingframeswilloperate.(4).ConditionsunderwhichContractorswillbepermittedtocarryouttheirownsoilinvestigationduringthetenderperiod.(5).Detailsofspecialprovisionsinrespectofnoisesuppression,noisyworking,timelimitationsandvibrationlimitationsotherthantomeetStatutoryrequirements.(6).Anyparticularrequirementregardingphasingorsequenceofdrivingpilesorconstructingcaissons.(7).Setrequiredfordrivenpilesandanylimitationsordrivingmethods.b.ProvidingandassemblingtheequipmentontheSiteandthesubsequentdismantlingandremovalshallbegivenasanitemforeachtypeofpilingorcaissoning.c.Movementandpilingframesintopositionandaboutthesite,anynecessaryexcavationorfillingrequiredtoplacetheframes,raisingorloweringtheframesandanystaging,bargesorthelikerequiredtosupporttheframes,shallbeheldtobeincludedintheitemsofdrivingthepiles.d.Drivingrakingpilesshallbekeptseparate.e.Redrivingorintermittentdrivingnecessitatebylengtheningpiles,orbytheremovalofobstructionsunderpilesorothercausesincludingmovingandrepositioningthepilingframeshallbeheldtobeincludedintheitemsofdrivingthepiles.f.Cuttingoffheadofpilestorequiredlevelsshallbeenumerated.Thesizeofcrosssectionofthepileandrequirementsfordisposalofdebris,andcleaning,straighteningandbendinganyprojectingreinforcementshallbestatedinthedescription.g.Excavationforandremovalofundergroundobstructionstogetherwithallworkinconnectiontherewithshallbegivenasaniteminrespectofeachtypeofpiling.Alternativelymeasureditemsmaybegiveninrespectofsuchwork.h.Thetestloadingofpilesorcaissonsshallbeenumeratedstatingthetypeofpileorcaissonandthetestloadtobeapplied.Temporarypilecapsandprovisionofallanchors,platforms,loadingmaterialsandthelikeshallbeheldtobeincludedintheitem.Thetestloadingoffirstandsubsequentpilesorcaissonsshalleachbegivenseparately.STEELSHEETPILING2.Steelsheetpiling
a.Supplying,handing,transportingandpitchingsteelsheetpilingshallbegivensupermeasuredtheareainplane(notdeveloped)elevationalongthecentrelineofthepiling.Thedesignlength,sizeofthecrosssectionofeachpileandthethickness,substance,sectionmodulusormanufactures’cataloguereferenceshallbestatedinthedescription.b.Drivingsteelsheetpiling(measuresfromformationlevelofthegroundtothebottomedgeofthepilingwhendriven)shallbegivensupermeasuredinplane(notdeveloped)elevationalongthecentrelineofthepiling.Initialtrenching,struttingandwalingfordriving,andanyjointingrequiredtoextendpilingverticallyshallbeheldtobeincludedintheitem.c.Cornerpiles,junctionpilesandotherspecialpilesshalleachbegivenrunasextraoverthesupplyinganddrivingitemsrespectivelyofthesteelsheetpilinginwhichtheyoccur.d.Cuttingorburningthroughsteelsheetpilingshallbegivenruninplane(notdeveloped)elevationalongthecentrelineofthepiling.e.Cuttingorburningholesforpipesandthelikethroughthesteelsheetpilingshallbeenumeratedandfullydescribed.f.Withdrawingsteelsheetpilingshallbegivensupermeasuredinplane(notdeveloped)elevationalongthecentrelineofthepiling.g.Requirementsinrespectofownershipanddisposalofoffcuts,wholepiles,andwithdrawingpilesshallbestatedandprovisionmadeforcredits.h.Anitemshallbegivenforstruttingandshoringtosteelpilingduringsubsequentexcavationandfoundationworkstatingthelengthandheightofthepilingfacetobeupheldandanyspecialrequirements.Alternativelysuchstruttingandshoringmaybemeasuredindetail.PRECASTCONCRETEPILES3.Precastconcretepilea.Supplyingprecastconcretepilesshallbegivenrunstatingthesizeofcrosssectionandthenumber.Pilespermittedtobecastonsiteshallbesodescribed.Mouldsshallbeheldtobincludedintheitems.b.ReinforcementshallbegiveninaccordancewiththerulesforreinforcedconcreteinSectionVIhereof.c.Heads,shoesandrockshoesshallbeenumeratedandfullydescribed.d.Handling,transportingandpitchingthepilesshallbeenumeratedstatingthesizeandlengthinstagesof2.00meters.e.Drivingpilesshallbegivenrun(measuredfromtheshoepointincontactwiththegroundwhenpitchedtotheshoepointwhendriven)statingthesizeofpile.f.Dollyingpilesbelowgroundlevelshallbegivenrunasextraoverthedrivingstatingthenumber.
a.Lengtheningpilesinpositionshallbegivenindetail.Connectionsshallbeenumerated.CASTINGIN-SITUCONERETEPILESINDRIVENCASINGS4.Castin-situpilesa.Supplying,handing,transporting,pitching,divingandwithdrawingshallbegivenrun(measuredfromtheshoepointincontactthegroundwhenpitchedtotheshoepointwhendriven)andthenumberstated.Theinternalsizeofthecasingandrequirementsregardingthedisposalofanyspoilshallbestatedinthedescription.b.Shoesandrockshoeshallbeenumeratedandfullydescribed.c.Thein-situconcretepileshallbegivenrun(measuredfromthebottomofthecastingtothecut-offlevelofthepiles)andthenumberstated.Themixofconcreteandsizeofacross-sectionshallbestatedinthedescription.d.Formationofenlargedbasesshallbeenumeratedasextraoverthelengthofthepiles.e.ReinforcementshallbegiveninaccordancewiththerulesforreinforcedconcreteinSectionVIhereof.BOREDPILES5.Boredpilesa.Boringthepileholesshallbegivenrun(measuredfrompointofentryintogroundtothebottomofbore)andthenumberofboresstated.Requirementsregardingdisposalofspoilshallbestatedinthedescription.b.Theconcretefillingshallbegivenrun(measuredfromthebottomoftheboretothecut-offlevelofthepile)andthenumberstated.Themixofconcreteandsizeofborecross-sectionshallbestatedinthedescription.c.Formationofenlargedbasesshallbeenumeratedasextraoverthelengthofboringandconcretefilling.d.ReinforcementshallbegiveninaccordancewiththerulesforreinforcedconcreteinSectionVIhereof.STEELPILES6.Steelpilesa.Supplyingsteelpilesshallbegivenrunstatingthesizeofthecrosssectionofeachpileandtheweight.,thickness,substance,sectionmodulusormanufacturers’cataloguereferenceannumber.b.Handing,transportingandpitchingthepilesshallbegivenrunstatingthesizeandnumber.c.Drivingpilesshallbegivenrun(measuredfromthepointincontactwithgroundwhenpitchedtothepointwhendriven)statingthesizeofthepileandthenumber.Struttingandbracingfordriving,useofdrivingcaps,andanyjointingandconnectionsrequiredtoextendthepileshallbeheldtobeincludedintheitem.
a.Dollyingpilesbelowgroundlevelshallbegivenrunasextraoverthedrivingstatingthenumber.CONTRACTORDESIGNEDCONCRETEPILES7.Contractordesignedconcretepilesa.Contractordesignedconcretepilesshallbeenumeratedstatingtheloadtobecarried,thelengthofconcreteshaftcut-offandthedepthofthetopbelowgroundlevel.AlternativelywheretheonusofdesigningthelengthofthepileistobeplacedontheContractorthepilesshallbeenumeratedstatingtheloadtobecarriedandthedepthofthetopbelowgroundlevelaftercut-off.b.Particularsshallbegivenofanyrestrictionsregardingtypeofpilesormethodofdrivingandrequirementsregardingthedisposalofanyspoil.Shoes,rockshoesandreinforcementshallbeheldtobeincludedintheitems.TRIALPILES8.Trialpilesa.Trialpilesshallbemeasuredinaccordancewiththeruleforproductionpiles.b.Whereplantisrequiredtobeleftonsitebutdelayisanticipatedbetweencompletionoftrialpilesandcommencementofproductionpiling,aprovisionalnumberofdaysshallbegivenforrigidlingtime.CAISSONS9.Generallya.Apreambleitemshallbegivenstatingrequirementswithregardtoventilationofshafts,precautionsagainstnoxiousgases,lightingandaccesstoshafts,liftingappliancesandanyothersafetyofspecialprecautions.b.Itshallbestatedwhetherornotblastingispermittedandanyspecialrestrictionsregardingsameshallbegiven.10.Caissonexcavationa.Settingupeachcaissonshallbeenumerated.b.Shaftexcavationincludingdisposalofsurplusexcavatedmaterialshallbegivenrun,measuredinstagesof1.50metersfromcommencingleveltofoundinglevelandstatingtheeffectivedesigndiameterrequiredtoaccommodatecaissonliningswhichdonotformpartoftheeffectivedesigndiameterandtoallowforconstructionorsinkingofliningsshallbeheldtobeincludedintheitem.c.Excavatingenlargedbasesshallbeenumeratedasextraovertheshaftexcavationstatingthesizeofthebase.d.Shaftexcavationshallbeheldtoincludeforexcavationthroughanymaterialotherthanrock.Removalofrockshallbemeasuredcubeasextraovertheshaftexcavation.e.Keepingeachshaftfreeofwaterduringexcavationandconstructionoftheliningshallbeheldtobeincludedintheitemsofshaftexcavation.
11.Caissonlininga.Caissonliningshallbegivenrun,measuredfromthelevelatwhichshaftexcavationcommencesandfullydescribedwiththeminimuminternaldiameterstated.b.Bottomkerb,steelring,orliningtoenlargedbasesshallbeenumeratedandfullydescribed.c.Breakinguptheliningabovefinishedcastingleveloftheconcretecore,togetherwithanyexcavationandclearingaway,shallbegivenrunstatingthenumberandtheminimuminternaldiameterofthelining.12.Caissoncoresa.Theconcretecoreofthecaissonshallbegivenrunmeasuredformfinishedleveltofoundinglevelstatingtheminimuminternaldiameterofthelining,thecompositionandmix(orstrength)requirementsoftheconcreteandanyparticularrequirementsinplacing,pouringorvibrating.Dewateringeachshaftpriortoconcretingandkeepingitfreeofwaterduringconcretingshallbeheldtobeincludedintheitem.b.Concretingenlargedbasesshallbeenumeratedstatedextraovertheconcretecorestatingthesizeofbase.13.ReinforcementReinforcementshallbegiveninaccordancewiththerulesforreinforcedconcreteinSectionVIhereof.13.RockanchorsRockanchorsshallbeenumeratedandfullydescribed.DRILLTESTINGANDCOREBORINGCAISSONS14.Drilltestingandcoreboringcaissonsa.Providingandassemblingdrillingequipmentonthesiteandthesubsequentdismantlingandremovalshallbegivenasanitem.Movementoftheequipmentaboutthesiteshallbeheldtobeincludedintheitemforeachtestdrillingorboring.b.Penetrationdrillingtestingofbedrockatbottomsofshaftshallbegivenrunstatingthenumber,commencingthelevelbelowgroundinstagesof15.00meters,sizeofdrillingandgroutingrequirements.c.Drillingtestcoresinconcretecaissonsorrockundershallbegivenrunstatingthenumber,depthinstagesof15.00meters,diameterofcorerequiredandgroutingrequirements.Extracting,labeling,boxingandtransportingcorestoatestlaboratoryshallbeheldtobeincludedintheitem.
