'《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1二接一管段预制,电弧焊,Φ48x3.5mm以内千米606.55198.6731.92375.968.332-2二接一管段预制,电弧焊,Φ48x4mm以内千米645.1899223.9842.91378.39.3912-3二接一管段预制,电弧焊,Φ48x5mm以内千米656.22227.149.49379.639.5222-4二接一管段预制,电弧焊,Φ60x3.5mm以内千米653.68221.8540.68391.159.3022-5二接一管段预制,电弧焊,Φ60x4mm以内千米678.46225.9350.92401.619.4732-6二接一管段预制,电弧焊,Φ60x5mm以内千米707.69245.6159.24402.8410.2982-7二接一管段预制,电弧焊,Φ60x6mm以内千米728.63245.9975.86406.7810.3142-8二接一管段预制,电弧焊,Φ60x7mm以内千米783.4275.1691.27416.9711.5372-9二接一管段预制,电弧焊,Φ60x8mm以内千米831.91283.62107.62440.6711.8922-10二接一管段预制,电弧焊,Φ60x9mm以内千米867.56307.9111.37448.2912.912-11二接一管段预制,电弧焊,Φ60x10mm以内千米890.42311.74128.5450.1813.0712-12二接一管段预制,电弧焊,Φ76x3.5mm以内千米719.15241.5151.61426.0310.1262-13二接一管段预制,电弧焊,Φ76x4.0mm以内千米749.09246.2564.35438.4910.3252-14二接一管段预制,电弧焊,Φ76x5.0mm以内千米767.1247.0979.45440.5610.362-15二接一管段预制,电弧焊,Φ76x6.0mm以内千米810.26268.9196.18445.1711.2752-16二接一管段预制,电弧焊,Φ76x7.0mm以内千米872.5299.44115.48457.5812.5552-17二接一管段预制,电弧焊,Φ76x8.0mm以内千米916.04308.17126.93480.9412.9212-18二接一管段预制,电弧焊,Φ76x9.0mm以内千米936.3310.19141.55484.5613.0062-19二接一管段预制,电弧焊,Φ76x10.0mm以内千米974.79314.99163.33496.4713.2072-20二接一管段预制,电弧焊,Φ76x12.0mm以内千米1126.53340.05225.35561.1314.2582-21二接一管段预制,电弧焊,Φ89x3.5mm以内千米809.84272.4960.86476.4911.4252-22二接一管段预制,电弧焊,Φ89x4mm以内千米834.1801275.5474.47484.1711.5532-23二接一管段预制,电弧焊,Φ89x5mm以内千米853.83276.1891.81485.8411.582-24二接一管段预制,电弧焊,Φ89x6mm以内千米904.65300.75111.94491.9612.612-25二接一管段预制,电弧焊,Φ89x7mm以内千米949.4399308.21134.64506.5912.9232-26二接一管段预制,电弧焊,Φ89x8mm以内千米1013.39316.66148.77547.9613.2772-27二接一管段预制,电弧焊,Φ89x9mm以内千米1034.47317.85165.33551.2913.327
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-28二接一管段预制,电弧焊,Φ89x10mm以内千米1108.35353.08190.51564.7614.8042-29二接一管段预制,电弧焊,Φ89x12mm以内千米1315.84393.88266.5655.4616.5152-30二接一管段预制,电弧焊,Φ89x14mm以内千米1427.52408.1327.55691.8717.1112-31二接一管段预制,电弧焊,Φ108x4mm以内千米953.69307.3586.8559.5412.8872-32二接一管段预制,电弧焊,Φ108x5mm以内千米993.23311.27115.3566.6613.0512-33二接一管段预制,电弧焊,Φ108x6mm以内千米1026.23313.03136.46576.7413.1252-34二接一管段预制,电弧焊,Φ108x7mm以内千米1087.61343.99157.87585.7514.4232-35二接一管段预制,电弧焊,Φ108x8mm以内千米1147.21353.79182.4611.0214.8342-36二接一管段预制,电弧焊,Φ108x9mm以内千米1194.41354.84209.91629.6614.8782-37二接一管段预制,电弧焊,Φ108x10mm以内千米1282.32393.62236.6652.116.5042-38二接一管段预制,电弧焊,Φ108x12mm以内千米1434.83418.52300.22716.0917.5482-39二接一管段预制,电弧焊,Φ108x14mm以内千米1560.82434.67368.99757.1618.2252-40二接一管段预制,电弧焊,Φ114x4mm以内千米1011.22323.1495.03593.0513.5492-41二接一管段预制,电弧焊,Φ114x5mm以内千米1041.16327.94117.61595.6113.752-42二接一管段预制,电弧焊,Φ114x6mm以内千米1068.45328.92140.48599.0513.7912-43二接一管段预制,电弧焊,Φ114x7mm以内千米1161.42366.86172.4622.1615.3822-44二接一管段预制,电弧焊,Φ114x8mm以内千米1222.78374.11191.84656.8315.6862-45二接一管段预制,电弧焊,Φ114x9mm以内千米1259.76381.12212.29666.3515.982-46二接一管段预制,电弧焊,Φ114x10mm以内千米1350.41421.29245.07684.0517.6642-47二接一管段预制,电弧焊,Φ114x12mm以内千米1563.99456.47332.93774.5919.1392-48二接一管段预制,电弧焊,Φ114x14mm以内千米1727.77478.14419.49830.1420.0482-49二接一管段预制,电弧焊,Φ127x4mm以内千米1115.12365.55101.73647.8415.3272-50二接一管段预制,电弧焊,Φ127x5mm以内千米1176.88372.27134.96669.6515.6092-51二接一管段预制,电弧焊,Φ127x6mm以内千米1196.34374.02146.38675.9415.6822-52二接一管段预制,电弧焊,Φ127x7mm以内千米1276.45409.34185.33681.7817.1632-53二接一管段预制,电弧焊,Φ127x8mm以内千米1336.6419.4210.65706.5517.5852-54二接一管段预制,电弧焊,Φ127x9mm以内千米1482.34441.37237.47803.518.506
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-55二接一管段预制,电弧焊,Φ127x10mm以内千米1602.66489.12281.67831.8720.5082-56二接一管段预制,电弧焊,Φ127x12mm以内千米1820.49524.82371.86923.8122.0052-57二接一管段预制,电弧焊,Φ127x14mm以内千米2003.13548.98468.4985.7523.0182-58二接一管段预制,电弧焊,Φ133x4mm以内千米1152.86372.68106.96673.2215.6262-59二接一管段预制,电弧焊,Φ133x5mm以内千米1206.35378.95138.27689.1315.8892-60二接一管段预制,电弧焊,Φ133x6mm以内千米1245.7379.6168.23697.8715.9162-61二接一管段预制,电弧焊,Φ133x7mm以内千米1406.58484.2202.47719.9120.3022-62二接一管段预制,电弧焊,Φ133x8mm以内千米1459.8492.62225.9741.2820.6552-63二接一管段预制,电弧焊,Φ133x9mm以内千米1575.23511.92248.85814.4621.4642-64二接一管段预制,电弧焊,Φ133x10mm以内千米1703.14530.42310.8861.9222.242-65二接一管段预制,电弧焊,Φ133x12mm以内千米1941.59610.89389.92940.7825.6142-66二接一管段预制,电弧焊,Φ133x14mm以内千米2171.28642.5507.091021.6926.9392-67二接一管段预制,电弧焊,Φ133x16mm以内千米2252.79645579.811027.9827.0442-68二接一管段预制,电弧焊,Φ159x5mm以内千米1669.82521.15164.79983.8821.8512-69二接一管段预制,电弧焊,Φ159x6mm以内千米1717.2522.1200.7994.421.8912-70二接一管段预制,电弧焊,Φ159x7mm以内千米1798.26535.65241.781020.8322.4592-71二接一管段预制,电弧焊,Φ159x8mm以内千米1907.69588.98270.941047.7724.6952-72二接一管段预制,电弧焊,Φ159x9mm以内千米2073.14618.62297.411157.1125.9382-73二接一管段预制,电弧焊,Φ159x10mm以内千米2153.37628.38343.281181.7126.3472-74二接一管段预制,电弧焊,Φ159x12mm以内千米2451.98677.55466.391308.0428.4092-75二接一管段预制,电弧焊,Φ159x14mm以内千米2732.96759.31587.871385.7831.8372-76二接一管段预制,电弧焊,Φ159x16mm以内千米2946.53780.61725.661440.2632.732-77二接一管段预制,电弧焊,Φ168x5mm以内千米1861.12581.56173.871105.6924.3842-78二接一管段预制,电弧焊,Φ168x6mm以内千米1911.22582.44211.91116.8824.4212-79二接一管段预制,电弧焊,Φ168x7mm以内千米1996.37596.7255.131144.5425.0192-80二接一管段预制,电弧焊,Φ168x8mm以内千米2117.87657.64286.481173.7527.5742-81二接一管段预制,电弧焊,Φ168x9mm以内千米2146.9657.97314.391174.5427.588