VEXCAVATOR1.Generallya.Apreambleitemshallbegivenstatingthat:-(1)Themeasurementsofallexcavationandsubsequentdisposalshallbethosebeforeexcavating;measurementoffillingshallbethoseaftercompaction.(2)Eachitemofexcavationshallbeheldtoincludedforexcavatinginanygroundencountered,gettingoutexcavatedmaterialsbyanymeansnecessary,alllevelingorgradingandrammingofbottom,trimmingsides,plankingandstruttingandanyextraexcavationrequiredtherefore.(3)Eachitemofdisposalofexcavatedmaterialshallbeheldtoincludeforallmulti-handlingtoandfromtemporaryspoilheapsasandifnecessary.b.Wherepracticablethenatureofthesoilshallbedescribed;attentionshallbedrawntoanyexistingtrialholes.c.Itshallbestatedwhetherornotblastingispermittedandanyspecialrestrictionsregardingsameshallbegiven.d.Allexcavators’workandthesubsequentdisposalofexcavatedmaterialshall,expectashereinafterprovided,begivencube.e.Alldisposalofexcavatedmaterialshall,expectashereinafterprovided,bemeasuredseparately.f.Allexcavation,expectoversitetoreducelevelsandbulkexcavationintobanks,shallbegiveninsuccessivestagesof1.50meters,statingthecommencinglevel.g.Wherereducedlevelexcavationisrequiredintobanksfortheconstructionofretainingwallsandsimilar,andtheverticalfaceheightofsuchexcavationexceeds1.50metersanitemshallbegivenfortemporaryshoringandsupportsstatingtheminimumandmaximumfaceheightsabovethereducedlevelandtheapproximateoveralllength;anyextraexcavationrequiredthereforeshallbeheldtobeincludedintheitem.2.WorkingspaceAllowanceforworkingspace,whereapplicable,shallbemadeasfollow:-a.0.25meterfromthefaceofconcreterequiringformworkwheretheformworkdoesnotexceed0.6meterinheight.b.0.6meterformthefaceofconcreterequiringformworkwheretheformworkexceeds0.6meterinheightandthebottomoftheformworkexceeds0.6meterbelowthestartinglevelofexcavation.c.0.6meterfromthefaceofworkbelowgroundlevelwhereitistobecoveredexternallywithdamp-proofcoveringorwherethemethodofconstructionoftheworkrequiresworkmentooperatefromtheoutside.3.Siteclearance
Clearingsiteoftallgrass,shrubs,bushesandthelikeandtreesnotexceeding0.6metergirth(measuredataheightof1.00meteraboveground)includinggrubbinguprootsshallbegivenasanitemstatingtheapproximatearea.4.CuttingdowntreesCuttingdowntreesexceeding0.6metergirth(measuredataheightof1.00meterabovetheground)includinggrubbinguptheirrootsshallbeenumeratedandgiveninfurtherof0.3metergirth.5.Surfaceexcavationa.Surfaceexcavationnotexceeding0.2meterinaveragedepthshallbegivensuperandtheaveragedepthstated.Excavationoversiteexceeding0.2meterinaveragedepthshallbegivencube.b.Ifturforvegetablesoilistobepreserved,thequantityshallbegivensuper,statingtheaveragedepthandthedisposalofthematerial.1.BasementexcavationBasementandsimilarexcavationshallbemeasuredtotheoutsideofthefoundationsubjecttoClause2hereof;exitingvoidsshallbededucted.2.Trenchexcavationa.Surfacetrenchesandtrenchesbelowbasementlevelshallbesodescribedandeachgivenseparately.b.Wheretrenchexceed1.00meterindepthaminimumwidthof0.75metershallbemeasured.c.Trenchesforservicepipes,cables,curbsandthelikeshallbegivenrun,statingtheaveragedepthinmultiplesof0.25meter;backfillinganddisposalofsurplusexcavatedmaterialshallbeheldtobeincludedintheitem.3.Columnbaseexcavation,etca.Excavationforcolumnorstanchionbases,isolatedpiers,manholesandthelikeshallbegivenseparately.b.Wheretheforegoingexceed1.5meterindepthaminimummeasurementonplanof1.25meterby1.25metershallbetakenforexcavation.c.Postholesnotexceeding0.3cubicmetershallbeenumerated;backfillinganddisposalsurplusexcavationmaterialshallbeheldtobeincludedintheitem.4.Excavationonsiteofoldbuildings,etcBreakingupandremovingpavings,surfaceconcreteandthelikeshallbegivensuperasextraoverexcavationanddisposaland,ifknown,thethicknessstated.Breakingupandremovingbrickwork,concrete,reinforcedconcretelikesubstancesmetwithinexcavatingshalleachbegivencubeasextraoverexcavationanddisposal;wherethequantitycannotaccuratelybeascertainedaprovisionalquantityshallbegiven.5.Fillinganddisposalofexcavatedmateriala.Fillingtomakeuplevelsandformingembankmentorterracesshallbegiven
cubeexceptwherenotexceeding0.3meterindepthwhenitshallbegivensuperandtheaveragedepthstated;wherepartexceeds0.3meterindepththewholeshallthenbegivencube;ifthematerialistobedepositedinlayers,thisshallbestated,givingthethicknessofsuchlayers.Thesourcefromwhichthematerialisobtainedandthemethodofconsolidationshallbedescribed.a.Backfillingshallbeincludingrammingandconsolidating.b.Removalofexcavatedmaterialfromthesiteshall,unlessotherwisestated,beheldtoincludetheprovisionofshoot,dump,ortipbytheContractor.c.Ifspoilistobedepositedonsitethisshallbestated.2.Treatmentofsurfacea.Theformationofslopestofillingandcuttingshalleachbegivenseparatelyandbegivensuper.b.Exposedfacesofrocktobeleftfairshallbegivensuper.c.Soiling,seedingandturfingsurfacesshallbegivensuperandthethicknessofsoil,natureandquantityofseedpersquaremeterorsizeofturves,methodoffixingandcentersatwhichtheyareplacedshallbedescribed.Worktoslopesexceeding1in7shallbegivenseparately.3.Removalofwatera.Anitemshallbegivenforkeepingthesiteandallexcavationsthereonfreefromstormandpercolatingwaterbypumpingorotherwiseand,whereknown,thewaterlevelgiven.b.WherespringsorrunningwaterarelikelytobeencounteredaProvisionalSumshallbeincludedforpumping,oraprovisionalnumberofpumpinghoursgivenstatingworkingcapacityorpowerofpump.4.Plankingandstruttinga.ThetermplankingandstruttingshallmeaneverythingrequisiteupholdfaceofexcavationotherthanspecialshoringasrequiredtobemeasuredunderClause1ghereofandcoverstheContractor’sresponsibilityforupholdingandmaintainingthesidesofearthworkbywhatevermeansareconsiderednecessary.b.PlankingandstruttingshallbeheldtobeincludedwiththeitemsofexcavationinaccordancewithClause1a(ii)hereof.5.Underpinninga.Underpinningworkincludingconcrete,brickwork,asphaltandthelikeshallbegivenunderaseparateheading.b.Adescriptionoftheworktobeunderpinnedshallbegiven,statingitslength,thedepthoftheunderpinningandthelimitoflengthtobecarriedoutinoneoperation.c.Temporarysupportstoworktobeunderpinnedshallbegivenasanitem.Particularsofsuchsupportsshallbegivenwherepracticable.
a.Preliminaryexcavationdowntothebaseoftheworktobeunderpinnedshallbegivenseparatelyandsodescribed.b.Allowancesforworkingspaceshallbemadeinthemeasurementsofexcavations.Thewidthoftheworkingspace(measuredhorizontallyfromthefaceofthewalltobeunderpinned,orwhereprojectionfoundationsaretoberetainedfromthefaceofsuchprojection)shallberelatedtothetotaldepthoftheexcavation(measuredfromthetopofthepreliminaryexcavationtotheundersideoftheunderpinningwork).Theallowancesshallbeasfollows:-(i)1.00meterfromthewallorprojectingfoundationwherethetotaldepthoftheexcavationdoesnotexceed1.5meters.(ii)1.5meterfromthewallorprojectingfoundationwherethetotaldepthoftheexcavationexceeds1.5metersbutdoesnotexceed3.00meters.(iii)2.00meterformthewallorprojectingfoundationwherethetotaldepthoftheexcavationexceeds3.00meters.c.Cuttingawaybrickworkandconcreteshalleachbemeasuredseparatelyandgivencube.2.ChunamsurfacingChunamsurfacingshallbegivensuper;worktoslopesexceeding1in7shallbegivenseparately.3.Hardcorea.Thematerialtobeusedforhardcoreandthemethodofconsolidationshallbedescribed.b.Hardcorefillingexceeding0.3meterthickafterconsolidationshallbegivencube;wherenotexceeding0.3meterthickafterconsolidationitshallbegivensuperstatingthethickness;wherepartexceeding0.3meterthickthewholeshallbethenbegivencube.c.Blindingsurfacesofhardcoreshallbegivensuper.Alternativelywherethehardcoreismeasuredsuper,blindingmaybegiveninthedescription.4.Cuttingoffheadsofpilesa.Cuttingoffheadsofpilestorequirelevelsshallbeenumerated;thenominalsizeofthepilesandrequirementsforthedisposalofdebrisandforanycleaningandbendingtoprojectingreinforcementshallbestatedinthedescription.b.Whereheadsofpileshavebeencuttotherequiredlevelsbythepilingcontractor,cleaningthetopofthepilesshallbeenumerated;thenominalsizeofthepilesandrequirementsofanycleaning,straighteningandbendingrequiredtoprojectingreinforcementshallbestatedinthedescription.
VICONCRETORCONCRETE1.Generallya.Apreambleitemshallbegivenstatingthateachitemofconcreteshallbeheldtoincludeforforminggroves(otherthaninfairfacedconcretetoformornamentalfeatures),chases,mortices,groutinginbalusers,bolts,dowelsandthelikewithcement,holesforpipesnotexceeding150millimetersdiameter,openingsnotexceeding0.025squaremeterssectionalarea,andmakinggoodandanyothersundryitemsofalikenature.b.Labourstoexitingworkshallbemeasured.c.Compositionandmix(orstrengthrequirement)oftheconcreteshallbestated.d.Particularsshallbegivenofanytestsrequired,boththematerialsandthefinishedwork.e.Allconcreteworkshallbegivencubeexceptashereinafterprovided.f.Thicknessofbeds,slabs,wallsandthelikeshallbestated.g.Anytreatmentoffinishedfaceofconcrete,beyondtheordinarydepositing,spreadingandlevelingshallbemeasuredseparatelyandgivensuper.h.Reinforcementconcreteshallbegivenseparately.Vibrationshallbeheldtobeincludedintheitem.i.Concreterequiredtobemechanicallytamped,placedinpositionbyaparticularmethod,orpouredatstatedspeeds,shallbegivenseparately.j.Concreteincastingtostructuralsteelworkshallbegivenseparately.k.Generallyconcreteslabs,walls,columns,beams,stairsandthelikeshalleachbegivenseparately.l.Concrete,formwork,andreinforcementshalleachbegivenseparatelyexceptashereinafterprovided.m.Modeductionshallbemadefor:-(1)Voidsnotexceeding0.05cubicmeters.(2)Thevolumeofthereinforcement.(3)Openingsinwalls,floors,roofslabs,roadwaysandthelikenotexceeding0.10squaremeters.2.Smallbasesforfencingposts,etc.Concreteinsmallbasesforfencingpostsandthelikeshallbeenumeratedandthesizesgiven.3.UnderpinningConcreteinunderpinningshallbegivenseparately.(SeeExcavatorClause14)4.Concretebedsa.Concretebedsshallbeheldtoincludeforlayinginbaysandthenecessaryformwork
tothejointsbetweenbays.a.Thicknesstoconcretebedsunderwalls,partitionsandthelikeandunderchannelsshallbegivenrunasextraoverthebedstatingthewidthandthickness.Extraexcavation,disposal,hardcoreandformworkshallbeheldtobeincludedintheitem.5.Channelsa.Surfacewaterchannelsshallbegivenrundescribingthethickness,shape,widthandaveragedepthandthedescriptionshallincludeforexcavation,disposal,formworkandrendering.Angles,ends,outletsandintersectionsshallbeheldtobeincludedintheitem.b.Channelsformedinconcretebedsshallbegivenrundescribingtheshape,width,andaveragedepth;thedescriptionshallincludeforformwork.Angles,ends,outletsandintersectionsshallbeheldtobeincludedintheitem.6.Foundations,bases,groundbeams,etc.Thefollowingshallbegivenseparately:-a.Foundationsincludingattachedstanchionorcolumnbasesorpilecaps.b.Isolatedstanchionorcolumnbasesorpilecaps.c.Groundbeams,tiebeamsandthelike.d.Blindingunderfoundations.e.Cementgroutingundersteelstanchionbasesorundersteelgrillagesgivensuper.7.Curbs,copings,cills,etc.Concretecurbs,copings,projectioncills,strings,cornicesandthelikeshalleachbegivenseparately.8.Suspendedfloors,roofs,etc.a.Themeasurementofsuspendedfloorsandroofsshallbetakenacrossbeams.b.Slopingsuspendedfloorsandroofsshallbegivenseparately;wherethepitchexceeds15degreesthisshallbestated.9.CasingtostructuralsteelworkThefollowingcasingtostructuralsteelworkshallbegivenseparately:-a.Concretecasingtobeams.b.Concretecasingtostanchions.10.Wallsa.Concretewallsshallbemeasuredbetweencolumnsorprojectionsandthethicknessstated.Ifthewidthofcolumnexceedsfourtimesitsthicknessitshallbeclassifiedasawall.b.Concreteretainingwallsshallbegivenseparately.11.HollowblockconstructionThein-situconcreteinfillingbetweenandoverhollowblockinsuspendedslabsshallbesodescribed,measurednetandgivencube;thehollowblockshallbefully
describedandenumerated.12.ExpansionjointsExpansionjointsinbeds,suspendedfloors,wallsandthelikeshallbegivenrun.Formworkandanylaborsshallbeincludedinthedescription.13.WaterstopsWaterstopsshallbefullydescribedandgivenrun;jointsatintersectionsandspecialjunctionpiecesincludingjointsshallbeenumerated;runningjointsshallbeheldtobeincludedintheitem.REINFORCEMENT14.Generallya.Thequalityofsteelshallbestatedandparticularsshallbegivenofanyteststobeappliedtosamples.b.Anyspecialrestrictionsinregardtohotorcoldbendingshallbestated.c.Mildsteelandhighyieldsteelshallbeeachbegivenseparately.15.Barreinforcementa.Barreinforcementshallbegivenbyweight;noallowanceshallbemadeintheweightforrollingmarginandthisshallbestated.Cuttingtolengths,hookedendsandbendingshallbeheldtobeincludeinitem.b.Barsshallbesub-dividedasfollows:a.Generalreinforcementbars.b.Links,stirrups,bindersandspecialspacers(e.g.steelchairstosupportsteelinrafts).c.Indentedbarsorbarsofotherspecialform.d.Barsexceeding12.00metersinlength,instagesof3.00meters.e.Helicalreinforcement.f.Barsspeciallybenttocuretosuitcircularconcreteworkirrespectiveofradius.c.Barsshallbegivenseparatelyforeachsize.16.Fabricreinforcementa.Fabricreinforcementshallbegivensuperandtheweightstated;onlythenetareacoveredshallbemeasured,butnodeductionshallbemadeforopeningsnotexceeding1.00squaremeters;thedescriptionshallincludetheextramaterialatlaps,particularsofwhichshallbegiven.Notchingaroundobstructionsandbendingshallbeheldtobeincludedintheitem.b.Tensionstripsshallbegivenrun.17.Tyingwire,etc.Tyingwire,precastconcreteorproprietaryspacerblocksandchairs,andordinaryspacerrodsshallbeheldtobeincludedintheitemsofreinforcement.N.B.Theitemtyingisreservedforthewiretyingtogetherreinforcementincontact,andthetermlinksorbindingsforthewireformingpartofthereinforcementandlinkingorbindingtogetherreinforcementnotincontact.
Formwork18.Generallya.Formworkshallbemeasuredtheactualsurfaceincontractwiththeconcrete.Itshallbegivensuperexceptashereinafterprovide;formworktosmallfeaturesshallbeenumerated.Coatingwithmouldoil,mouldliquidorlimewhiteshallbeheldtobeincludedintheitemsofformwork.b.Wroughtformworkandformworktobeleftinshallbedescribedandgivenseparately.c.Formworkrequiredtobelinedwithwallboard,hardboard,plywoodorpaperliningshallbesodescribedandgivenseparately.d.Whereliningofwallboard,hardboard,asbestos,corkslabandthelikeisofapermanentcharacterandtobeleftin,suchliningshallbegivenseparately;thedescriptionshallincludeforanynecessaryfixingtotheconcrete.e.Nodeductionshallbemadeforopeningnotexceeding1.00squaremetre.19.Labours,strutting,etc.a.Splayededges,notchings,allowanceforoverlapsandpassingsatangles,battens,filletsforchases,recesses,chamferededgesandthelike,splayedangles,strutting,bolting,wedging,easing,strikingandremovalshallbeheldtobeincludedintheitemsofformwork.b.Wheretheheightofstruttingtosoffitsexceeds3.5metresformworkshallbegivenseparatelyandtheheightstatedinstagesof1.5metres.c.Roundedormouldededgesshallbegivenrun.Stopsshallbeheldtobeincludedintheitem.d.Formworktosecondarybeamsshallbemeasureduptothesidesofmainbeams,butnodeductionshallbemadefromtheformworkofthemainbeamwherethesecondarybeamintersectsit.Formworktobeamwhichintersectwithstanchioncasingsorcolumnsshallbemeasureduptothemonallsides.Nodeductionshallbemadefromtheformworktostanchioncasingsorcolumnsattheseintersections.20.ClassificationFormworkgenerallyshallbeclassifiedandgivenseparatelytothefollowing:a.Flatsurfaces,suchassoffitsofslabsandthelike;solidslabsexceeding225millimetresthickshallbegivenseparately.b.Verticalsurfaces,suchaswallfacesandthelike.c.Slopingsurfaces.d.Curvedsurfaces.e.Sidesandsoffitsofbeams;thattobeamsexceeding0.75metredeep(belowsoffitofslab)shallbegivenseparately.f.Sidesofpiers,columnsandstanchions.g.Edgesandbreaksinslabsandwallsincludingsoffitsofopeningsinwallsandsidesofcurbs,givenrunwherenotexceeding225millimetresinwidthandgroupedinstagesof5millimetres;suspendededgdsshallbegivenseparately.h.Risersandopenstringsofstairsgivenruninstagesof75millimetres.
a.Edgesandsoffitsofcopings,cills,strings,cornices,eavesoverhangs,andthelikenotexceeding0.5metrewidegroupedtogetherandgivenrunstatingthegirth.Wherethesefeaturesoccurasprojectionsonwalls,beamsandsimilartheformworktothemshallbemeasuredasextraovertheformworktotheprincipalsurfacefromwhichtheyproject.b.Filletsplantedontoformgroovesasornamentalfeatureinfairfacedconcretegivenrun,statingthesize.c.Smallsurfacessuchascantileverends,brackets,endsofsteps,capsandbasestopilastersandcolumnsandthelikeenumeratedstatingthesize.d.Formingholesforpipesexceeding150millimetresdiameterenumeratedandthethicknessofconcreteandthesizeofpipestated.e.Boxingsforopeningsexceeding0.025squaremeterandnotexceeding1.00squaremetersectionalareaenumeratedstatingthethicknessofconcreteandthesizeinstagesof0.1squaremeters.21.Formworktowalls,etcFormworkshallbemeasuredtobothfacesofwallsandtothesurfaceoftheworkslopingmorethan15degreesformthehorizontal.Precastconcretework22.Generallya.Precastworkshallbedescribedincludingfinishedfaces(givingsizesanddescription)andsetting;thereinforcementshallbedescribedandincludedwiththeitem.Allmouldsshallbeheldtobeincludedintheitem.Allunitsexceeding2.00meterslongshallbegivenseparatelyandthenumberstated.b.Slabwallingshallbemeasuredinaccordancewiththerulesmeasurementforblockwalling,bricklayerClause10.23.Cornices,lintols,caps,etc.a.Cornices,stringcourses,plinths,copingsandothersimilaritemsshallbegivenrun;anglestones,kneelersandthelikeshallbeenumerated.b.Cillsandlintolsshallbegivenrunandthenumberstated.Stoolingsandthelikeshallbeenumerated.c.Pierandchimneycapsshallbeenumerated.24.StepsandlandingsSteps(otherthanspandrelstepsandwinders)shallbegivenrunandthenumberstated;endsshallbeheldtobeincludedintheitem.Spandrelstep,windersandlandingsshallbeenumeratedandtheextremesizesstated.25.SlabpartitionsSlabpartitionsshallbeenumeratedandfullydescribed.Prestressedconcretework26.Generallya.Prestressedconcretework(i.e.workwheretendonsaretensionedbeforeorastheloadis
applied)anditsreinforcementandassociatedformworkshallbegivenunderanappropriateheading.a.Ageneraldescriptionoftheprestressedworkandofthesystemandmethodtensioningshallbegiven.b.Particularofthefollowingshallbegiven:1.Tendonsandanypreparatorytreatment.2.Whethertendonstobepre-tensionedorpost-tensionedastheloadapplied.3.Maturityofconcretebeforepre-tensioningisreleasedorpost-tensioningisapplied.4.Teststobeapplied.27.Structuralin-situmembersa.Concreteinstructuralin-situmembers(e.g.beams,columns,slabsandthelike)shallbegiveninaccordancewith.b.ReinforcementshallbegiveninaccordancewithClause14to17hereof.c.Formworktopre-tensionedandpost-tensionedworkshallbegivenseparatelyinaccordancewithClause18to21hereof.28.Ductsandgroutinga.Ductsshallbegivenrunstatingthenumberandsize,numberanddiameteroftendonstobeenclosed,anddetailsofgrouting.Sheathingorothermaterialusedintheformationoftheductsshallbedescribed.b.Ductsover6.00meterslongshallbesodescribedstatingthelengthinfurtherstagesof3.0meters.c.Curvedductsshalleachbesodescribedirrespectiveofradius.d.Theprovisionofsupportstothematerialusedintheformationoftheducts,andformingandgroutingairholesshallbeheldbeheldtobeincludingintheitem.29.Tendonsa.Supplyingtendons(measurednetlengthsbetweenouterfacesofanchorages)shallbegivenbyweightstatingtheultimatestrengthandthesizeofthetendons.Eachsizeshallbegivenseparately.b.Fixingeachtendonshallbeenumeratedstatingthelength,sizeandtypeofsheathing(ifany).Degreasing,straightening,cuttingtolengthsandassemblingtendonsshallbeheldtobeincludedintheitem.30.AnchoragesAnchorageshallbedescribedandenumeratedasacompleteassemblyincludinganchorplate,cones,wedges,andthelikeandstatingthenumber,sizeandtypetendonstobeanchored;thedescriptionshallincludeforfixinginposition,formworktoformrecessandfixingintherecess.Deadanchoragesshallbegivenseparately.Precistprestressedconcretework31.Generelly
a.Precastprestressedconcreteunitsandassociatedworkincludinghoistingandfixingshallbegivenunderandappropriateheading.b.Ageneraldescriptionoftheprecastprestressecunitsandthesystemandmethodoftensioningshallbegiven.c.Particularoftendons,maturityofconcretebeforetensioning,andtestsshallbegiveninaccordancewithClause26chereof.32.PrecastunitsPrecastuntisshallbeenumeratedstatingthesize,shapeofcrosssection,length,andnatureandextendofsurfacefinish.Unitsshallbeclassifiedfollows:-1.Pre-tensionedinthemould.2.Post-tensionedonthegroundaftercasting.3.Castinsections,assembledandpost-tensionedbeforeerection.4.Castinsectionsforassembledin-situandpost-tensionedaftererection.5.Post-tensionedafterhoistingbutcapableofselfsupport.6.Post-tensionedafterhoistingbutrequiringsupportuntiltensioningiscomplete.Allmouldsshallbeheldtobeincludedintheitems.33.Fixingprecastunita.Hoisting,fixingandbeddingprecastunitsshallbeenumeratedstatingthesizeandlengthoftheunitandheightofbearingabovegroundlevelinstagesof3.00meters.Unitsofidenticalsectionbutvaryinglengthshallbegroupedtogetherof1.50metersandtheaveragelengthstated.Compositionandmixjointingmaterialshallbestatedinthedescription.b.Anyspecialtemporarysupportsrequiredinconnectionwithpost-tensionedunitsclassifiedunder32(4)and(6)hereofshallbeenumeratedstatingthesizeandspanoftheunitandtheheightofthesupportinstageof1.50meters.34.Reinforcement,ducts,tendonsandanchoragesReinforcement,ductsandgrouting,tendonsandanchoragesshallbegiveninaccordancewithClause27b,28,29and30hereofrespectively.
VIIBRICKLAYERBRICKWORK1.Generallya.Apreambleitemshallbegivenstatingthatthedescriptionofeachitemofbrickwork,blockwallingandfacingsshallbeheldtoincludeforallroughandfaircuttings,oversailingandrecedingcourses,roughrelievinganddischargingarches,wedgingandpinning,rakingoutjointstoformkey,rakingoutjointforandpointingflashings,beddingplates,beddingandpointingwoodframes,pargingandcoringflues,laboreavesfilling,plumbingangles,formingsquareandrebatedreveals,cutsquintsorbirds-mouths,notches,forming,leavingorcuttingchases,holesandmorticesandcuttingandpinningandmakinggoodandanyothersundryitemsofalikenature.b.Laborstoexistingworkshallbemeasured.c.Brickwallsexceedingoneandahalfbricksthick,whereamultipleofhalfabrickthick,shallbegivensupergroupedtogetherandreducedtoonebrickthickness.d.Brickwallsnotexceedingoneandahalfbricksthickshallbegivensuperstatingthethickness.e.Brickwallsnotamultipleofhalfbrickthickshallbegivensuperstatingthethickness;thedescriptionshallincludeforallcutting.f.Hollowwallsshallbegivensuperstatingthethicknessoftheinnerandoutershinsandthewidthofthecavity;dispositionofthetiesshallbedescribed.2.ClassificationThefollowingshallbegivenseparately:-a.Brickworkinfillinginopenings.b.Isolatedpiersandchimneystacksgroupedtogether.c.Dwarfwallssupportingfittings,tanksandthelike,groupedtogether.d.Brickworkcircularonplan,measuredthemeanlength;thedescriptionshallincludeforallcuttingandtemplates.e.Wallswithbatteringfacesstatingthemeanthicknessandtherateofbatter;thedescriptionshallincludeforallcutting.f.Wallsbuiltbattering.g.Brickworkinbackingtomasonry;thedescriptionshallincludeforallcuttingandbonding.3.Deductionsa.Deductionsshallbemeasuredthenetsizesoftheopeningsandrecesses;nodeductionsshallbemadeforopeningsnotexceeding0.10squaremeter.b.Deductionsshallbemadeforstringcourses,cills,lintols,andthelikeonlytotheextentofthefullbrickcoursesintheheight.4.Losingcavitiesofhollowwalls
Closingcavitiesofhollowwallsatendsoratopeningsshallbegivenrunandmaterialandmethoddescribed.1.Labortoexistingbrickworka.Laborstoexistingbrickworkshallbegivenseparately.b.Whereendsofnewwallsarebondedtoexisting,anitemoflaborandmaterialincutting,toothingandbondingshallbegivenrunstatingthethicknessofthewall.c.Thepreparationoftopsofexistingwallsforraisingshallbegivenrunstatingthethicknessofthewall.2.Settingstovesa.Settingstoves,grates,mantelsandrangesshallbeenumeratedandthetypedescribed;wheresetinafireplaceopening,thesizeoftheopeningshallbegiven;thedescriptionshallincludeforconcreteandbrickbackingwhererequired.b.Settingtile,marbleandothersurroundsandhearthsshallbeenumerated;thedescriptionshallstatewhetherthesurroundorhearthisslabbedorbuiltinpositionandshallincludebeddingandpointing.3.Fluesa.Flueliningsshallbegivenrunandthedescriptionshallincludeforallbendsandeasingsformedbycutting.b.Nodeductionofbrickworkshallbemadeforflues,linedfluesorblockswherethebrickflueislessthan0.25squaremeterinsectionalarea.4.BuildinginsafeandstrongroomdoorsandframesBuildinginsafe,strongroom,andsimilarspecialdoorsandthelikeshallbeenumeratedstatingtheapproximateweightandfloorlevel.5.Sundryitemsa.Airbricksandthebuildinginofventilatinggratings,sootdoorsandthelikeshallbeenumeratedstatingthethethicknessofthewallintowhichtheyarebuilt;theformationoftheopeningincludingthelintolshallbedescribed.b.Chimneypots,includingthesettingandflaunching,shallbeenumerated.6.Blockwallinga.Wallsorpartitionsformedofconcreteblock,hollowtilesorpatentblocksshallbegivensuper;thedescriptionshallstatethesizeandfinishoftheblocks.b.Blockwallinginisolatedpositioninverticalpipeductsandthelikeshallbegivenseparately.c.Specialsolidblocksoffillinginhollowblocksatendsorintersectionsshallbegivenrun.d.Cuttingandbondingtowallsofdifferentconstructionshallbegivenrunsandescribedasincludingtheextramaterials.7.ReinforcementtobrickworkReinforcementtobrickworkshallbegivenrun.8.Damp-proofcourses(exceptasphalt)
a.Damp-proofcoursesexceeding225millimeterswideshallbegivensuper;thosenotexceeding225millimeterswideshallbegivenrun.b.Horizontalandverticaldamp-proofcoursesshallbegivenseparately.c.Damp-proofcoursesorliningsoncircularwalls,bothhorizontalandvertical,shallbedescribedasincludingallextracutting.FACINGS,FAIRFACETOBRICKWORK,ETC1.Facingsa.Facingsgenerallyshallbemeasuredtothewholeofthefacesofwallsexposedtoviewasextraoverthecommonorotherbrickworkandshallbegivensuper,exceptashereinafterprovided.Theallowanceatrevealandreturnsshallbemultiplesofahalfbrick.Thenatureofthebricks,thepointingandbondshallbedescribed.b.Halfbrickwallsinfacingbricksandonebrickwallinfacingbricksbothsidesshalleachbegivenseparately.c.Facingstobebuiltoverheadshallbegivenseparately.d.Batteringfacingsshallbegivenseparatelyandthebatterdescribed.e.Circularfacingsshallbegivenseparately.f.Allpurposemadebricksshallbedescribed.g.Facingswithbricksdifferinginsizefromthebackingbrickworkshallbegivenseparatelyandthesizeofthebrickandthemethodofbondingtobackingbrickworkstated.h.Facingsinpanelsnotexceeding1.00squaremetershallbegivenseparatelyandthenumberstated;facingsinbandsdifferingfromthegeneralfacingandnotexceedingfourcoursesinheightshallbegivenrun.2.FairfacetobrickworkFairfacetobrickworkshallbemeasuredinaccordancewiththerulesforfacings.3.Archesa.Archesshallbemeasuredthemeanlengthonfaceandgivenrunstatingtheheightonfaceandwidthofexposedportionofsoffit.b.Archesofvaryingshapesandtypesandarchesofpurposemadebrickshalleachbegivenseparately.c.Archesofunusualoutlineshallbeenumerated.4.Cills,copings,etc.a.Cills,cornices,plinthcappings,copingsandthelikeshallbegivenrunstatingthenumberofcoursesandprojection(ifany).Angles,returnedendsandthelikeshallbeheldtobeincludedintheitem.b.Piercapsshallbeenumerated.c.Circularworkshallbegivenseparately.5.SundryitemsKeyblocks,corbelsandthelikeshallbeenumerated.