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-82二接一管段预制,电弧焊,Φ168x10mm以内千米2230.27667.9362.411199.9628.0042-83二接一管段预制,电弧焊,Φ168x12mm以内千米2643.76722.63492.951428.1830.2992-84二接一管段预制,电弧焊,Φ168x14mm以内千米2953.31786.07621.091546.1532.9592-85二接一管段预制,电弧焊,Φ168x16mm以内千米3237866.42766.831603.7536.3282-86二接一管段预制,电弧焊,Φ168x18mm以内千米3562.96911.57931.891719.538.2212-87二接一管段预制,电弧焊,Φ194x6mm以内千米2193.01660.65244.591287.7727.72-88二接一管段预制,电弧焊,Φ194x7mm以内千米2291.46677.03294.661319.7728.3872-89二接一管段预制,电弧焊,Φ194x8mm以内千米2432.69700.81351.011380.8729.3842-90二接一管段预制,电弧焊,Φ194x10mm以内千米2570.87768.4418.761383.7132.2182-91二接一管段预制,电弧焊,Φ194x12mm以内千米3175.86878.16569.651728.0536.822-92二接一管段预制,电弧焊,Φ194x14mm以内千米3455.09914.93717.731822.4338.3622-93二接一管段预制,电弧焊,Φ194x16mm以内千米3808.531033.11886.381889.0443.3172-94二接一管段预制,电弧焊,Φ194x18mm以内千米4316.881105.31137.52074.0846.3442-95二接一管段预制,电弧焊,Φ194x20mm以内千米4522.321121.981283.22117.1447.0432-96二接一管段预制,电弧焊,Φ219x6mm以内千米2306.31702.95277.141326.2229.4742-97二接一管段预制,电弧焊,Φ219x7mm以内千米2417.3721.39333.631362.2830.2472-98二接一管段预制,电弧焊,Φ219x8mm以内千米2577.8748.32397.691431.7931.3762-99二接一管段预制,电弧焊,Φ219x10mm以内千米2718.9809.25474.521435.1333.9312-100二接一管段预制,电弧焊,Φ219x12mm以内千米3370.89926.69644.871799.3338.8552-101二接一管段预制,电弧焊,Φ219x14mm以内千米3685.96968.24812.091905.6340.5972-102二接一管段预制,电弧焊,Φ219x16mm以内千米4052.631068.861002.851980.9244.8162-103二接一管段预制,电弧焊,Φ219x18mm以内千米4478.291127.721218.792131.7847.2842-104二接一管段预制,电弧焊,Φ219x20mm以内千米4859.041169.221451.422238.449.0242-105二接一管段预制,氩电联焊,Φ48x3.5mm以内千米673.15201.3758.62413.168.4432-106二接一管段预制,氩电联焊,Φ48x4mm以内千米738.55236.974.01427.649.9332-107二接一管段预制,氩电联焊,Φ48x5mm以内千米750.54237.5983.53429.429.9622-108二接一管段预制,氩电联焊,Φ60x3.5mm以内千米737.41225.5773.88437.969.458
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-109二接一管段预制,氩电联焊,Φ60x4mm以内千米749.3228.1576.51444.649.5662-110二接一管段预制,氩电联焊,Φ60x5mm以内千米794.13248.2393.8452.110.4082-111二接一管段预制,氩电联焊,Φ60x6mm以内千米812.95250.47104.7457.7810.5022-112二接一管段预制,氩电联焊,Φ60x7mm以内千米922.15306.78124.44490.9312.8632-113二接一管段预制,氩电联焊,Φ60x8mm以内千米978.16318.02138.28521.8613.3342-114二接一管段预制,氩电联焊,Φ60x9mm以内千米999.69318.02153.36528.3113.3342-115二接一管段预制,氩电联焊,Φ60x10mm以内千米1030.92324.38168.65537.8913.6012-116二接一管段预制,氩电联焊,Φ76x3.5mm以内千米821.4301246.0695.23480.1410.3172-117二接一管段预制,氩电联焊,Φ76x4.0mm以内千米835.87249.1698.61488.110.4472-118二接一管段预制,氩电联焊,Φ76x5.0mm以内千米861.76250.52119.7491.5410.5042-119二接一管段预制,氩电联焊,Φ76x6.0mm以内千米915.33274.92135.57504.8411.5272-120二接一管段预制,氩电联焊,Φ76x7.0mm以内千米975.0601285.22158.57531.2711.9592-121二接一管段预制,氩电联焊,Φ76x8.0mm以内千米1042.85298.67176.52567.6612.5232-122二接一管段预制,氩电联焊,Φ76x9.0mm以内千米1103.18324.1200.4578.6813.5892-123二接一管段预制,氩电联焊,Φ76x10.0mm以内千米1152.92332.35220.64599.9313.9352-124二接一管段预制,氩电联焊,Φ76x12.0mm以内千米1270.29352.96264.58652.7514.7992-125二接一管段预制,氩电联焊,Φ89x3.5mm以内千米925277.47110.23537.311.6342-126二接一管段预制,氩电联焊,Φ89x4mm以内千米933.79278.83114.14540.8211.6912-127二接一管段预制,氩电联焊,Φ89x5mm以内千米965.2599280.71138.89545.6611.772-128二接一管段预制,氩电联焊,Φ89x6mm以内千米1025.12308.02156.92560.1812.9152-129二接一管段预制,氩电联焊,Φ89x7mm以内千米1095.57320.21183.85591.5113.4262-130二接一管段预制,氩电联焊,Φ89x8mm以内千米1186.73334.28205.05647.414.0162-131二接一管段预制,氩电联焊,Φ89x9mm以内千米1211.93334.78228.42648.7314.0372-132二接一管段预制,氩电联焊,Φ89x10mm以内千米1312.91374.45257.12681.3415.72-133二接一管段预制,氩电联焊,Φ89x12mm以内千米1474.73409.17309.38756.1817.1562-134二接一管段预制,氩电联焊,Φ89x14mm以内千米1591.03425.48367.36798.1917.842-135二接一管段预制,氩电联焊,Φ108x4mm以内千米1088.2316.01140.57631.6213.25
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-136二接一管段预制,氩电联焊,Φ108x5mm以内千米1126.35318.23170.72637.413.3432-137二接一管段预制,氩电联焊,Φ108x6mm以内千米1162.16322.52191.22648.4213.5232-138二接一管段预制,氩电联焊,Φ108x7mm以内千米1280.72362.71224.68693.3315.2082-139二接一管段预制,氩电联焊,Φ108x8mm以内千米1352.9375.59250.92726.3915.7482-140二接一管段预制,氩电联焊,Φ108x9mm以内千米1402.52376.93279.83745.7615.8042-141二接一管段预制,氩电联焊,Φ108x10mm以内千米1519.6419316.11784.4917.5682-142二接一管段预制,氩电联焊,Φ108x12mm以内千米1694.39449.74381.25863.418.8572-143二接一管段预制,氩电联焊,Φ108x14mm以内千米1841.11470.51453.83916.7719.7282-144二接一管段预制,氩电联焊,Φ114x4mm以内千米1143.67332.78147.68663.2113.9532-145二接一管段预制,氩电联焊,Φ114x5mm以内千米1184.23335.19179.65669.3914.0542-146二接一管段预制,氩电联焊,Φ114x6mm以内千米1221.77339.65201.27680.8514.2412-147二接一管段预制,氩电联焊,Φ114x7mm以内千米1350383.13238.43728.4416.0642-148二接一管段预制,氩电联焊,Φ114x8mm以内千米1444.37397.34266.17780.8616.662-149二接一管段预制,氩电联焊,Φ114x9mm以内千米1490.39403.92296.81789.6616.9362-150二接一管段预制,氩电联焊,Φ114x10mm以内千米1614.86450.1333.69831.0718.8722-151二接一管段预制,氩电联焊,Φ114x12mm以内千米1800.36482.72402.82914.8220.242-152二接一管段预制,氩电联焊,Φ114x14mm以内千米1955.37504.52480.06970.7921.1542-153二接一管段预制,氩电联焊,Φ127x4mm以内千米1278.5375.59165.52737.3915.7482-154二接一管段预制,氩电联焊,Φ127x5mm以内千米1323.73378.36201.19744.1815.8642-155二接一管段预制,氩电联焊,Φ127x6mm以内千米1366.44383.51225.51757.4216.082-156二接一管段预制,氩电联焊,Φ127x7mm以内千米1509.48431.73267.02810.7318.1022-157二接一管段预制,氩电联焊,Φ127x8mm以内千米1612.78447.5298.16867.1218.7632-158二接一管段预制,氩电联焊,Φ127x9mm以内千米1741.38467.29332.68941.4119.5932-159二接一管段预制,氩电联焊,Φ127x10mm以内千米1879.98518.31373.97987.721.7322-160二接一管段预制,氩电联焊,Φ127x12mm以内千米2089.47555.06451.821082.5923.2732-161二接一管段预制,氩电联焊,Φ127x14mm以内千米2267.95579.96539.011148.9824.3172-162二接一管段预制,氩电联焊,Φ133x4mm以内千米1323.47383.29174.13766.0516.071
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-163二接一管段预制,氩电联焊,Φ133x5mm以内千米1371.27386.2211.51773.5616.1932-164二接一管段预制,氩电联焊,Φ133x6mm以内千米1415.62391.52236.95787.1516.4162-165二接一管段预制,氩电联焊,Φ133x7mm以内千米1642.59503.47280.52858.621.112-166二接一管段预制,氩电联焊,Φ133x8mm以内千米1720.11519.79299.87900.4521.7942-167二接一管段预制,氩电联焊,Φ133x9mm以内千米1862.59539.25349.5973.8422.612-168二接一管段预制,氩电联焊,Φ133x10mm以内千米1954.36554.54386.741013.0823.2512-169二接一管段预制,氩电联焊,Φ133x12mm以内千米2242.84642.97474.831125.0426.9592-170二接一管段预制,氩电联焊,Φ133x14mm以内千米2428.32669.23566.651192.4428.062-171二接一管段预制,氩电联焊,Φ133x16mm以内千米2645.71695.35690.871259.4929.1552-172二接一管段预制,氩电联焊,Φ159x4.5mm以内千米1791.56476.05237.941077.5719.962-173二接一管段预制,氩电联焊,Φ159x5mm以内千米1874.44530.14252.541091.7622.2282-174二接一管段预制,氩电联焊,Φ159x6mm以内千米1929.22536.82283.171109.2322.5082-175二接一管段预制,氩电联焊,Φ159x7mm以内千米2057.99559.14332.351166.523.4442-176二接一管段预制,氩电联焊,Φ159x8mm以内千米2224.98621.32376.731226.9326.0512-177二接一管段预制,氩电联焊,Φ159x9mm以内千米2411.36652.01420.511338.8427.3382-178二接一管段预制,氩电联焊,Φ159x10mm以内千米2523.29670.73465.691386.8728.1232-179二接一管段预制,氩电联焊,Φ159x12mm以内千米2790.03717.62565.171507.2430.0892-180二接一管段预制,氩电联焊,Φ159x14mm以内千米3085.9801.24681.811602.8533.5952-181二接一管段预制,氩电联焊,Φ159x16mm以内千米3350.24833.01832.861684.3734.9272-182二接一管段预制,氩电联焊,Φ168x5mm以内千米2081.92591.05267.111223.7624.7822-183二接一管段预制,氩电联焊,Φ168x6mm以内千米2139.01597.92299.531241.5625.072-184二接一管段预制,氩电联焊,Φ168x7mm以内千米2275.4621.63351.551302.2226.0642-185二接一管段预制,氩电联焊,Φ168x8mm以内千米2463.37691.86403.621367.8929.0092-186二接一管段预制,氩电联焊,Φ168x9mm以内千米2563.24693.41497.941371.8929.0742-187二接一管段预制,氩电联焊,Φ168x10mm以内千米2644.25713509.161422.0929.8952-188二接一管段预制,氩电联焊,Φ168x12mm以内千米3013.3765.42603.491644.3932.0932-189二接一管段预制,氩电联焊,Φ168x14mm以内千米3321.39831.05722.231768.1134.845