BRICKPAVINGSANDSTEPS1.Generallya.Brickpavingsshallbegivensuper;iflaidtopatternthepavingsshallbesodescribed.b.Brickstepsshallbegivenrunstatingthewidthandheight;circularstepsshallbegivenseparately.BOILERSEATINGANDFLUESANDCHIMNEYSTACKS2.GenerallyAllworkinconnectionwithboilerseatingsandfluesandboilershaftsshallbegivenseparately.3.Boilerseatings,etc.Firebrickandfireclayworkshallbegivenseparately.Boilerseatingsblocksandcurvedfluecoversshallbegivenrunandallirregularpiecesenumerated.4.ChimneystacksThebrickworkindetachedchimneystacksshallbegivenseparatelyandthesizeandshapeofthestackdescribed;iftobebuiltfromanoutsidescaffolditshallbesostated.5.FirebrickliningsFirebrickliningsshallbegivensuperstatingthethickness;ifbondedtothebackingtheyshallbesodesceibed.VIIIDRAINLAYER1.NatureofsoilTheprovisionsofExcavatorClause1a(2)and(3)shallapplytoDrainlayer.2.PumpingTheprovisionsofExcavatorClause12shallapplytoDrainlayer.3.ExcavatingtrenchesfordrainpipesExcavatingtrenchesfordrainpipesshallbegivenruninstatesof1.50metersdeep(i.e.”notexceeding1.50metertotaldepth”,“exceeding1.50metersandnotexceeding3.0meterstotaldepth”etc.)andtheaveragedepthstatedinmultiplesof250millimeters;trenchesforpipesnotexceeding200millimetersdiametershallbegroupedtogetherandwherepipesexceed200millimetersdiameterthesizeshallbestated.Gradingbottoms,fillinginandramming,disposalofsurplusexcavatedmaterialandanyplankingandstruttingrequiredshallbeheldtobeincludedintheitem.4.Concretebeds,benchingsandcoveringsConcretebeds,benchingsandcoverings,includinganyformworkrequired,shallbegivenrunstatingthediameterofthepipeandthedimensionsoftheconcrete.5.Drainpipes
a.Drainpipesshallbegivenrun,measuredthenetlengthaslaid,overallbends,junctionsandsimilarfittings;thepipesandthemethodoflayingandjointingshallbedescribed.b.Bends,junctions,diminishingpipesandthelikeshallbeenumeratedasextraoverdrainpipes.Extrajointsandcuttingonpipesshallbeheldtobeincludedintheitem.c.Suspendeddrainsshallbegivenseparatelyandthesupportsenumerated.1.Gullies,traps,etc.Gullies,trapsandsimilaritems,togetherwiththeirsetting,concretebeddingandconnectionstodrains,shallbeenumerated.2.Inspectionchamber,manholes,cesspools,etcInspectionchamber,manholes,cesspools,septictanks,soakawaysandsimilaritemsshallbemeasuredindetailandgivenseparately,statingthenumber.Excavation,concretework,brickworkandotherworkshallbegiveninaccordancewiththerulesintheappropriateSectionhereof.Connectionsofdrainsandcuttingshallbeheldtobeincludedintheitem.Benchingsincludingformingchannelsshallbegivensuperstatingtheaveragethickness.Stepironsandcoversshallbeenumerated.3.ConnectionswithpublicsewersAllworktobecarriedoutbythePublicWorksDepartmentshallbecoveredbyaProvisionalSum.4.TestingdrainsThetestingofthedrainagesystemshallbegivenasanitem.
IXASPHALTER1.Generallya.Apreambleitemshallbegivenstatingthateachitemshallbeheldtoincludeforworkatanyheight,alltemporaryrules,layingtofallsandcurrents,allnarrowwidths,arrises,fairandroundededgesandturn-ins;allangles,intersections,andstopstointernalanglefillets,skirting,fascias,curbs,channelsandthelike.b.Asphaltingshallbeclassifiedunderthefollowingheadings:-1)Damp-proofingandtanking.2)Pavings.3)Roofcoverings.c.Workwhichofnecessaryisexecutedoverhandorworkinconfinedsituations(whereatleastor0.6meterofworkspacecannotbeprovided)shallbeeachsodescribed.d.Thesurfaceonwhichasphaltistobeappliedshallbestatedandanyunderlayofpaper,feltorothermaterialandanyreinforcementshallbeincludedwiththeasphalt.Laps,cuttings,notchingandbendingoftheunderlayandreinforcementshallbeheldtobeincludedintheitem.e.Horizontalwork,slopingwork,workonsoffits,verticalworkandcircularworkshalleachbegivenseparately.f.Asphaltingrequiredtobecarriedoutinsections,suchasunderpinningandtoretainingwalls,shallbegivenseparately.Jointingbetweensectionsshallbeheldtobeincludedintheitem.g.Nodeductionshallbemadeforvoidsnotexceeding0.50squaremeters.2.Coveringstosurfacesa.Asphaltcoveringsshallbemeasuredthenetareacoveredandgivensuperstatingthethicknessandnumberofcoats.b.Internalanglefilletsshallbegivenrunstatingthenumberofcoats.c.Cuttingbackforandjointingnewtooldasphaltshallbegivenrun.3.Skirtingsa.Skirtingsshallbegivenrunstatingthethicknessandaverageexposedfaceheight;thedescriptionshallincludetheanglefilletatbottomandarrisandfairedgeandturn-inattop.b.Stepped,rakingandcircularskirtingsshalleachbegivenseparately.4.FasciasandapronsFasciasandapronsshallbegivenrunstatingthethicknessandaverageexposedfaceheight;thedescriptionshallincludethefairedgeordripatbottomandthearrisattop.5.Gutters,channels,andcurbsa.Liningstogutters,dishingstochannelsandcoveringstocurbsshallbegivenrunstatingtheexposedfacegirth,numberoranglefilletsandarrises.b.Outletsshallbeenumerated.6.Cesspools,sumps,etc.
Liningstocesspools,sumpsandthelikeshalleachbeenumeratedseparatelystatingtheexposedfacesize.1.Pipeoutlets,collars,etc.Workingasphalttooutletpipes,dishingtogullies,formingcollarsaroundpipes,railingstandardsandthelikeshalleachbeenumeratedseparatelyirrespectiveofsize.
XSTONEMASON1.Generallya.Apreambleitemshallbegivenstatingthateachitemforstoneworkshallbeheldtoincludeforalllabors(exceptashereinafterprovided),stopsandreturnstoalllabors.Rakingoutjointsfroandpointingflashings,beddingplates,beddingandpointingwoodframes,alljoggles,templatesandthelike,hoisting,setting,jointingandpointing,protectingwithslurryandcleaningoffandrubbingdownoncompletionifrequired.b.Stonesexceeding1.5meterslongshallbegivenseparately,statingthelengths.c.Stonesexceeding0.50cubicmetershallbegivenseparatelyinsuccessivestagsof0.25cubicmeters.d.Laborsonstonesshallbedescribedas:1)plain.2)sunk.3)moulded.4)circular.5)circularsunk.6)circularcircular.7)circularcircularsunk.Andthelikeandincludedinthedescriptionoftherelativeitemsofstonework.2.Stoneworkgivencubea.Stoneworkshallbegivencube,exceptashereinafterprovided,underthefollowingorsimilarclassifications:-1)Quoins.2)Pilasters.3)Capsandbasestopilasters(statingthenumber).4)Jambs.5)Springers(statingthenumber).6)Voussoirs(statingthenumber).7)Keystones(statingthenumber).8)Columns(statingthediameter).9)Capsandbasestocolumns,post,etc.(statingthenumber).10)Cornicesandstringcoursesexceeding250millimetershigh.11)Anglestonetolast.12)Wallingexceeding250millimetersthick.b.Stoneshallbemeasuredthesmallestrectangularblockformwhicheachstonecanbeobtainedandthemeasurementsshallincludethethicknessofonemortarbedandjoint.c.Thefinishtoexposedfacesshallbegivensuper.d.Grooves,flutingandsimilarlaborsshallbegivenrun.Stonesshallbeheldtobeincluded
intheitem.3.Stoneworkgivensupera.Thefollowingworkandsimilaritemsshallbegivensuperstatingthethickness:-1)Ashlar.2)Allstonesnotexceeding100millimetersonbed.3)Wallinginskinofhollowwalls.Formingthecavityincludingtiesandthedispositionofsameshallbemeasuredseparately.4)Wallingnotexceeding250millimetersthick.b.Stonesofirregularshapeshallbemeasuredthesmallestrectangularblockfromwhicheachstonecanbeobtainedandmeasurementsshallbeincludedintheitem.c.Thefinishonexposededgesshallbegivenrun.d.Circularworkshallbegivenseparately.e.Grooves,flutingandsimilarlaborsshallbegivenrun.Stopsshallbeheldtobeincludedintheitem.4.Stoneworkgivenruna.Thefollowingandsimilaritemsshallbegivenrunstatingthesize:-1)Plinthcappings.2)Cills.3)Mullions.4)Transoms.5)Cornicesandstringcoursesnotexceeding250millimetershigh.6)Copings.7)Curbs,fendersandthelike.8)Architraves.b.Angles,intersections,shoulderstoarchtraves,stoppings,returnedends,sunkjointstoolingsandthelikeshallbeheldtoincludeintheitemofstoneworkgivenrun.c.Kneelers,bonders,apexstones,shouldertoarchitraves,returnedendsandthelikewhichrequirelargestonesshallbeenumeratedaseparatestonesimmediatelyfollowingtherunninitem.d.Circularworkshallbegivenseparately.5.StoneworkenumeratedThefollowingandsimilaritemsshallbeenumeratedstatingthesizes:-1)Templatesorpadstones.2)Bollards.6.CircularworkStoneworktowallscircularonplanshallbegivenseparately.7.BatteringworkStoneworktowallsbuiltbatteringorwithbatteredfacesshallbegivenseparatelystatingtherateofbatter.
1.Cramps,dowelsandplugsMetalcrampsordowels,leadplugsandsimilaritemsshallbeenumerated.2.Staircasesandstepsa.Landingshallbegivensuper;fair,mouldedandrapatededgesandthelikeshallbegivenrun.b.Spandrelstepsandwindersshallbeenumeratedandtheextremesizesgiven.c.Otherstepsshallbegivenrunstatingthenumber.Fairendsstoolingsshallbeenumeratedasextraoverthestep.3.Wallinga.Wallingbroughttocoursesshallbesodescribedgivingtheheightsoraverageheightsofthecourses.b.Wallingcircularonplanshallbemeasuredthemeanlengthandgivenseparately;thedescriptionshallincludeforallcuttingandtemplates.c.Wallswithbatteringfacesshallstatethemeanthicknessandtherateofbatter;thedescriptionshallincludeforallcutting.d.Wallsbuiltbatteringshallbegivenseparately.e.Theprojectionsofattachedpiers,plinthsandthelikesshallbegivenrun.f.Deductionsshallbemeasuredthenetsizeoftheopeningsandrecesses.Nodeductionsshallbemadeforopeningsnotexceeding0.10squaremeters.Deductionshallbemadeforstringcourses,cills,lintolsandthelikeexceeding100millimetershigh.4.Laborstoexistingwallinga.Laborstoexistingwallingshallbegivenseparately.b.Cutting,toothingandbondingnewwallingtoexistingshallbegivenrunstatingthethicknessofthenewwalling.5.AirbricksAirbricksandthebuildinginofventilatinggratingandthelikeshallbeenumeratedstatingthethicknessofthewallintowhichtheyarebuilt;theformationoftheopeningsincludingthelintolshallbedescribed.6.Facingstostonewallinga.Facingsorfairfacegenerallyshallbemeasuredtothewholeofthefaceofwallingexposedtoview,includingtheareaofrevealsandreturns,andshallbedescribedasextraoverwallingandgivensuper.b.Thedescriptionshallstatethecharacterofthefacing(e.g.squaredorcoursedorrandomrubble),thenatureofthefacefinish,theaveragewidthofbed,thethicknessofthejointsandthetypeofopening.c.Theheightofcoursesincoursedworkshallbestated;ifregularlydiminishedthisshallbedescribed,givingthemaximumandminimumheightofcourses.7.WeepholesWeepholeshallbefullydescribed,givenrunandthenumberstated.
XIROOFERGENERELLY1.Generallya.Apreambleitemshallbegivenstatingthateachitemshallbeheldtoincludeforworkatanyheightandallnarrowwidths.b.Horizontalwork,slopingwork,workonsoffits,verticalworkandcircularworkshalleachbegivenseparately.c.Nodeductionshallbemadeforvoidsnotexceeding0.5squaremeters.CHINESEROORTILIING2.Rooftilinga.Chineserooftilingshallbemeasuredthenetareacoveredandgivensuperandshallbefullydescribedunderthefollowingheadings:-1)Singlecourse,singlelayer.2)Singlecourse,doublelayer.3)Doublecourse,singlelayer.4)Doublecourse,doublelayer.b.Thedescriptionshallbestatethelapandmaterialonwhichthetilingistobelaidandshalldescribedthemortar.c.Allcuttingatsquareandrakingabutments,topedgesandthelike,beddingandpointingeaves,vergesandthelikeandcuttingandfittingandmakinggoodaroundoutlets,pipesandsimilarshallbeheldtobeincludedintheitem.3.Eaves,ridges,hips,etcEavescourses,ridges,hips,valleysandvergesshallbegivenrunasextraovertiling.Fairends,stopsends,intersectionsandthelikeshallbeincludedintheitem.4.OrnamentaltilesOrnamentaltilesshallbeenumerated.CORRUGATEDANDSIMILARSHEETINGOFASBESTOSCEMENT,PLASTICORMETALANDTHELIKE5.Asbestoscementandsimilarsheetinga.Corrugatedandsimilarsheetingofasbestoscement,plasticormetalandthelikeshallbemeasuredthenetareacoveredandgivensuper;thedescriptionshallstatethesideandendlaps,thegeneralspacingofthepurlins,themethodoffixingthesheetingandanybeddingrequired.b.Crankedandturnedupsheetsshallbegivenrunasextraoversheetingc.Allcuttingandsquareandrakingabutments,topedges,vergesandthelike,beddingandpointingeavesfillers,vergesandthelikeandcuttingandfittingandmakinggoodaroundoutlets,pipesandsimilarshallbeheldtobeincludedintheitem.6.Fillerpieces,ridges,hips,bargesboards,etc.
a.Thefollowingshallbegivenrun:-1)Fillerpieces.2)Ridgesandhipcappings.3)Bargeboardsandcornerpieces.4)Flashingsandexpansionjoints.5)Louvers.b.Cappedends,finialsandtheliketoridgesandhipcappingsshallbeenumerated.2.RooflightsandspecialsheetingsThefollowingshallbeenumeratedasextraoversheetings:-a.Deadlightsandopeningslights.b.Transparentplasticsheets.c.Ventilatorsheets.d.Sheetswithsoakerflangesforpipesstatingthesizeofpipe.3.RoofventilatorsRoofventilatorsshallbeenumeratedstatingthetypeofbaserequired.FELTROOFING4.Feltroofcoveringsa.Feltroofcoveringsincludingbuilt-uproofingwithorwithoutoverlayofmacadam,asphaltorthelikeshallbemeasuredthenetareacoveredandgivensuper.b.Thesurfaceonwhichfeltistobelaidshallbestatedandanyunderlayofpaper,feltorothermaterialshallbeincludedinthedescription.Layingtofallsandcurrents,laps,cuttings,notchingandbendingoftheunderlayandfeltandturn-insshallbeheldtobeincludedintheitem.c.Cuttingbackforandjointingnewtooldfeltshallbegivenrun.5.Eaves,verges,abutments,apronsandskirtingsTheturn-uporturn-downateaves,verges,abutments,apronsandskirtingsshallbegivenrunstatingtheaveragesexposedfaceheightordepth.Angles,intersections,stopsandthelikeshallbeheldtobeincludedintheitem.6.LiningstoguttersandcoveringstocurbsLiningstogutters,dishingtochannelsandcoveringstocurbsshallbegivenstatingtheexposedfacesgirth.Angles,intersections,stopsandthelikeshallbeheldtobeincludedintheitem.7.Liningstocesspools,sumps,etc.Liningstocesspools,sumpsandthelikeshalleachbeenumeratedseparatelystatingtheexposedfacesize.8.Outletpipes,gullies,etc.Cuttingandfittinganddressingtooutletpipesandgullies,andaroundpipesandrailingstandardsandthelikeincludingformingcollars,shalleachbeenumeratedseparatelyirrespectiveofsize.
LEAD,ZINCANDCOPPERROOFING1.Lead,zincandcopperroofingForroofinginlead,zincandcopperseePlumberClauses1to4.
XIICARPENTERGENERELLY1.Generallya.ApreambleitemshallbegivenstatingthateachitemforCarpentershallbeheldtoincludeforalllaborsandnailing;workfixedwithscrewsshallbedescribed.b.Nodeductionshallbemadeforopeningsnotexceeding0.5squaremeters.CENTERINGN.B.Forformwork,i.e.shuttering,centeringandcasingtoconcrete,seeConcretorClause18to21.2.Centeringa.Centeringshallbemeasuredtheactualnetsurfacetobesupportedandshallbedescribedasincludingallstrutting,bolting,wedging,easing,strikingandremoval;slopingcenteringshallbegivenseparately.Whenhorsingisrequiredthisshallbestatedandtheheightuptospringinggiven,ifexceeding3.5meters.b.Thedescriptionshallstatewhetherthecenteringisforbrickworkorstoneworkandtheshapeofthesoffit,i.e.whetherforflat,segmental,semi-circularorothershapedarch.c.Centeringexceeding300millimeterswideshallbegivensuper.Wherenotexceeding300millimeterswideitshallbegivenrunstatingthewidth.TIMBER3.Generallya.Theextremescantlingsandthenetlengthsoftimberwhenfixedintheworkshallbemeasured;iftenonedthelengthofthetenonshallbeaddedtothesightlength.b.Exceptashereinafterprovided,structuraltimbershallbegivenrunstatingthescantling.c.Wroughttimbershallbegivenseparatelyandsodescribed.d.Unlessworkisdescribedasbeingtofinishedsizes,3millimetersshallbeallowedfromthesizegivenforeachwroughtface.e.Timberexceeding5.00metersinlengthshallbegivenseparately.f.Unlessotherwiseshownorspecified,ajointshallbetakenevery5.00metersinthelengthandanadditionof0.15metersshallbemadetofinishedlengthforeveryhalvedordovetailedjointinplates,curbsandthelike,andoftwicethedepthofthetimberforeveryscarfedjointinbearingtimbers.g.Circularworkshallbegivenseparately.4.RoofboardingRoofboardingshallbegivensuper;wherelaiddiagonallyortoverticalsideandtomansardsitshallbegivenseparately.5.GangboardingBoardingforminggangwaysinroofsshallbegivensuper.6.Insulatingquilts
Insulatingquiltsandotherflexiblesheetingsshallbegivensuperthenetareacovered;thetapsandbattensandthespacing.7.FloorfilletsinconcreteFloorfilletsinoronconcreteshallbegivensunstatingthesize,shape,treatmentandthemethodoffixing.Clipsforfixingfilletsshallbeenumerated.8.Bracketing,cradling,etc.a.Bracketingtoformshapedfalseceilingsshallbegivendetail.b.Cradlingandbracketingtosteelwork,andblockingdownforfalsebeamsandcornicesshallbemeasuredtheextremegirthandgivensuper;thescantlingsofthematerialandthemethodoffixingshallbedescribed.c.Bracketingforcornicesshallbegivenrunanddescribedasincludinganglebrackets,groundsandpluggingwhererequired.SHEETLININGS9.Liningstowalls,ceilingsandroofsa.Fibrebuildingboardsandothersheetmaterialsofalikenaturewhereusedforliningsceilings,wallsandroofsshallbegivensuperandthemethodoffixingstated.Whererequiredinpanelstodesign,itshallbesostated.b.Coverstrips,whererequired,shallbegivenrun.c.Thesidesandsoffitsofbeamsshallbemeasuredtogetherbutgivenseparatelyfromtheordinaryceilingwork.d.Ceilingsatagreaterheightthan3.50metersfromthefloorshallbegivenseparatelyandtheheightstated.
XIIIJOINER1.Generala.Apreambleitemshallbegivenstatingthateachitemofjoineryshallbeheldtoincludeforallnailing,glueing,screwing,cutting,splayedorroundededges.Notching,holes,housingends,ship-lapjoints,mitres,endsandshapedends,angles,junctions,headingjoints,shortlengthsandanyothersundryitemsofalikenature.b.Tonguedangles,chamfers,rebates,groovesandanyothersundrylinealitemsofalikenatureshallbeincludedinthedescriptionoftheitem.Labortostopsoracrossgrainshallbeheldtobeincludedwiththeitem.c.Nodeductionsshallbmadeforopeningsnotexceeding0.5squaremeters.d.Woodtobeselectedandkeptcleanforstainingorpolishingshallbesodescribedandgivenseparately.e.Unlessworkisdescribedasbeingtofinishedsizes,3millimetersshallbeallowedfromthesizesgivenforeachwroughtface.f.Itemsofplainwoodworkexceeding200millimeterswideshallbegivenseparatelyandthemethodofjointingdescribed,unlessspeciallyrequiredinonewidth,inwhichcasethisshouldbementionedandthewidthstated.g.Workfixedwithplugsandscrewsorwithscrewsandcupsshallbesodescribed;ifscrewsotherthanordinarysteelarerequiredtheyshallbedescribed;ifpelletingisrequireditshallbestated.h.Workframeduporbeddedinwhiteleadshallbesodescribed.i.Groundandbackingsforfixingjoinerworkshallbedescribed;wherenoincludedwiththeitem,skeletonframedgroundsshallbegivensuperandothergroundsgivenrun.j.Circularworkshallbegivenseparately.2.Boardedfloorsa.Floorsshallbegivensuperandshallbemeasuredthenetareacovered;thedescriptionshallstatethewidthofboardsandthemethodofjointingandnailing;iffloorsaretobetraversedorfinishedforpolishingitshallbesostated.b.Floorstonguedwithmetaltonguesshallbesodescribedandshallincludethetongues.3.Blockandparqueta.Blockorparquetflooringshallbegivensuperandthedescriptionshallstatethesizeandthematerialsforbedding.Floorsfinishedforpolishingshallbesodescribed.b.Thegirtharoundeachspacecoveredshallbegivenrunforborder,ifany.4.TrapsinfloorsAccesstrapsandthelikeshallbeenumerated.5.NosingstofloorsNosingsandmarginstofloorsshallbegivenrun;iftonguedontheyshallbesodescribed.
1.Plywood,hardboardandplasticsheetliningsa.Plywood,hardboard,plasticandsimilarsheetliningsshallbegivensuper.b.Surfacesnotexceeding300millimeterswideshallbegivenrun;thissub-clauseshallnotapplytonarrowwidthscausedbyopeningandthelike.2.Skirtings,cornices,cappings,pictureanddadorailsa.Skirtings,cornices,picturerailsanddadorailsshallbegivenrun.Itemplugged,tonguedorhousedshallbesodescribed.b.Built-upskirtingsorcornicesshallhavethesizeofeachmemberstatedandanybracketingincludedinthedescription.3.Casementsa.Casementsshallbegivensuperandthenumberstated;thedescriptionshallstatedwhetherthecasementisinonesquareordividedintopanes.b.Thefittingandhangingofcasementstoopenshallbeheldtobeincludedintheitem.c.Wherecasementsaretobehungfoldingtheextremewidthofeachleafshallbemeasured;thelaborsonmeetingstilesshallbeincludedinthedescription.d.Casementsofirregularshapeshallbemeasuredtheextremesizeassquareandgivenseparately.e.Casementsdividedintopanesotherthanrectangularinshapeshallbegivenseparatelyandthearrangementofthepanesdescribed.f.Splayedbottomedgestocasementsshallbeheldtobeincludedwiththeitem.g.Bulls-eyecasementsshallbeenumerated.h.Glazingbeadsshallbegivenrun.4.StopfilletsaroundcasementsStopfilletsaroundcasementsshallbegivenrun;thosecutandmitredtocentrehungcasementsshallbegivenseparately.5.Paneledworkgenerallya.Inpaneledworkthethicknessofpanelsandsizeofstiles,toprails,muntins,intermediateandbottomrailsshallbegivenseparately.b.Mouldingstopaneledwork,ifonsolid,shallbesodescribed.c.Appliedmouldings(otherthanpanelmoulds)orinlayshallbegivenrun.d.Raisedorraisedmouldedandmitredpanelsshallbedescribedanditshallbestatedifthelaborisononeorbothsides.Extraforlinedfolepanlesshallbeenumerated.6.Paneledwallliningsandpartitionsa.Paneledwallliningsandpartitionsshallbegivensuper.b.Panelingnotexceeding300millimetersinwidthorheightshallbegivenrun.c.Iftheareaofpanelsdoesnotexceed0.1squaremeterthepanelingshallbegivenseparately.d.Spandrilorrakingpanelingshallbesodescribedandmeasurednet.e.Thegroundsandthemethodoffixingofwallpanelingshallbedescribed.