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-190二接一管段预制,氩电联焊,Φ168x16mm以内千米3674.25922.59882.611869.0538.6832-191二接一管段预制,氩电联焊,Φ168x18mm以内千米3998.53971.361032.961994.2140.7282-192二接一管段预制,氩电联焊,Φ194x6mm以内千米2454678.91345.321429.7728.4662-193二接一管段预制,氩电联焊,Φ194x7mm以内千米2611.5706.22405.51499.7829.6112-194二接一管段预制,氩电联焊,Φ194x8mm以内千米2745.4730.1454.191561.1130.6122-195二接一管段预制,氩电联焊,Φ194x10mm以内千米3038.81821.27575.81641.7434.4352-196二接一管段预制,氩电联焊,Φ194x12mm以内千米3608.32928.91698.831980.5838.9482-197二接一管段预制,氩电联焊,Φ194x14mm以内千米3889.18968.76837.672082.7540.6192-198二接一管段预制,氩电联焊,Φ194x16mm以内千米4400.121100.491024.842274.7946.1422-199二接一管段预制,氩电联焊,Φ194x18mm以内千米4781.131157.851201.142422.1448.5472-200二接一管段预制,氩电联焊,Φ194x20mm以内千米5100.531195.11387.622517.8150.1092-201二接一管段预制,氩电联焊,Φ219x6mm以内千米2599.46723.9392.041483.5230.3522-202二接一管段预制,氩电联焊,Φ219x7mm以内千米2777.86754.8460.191562.8731.6482-203二接一管段预制,氩电联焊,Φ219x8mm以内千米2929.31781.78515.491632.0432.7792-204二接一管段预制,氩电联焊,Φ219x10mm以内千米3243.27869.55653.531720.1936.4592-205二接一管段预制,氩电联焊,Φ219x12mm以内千米3857.72985.1793.362079.2641.3042-206二接一管段预制,氩电联焊,Φ219x14mm以内千米4177.991030.61951.352196.0343.2122-207二接一管段预制,氩电联焊,Φ219x16mm以内千米4640.421146.851164.442329.1348.0862-208二接一管段预制,氩电联焊,Φ219x18mm以内千米5075.031212.271365.732497.0350.8292-209二接一管段预制,氩电联焊,Φ219x20mm以内千米5441.311255.21578.92607.2152.6292-210单根管段预制,无缝钢管,Φ48x3.5-5mm以内千米298.8775.130223.743.152-211单根管段预制,无缝钢管,Φ60x3.5-7mm以内千米298.8775.130223.743.152-212单根管段预制,无缝钢管,Φ60x8-10mm以内千米318.3481.090237.253.42-213单根管段预制,无缝钢管,Φ76x3.5-7mm以内千米318.3481.090237.253.42-214单根管段预制,无缝钢管,Φ76x8-12mm以内千米337.8187.050250.763.652-215单根管段预制,无缝钢管,Φ89x3.5-7mm以内千米337.8187.050250.763.652-216单根管段预制,无缝钢管,Φ89x8-10mm以内千米371.3591.580279.773.84
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-217单根管段预制,无缝钢管,Φ89x12-14mm以内千米396.22104.940291.284.42-218单根管段预制,无缝钢管,Φ108x4-8mm以内千米396.22104.940291.284.42-219单根管段预制,无缝钢管,Φ108x9-14mm以内千米413.85105.420308.434.422-220单根管段预制,无缝钢管,Φ114x4-7mm以内千米413.85105.420308.434.422-221单根管段预制,无缝钢管,Φ114x8-14mm以内千米445.68113.530332.154.762-222单根管段预制,无缝钢管,Φ127x4-8mm以内千米428.05113.0503154.742-223单根管段预制,无缝钢管,Φ127x9-14mm以内千米541.18137.850403.335.782-224单根管段预制,无缝钢管,Φ133x4-8mm以内千米445.68113.530332.154.762-225单根管段预制,无缝钢管,Φ133x9-16mm以内千米541.18137.850403.335.782-226单根管段预制,无缝钢管,Φ159x4.5-8mm以内千米760.47192.710567.768.082-227单根管段预制,无缝钢管,Φ159x9-16mm以内千米907.27231.110676.169.692-228单根管段预制,无缝钢管,Φ168x5-12mm以内千米907.27231.110676.169.692-229单根管段预制,无缝钢管,Φ168x14-18mm以内千米1082.36275.710806.6511.562-230单根管段预制,无缝钢管,Φ194x6-10mm以内千米1082.36275.710806.6511.562-231单根管段预制,无缝钢管,Φ194x12-20mm以内千米1337.03340.580996.4514.282-232单根管段预制,无缝钢管,Φ219x6-10mm以内千米1082.36275.710806.6511.562-233单根管段预制,无缝钢管,Φ219x12-20mm以内千米1337.03340.580996.4514.282-234单根管段预制,无缝钢管,Φ245x6-14mm以内千米1337.03340.580996.4514.282-235单根管段预制,无缝钢管,Φ245x16-22mm以内千米1614.72413.3201201.417.332-236单根管段预制,无缝钢管,Φ273x6-12mm以内千米1337.03340.580996.4514.282-237单根管段预制,无缝钢管,Φ273x14-22mm以内千米1614.72413.3201201.417.332-238单根管段预制,无缝钢管,Φ325x6-12mm以内千米1337.03340.580996.4514.282-239单根管段预制,无缝钢管,Φ325x14-22mm以内千米1813.66520.1701293.4921.812-240单根管段预制,无缝钢管,Φ377x6-12mm以内千米1619.96472.2301147.7319.82-241单根管段预制,无缝钢管,Φ377x14-22mm以内千米1901.64575.2601326.3824.122-242单根管段预制,无缝钢管,Φ426x6-12mm以内千米1874.93548.5501326.38232-243单根管段预制,无缝钢管,Φ426x14-22mm以内千米2307.41675.1901632.2228.31
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-244单根管段预制,螺旋焊缝钢管,Φ219x6mm以内千米895.54163.9939.03692.526.8762-245单根管段预制,螺旋焊缝钢管,Φ219x7mm以内千米903.97166.5244.93692.526.9822-246单根管段预制,螺旋焊缝钢管,Φ219x8mm以内千米911.8168.7150.57692.527.0742-247单根管段预制,螺旋焊缝钢管,Φ219x10mm以内千米926.29172.5861.19692.527.2362-248单根管段预制,螺旋焊缝钢管,Φ219x12mm以内千米1136.64210.0271.16855.468.8062-249单根管段预制,螺旋焊缝钢管,Φ219x14mm以内千米1148.72212.6580.61855.468.9162-250单根管段预制,螺旋焊缝钢管,Φ219x16mm以内千米1160.19215.1389.6855.469.022-251单根管段预制,螺旋焊缝钢管,Φ219x18mm以内千米1170.89217.2398.2855.469.1082-252单根管段预制,螺旋焊缝钢管,Φ219x20mm以内千米1176.33219.66101.21855.469.212-253单根管段预制,螺旋焊缝钢管,Φ245x6mm以内千米1096.57199.4841.63855.468.3642-254单根管段预制,螺旋焊缝钢管,Φ245x7mm以内千米1105.32202.1547.71855.468.4762-255单根管段预制,螺旋焊缝钢管,Φ245x8mm以内千米1113.64204.4453.74855.468.5722-256单根管段预制,螺旋焊缝钢管,Φ245x10mm以内千米1129.03208.565.07855.468.7422-257单根管段预制,螺旋焊缝钢管,Φ245x12mm以内千米1142.9211.7475.7855.468.8782-258单根管段预制,螺旋焊缝钢管,Φ245x14mm以内千米1156.07214.8485.77855.469.0082-259单根管段预制,螺旋焊缝钢管,Φ245x16mm以内千米1377.7253.7295.391028.5910.6382-260单根管段预制,螺旋焊缝钢管,Φ245x18mm以内千米1389.15255.96104.61028.5910.7322-261单根管段预制,螺旋焊缝钢管,Φ245x20mm以内千米1399.16259.06111.511028.5910.8622-262单根管段预制,螺旋焊缝钢管,Φ245x22mm以内千米1414.41263.16122.661028.5911.0342-263单根管段预制,螺旋焊缝钢管,Φ273x6mm以内千米1104.35203.6845.21855.468.542-264单根管段预制,螺旋焊缝钢管,Φ273x7mm以内千米1111.22203.6852.08855.468.542-265单根管段预制,螺旋焊缝钢管,Φ273x8mm以内千米1120.17206.0658.65855.468.642-266单根管段预制,螺旋焊缝钢管,Φ273x10mm以内千米1136.9210.3671.08855.468.822-267单根管段预制,螺旋焊缝钢管,Φ273x12mm以内千米1152.04213.7982.79855.468.9642-268单根管段预制,螺旋焊缝钢管,Φ273x14mm以内千米1376.01253.5393.891028.5910.632-269单根管段预制,螺旋焊缝钢管,Φ273x16mm以内千米1389.31256.22104.51028.5910.7432-270单根管段预制,螺旋焊缝钢管,Φ273x18mm以内千米1401.83258.53114.711028.5910.84