a.Doorsinpaneledpartitionsshallbeenumeratedasextraoverpanelingstatingthesizeofthedoorandmouldingsshallbeincludedinthedescription.1.Doorsa.Doorsshallbegivensuperandthenumberstated;whenpaneledthenumberofpanelsshallbegivenandthegeneralrulessetoutinClause10shallbeapplied.b.doorswithshapedheadsshallbemeasuredtheextremesizeassquareandgivenseparately.c.Doorswithdiminishedstilesshallbegivenseparately.d.Ifpanelsareofunusualshapeorarrangementthedoorsinwhichtheyoccurshallbegivenseparately.e.Openingsinflushdoorsopenforglassorlouversshallbeenumeratedasextraoverthedoorsstatingthesize.f.Paneleddoorswithpanelsopenforglassorlouversshallbegivenseparately;iftheopenpanelsaredividedintopanesthenumberofpanesshallbestated.g.Glazingheadshallbegivenrun.h.Foldingdoorsshallbegivenseparatelyandtheextremewidthofeachleafshallbemeasured;laborsonmeetingstilesshallbeincludedinthedescription.i.Swingdoorsshallbegivenseparately;laborstoedgesofstilesshallbeincludedinthedescription.j.Standarddoorsshallbeenumerated.2.WindowanddoorliningsWindowanddoorliningsshallbegivenrunandifpaneledthenumberofpanelsineachsetshallbestated;tonguedanglesshallbeincludedinthedescription.3.Windowanddoorframes,etc.a.Solidwindowanddoorframes,mullions,transomsandcillsshalleachbegivenrun.b.Thefulllengthoftenonsandotherjointsshallbeincludedinthelengthofframesandthelikeand75millimetersshallbeaddedforeachhornunlessotherwiseshownorspecified.c.Framestobulls-eyewindowsandthelikeshallbeenumerated.4.Windowboardsandnosingsa.Windownosingsshallbegivenrun.b.Windowboardswiththeirbearersshallbegivenrun.c.Bedmouldsunderwindowboardsshallbegivenrun;ifhousedortonguedtowindowboardtheyshallbesodescribed.5.Architravesa.Architravesshallbegivenrun.b.Plinthblocksshallbeenumeratedandthejointswitharchitravesdescribed.6.Skylightsa.Framedskylightsshallbegivensuperandthenumberstated.b.Thehangingandfittingofopeningportionsshallbeenumeratedasextraoverstatingthe
sizeandthemethodofhanging.a.Rollstoridgesandhipsshallbegivenrun.b.Curbsandliningstoskylightsshallbegivenrun.1.LanternsLanternssidesshallbemeasuredasdescriedforcasementsandframes,andtopsasdescribedforskylights;thesidesandtopsshallbegivenseparatelyanddescribedasinlanterns.2.Casingstobeams,pilasters,etc.a.Casingstobeam,columns,pilastersandthelikeshallbegivenseparately,measuredtheexternalgirthandgivensuper.b.Flutings,readingsandthelikeshallbegivenrun.c.Capsandbasestopilastersshallbeenumerated.3.Shelvinga.Plainshelvingexceeding200millimeterswideshallbegivensuper;wherenotexceeding200millimeterswideitshallbegivenrun.b.Slattedshelvingincludingtheledgesshallbegivensuperstatingthesizeandspacingofslatsandledges.c.Bearersshallbegivenrun.4.FittingsFittingssuchascupboards,tables,bookcases,countersandthelikeshalleachbegivenindetailunderaseparateheadingandthenumberstated;thoseofsimilardesignshallbegroupedtogether.5.SinksWoodsinksshallbeenumerated.6.DrainingboardsDrainingboardsshallbeenumerated;thedescriptionshallincludeforopeningsandlaborstoedges.7.PipecasingsPipecasingsshallbegivenrun;accessdoorsshallbeenumeratedasextraover.8.Staircasesa.Worktostaircasesshallbegivenunderaseparateheading.b.Landingsshallbegivensuper;bearersshallbeincludedinthedescription.c.Treadsandrisersshallbegivensuper,ifcarriagesarerequiredthenumberandsizeshallbestatedandincludedinthedescription.Windersshallbemeasurednettogetherwiththeirrisersandgivenseparatelyincludingrakingcutting.d.Curtailendstotreadsandrisersshallbeenumerated.e.Strings,cappings,handrailsandappliednouldingsshallbegivenrun;ramps,wreathsandquadrantsshallbeenumeratedasextraoverandthedescriptionshallincludeforheadingjointshandrailscrewsandthelike.
a.Apronliningsshallbegivenrun.b.Scrollendstohandrailsshallbeenumeratedandoverallsizegiven.c.Balustersshallbeenumeratedstatingtheoveralllength.d.Newelsandstoreypostsshallbegivenrun;ifturnedthelengthofturningshallbegiven.e.Newelcapsandpendantsshallbeenumerated.
XIVIRONMONGER1.Generallya.Ironmongeryshallbeenumeratedincludingthefixing.b.InthecaseofironmongerysuppliedseparatelyandforwhichaPrimeCostsumhasbeenincluded,thefixingshallbeenumeratedseparately.c.Fixingshallbeheldtoincludeforallfitting,cutting,boringandmorticingand,unlessotherwisestated,thesupplyofscrewstomatch.d.Ironmongeryfixedformetalshallbegivenseparately.e.Thefixingofslidingdoorgearshallbemeasuredindetail.2.Sundriesa.Waterbarsandthelikeshallbegivenrun.b.Dowels,handrailbracketsandthelikeshallbeenumerated.
XVSTEELANDMETALWORKERSTRUCTURALSTEELWORK1.Generallya.Apreambleitemshallbegivenstatingthateachitemshallbeheldtoincludeforallcutting,notching,drillingandwelding.b.Allstructuralsteelworkshallbegivenbyweightexceptashereinafterprovided.c.Wherethesteelworkformsthemajorpartofthestructureofabuildingageneraldescriptionofthestructurestatingtheapproximateareaonplan,numberofstoreyandoverallheight,andmethodoffabricationofthesteelshallbegiven.d.Wherethestructuralworkdoesnotformthemajorpartofthestructureitshallbegroupedaccordingtothebearinglevelsforhoistingandfixingwhichshallbestatedinstagesof3.00metersabovegroundlevel.e.Joists,channels,angles,tees,platesandthelikeshalleachbegivenseparatelystatingthesize.f.Joistsandchannelsectionsexceeding9.0metersinlengthshallbegivenseparatelyinstagesof1.50meters.g.Nodeductionshallbemadeforrollingmargin.h.Nodeductionshallbemadefornotches,holesandthelike.2.CompositeunitsRooftrusses,portalframes,compoundgirdersandstanchionandsimilarcompositeunitsshallbemeasuredindetailandgivenunderaheadingstatingthenumberorunits.3.Connections,capsandbasesCleats,brackets,packingpieces,platesandthelikeshallbegivenseparatelyunderaheadingof“Connections,CapsandBases”.4.Rivetsa.Inrivetedworktheweightoftherivetheadsshallbeadded.b.Countersinkingrivetheadsshallbeenumeratedandgivenasextralabor.5.BoltsBoles,exceptashereinafterprovided,shallbegivenseparatelybyweightforeachtypeanddiameter,includingnutsandwashers,andthenumberstated.6.TurnedandfrictionboltsandexpansionboltsTurnedandfrictionboltsandexpansionboltsshallbeenumeratedstatingthediameterandlength.Nutsandwashersshallbeheldtobeincludedintheitem.7.WedgingunderbasesWedgingunderstanchionbasesandthelikeshalleachbeenumeratedseparatelystatingthesizeofthebaseplate.8.TubularcolumnsTubularcolumnsshallbeenumeratedthedescriptionshallincludedcapsandbasesandmethodofattachmentandshallstatedtheapproximateweight.
MIDESTEEL1.Generallya.Apreambleitemshallbegivenstatingthatthedescriptionofeachitemshallbeheldtoincludefrocuttingtocorrectlengths,splaycutendsandalldrilling.b.Allmildsteelworkshallbegivenbyweight,exceptashereinafterprovided.c.Bars,rod,angles,tees,channelsandthelikeshalleachbegivenseparatelystatingthesize.d.Whereanyitemisenumeratedtheapproximatetotalweightshallbestated.2.Framedworka.Framedworksuchasgrating,grilles,ladders,balustrade,failings,gatesandthelikeshalleachbegivenseparatelyindetailunderaheadingwhichshallstatedthenatureoftheconnections,e.g.welded,boltedortapscrewed.Inthecaseofbalusters,ladderrungsandthelike,thenumbershallbestated.b.Pointed,forgedorfangedendsandthelikeshalleachbeenumerated.c.Portionsofframedworkmadetoopenshallbeenumeratedasextraoverthemainframework.d.Matframesshallgivenbyweight,fullydescriptionandthenumberstated.3.CoreandhandrailsThedescriptionofcoreandhandrailsandthelikeshallbeheldtoincludedforangles,ramps,wreathsandthelike;bracketsshallbeenumerated.4.TubularhandrailsorbalustradesTubularrailsandstandardsshallbegivenrunstatingthediameterofbore,quality,andmethodofjointing.Fittingandmadebendsshallbeheldtobeincludedintheitem.5.BoltsBoltsincludingnutsandwashersshallbegivenseparatelyforeachtypeanddiameter,andthenumberstated.6.Straps,hangersandtie-rodsStraps,hangers,tie-rodsandthelikeshalleachbefullydescribedincludingforgerorthreadedendsandthenumberstated.7.Corbels,brackets,etc.Corbels,brackets,distancepieces,coverplatesandsimilarsmallitemsshalleachbefullydescribedandthenumberstated.CASTIRON8.GenerallyThetotalapproximateweightofeachitemshallbestated.9.Chequerplatea.Chequerplateflooringshallbegivensuper.b.Chequerplatecoversshallbegivenrun.10.StaircasesTreads,risersandlandingsshalleachbegivenseparatelyandenumerated;thedescriptionshallincludeforallconnections.
1.Gratingsa.Gratingstofloorchannelsetc.shallbegivenrunstatingthegenerallengthofsections;framesshallbegivenrun.b.Gratingstoopenings,ventilatorandthelikeshallbeenumeratedincludingframes.2.BracketsCantileverbracketsandthelikeshallbeenumeratedandthemethodoffixingstated.3.ManholecoversManholescoversandthelikeshallbeenumeratedincludingframe.STAINLESSSTEELANDNON-FERROUSMETAL4.Generallya.Workinvariousmetalsandalloys(e.g.stainlesssteel,brass,aluminium)shalleachbegivenseparatelyunderaheading.b.Apreambleitemshallbegivenstatingthatthedescriptionofeachitemshallbeheldtoincludeforcuttingtocorrectlengths,splaycutendandalldrilling5.Framedworka.Framedworksuchasgratings,grills,balustrades,railings,gatesandthelikeshalleachbegivenseparatelyindetailunderaheadingwhichshallstatethenatureoftheconnections,e.g.welded,brazed,boltedortapscrewed;themembersthereofshallbegivenrun.Inthecaseofbalusterandthelikethenumbershallbestated.b.Matframesshallbeenumerated.6.Gratingsa.Gratingstofloorchannelsetc.shallbegivenrunstatingthegenerallengthofsections;framesshallbegivenrun.b.Gratingstoopenings,ventilatorsandthelikeshallbeenumerated.7.Handrails,balusters,etc.a.Coreandhandrailsshallbegivenrun.Bends,angles,ramps,wreaths,andthelikeshallbeheldtobeincludedintheitem;bracketsshallbeenumerated.b.Balusters(otherthanframedwork0shallbeenumerated.8.Tubularrailsa.Tubularrails,standardsandthelikeshallbegivenrunstatingthediameterofthebore,andmethodofjointing.Madebendsshallbeheldtobeincludedintheitem.b.Bends,cappedends,flangeplates,bracketsetc.shallbeenumerated.MANUFACTUREDMETALWORK9.WindowsandcasementdoorsMetalwindowsandcasementdoorsshalleachbeenumeratedstatingtheoverallsize,numberoffixedlightsandnumberandtypeofopeninglights;ironmongeryandfixingshallbeincludedinthedescription.Compositewindowsandcasementdoorshallbesodescribedstatingthenumberofunitsandthenumberofcouplingmullionsandtransoms.10.Collapsiblegatesandrollershutters
Collapsiblegatesandrollershuttersshalleachbeenumerated.1.TrunkingVentilatingtrunkingshallbegivenrun;bends,inlets,outlets.Junctions,connectionsandthelikeshallbeenumerated;straps,hangersandbracketsshallbeenumerated.2.Pressedorextrudedmetalworka.Pressedmetalorextrudedrails,skirtingsandthelikeshallbegivenrun;mitresandthelikeshallbeheldtobeincludedintheitem.b.Diesfornon-standardextrudedsectionsshallbeenumerated.c.Pressedmetalwindowanddoorsurroundsandthelikeshallbeenumerated.SHEETMETALWIREWOKR3.MetalcoveringsandpanelsMetalcoverings(otherthanthoseincludedinSectionXVIIPlumbingClauses2,3and40andpanelsshallbegivensuper;wherenotexceeding0.10squaremeterseachthenumbershallbestated.Worknotrectangularinformshallbemeasuredsquareanddescribedasirregularshapes,measuredsquare.4.Wireworka.Wireworkshallbegivensuper;worknotrectangularinformshallbemeasuredsquareanddescribedasirregularshapes,measuredsquare.Thediameterofwireandthesizeofthemeshshallbestatedinthedescription/b.Stripslessthan300millimeterswideshallbegivenrun.c.Straining,selvedgeandbarbedwireshallbegivenrun.FENCING5.FencingFencingshallbemeasuredindetailandgivenunderaheading.Excavationpostholes,concrete,timberorsteelpostsandwireorwiremeshcoveringorthelikeshallbegiveninaccordancewiththerulesintheapproximatesectionhereof.PROPRIETARYDEMOUNTABLEPARTITIONS6.Proprietarydemountablepartitionsa.Proprietarydemountablepartitionsshallbefullydescribedandgivenrunstatingtheheightandmethodoffixingattopandbottom.Skirtingandcableductskirtingshallbeincludedinthedescription.b.Stopends,angles,threewayandfourwayintersectionsshalleachbeenumerated.c.Intersectionswithwallsandcolumnsofothermaterialsshallbeenumerated.d.Doors,hatchesandthelikeshallbefullydescribedandenumeratedasextraoverthepartitions.e.Notchingorframingaroundducts,beamsorotherprojectionsshallbeenumeratedandgiveninstatesof0.20squaremeter.