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-271单根管段预制,螺旋焊缝钢管,Φ273x20mm以内千米1414.82261.71124.521028.5910.9732-272单根管段预制,螺旋焊缝钢管,Φ273x22mm以内千米1429.9264.69136.621028.5911.0982-273单根管段预制,螺旋焊缝钢管,Φ325x7mm以内千米1119.73205.6858.59855.468.6242-274单根管段预制,螺旋焊缝钢管,Φ325x8mm以内千米1130.29208.5966.24855.468.7462-275单根管段预制,螺旋焊缝钢管,Φ325x10mm以内千米1149.02213.2280.34855.468.942-276单根管段预制,螺旋焊缝钢管,Φ325x12mm以内千米1166.4217.2793.67855.469.112-277单根管段预制,螺旋焊缝钢管,Φ325x14mm以内千米1392.22257.29106.341028.5910.7882-278单根管段预制,螺旋焊缝钢管,Φ325x16mm以内千米1407.37260.3118.481028.5910.9142-279单根管段预制,螺旋焊缝钢管,Φ325x18mm以内千米1421.93263.18130.161028.5911.0352-280单根管段预制,螺旋焊缝钢管,Φ325x20mm以内千米1432.08265.81137.681028.5911.1452-281单根管段预制,螺旋焊缝钢管,Φ325x22mm以内千米1450.37270.65151.131028.5911.3482-282单根管段预制,螺旋焊缝钢管,Φ377x7mm以内千米1128.03208.4564.12855.468.742-283单根管段预制,螺旋焊缝钢管,Φ377x8mm以内千米1138.7210.9872.26855.468.8462-284单根管段预制,螺旋焊缝钢管,Φ426x7mm以内千米1346.43247.1870.661028.5910.3642-285单根管段预制,螺旋焊缝钢管,Φ426x8mm以内千米1358.65250.3879.681028.5910.4982-286单根管段预制,螺旋焊缝钢管,Φ480x7mm以内千米1353.33249.6675.081028.5910.4682-287单根管段预制,螺旋焊缝钢管,Φ480x8mm以内千米1366.38252.9184.881028.5910.6042-288单根管段预制,螺旋焊缝钢管,Φ480x9mm以内千米1375.76253.1993.981028.5910.6162-289单根管段预制,螺旋焊缝钢管,Φ508x7mm以内千米1703.63311.3478.541313.7513.0542-290单根管段预制,螺旋焊缝钢管,Φ508x8mm以内千米1717.16314.6388.781313.7513.1922-291单根管段预制,螺旋焊缝钢管,Φ508x9mm以内千米1729.45317.498.31313.7513.3082-292单根管段预制,螺旋焊缝钢管,Φ530x7mm以内千米1705.15310.1981.211313.7513.0062-293单根管段预制,螺旋焊缝钢管,Φ530x8mm以内千米1721.82316.2591.821313.7513.262-294单根管段预制,螺旋焊缝钢管,Φ530x9mm以内千米1747.41319.3114.361313.7513.3882-295钢管除锈,机械钢丝刷除锈,DN200以内1000m21075.73298.13568.4209.212.52-296钢管除锈,机械钢丝刷除锈,DN500以内1000m2912.03198.74507.5205.798.3332-297钢管除锈,机械钢丝刷除锈,DN1000以内1000m2847.5699149.06466.9231.616.25
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-298钢管除锈,喷射除锈,钢管表面喷砂DN200以内1000m212636.811624.427766.723245.6768.112-299钢管除锈,喷射除锈,钢管表面喷砂DN500以内1000m210441.531462.016059.222920.361.32-300钢管除锈,喷射除锈,钢管表面喷砂DN1000以内1000m29333.961299.595436.72597.6754.492-301钢管除锈,抛丸除锈,抛丸除锈DN200以内1000m25127.17969.031739.32418.8440.632-302钢管除锈,抛丸除锈,抛丸除锈DN500以内1000m23751.78645.861490.831615.0927.082-303钢管除锈,抛丸除锈,抛丸除锈DN1000以内1000m23373.72484.391242.361646.9720.312-304钢管石油沥青防腐,普通级,DN801000m228852.421930.7121268.645653.0780.9522-305钢管石油沥青防腐,普通级,DN1001000m225139.041351.5119829.673957.8656.6672-306钢管石油沥青防腐,普通级,DN2001000m223815.991026.4619783.743005.7943.0382-307钢管石油沥青防腐,普通级,DN2501000m222669.5995419077.812637.78402-308钢管石油沥青防腐,普通级,DN4501000m221755.9715.519062.661977.74302-309钢管石油沥青防腐,普通级,DN5501000m221274.38660.4518788.141825.7927.6922-310钢管石油沥青防腐,普通级,DN6501000m221095.29647.2218783.731664.3427.1372-311钢管石油沥青防腐,普通级,DN7501000m221073.73633.9818628.211811.5426.5822-312钢管石油沥青防腐,普通级,DN8501000m221040.22626.0618625.511788.6526.252-313钢管石油沥青防腐,普通级,DN10001000m220910.16618.3418526.061765.7625.9262-314钢管石油沥青防腐,加强级,DN801000m235912.491987.4928271.935653.0783.3332-315钢管石油沥青防腐,加强级,DN1001000m231704.721391.2426355.623957.8658.3332-316钢管石油沥青防腐,加强级,DN2001000m230357.651056.6526295.213005.7944.3042-317钢管石油沥青防腐,加强级,DN2501000m228985.52980.525367.242637.7841.1112-318钢管石油沥青防腐,加强级,DN4001000m228059.92735.3725346.811977.7430.8332-319钢管石油沥青防腐,加强级,DN5001000m227484.75678.8224980.141825.7928.4622-320钢管石油沥青防腐,加强级,DN6501000m227302.44663.9424974.161664.3427.8382-321钢管石油沥青防腐,加强级,DN7501000m227226.98649.0824766.361811.5427.2152-322钢管石油沥青防腐,加强级,DN8501000m227192.35640.9724762.731788.6526.8752-323钢管石油沥青防腐,加强级,DN10001000m227028.64633.0524629.831765.7626.5432-324钢管石油沥青防腐,特加强级,DN801000m242982.792044.2835285.445653.0785.714
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-325钢管石油沥青防腐,特加强级,DN1001000m238283.49143132894.633957.86602-326钢管石油沥青防腐,特加强级,DN2001000m236912.941086.8432820.313005.7945.572-327钢管石油沥青防腐,特加强级,DN2501000m235501.021006.9931856.252637.7842.2222-328钢管石油沥青防腐,特加强级,DN4001000m234563.6755.2631830.61977.7431.6672-329钢管石油沥青防腐,特加强级,DN5001000m233894.81697.1631371.861825.7929.2312-330钢管石油沥青防腐,特加强级,DN6501000m233709.33680.6831364.311664.3428.542-331钢管石油沥青防腐,特加强级,DN7501000m233579.98664.1731104.271811.5427.8482-332钢管石油沥青防腐,特加强级,DN8501000m233544.22655.8831099.691788.6527.52-333钢管石油沥青防腐,特加强级,DN10001000m233346.86647.7730933.331765.7627.162-334钢管环氧煤防腐,普通级,DN1251000m219306.42125.0414340.872840.4989.12-335钢管环氧煤防腐,普通级,DN2001000m219223.642089.6214340.872793.1587.6152-336钢管环氧煤防腐,普通级,DN2501000m219538.222066.0114484.642987.5786.6252-337钢管环氧煤防腐,普通级,DN3501000m219599.242054.214574.542970.586.132-338钢管环氧煤防腐,普通级,DN4501000m219310.461936.1414574.542799.7881.182-339钢管环氧煤防腐,普通级,DN5501000m219137.21865.3114574.542697.3578.212-340钢管环氧煤防腐,普通级,DN6501000m218847.771782.6714487.252577.8574.7452-341钢管环氧煤防腐,普通级,DN7501000m218858.531676.4214574.542607.5770.292-342钢管环氧煤防腐,普通级,DN8501000m218677.511605.5814574.542497.3967.322-343钢管环氧煤防腐,普通级,DN10001000m218496.51534.7514574.542387.2164.352-344钢管环氧煤防腐,加强级,DN1251000m2312172369.7425943.652903.6199.362-345钢管环氧煤防腐,加强级,DN2001000m230689.162331.125501.792856.2797.742-346钢管环氧煤防腐,加强级,DN2501000m230927.432305.3425566.233055.8696.662-347钢管环氧煤防腐,加强级,DN3501000m230919.092279.5825617.83021.7195.582-348钢管环氧煤防腐,加强级,DN4501000m230551.882150.7925550.09285190.182-349钢管环氧煤防腐,加强级,DN5501000m230324.652073.5225502.572748.5686.942-350钢管环氧煤防腐,加强级,DN6501000m230080.641983.3725468.212629.0683.162-351钢管环氧煤防腐,加强级,DN7501000m229971.731867.4625441.612662.6678.3
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-352钢管环氧煤防腐,加强级,DN8501000m229978.042004.8325420.732552.4884.062-353钢管环氧煤防腐,加强级,DN10001000m229559.071712.9125403.862442.371.822-354钢管环氧煤防腐,特加强级,DN1251000m240960.142623.0235370.382966.74109.982-355钢管环氧煤防腐,特加强级,DN2001000m238562.782581.1733062.222919.39108.2252-356钢管环氧煤防腐,特加强级,DN2501000m238689.012553.2633011.613124.14107.0552-357钢管环氧煤防腐,特加强级,DN3501000m238617.632525.3633002.273090105.8852-358钢管环氧煤防腐,特加强级,DN4501000m238140.942371.8832866.852902.2199.452-359钢管环氧煤防腐,特加强级,DN5501000m237857.612286.0232771.812799.7895.852-360钢管环氧煤防腐,特加强级,DN6501000m237573.872190.532703.092680.2891.8452-361钢管环氧煤防腐,特加强级,DN7501000m237183.212064.9332400.532717.7586.582-362钢管环氧煤防腐,特加强级,DN8501000m237216.242000.5432608.132607.5783.882-363钢管环氧煤防腐,特加强级,DN10001000m236969.291897.5132574.392497.3979.562-364钢管煤焦油瓷漆防腐,普通级,DN1251000m238697.481546.3434629.252521.8964.8362-365钢管煤焦油瓷漆防腐,普通级,DN2001000m237377.38151833431.772427.6163.6482-366钢管煤焦油瓷漆防腐,普通级,DN2501000m237028.831520.8732904.072603.8963.7682-367钢管煤焦油瓷漆防腐,普通级,DN3501000m237218.261524.4433089.932603.8963.9182-368钢管煤焦油瓷漆防腐,普通级,DN4501000m236767.291496.432794.642476.2562.7422-369钢管煤焦油瓷漆防腐,普通级,DN5501000m236479.091467.9232637.032374.1461.5482-370钢管煤焦油瓷漆防腐,普通级,DN6501000m236201.661440.1632489.472272.0360.3842-371钢管煤焦油瓷漆防腐,普通级,DN7501000m236116.721412.432367.862336.4659.222-372钢管煤焦油瓷漆防腐,普通级,DN8501000m235892.271385.3532280.412226.5158.0862-373钢管煤焦油瓷漆防腐,普通级,DN10001000m235537.411357.332173.962006.1556.912-374钢管煤焦油瓷漆防腐,加强级,DN1251000m248493.161770.7243564.193158.2574.2442-375钢管煤焦油瓷漆防腐,加强级,DN2001000m246459.351733.9441685.013040.472.7022-376钢管煤焦油瓷漆防腐,加强级,DN2501000m246978.651754.4141880.023344.2273.562-377钢管煤焦油瓷漆防腐,加强级,DN3501000m247167.341758.5642090.093318.6973.7342-378钢管煤焦油瓷漆防腐,加强级,DN4501000m246635.051721.0641722.943191.0572.162
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-379钢管煤焦油瓷漆防腐,加强级,DN5501000m246264.161683.1441517.613063.4170.5722-380钢管煤焦油瓷漆防腐,加强级,DN6501000m245881.651645.9441325.472910.2469.0122-381钢管煤焦油瓷漆防腐,加强级,DN7501000m245770.31608.8741165.272996.1667.4582-382钢管煤焦油瓷漆防腐,加强级,DN8501000m245466.211572.141035.392858.7265.9162-383钢管煤焦油瓷漆防腐,加强级,DN10001000m245177.471535.3240920.862721.2964.3742-384钢管煤焦油瓷漆防腐,特加强级,DN1251000m258904.492011.5653074.753818.1884.3422-385钢管煤焦油瓷漆防腐,特加强级,DN2001000m256427.471965.3450808.933653.282.4042-386钢管煤焦油瓷漆防腐,特加强级,DN2501000m257222.081992.8151195.794033.4883.5562-387钢管煤焦油瓷漆防腐,特加强级,DN3501000m257653.851998.6851647.214007.9683.8022-388钢管煤焦油瓷漆防腐,特加强级,DN4501000m257049.091951.4551217.333880.3181.8222-389钢管煤焦油瓷漆防腐,特加强级,DN5501000m256555.681903.6650950.43701.6279.8182-390钢管煤焦油瓷漆防腐,特加强级,DN6501000m256093.921857.0150713.993522.9277.8622-391钢管煤焦油瓷漆防腐,特加强级,DN7501000m255965.071810.550526.193628.3875.9122-392钢管煤焦油瓷漆防腐,特加强级,DN8501000m255587.141763.9950359.693463.4673.9622-393钢管煤焦油瓷漆防腐,特加强级,DN10001000m255232.231717.9250215.783298.5372.032-394聚乙烯管段防腐,普通级,DN801000m248948.652464.4935353.4711130.69103.3332-395聚乙烯管段防腐,普通级,DN1001000m245773.931344.2838358.376071.2856.3642-396聚乙烯管段防腐,普通级,DN2001000m244733.321155.2538358.375219.748.4382-397聚乙烯管段防腐,普通级,DN2501000m248672.791124.3641363.286185.1547.1432-398聚乙烯管段防腐,普通级,DN4001000m248007.891022.1441363.285622.4742.8572-399聚乙烯管段防腐,普通级,DN5001000m252356.361013.9445862.785479.6442.5132-400聚乙烯管段防腐,普通级,DN6501000m252586.281005.7345862.785717.7742.1692-401聚乙烯管段防腐,普通级,DN7501000m252274.32959.4945862.785452.0540.232-402聚乙烯管段防腐,普通级,DN8501000m259582.15927.553382.915271.7438.8892-403聚乙烯管段防腐,普通级,DN10001000m259381.4897.5753382.915100.9237.6342-404聚乙烯管段防腐,加强级,DN801000m260024.872567.2145862.7811594.88107.642-405聚乙烯管段防腐,加强级,DN1001000m256589.711400.2848867.686321.7558.712
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-406聚乙烯管段防腐,加强级,DN2001000m255507.831203.3848867.685436.7750.4562-407聚乙烯管段防腐,加强级,DN2501000m259484.321171.251872.596440.5349.1072-408聚乙烯管段防腐,加强级,DN4001000m258793.531064.7451872.595856.244.6432-409聚乙烯管段防腐,加强级,DN5001000m263148.71056.1756387.825704.7144.2842-410聚乙烯管段防腐,加强级,DN6501000m263390.491047.6456387.825955.0343.9262-411聚乙烯管段防腐,加强级,DN7501000m263067.09999.4656387.825679.8141.9062-412聚乙烯管段防腐,加强级,DN8501000m270353.12966.1463892.225494.7640.5092-413聚乙烯管段防腐,加强级,DN10001000m270141.65934.9963892.225314.4439.2032-414钢管硬质聚氨酯泡沫塑料防腐,DN100,泡沫塑料层1000m244355.87286230106.2811387.591202-415钢管硬质聚氨酯泡沫塑料防腐,DN100,保护层1000m231093031093002-416钢管硬质聚氨酯泡沫塑料防腐,DN250,泡沫塑料层1000m243060.462601.8230106.2810352.36109.0912-417钢管硬质聚氨酯泡沫塑料防腐,DN250,保护层1000m234053.5034053.5002-418钢管硬质聚氨酯泡沫塑料防腐,DN400,泡沫塑料层1000m242115.162517.5130106.289491.37105.5562-419钢管硬质聚氨酯泡沫塑料防腐,DN400,保护层1000m237014037014002-420钢管硬质聚氨酯泡沫塑料防腐,DN500,泡沫塑料层1000m240913.582265.7530106.288541.55952-421钢管硬质聚氨酯泡沫塑料防腐,DN500,保护层1000m241447041447002-422热缩防水帽安装,外径48mm100个40.6140.550.0601.72-423热缩防水帽安装,外径60mm100个40.6340.550.0801.72-424热缩防水帽安装,外径76mm100个40.6440.550.0901.72-425热缩防水帽安装,外径89mm100个40.6640.550.1101.72-426热缩防水帽安装,外径114mm100个50.2250.090.1302.12-427热缩防水帽安装,外径159mm100个64.6264.40.2202.72-428热缩防水帽安装,外径219mm100个64.764.40.302.72-429热缩防水帽安装,外径245mm100个74.2673.940.3203.12-430热缩防水帽安装,外径273mm100个74.2873.940.3403.12-431热缩防水帽安装,外径325mm100个74.3473.940.403.12-432热缩防水帽安装,外径377mm100个86.3285.860.4603.6