XVIPLASTERER1.Generallya.Apreambleitemshallbegivenstatingthateachitemofworkshallbeheldtoincludefornarrowwidthsandsmallquantities,layingorexecutingworkinbaysorbetweenstrips,temporaryformworkandrules,jointsbetweendifferenttypesofworkandbetweennewanoldwork,groinpoints,allmakinggoodandanyothersundryitemsofalikenature.b.Internalandexternalworkshalleachbegivenseparately.c.Preparingsurfacesshallbeallowedforintheappropriatetrade.Preparationofoldsurfacesshallbegivenseparately.d.Allwork,exceptashereinafterprovided,shallbegivensuper,andunlessotherwisestatedshallbemeasuredthenetareacovered.e.Nodeductionshallbemadeforvoidsnotexceeding0.5squaremeter,forvoidsnotexceeding300millimeterswide,norforunbracketedcornices,mouldingsandthelikeofanywidth.f.Worktoceilingsandbeamswheretheceilingexceeding3.5metersfromthefloorshallbegivenseparatelyandsodescribed,theheightbeingstatinginstagesof1.5meters.g.Worktothefollowingsurfacesorofthefollowingtypesshallbegivenseparately:-1)Wallsandcolumns.2)Floors.3)Ceilingsincludingsidesandsoffitsoobeams.4)Slopingsoffitsofstaircases.5)Flewingsoffitsofstaircases.6)Circularwork.7)Elliptical,sphericalandgroinedwork.8)Patternedwork.9)Coloredworkstatingthecolororcolorgroup.10)Workinrepairsstatingthethicknessofanydubbingrequired.SPATTERDASH2.SpatterdashSpatterdashtoallsurfacesshallbemeasuredtogetherandgivensuper.LATHINGANDPLASTERBOARD3.GenerallyEachitemoflathingandplasterboardshallbeheldtoincludeforallholes,notchingandanyothersundryitemsofalikenature.4.MetallathingThedescriptionofmetallathingshallstatethelaps,thickness,meshandmethodoffixing.5.PlasterboardThedescriptionofplasterboardandsimilarmaterialsshallstatethetreatmentofthejoints
andthemethodoffixing.IN-SITUFINISHESANDSCREEDS1.Generallya.WorkmeasuredunderthisSectionshallincluderendering,plastering,screeds,granolithic,terrazzoandproprietaryin-situfinishes.Eachtypeofworkshallbegroundunderaseparatelyheading.b.Apreambleitemshallbegivenstatingthateachitemofworkshallbeheldtoincludeforinternalangles,arrises,quirks,throats,dripsandthelike,covesandroundedexternalanglesnotexceeding25millimetersradius,andangles,stops,intersections,fairends,junction,wreathedcornersandthelikeoncornices,mouldings,enrichments,coves,skirtings,gutters,channels,strings,curbsandsimilarandothersundryitemsofalikenature.c.Thenumberofcoatsandthicknessoftheworkexclusiveofkeys,groovesoropenjointsinbrickworkorlathspacing,shallbestated.d.Workonlathingoronplasterboardorthelikeshallbegivenseparately.e.Thedescriptionofscreedsshallstatethematerialtobereceived.f.Workexecutedinoneoperationwithconcreteshallbegivenseparately.2.Floorsa.Apreambleitemshallbegivenstatingthateachitemofworktofloorsshallbeheldtoincludeforlayingorfinishingtoslopes,fallsandcurrents.b.Coloredmargins,bands,andthelikeshallbegivenrunasextraovertheworkinwhichtheyoccur.c.Fillingsinshapedinsets,recessedmanholeorsimilarcovers,matsinkings,pipertrenchcoversandthelikeshallbegivenasextraovertheworkinwhichtheyoccur.Fillingstopipetrenchcoversshallbegivenrun;thattoinstes,manholecoversandmatsinkingsshallbeenumerated.3.SkirtingsSkirtingsshallbegivenrunandfullydescribedstatingtheheightabovethefinishedfloor.4.Stepsandstaircasesa.Worktotreadsandrisersofstepsandstaircasesshallbegivenseparately.b.Wallstringsandopenstringsshallbegivenrunandheaverageheightstated.c.Curbstringsshallbegivenrunstatingthegirth.5.ChannelsWorktochannelsshallbegivenrunstatingthewidthanddepth.Whereformedinworkofasimilartypetheyshallbegivenasextraovertheworkinwhichtheoccur.6.Wallsa.Worktowallsshallbemeasuredfromthetopoftheskirtingswhenoftilesorothersolidmaterial;wherewoodskirtingsoccur,themeasurementshallbefromthetopofthewood
groundorfromthefloorwherenogroundisprovided.a.Worklinedtoformpatternshallbegivenseparately.2.Roundedangles,covesandcornicesa.Covers,internalandexternalroundedanglesandquirksexceeding2.5millimetersradiusandcornicesshallbemeasuredonthelineofwallorbeamandgivenrun;thedescriptionshallstatethegirthofthevisiblecontourincludinganyflatorweatheredtopandthemaximumthicknessofdubbing.b.Covesandcornicesrequirestobebracketedshallbegivenseparately.ForframedbracketingseeCarpenterClause9c.3.Mouldings,ceilingsribsandenrichmentsMouldings,ceilingsandenrichmentsshallbegivenrunandfullydescribedstatingthevisiblegirth.Modelsandsamplelengthsshallbeenumerated.TILE,SLABANDSHEETFINISHES4.Generallya.Workmeasuredunderthissectionshallincludetilingandmosaicitems,linoleum,cork,vinylsheetingandthelike.Eachtypeofworkshallbegroupedunderaseparateheading.b.Apreambleitemshallbegivenstatingthateachitemofworkshallbeheldtoincludeforinternalanglesandarrises,cuttingandfittinguptoframesandmetalworkandaroundpipesandbracketendsandthelikeandmitres,stops,intersections,fairends,junctions,wreathedcornersandthelikeonmouldings,coves,skirtings,gutters,channels,strings,curbsandsimilarsexceptwherespecialtilesoffittingsarerequired.5.Floorsa.Apreambleitemshallbegivenstatingthateachitemofworktofloorsshallbeheldtoincludeforlayingtoslopes,fallsandcurrents.b.Coloredmargins,bandsandthelikeshallbegivenrunasextraovertheworkinwhichtheyoccur.c.Fillingintoshapedinsets,recessedmanholeofsimilarcovers,sinkings,pipetrenchcoversandthelikeshallbegivenasextraovertheworkinwhichtheoccur.Wherejointingisrequiredtolinewithadjointingworkitshallbesostated.Fillingtopipetrenchcoversshallbegivenrun;thattoinsets,manholecoversandmatsinkingsshallbeenumerated.6.SkirtingsSkirtingsshallbegivenrunandfullydescribedstatingtheheightabovethefinishedfloor.Angles,junctions,fairendsandthelikerequiringspecialtilesorfittingsshallbeenumerated.7.Stepsandstaircasesa.Worktotreadsandrisersofstepsandstaircasesshallbegivenseparately.b.Nonsliptilenosingsshallbegivenrun.c.Wallstringsandopenstringsshallbegivenrunandtheaverageheightstate.Angles,junctions,fairendsandthelikerequiringspecialfilesoffittingsshallbeenumerated.
a.Curbstringsshallbegivenrunstatingthegirth.Angles,junctions,fairendsandthelikerequiringspecialtilesorfittingsshallbeenumerated.2.ChannelsChannelsshallbegivenrunstatingthewidthanddepthonface.Whereformedinworkofasimilartypetheyshallbegivenasextraovertheworkinwhichoccur.3.WallsWorktowallsshallbemeasuredformfinishedfloorsurfaceortopofskirtingasappropriate.4.ExternalworkWorktothefollowingsurfacesexternallyshallbegivenseparately:-1)Cills,copings,horizontallouvers,sunbreakersandthelikegroupedtogether.2)Verticalfins,sunbreakersandthelikegroupedtogether.3)Smallfeaturessuchasairconditionerboxesandthelikegroupedtogether.5.RoundededgesandmouldingsRoundededgetilesandslabs,coves,beads,nouldingsandthelikeshallbegivenrunasextraovertheworkonwhichtheoccur.Angles,junctions,stops,fairendsandthelikerequiringspecialtilesorfittingsshallbeenumerated.SUNDRIES6.DivisionstripsDivisionstripsshallbefullydescribedandgivenrun.7.Non-slipinsertsNon-slipinsertstotreadsandthelikeshallbefullydescribedandgivenrun.8.BeddingframestoconcreteBeddingwoodframesandcillsfixedtoconcreteshallbegivenrun.Pointingtooneorbothsidesshallbegiveninthedescription.
XVIIPLUMBERIncludingGasandHotWaterFitter,ZincWorkerandCoppersmithGENERALLY1.Generallya.Workshallbegroupedasfollowsandeachgroupshallbegivenunderanappropriateheading:_1)Leadwork.2)Zincwork.3)Coppersmith.4)Rainwaterdisposal.5)Sanitaryfittings.6)Soil,wasteandventilationpipesystem.7)Coldwaterinstallation.8)Hotwaterinstallation.9)Flushingwaterinstallation.10)Firefightinginstallation.11)Compressedairinstallation.12)Gasinstallation.(statingtype—eachtypekeptseparate)13)Otherspecialservices.Eachgivenseparately.b.Externalorundergroundmainsandsub-mainstoeachoftheaboveservices7)to8)shallbegivenseparately.LEADWORK2.Sheetleadworka.Leadshallbegivensuper,exceptashereinafterprovided,theCodeNo.andthicknessbeingstatedinallcases.b.Thetermsmilledleadandlabororcastleadandlaborshallbeheldtoincludeforwedging,solderandalllaborsconnectedwiththeitemdescribed.c.Leadworkgenerallyshallbegivenunderthefollowingorsimilarclasstications:-1)Gutters,includingcesspools,valleysandcoveringstohipsandridges.2)Apronsandflashings.3)Steppedflashings.4)Soakers.5)Weatheringstocornices.6)Guttersordampfroofcoursestohollowwalls.7)Liningstosafes,cisterns,sinksandthelike.
1)Liningstodoors,wallsandthelike.b.Sheetleadinisolatedstripsatedgesofasphaltflatsandthelikeshallbegivenrun.c.Leadtacksshallbemeasuredandaddedtothesuperficialareaoftheitemswithwhichtheyareconnected.d.Intheabsenceofanydirectionstothecontrary,thefollowingallowanceshallbemade:-1)Forpassingsinrunninglengthsofapronsandflashings,100millimetersinevery2linearmeters.2)Forweltedlaps,100millimeters.3)Forweltededges,25millimeters.e.Thefollowingshallbemeasured:-1)Costleaddots,soldereddots,leadplugsandliningstocesspools.2)Saddlesandleadslatestopipespassingthroughroofs.f.Coppernailingshallbegivenrunanddescribedasclosewherethespacingdoesnotexceed50millimeters.ZINCWORK2.Zincworka.Thequalityandthicknessofzincrequiredshallbestated.b.Zincshallbeclassifiedasdescribedforleadworkinclause2candgivensuper,clipsshallbemeasuredandaddedtothesuperficialarea.c.Thetermzincandlaborshallbeheldtoincludeforanynecessarywedges,solderandalllaborsconnectedwiththeitemdescribed.d.Intheabsenceofanydirectionstothecontrary,anallowanceof100millimetersinevery2linearmetersshallbemadeforpassingsinrunninglengthsofapronsandflashings.e.Nailingshallbegivenrunanddescribedasclosewherethespacingdoesnotexceeded50millimeters.COPPERSMITH3.Coppera.Thequalityandthicknessofcopperrequiredshallbestated.b.Coppershallbeclassifiedasdescribedforleadworkinclause2candgivensuper;clipsshallbemeasuredandaddedtothesuperficialarea.c.Intheabsenceofanydirectionstothecontrarythefollowingallowancesshallbemade;-1)Forweltedlaps,100millimeters.2)Lapsincoverflashings,75millimetersineverylinearmeter.3)Forpassingsinrunninglengthsofcoveringstoapronsandflashing100millimetersinevery2linearmeters.d.Coppernailingshallbegivenrunanddescribedasclosewherethespacingdoesnot
exceed50meters.RAINWATERDISPOSAL1.Generallya.Rainwatergoodsineachmaterialandgradeshallbegivenseparatelyunderaheading.b.Rainwaterpipesshallbemeasuredinaccordancewiththerulesformeasurementofpipeworkbelow.c.Eavesguttersshallbegivenrunmeasuredthemeanlengthoverallbends,junctions,anglesandthelike;themethodofjointingandfixingshallbestatedinthedescription.Shortlengthsshallbeheldtobeincludedintheitem.d.Angles,stoppedendsandoutletsshallbeenumeratedasextraoverthelengthofgutter;theextrajointsshallbeincludedintheitem.e.Heads,roofoutletsandthelikeshallbeenumerated.2.GratingsGratingstoheads,cesspoolsandoutletsshallbeenumerated.SANITARYFITTINGSANDPLANT3.FittingsBaths,lavatories,W.C.s,sinks,urinals,flushingcisternsandotherfittingstogetherwiththefixingshallbeenumerated;jointstoservice,wasteandoverflowpipesshallbeheldtobeincludedintheitem.4.Boilers,cisternsandcylindersBoilers,cisternsandcylindersshallbeenumeratedstatingthesizeandmethodoffixing;jointstoservice,overflowandexpansionpipesshallbeheldtobeincludedintheitem.PIPEWORK5.Generalrulesformeasurementofpipeworka.Apreambleitemshallbegivenstatingthateachitemofpipeworkshallbeheldtoincludeforallshortlengths,jointsintherunninglength,andjointstoallbends,branches,teesandotherpipefittingsandheads,roofandflooroutletsandthelike.b.Pipesshallbegivenrun,measuredthemeanlengthoverallbends,branches,junctionsandthelike.c.Pipesshallbeclassifiedaccordingtonominalsize,substance,qualityandfinishe;themethodofjointandfixingshallbestatedinthedescription.6.Castironorasbestos-cementsoil,wasteandventilatingpipesa.Bends,swannecks,offsets,branches,inspectiondoors,shoes,enlargedsocketsandotherfittingsshallbeenumeratedasextraoverthepipe.b.Headsshallbeenumerated.c.Gratingsinendsofpipesandinheadsshallbeenumerated.7.P.V.C.soil,wasteandventilatingpipesa.Pipesnotexceeding40millimetersdiametershallbemeasuredinaccordancewith
therulesformeasurementofPlasticPipesinclause14abelow.a.Onpipesexceeding40mmdiameter,bends,swannecks,offsets,branches,inspectiondoors,shoes,enlargedsocket,bossjointsandotherfittingsshallbeenumeratedasextraoverthepipe.Perforatingthepipeforbossjoints,sockets,accessdoorsandthelikeshallbeheldtobeincludedintheitem.b.Heads,aprons,ventcowls.Roofandflooroutletsandthelikeshallbeenumerated.c.Capsandgratingsinendsofpipesshallbeenumerated.2.Mildsteelpipesa.Pipesnotexceeding40millimetersdiametershallbeheldtoincludeallsocket,connectors,unions,elbowsbends,madebends,tees,diminishingsockets,plugsandthelike.b.Pipesexceeding40millimetersdiametershallbeheldtoincludeallsocket,connectors,unions.Elbowsbends,madebends,tees,diminishingsockets,plugsandthelikeshallbeenumeratedasextraoverthepipe.3.Brassorcopperpipesa.Pipesshallbeheldtoincludeallmadebends.b.Elbows,bends,tees,connectors,unions,diminishingsockets,plugsandthelikeshallbeenumeratedasextraoverthepipe.4.Plasticpipesa.Pipesnotexceeding40millimetersdiametershallbeheldtoincludeallsocket,connectors,unions,elbowsbends,madebends,tees,weldedjunctions,diminishingsockets,plugandthelike.b.Onpipesexceeding40mmdiameter,elbows,bends,madebends,tees,weldedjunctions,connectors,unions,diminishingsocketsandthelikeshallbeenumeratedasextraoverthepipe.5.Castiron,spunironandflangedpipewatermainsBends,tees,connectors,unions,diminishingsockets,strainersandthelikeshallbeenumeratedasextraoverthepipe.6.AsbestosBends,tees,connectors,unions,diminishingsockets,strainersandthelikeshallbeenumeratedasextraoverthepipe.7.ConnectiontowatermainsTheconnectiontoawatermain,whereitcannotbemeasuredindetail,shallbedealtwithbymeansofaProvisionalSum.PLUMBER’SBRASSWORK8.BrassworkandsundriesCones,traps,unions,ferrules,sleevepieces,sockets,flangeplates,tankconnectorsandthelikeandallvalvesandsimilaritemsshallbeenumeratedandthejointsandfixingdescribed.