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-433热缩防水帽安装,外径426mm100个98.3197.790.5204.12-434热缩防水帽安装,外径530mm100个119.9119.250.65052-435钢管外表面环氧粉末防腐,普通型,管外径48-601000m243590.552091.6522381.7619117.1487.72-436钢管外表面环氧粉末防腐,普通型,管外径76-891000m241004.771989.0922381.7616633.9283.42-437钢管外表面环氧粉末防腐,普通型,管外径108-1331000m240913.061903.2322375.9116633.9279.82-438钢管外表面环氧粉末防腐,普通型,管外径159-2191000m239413.371807.8322377.5615227.9875.82-439钢管外表面环氧粉末防腐,普通型,管外径245-2731000m243640.981726.7422377.5619536.6872.42-440钢管外表面环氧粉末防腐,普通型,管外径323.9-3551000m243561.931655.1922370.0619536.6869.42-441钢管外表面环氧粉末防腐,普通型,管外径406-4571000m240150.191588.4122370.0616191.7266.62-442钢管外表面环氧粉末防腐,普通型,管外径508-5591000m237484.911545.4819747.7116191.7264.82-443钢管外表面环氧粉末防腐,普通型,管外径610-6601000m237441.981502.5519747.7116191.72632-444钢管外表面环氧粉末防腐,普通型,管外径711-7621000m244090.621459.6219749.3622881.6461.22-445钢管外表面环氧粉末防腐,普通型,管外径813-8641000m244052.461421.4619749.3622881.6459.62-446钢管外表面环氧粉末防腐,普通型,管外径914-10161000m238710.661097.119749.3617864.2462-447钢管外表面环氧粉末防腐,加厚型,管外径48-601000m249532.642177.7428237.7619117.1491.312-448钢管外表面环氧粉末防腐,加厚型,管外径76-891000m249425.32068.7528239.4119117.1486.742-449钢管外表面环氧粉末防腐,加厚型,管外径108-1331000m246845.141979.3128231.9116633.9282.992-450钢管外表面环氧粉末防腐,加厚型,管外径159-2191000m246747.581880.128233.5616633.9278.832-451钢管外表面环氧粉末防腐,加厚型,管外径245-2731000m249566.151795.9128233.5619536.6875.32-452钢管外表面环氧粉末防腐,加厚型,管外径323.9-3551000m249500.691737.9528226.0619536.6872.872-453钢管外表面环氧粉末防腐,加厚型,管外径406-4571000m245107.541651.8528227.7115227.9869.262-454钢管外表面环氧粉末防腐,加厚型,管外径508-5591000m242579.721607.2528227.7112744.7667.392-455钢管外表面环氧粉末防腐,加厚型,管外径610-6601000m242535.121562.6528227.7112744.7665.522-456钢管外表面环氧粉末防腐,加厚型,管外径711-7621000m245939.131518.0528229.3616191.7263.652-457钢管外表面环氧粉末防腐,加厚型,管外径813-8641000m245899.31478.2228229.3616191.7261.982-458钢管外表面环氧粉末防腐,加厚型,管外径914-10161000m241927.57851.4528229.3612846.7635.72-459钢管内壁环氧粉末防腐,DN65mm10m2661.2862.25128.38470.652.61
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-460钢管内壁环氧粉末防腐,DN80mm10m2596.6152.95128.38415.282.222-461钢管内壁环氧粉末防腐,DN100mm10m2473.9441.02128.38304.541.722-462钢管内壁环氧粉末防腐,DN150mm10m2379.4329.57128.38221.481.242-463钢管内壁环氧粉末防腐,DN200mm10m2315.7221.23128.38166.110.892-464钢管内壁环氧粉末防腐,DN250mm10m2283.7416.93128.38138.430.712-465钢管防腐,聚合物水泥砂浆内衬里,管外径114mm10m2497.0457.65236.11203.282.4172-466钢管防腐,聚合物水泥砂浆内衬里,管外径159mm10m2433.7743.24236.94153.591.8132-467钢管防腐,聚合物水泥砂浆内衬里,管外径168mm10m2427.5741.93236.94148.71.7582-468钢管防腐,聚合物水泥砂浆内衬里,管外径219mm10m2457.731.43315.92110.351.3182-469钢管防腐,聚合物水泥砂浆内衬里,管外径273mm10m2423.5423.85316.5883.1112-470钢管防腐,聚合物水泥砂浆内衬里,管外径325mm10m2411.1120.27317.5173.330.852-471H87环氧涂料内涂层,DN80mm以内,底漆一遍10m294.017.6335.1851.20.322-472H87环氧涂料内涂层,DN80mm以内,中间漆二遍10m2169.4421.94128.5818.920.922-473H87环氧涂料内涂层,DN80mm以内,中间漆每增减一遍10m284.7210.9764.299.460.462-474H87环氧涂料内涂层,DN80mm以内,面漆二遍10m284.868.8268.387.660.372-475H87环氧涂料内涂层,DN80mm以内,面漆每增减一遍10m242.084.2934.193.60.182-476H87环氧涂料内涂层,DN150mm以内,底漆一遍10m279.25.7235.2638.220.242-477H87环氧涂料内涂层,DN150mm以内,中间漆二遍10m2158.9815.98128.5814.420.672-478H87环氧涂料内涂层,DN150mm以内,中间漆每增减一遍10m279.377.8764.297.210.332-479H87环氧涂料内涂层,DN150mm以内,面漆二遍10m280.476.6868.385.410.282-480H87环氧涂料内涂层,DN150mm以内,面漆每增减一遍10m240.233.3434.192.70.142-481H87环氧涂料内涂层,DN250mm以内,底漆一遍10m270.724.5335.5230.670.192-482H87环氧涂料内涂层,DN250mm以内,中间漆二遍10m2152.9613.12128.5811.260.552-483H87环氧涂料内涂层,DN250mm以内,中间漆每增减一遍10m276.596.4464.295.860.272-484H87环氧涂料内涂层,DN250mm以内,面漆二遍10m278.145.2568.384.510.222-485H87环氧涂料内涂层,DN250mm以内,面漆每增减一遍10m239.062.6234.192.250.112-486无机硅酸锌涂料内涂层,DN80mm以内,底漆一遍10m2136.2913.3660.0262.910.56
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-487无机硅酸锌涂料内涂层,DN80mm以内,面漆一遍10m285.610.2660.0215.320.432-488无机硅酸锌涂料内涂层,DN150mm以内,底漆一遍10m2117.0610.2660.0246.780.432-489无机硅酸锌涂料内涂层,DN150mm以内,面漆一遍10m279.157.8760.0211.260.332-490无机硅酸锌涂料内涂层,DN250mm以内,底漆一遍10m2105.558.1160.0237.420.342-491无机硅酸锌涂料内涂层,DN250mm以内,面漆一遍10m275.236.260.029.010.262-492无机硅酸锌涂料内涂层,DN350mm以内,底漆一遍10m298.757.6360.0231.10.322-493无机硅酸锌涂料内涂层,DN350mm以内,面漆一遍10m273.645.9660.027.660.252-494无机硅酸锌涂料内涂层,DN500mm以内,底漆一遍10m289.365.7260.0223.620.242-495无机硅酸锌涂料内涂层,DN500mm以内,面漆一遍10m270.414.5360.025.860.192-496防腐预制管段运输,DN50mm,运距20km千米364.6341.2650.31273.061.732-497防腐预制管段运输,DN50mm,每增减5km千米36.583.67032.910.1542-498防腐预制管段运输,DN65mm,运距20km千米540.6550.5650.31439.782.122-499防腐预制管段运输,DN65mm,每增减5km千米60.116.01054.10.2522-500防腐预制管段运输,DN80mm,运距20km千米617.1658.9150.31507.942.472-501防腐预制管段运输,DN80mm,每增减5km千米69.336.92062.410.292-502防腐预制管段运输,DN100mm,运距20km千米983.2187.7750.31845.133.682-503防腐预制管段运输,DN100mm,每增减5km千米115.9311.520104.410.4832-504防腐预制管段运输,DN125mm,运距20km千米1125.5115.6750.31959.524.852-505防腐预制管段运输,DN125mm,每增减5km千米125.5812.470113.110.5232-506防腐预制管段运输,DN150mm,运距20km千米1198.53117.3450.311030.884.922-507防腐预制管段运输,DN150mm,每增减5km千米142.7914.170128.620.5942-508防腐预制管段运输,DN200mm,运距20km千米2757.03124.7489.752542.545.232-509防腐预制管段运输,DN200mm,每增减5km千米307.6314.170293.460.5942-510防腐预制管段运输,DN250mm,运距20km千米3028.31138.8189.752799.755.822-511防腐预制管段运输,DN250mm,每增减5km千米337.6715.570322.10.6532-512防腐预制管段运输,DN300mm,运距20km千米3522.51155.9889.753276.786.542-513防腐预制管段运输,DN300mm,每增减5km千米397.0718.320378.750.768
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-514防腐预制管段运输,DN350mm,运距20km千米3788.25178.1689.753520.347.472-515防腐预制管段运输,DN350mm,每增减5km千米422.4119.490402.920.8172-516防腐预制管段运输,DN400mm,运距20km千米4314.11203.6889.754020.688.542-517防腐预制管段运输,DN400mm,每增减5km千米482.4522.250460.20.9332-518防腐预制管段运输,DN450mm,运距20km千米5495.32259.25119.915116.1610.872-519防腐预制管段运输,DN450mm,每增减5km千米614.2328.330585.91.1882-520防腐预制管段运输,DN500mm,运距20km千米6031.63285.01119.915626.7111.952-521防腐预制管段运输,DN500mm,每增减5km千米675.740131.150644.591.3062-522绝热预制管段运输,DN50mm,运距20km千米424.140.0750.31333.721.682-523绝热预制管段运输,DN50mm,每增减5km千米43.294.32038.970.1812-524绝热预制管段运输,DN65mm,运距20km千米546.9352.9550.31443.672.222-525绝热预制管段运输,DN65mm,每增减5km千米58.365.77052.590.2422-526绝热预制管段运输,DN80mm,运距20km千米713.8860.8250.31602.752.552-527绝热预制管段运输,DN80mm,每增减5km千米80.257.99072.260.3352-528绝热预制管段运输,DN100mm,运距20km千米1075.6188.9650.31936.343.732-529绝热预制管段运输,DN100mm,每增减5km千米124.3512.380111.970.5192-530绝热预制管段运输,DN125mm,运距20km千米1279.41129.5150.311099.595.432-531绝热预制管段运输,DN125mm,每增减5km千米144.9414.430130.510.6052-532绝热预制管段运输,DN150mm,运距20km千米1510.43155.550.311304.626.522-533绝热预制管段运输,DN150mm,每增减5km千米163.3416.190147.150.6792-534绝热预制管段运输,DN200mm,运距20km千米3955.97217.9989.753648.239.142-535绝热预制管段运输,DN200mm,每增减5km千米469.0421.630447.410.9072-536绝热预制管段运输,DN250mm,运距20km千米5700.61299.0889.755311.7812.542-537绝热预制管段运输,DN250mm,每增减5km千米803.5437.090766.451.5552-538绝热预制管段运输,DN300mm,运距20km千米7477.78342.7289.757045.3114.372-539绝热预制管段运输,DN300mm,每增减5km千米937.4843.290894.191.8152-540绝热预制管段运输,DN350mm,运距20km千米8879.85429.0489.758361.0617.989
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-541绝热预制管段运输,DN350mm,每增减5km千米1125.6451.9201073.722.1772-542绝热预制管段运输,DN400mm,运距20km千米10468.86504.5989.759874.5221.1572-543绝热预制管段运输,DN400mm,每增减5km千米1351.1262.3201288.82.6132-544绝热预制管段运输,DN450mm,运距20km千米12016.53587.1689.7511339.6224.6192-545绝热预制管段运输,DN450mm,每增减5km千米1501.0269.2601431.762.9042-546绝热预制管段运输,DN500mm,运距20km千米17483.1695.6189.7516697.7429.1662-547绝热预制管段运输,DN500mm,每增减5km千米1688.8277.9201610.93.2672-548管道安装,电弧焊,无缝钢管,二接一,Φ48x3.5mm以内千米1187.67448.2196.34643.1218.7932-549管道安装,电弧焊,无缝钢管,二接一,Φ48x4mm以内千米1228.23453.03108.18667.0218.9952-550管道安装,电弧焊,无缝钢管,二接一,Φ48x5mm以内千米1288.75491.52116.66680.5720.6092-551管道安装,电弧焊,无缝钢管,二接一,Φ60x3.5mm以内千米1432.43529.76109.51793.1622.2122-552管道安装,电弧焊,无缝钢管,二接一,Φ60x4.0mm以内千米1413.24547.43120.85744.9622.9532-553管道安装,电弧焊,无缝钢管,二接一,Φ60x5.0mm以内千米1446.02558.28134.66753.0823.4082-554管道安装,电弧焊,无缝钢管,二接一,Φ60x6.0mm以内千米1545.86577.24149.9818.7224.2032-555管道安装,电弧焊,无缝钢管,二接一,Φ60x7.0mm以内千米1592.09587.43167.01837.6524.632-556管道安装,电弧焊,无缝钢管,二接一,Φ60x8.0mm以内千米1635.64589.79188.15857.724.7292-557管道安装,电弧焊,无缝钢管,二接一,Φ60x9.0mm以内千米1689.41618.17190.33880.9125.9192-558管道安装,电弧焊,无缝钢管,二接一,Φ60x10mm以内千米1747.67623.34208.7915.6326.1362-559管道安装,电弧焊,无缝钢管,二接一,Φ76x3.5mm以内千米1513.68561.72124.1827.8623.5522-560管道安装,电弧焊,无缝钢管,二接一,Φ76x4mm以内千米1590.01582.42138869.5924.422-561管道安装,电弧焊,无缝钢管,二接一,Φ76x5mm以内千米1684.95598.56155.82930.5725.0972-562管道安装,电弧焊,无缝钢管,二接一,Φ76x6mm以内千米1693.59615.5174.93903.1625.8072-563管道安装,电弧焊,无缝钢管,二接一,Φ76x7mm以内千米1773.46632196.36945.126.4992-564管道安装,电弧焊,无缝钢管,二接一,Φ76x8mm以内千米1923.85632.65210.271080.9326.5262-565管道安装,电弧焊,无缝钢管,二接一,Φ76x9mm以内千米1901.18676.17226.85998.1628.3512-566管道安装,电弧焊,无缝钢管,二接一,Φ76x10mm以内千米2001.93684.21272.81044.9228.6882-567管道安装,电弧焊,无缝钢管,二接一,Φ76x12mm以内千米2409.71791.92314.79130333.204
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-568管道安装,电弧焊,无缝钢管,二接一,Φ89x3.5mm以内千米1587.73579.75135.64872.3424.3082-569管道安装,电弧焊,无缝钢管,二接一,Φ89x4mm以内千米1659.96587.19148.64924.1324.622-570管道安装,电弧焊,无缝钢管,二接一,Φ89x5mm以内千米1714.79600.69171.04943.0625.1862-571管道安装,电弧焊,无缝钢管,二接一,Φ89x6mm以内千米1855.93620.03193.871042.0325.9972-572管道安装,电弧焊,无缝钢管,二接一,Φ89x7mm以内千米1958.01690.6218.991048.4228.9562-573管道安装,电弧焊,无缝钢管,二接一,Φ89x8mm以内千米2014.75695.32235.561083.8729.1542-574管道安装,电弧焊,无缝钢管,二接一,Φ89x9mm以内千米2148.45700.02254.351194.0829.3512-575管道安装,电弧焊,无缝钢管,二接一,Φ89x10mm以内千米2178.03747.58281.45114931.3452-576管道安装,电弧焊,无缝钢管,二接一,Φ89x12mm以内千米2719.04889.18368.071461.7937.2822-577管道安装,电弧焊,无缝钢管,二接一,Φ89x14mm以内千米3008.52975.18424.151609.1940.8882-578管道安装,电弧焊,无缝钢管,二接一,Φ108x4mm以内千米1896.04680.04173.011042.9928.5132-579管道安装,电弧焊,无缝钢管,二接一,Φ108x5mm以内千米1977.13694.58206.931075.6229.1232-580管道安装,电弧焊,无缝钢管,二接一,Φ108x6mm以内千米2072.28719.75229.231123.330.1782-581管道安装,电弧焊,无缝钢管,二接一,Φ108x7mm以内千米2388.01802.29253.611332.1133.6392-582管道安装,电弧焊,无缝钢管,二接一,Φ108x8mm以内千米2375.84813.29280.861281.6934.12-583管道安装,电弧焊,无缝钢管,二接一,Φ108x9mm以内千米2392.62817.84310.841263.9434.2912-584管道安装,电弧焊,无缝钢管,二接一,Φ108x10mm以内千米2712.92879.95339.91493.0736.8952-585管道安装,电弧焊,无缝钢管,二接一,Φ108x12mm以内千米3052.041039.48407.631604.9343.5842-586管道安装,电弧焊,无缝钢管,二接一,Φ108x14mm以内千米3438.081145.68525.091767.3148.0372-587管道安装,电弧焊,无缝钢管,二接一,Φ114x4mm以内千米2009.19706.48181.771120.9429.6222-588管道安装,电弧焊,无缝钢管,二接一,Φ114x5mm以内千米2060.25721.68208.011130.5630.2592-589管道安装,电弧焊,无缝钢管,二接一,Φ114x6mm以内千米2137.09743.17239.411154.5131.162-590管道安装,电弧焊,无缝钢管,二接一,Φ114x7mm以内千米2339.33835.44269.061234.8335.0292-591管道安装,电弧焊,无缝钢管,二接一,Φ114x8mm以内千米2642.57843.07291.511507.9935.3492-592管道安装,电弧焊,无缝钢管,二接一,Φ114x9mm以内千米2502.75849.23314.751338.7735.6072-593管道安装,电弧焊,无缝钢管,二接一,Φ114x10mm以内千米2646.17911.9349.931384.3438.2352-594管道安装,电弧焊,无缝钢管,二接一,Φ114x12mm以内千米3369.041091.97441.641835.4345.785
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-595管道安装,电弧焊,无缝钢管,二接一,Φ114x14mm以内千米3703.751210.39531.641961.7250.752-596管道安装,电弧焊,无缝钢管,二接一,Φ127x4mm以内千米2358.67735.7229.71393.2730.8472-597管道安装,电弧焊,无缝钢管,二接一,Φ127x5mm以内千米2415.62751.66264.151399.8131.5162-598管道安装,电弧焊,无缝钢管,二接一,Φ127x6mm以内千米2468.25789.29279.561399.433.0942-599管道安装,电弧焊,无缝钢管,二接一,Φ127x7mm以内千米2764.76880.59330.631553.5436.9222-600管道安装,电弧焊,无缝钢管,二接一,Φ127x8mm以内千米2866.81890.73350.151625.9337.3472-601管道安装,电弧焊,无缝钢管,二接一,Φ127x9mm以内千米3189.22901.15379.991908.0837.7842-602管道安装,电弧焊,无缝钢管,二接一,Φ127x10mm以内千米3204.45975.8426.661801.9940.9142-603管道安装,电弧焊,无缝钢管,二接一,Φ127x12mm以内千米3779.781124.91521.312133.5647.1662-604管道安装,电弧焊,无缝钢管,二接一,Φ127x14mm以内千米4339.871234.95621.722483.251.782-605管道安装,电弧焊,无缝钢管,二接一,Φ133x4mm以内千米2417.11757.24234.31425.5731.752-606管道安装,电弧焊,无缝钢管,二接一,Φ133x5mm以内千米2544.74780.82761487.9432.7382-607管道安装,电弧焊,无缝钢管,二接一,