THERMALINSULATION1.Thermalinsulationgenerallya.Particularsofthefollowingshallbegiven:-1)Materials.2)Thickness.3)Finishand/orprotection.4)Methodoffixing.5)Hotfacetemperatureforservicesotherthanhotwaterinstallations.b.Workingorcuttingandfittingtheinsulationmaterialaroundsupports,joints,elbows,tees,valvesandotherfittingsshallbeheldtobeincludedintheitem.c.Wheretheinsulationisexposedtotheweatherthisshallbestatedinthedescription.2.InsulationtopipeworkInsulationtopipeworkshallbegivenrunstatingthetypeandnominaldiameterofpipe.3.InsulationtoplantInsulationtoplant(e.g.boilers,calorifiers,cylindersandthelike)shallbeenumeratedstatingtheoverallsizeoftheplant.Theitemshallbeheldtoincludeworkingorcuttingandfittingaroundaccessdoors,gauges,connectionsandthelike.SUNDRRYSERVICES4.TestingThetestingofplumbingandsanitaryworkshallbegivenasanitem.5.IdentificationpaintingIdentificationpaintingofcolorcodedbands,arrowsorthelikeshallbegivenasanitemstatingtherequirementinrelationtoeachserviceorsystem.6.TemporaryoperatinganinstallationTemporaryoperatinganinstallation(exceptfortesting)shallbegivenasanitemstatinganyrequiredqualificationoftheattendant,thedurationoftheoperatingperiodandthepurpose(e.g.dryingoutorlagging,instructingtheemployer’staffinoperatingtheinstallationetc.)andtheparticularsofanyspecialinsurancecoverrequired.Theprovisionofanyfuleorpowerrequiredshallbeheldtobeincludedintheitem.7.RecordplansofinstallationsPreparationofrecordplansand/ordiagramsofinstallationsasfittedshallbegivenasanitemstatingtheinformationrequiredtobeshownandthenumberofcopiesofeachdrawingrequired.
XVIIIGLAZIER1.Generallya.Thevariouskindsofglassshallbedescribedinaccordancewiththeusualtradetermsandeachshallbegivenseparatelystatingthequantity,nominalweightorthickness.b.Themethodofglazingshallbedescribedstatingifspriggedandweatherglazingistowoodormetalandiffrontandbackbedded.Puttyorglazingcompoundshallbedescribed;ifglassifbeddedinwashleather,Indiarubber,plasticorthelike,thebeddingmaterialshallbegivenseparately.Glassfixedwithwoodormetalbeadsormouldingsshallbesodescribedandgivenseparately.c.Exceptashereinafterprovide,glassshallbegivensuperinthefollowingstages:-1)Notexceeding0.1squaremeters.2)Exceeding0.1butnotexceeding0.3squaremeters.3)Exceeding0.3butnotexceeding0.5squaremeters.4)Exceeding0.5butnotexceeding1.0squaremeters.5)Thereafterinsuccessivestageof0.5squaremeter.d.Eachpaneofglassorpanelofleadlightglazingshallbemeasured.e.Panesofglassofirregularshapeshallbemeasuredthesmallestrectangularareaoutofwhichsuchirregularshapecanbecut,givenseparatelyanddescribedasinirregularshapes,measuredsquare.f.Hackingoutandpreparingfornewglassshallbegivensuper.g.Glasslouversshallbegivenrunstatingthenumberandfinishtoedges.h.Holesinglassshallbeenumeratedstatingthesizeoftheholeandtypeandthicknessoftheglassandthesizeofthepane.2.PolishedplatePolishedplateglassrequiredtobeofanextrathicknessshallbesodescribed.3.BentglassBentpanesshallbeenumeratedstatingthesizeofthepaneandgirthandradiusofthebend.4.Grinding,polishing,sandblastingandembossingGrinding,polishing,sandblastingorembossingsurfacesoredgesshallbefullydescribed.5.BrilliantcuttingBrilliantcuttingpanesandpaneswithotherdecorativeworkshallbeenumeratedandfullydescribedstatingthesizeofthepane.6.BevelingBevelingshallbegivenrunstatingthewidthofthebevelandincludingmiters;whenoncircularedgesitshallbegivenseparately.
1.SilveringSilveringshallbegivensuper;silveringonbentglassshallbegivenseparately.2.GlassblocksGlassblockwallsorpanelsshallbegivensuper;thedescriptionshallstatethesizeoftheblocksandthemethodofbedding.Anyspecialbeddingattheperimeterandreinforcementtojointsshallbegivenrun.3.GlassliningsGlassingliningsandthelikeshallbegivensuperandthemethodoffixingdescribed.4.MirrorsMirrorsshallbeenumeratedandfullydescribe.5.DomelightsDomelightsshallbeenumeratedstatingtheoverallsize,shapeandmethodoffixing.
XIXPAINTERGENERALLY1.Generallya.Apreambleshallbegivenstatingthateachitemshallbeheldtoincludeformulticoloredworkandcuttingtoline.b.Worktoceilingsexceeding3.5metersfromthefloorwithnoapplierfinishofliningandrequiringtheerectionofspecialscaffolding,cradles,rowersorthelikeshallbegivenseparately,theheightbeingstatedinstagesof1.5meters.c.Workindifferingmaterialsshalleachbegivenseparately.Materialrequiredtobeappliedbyaparticularmethodshallbesodescribedstatingthemethod.d.Workonwood,brick,plaster,stone,metalorothertypesofsurfaceshalleachbegivenseparately.Preliminarypreparatoryworktothesurfacerequiredbeforetheapplicationofanymaterialshallbeheldtobeincludedintheitem.e.Workrequiredtobeexecutedofmembersbeforefixingshallbesodescribed.f.Preparatoryworksuchasknottingandstopping,primingandsealingcoatsshallallbestatedinthedescription.Rubbingdownbetweencoatsshallbeheldtobeincludedintheitem.g.Workonexistingsurfacesshallbegivenseparatelyandpreparatorytreatmentofexistingdecorationsuchaswashingdown,burningoff,strippingandthelikeshallbestatedinthedescription.h.Workgenerallyshallbegivensuperandallowanceshallbemadeformouldingsonpaneling,edgesandthelike.Workonsurfacesnotexceeding300millimeterswideorgirth,wherenotinconjunctionwithsimilarpaintedwork,shallbegroupedinstagesof100millimetersandgivenrun.Beads,hingesandotherfittings,brackets,bolts,lugsandthelikeshallbeheldtobeincludedwiththeworkwhichtheyareassociated.i.Workoncarvedorenrichedsurfacesshallbegivenseparately;allowanceshallbemadefortheadditionalareacovered.Workonenrichedmouldingsshallbegivenrun.Workonsmallcarvedsurfaces,centreflowers,rosettes,modillionsandthelikeshallbeenumerated.PAINTINGANDSIMILARWROK2.Walls,columns,ceilingsandbeamsWorkonwallsandcolumns(groupedtogether)shallbegivenseparatelyfromthatonceilings.Workonceilingsandbeamsshallbegroupedtogether.3.ConcretegrillesWorkonconcretegrillesandthelikeshallbemeasuredflatoverallonbothsidesstatingthethicknessofgrilleandgivensuper.4.Metalwrok
a.Workonmembersofrooftrusses,latticesteelworkandthelikeshallbesodescribedandgivenseparately.b.Workonmetalwindowsanddoorsshallbemeasuredflatoverallonbothsidesandgivensuper.Openingedgesandallsurfacesofframes,mullions,transoms,cillsandthelikeshallbemeasuredindetail.c.Worktotheindividualmembersofbalustrading,fencing,gates,railingsandthelikeshallbemeasuredindetail.d.Workonmeshcoveredorornamentalfencing,railings,gatesandthelikeshallbemeasuredflatoverallonbothsidesandgivensuper.e.Worknoradiatorsshallbegiventhesuperficialareaofheatingsurface;workonbracketsandstaysshallbeheldtobeincludedwiththeitem.2.PipesWorktopipesandconduitsshallbegivenrunandclassifiedinaccordancewithGeneralPrinciplesClause10hereof.3.GuttersWorkoneavesguttersshallbegivenrunstatingthesize.4.SundryitemWorkonairbricks,water-wastepreventers,rainwaterheading,ventilatingsandsimilarsmallisolateditemsshallbeenumerated.5.Woodwindows,glazeddoorsandscreensWorkonwoodsashes,woodcasements,glazedwoodscreensandthelikeshallbemeasuredoverallonbothsides,groupedtogetherandgivensuper.Openingedgesofsashesandcasementwindowsshallbeheldtobeincludedintheitem.POLISHING6.PolishingTypeofpolish(e.g.Frenchpolish,waxpolish)andpreparatorywork(e.g.fuming,staining,bodyinginandthelike)shallbestatedinthedescription.SIGNWRITING7.SignwritingLetters,numerals,characters,stopsandsimilaritemsshallbeenumeratedandtheheightandstylestated.PAPERHANGING8.Paperhanginggenerallya.Wallpapershallbefullydescribedtogetherwiththeadhesive,measuredthenetareacoveredandgivensuper.b.Workappliedtodifferentbasesshallbegivenseparatelyandthenatureofthebaseandanypreparatoryworkshallbestatedinthedescription.c.Workonwalls,columns,ceilingsandbeamsshalleachbegivenseparately.d.Cuttingandfittingpaperaroundpipes,switches,bracketsandthelikeshallbeheld
tobeincludedintheitem.1.Border,cornersandmotifsa.Borderstripsandthelikeshallbegivenrun.Cuttingstripstoprofileshallbeincludedinthedescription.b.Cornersandmotifsshalleachbeenumeratedseparately.Cuttingtoprofileshallbeincludedinthedescription.'
您可能关注的文档
- 天津市工程量清单计价规范
- gb_50500-2008_建设工程工程量清单计价规范_附录b____装饰装修工程工程量清单
- 2007《建设工程工程量清单计价规范》有关问题解释答疑专集
- 馆藏文物保护修复工作量清单计价规范(征求意见稿)
- 2013《建设工程工程量清单计价规范》
- 2013工程量清单计价规范
- 新《建设工程工程量清单计价规范》重点解析(四)
- 工程造价 毕业论文——08清单计价规范下措施项目费
- 建设工程工程量清单计价规范 解释与答疑
- 建设工程工程量清单计价规范 15条强制性条文
- 馆藏文物保护修复工作量清单计价规范(征求意见稿)
- 水运工程工程量清单计价规范
- 四川省《建设工程工程量清单计价规范》实施办法d
- 建设工程工程量清单计价规范分析报告工程造价计价模式标准规范
- 最新电力建设工程量清单计价规范
- 建设工程工程量清单计价规范(郭婧娟)
- 《建设工程工程量清单计价规范》有关问题解释答疑
- 通风空调工程量清单计价规范