Φ133x6mm以内千米2638.38808.52303.81526.0633.92-608管道安装,电弧焊,无缝钢管,二接一,Φ133x7mm以内千米2865.86914.48340.991610.3938.3432-609管道安装,电弧焊,无缝钢管,二接一,Φ133x8mm以内千米3017.53923.66369.11724.7738.7282-610管道安装,电弧焊,无缝钢管,二接一,Φ133x9mm以内千米3027.59930.96394.041702.5939.0342-611管道安装,电弧焊,无缝钢管,二接一,Φ133x10mm以内千米3591.191017.99458.212114.9942.6832-612管道安装,电弧焊,无缝钢管,二接一,Φ133x12mm以内千米3925.931151.26541.772232.948.2712-613管道安装,电弧焊,无缝钢管,二接一,Φ133x14mm以内千米4441.511259.09662.62519.8252.7922-614管道安装,电弧焊,无缝钢管,二接一,Φ133x16mm以内千米4864.11331.5737.282795.3255.8282-615管道安装,电弧焊,无缝钢管,二接一,Φ159x5mm以内千米2826.82879.06307.91639.8636.8582-616管道安装,电弧焊,无缝钢管,二接一,Φ159x6mm以内千米2948.72913.74352.271682.7138.3122-617管道安装,电弧焊,无缝钢管,二接一,Φ159x7mm以内千米3224.91040.65392.071792.1843.6332-618管道安装,电弧焊,无缝钢管,二接一,Φ159x8mm以内千米3372.031053.41424.371894.2544.1682-619管道安装,电弧焊,无缝钢管,二接一,Φ159x9mm以内千米3450.411062.11456.251932.0544.5332-620管道安装,电弧焊,无缝钢管,二接一,Φ159x10mm以内千米3648.561151.88503.761992.9248.2972-621管道安装,电弧焊,无缝钢管,二接一,Φ159x12mm以内千米4730.731270.89630.282829.5653.287
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-622管道安装,电弧焊,无缝钢管,二接一,Φ159x14mm以内千米5016.541422.29756.012838.2459.6352-623管道安装,电弧焊,无缝钢管,二接一,Φ159x16mm以内千米5472.321561.67897.313013.3465.4792-624管道安装,电弧焊,无缝钢管,二接一,Φ168x5mm以内千米2954.96915.12329.861709.9838.372-625管道安装,电弧焊,无缝钢管,二接一,Φ168x6mm以内千米3059.25950.06371.011738.1839.8352-626管道安装,电弧焊,无缝钢管,二接一,Φ168x7mm以内千米3367.81085.27435.221847.3145.5042-627管道安装,电弧焊,无缝钢管,二接一,Φ168x8mm以内千米3522.331098.39453.131970.8146.0542-628管道安装,电弧焊,无缝钢管,二接一,Φ168x9mm以内千米3558.811108.83484.311965.6746.4922-629管道安装,电弧焊,无缝钢管,二接一,Φ168x10mm以内千米3911.321203.42597.192110.7150.4582-630管道安装,电弧焊,无缝钢管,二接一,Φ168x12mm以内千米4594.831331.28670.082593.4755.8192-631管道安装,电弧焊,无缝钢管,二接一,Φ168x14mm以内千米5574.581491.79802.593280.262.5492-632管道安装,电弧焊,无缝钢管,二接一,Φ168x16mm以内千米5787.861640.14951.913195.8168.7692-633管道安装,电弧焊,无缝钢管,二接一,Φ168x18mm以内千米6478.061757.961119.713600.3973.7092-634管道安装,电弧焊,无缝钢管,二接一,Φ194x6mm以内千米3450.61066.64425.981957.9844.7232-635管道安装,电弧焊,无缝钢管,二接一,Φ194x7mm以内千米3750.721222.15480.212048.3651.2432-636管道安装,电弧焊,无缝钢管,二接一,Φ194x8mm以内千米4097.31251.22555.42290.6852.4622-637管道安装,电弧焊,无缝钢管,二接一,Φ194x10mm以内千米4220.831294.36616.122310.3554.2712-638管道安装,电弧焊,无缝钢管,二接一,Φ194x12mm以内千米5022.051339.99772.462909.656.1842-639管道安装,电弧焊,无缝钢管,二接一,Φ194x14mm以内千米5811.981502.43977.053332.562.9952-640管道安装,电弧焊,无缝钢管,二接一,Φ194x16mm以内千米6292.731649.561098.273544.969.1642-641管道安装,电弧焊,无缝钢管,二接一,Φ194x18mm以内千米7961.461923.671351.174686.6280.6572-642管道安装,电弧焊,无缝钢管,二接一,Φ194x20mm以内千米8087.82054.371496.194537.2486.1372-643管道安装,电弧焊,无缝钢管,二接一,Φ219x6mm以内千米3816.521242.59477.922096.0152.12-644管道安装,电弧焊,无缝钢管,二接一,Φ219x7mm以内千米4279.141335.67539.012404.4656.0032-645管道安装,电弧焊,无缝钢管,二接一,Φ219x8mm以内千米4521.221399.97607.232514.0258.6992-646管道安装,电弧焊,无缝钢管,二接一,Φ219x10mm以内千米4757.131456.95777.12523.0861.0882-647管道安装,电弧焊,无缝钢管,二接一,Φ219x12mm以内千米5646.951553.16869.323224.4765.1222-648管道安装,电弧焊,无缝钢管,二接一,Φ219x14mm以内千米6412.451737.41042.113632.9472.847
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-649管道安装,电弧焊,无缝钢管,二接一,Φ219x16mm以内千米7239.381905.331332.754001.379.8882-650管道安装,电弧焊,无缝钢管,二接一,Φ219x18mm以内千米8147.192165.651456.934524.6190.8032-651管道安装,电弧焊,无缝钢管,二接一,Φ219x20mm以内千米9623.42342.141687.145594.1298.2032-652管道安装,电弧焊,无缝钢管,单根,Φ48x3.5mm以内千米1656.06631.55127.94896.5726.482-653管道安装,电弧焊,无缝钢管,单根,Φ48x4mm以内千米1711.02633.91150.67926.4426.5792-654管道安装,电弧焊,无缝钢管,单根,Φ48x5mm以内千米1757.01654.85165.67936.4927.4572-655管道安装,电弧焊,无缝钢管,单根,Φ60x3.5mm以内千米1951.8757.26149.81044.7431.7512-656管道安装,电弧焊,无缝钢管,单根,Φ60x4.0mm以内千米1985.66789.91167.341028.4133.122-657管道安装,电弧焊,无缝钢管,单根,Φ60x5.0mm以内千米2088.11809.66196.581081.8733.9482-658管道安装,电弧焊,无缝钢管,单根,Φ60x6.0mm以内千米2239.03844.622251169.4135.4142-659管道安装,电弧焊,无缝钢管,单根,Φ60x7.0mm以内千米2380.79862.37256.931261.4936.1582-660管道安装,电弧焊,无缝钢管,单根,Φ60x8.0mm以内千米2447.43865.23291.481290.7236.2782-661管道安装,电弧焊,无缝钢管,单根,Φ60x9.0mm以内千米2724.26919.06300.621504.5838.5352-662管道安装,电弧焊,无缝钢管,单根,Φ60x10mm以内千米2690.58927.69335.961426.9338.8972-663管道安装,电弧焊,无缝钢管,单根,Φ76x3.5mm以内千米2207.94817.08175.051215.8134.2592-664管道安装,电弧焊,无缝钢管,单根,Φ76x4mm以内千米2313.55864.75201.731247.0736.2582-665管道安装,电弧焊,无缝钢管,单根,Φ76x5mm以内千米2450.52885.38234.51330.6437.1232-666管道安装,电弧焊,无缝钢管,单根,Φ76x6mm以内千米2557.86916.22273.731367.9138.4162-667管道安装,电弧焊,无缝钢管,单根,Φ76x7mm以内千米2724.33943.79310.731469.8139.5722-668管道安装,电弧焊,无缝钢管,单根,Φ76x8mm以内千米2828.79947.01335.961545.8239.7072-669管道安装,电弧焊,无缝钢管,单根,Φ76x9mm以内千米2986.231027.89364.151594.1943.0982-670管道安装,电弧焊,无缝钢管,单根,Φ76x10mm以内千米3164.581041.84455.191667.5543.6832-671管道安装,电弧焊,无缝钢管,单根,Φ76x12mm以内千米4081.541247.31537.962296.2752.2982-672管道安装,电弧焊,无缝钢管,单根,Φ89x3.5mm以内千米2379.72849.68195.91334.1435.6262-673管道安装,电弧焊,无缝钢管,单根,Φ89x4mm以内千米2507.41876.11224.441406.8636.7342-674管道安装,电弧焊,无缝钢管,单根,Φ89x5mm以内千米2576.31904.8261.961409.5537.9372-675管道安装,电弧焊,无缝钢管,单根,Φ89x6mm以内千米2759.1923.42304.68153138.718
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-676管道安装,电弧焊,无缝钢管,单根,Φ89x7mm以内千米3072.011056.96368.261646.7944.3172-677管道安装,电弧焊,无缝钢管,单根,Φ89x8mm以内千米3198.281063.59382.881751.8144.5952-678管道安装,电弧焊,无缝钢管,单根,Φ89x9mm以内千米3261.241071.7418.081771.4644.9352-679管道安装,电弧焊,无缝钢管,单根,Φ89x10mm以内千米3542.621161.33471.981909.3148.6932-680管道安装,电弧焊,无缝钢管,单根,Φ89x12mm以内千米4563.591431.88624.222507.4960.0372-681管道安装,电弧焊,无缝钢管,单根,Φ89x14mm以内千米5281.931594.56748.522938.8566.8582-682管道安装,电弧焊,无缝钢管,单根,Φ108x4mm以内千米2918.341018.06258.961641.3242.6862-683管道安装,电弧焊,无缝钢管,单根,Φ108x5mm以内千米3038.711044.03319.031675.6543.7752-684管道安装,电弧焊,无缝钢管,单根,Φ108x6mm以内千米3172.261090.35364.371717.5445.7172-685管道安装,电弧焊,无缝钢管,单根,Φ108x7mm以内千米3519.881246409.941863.9452.2432-686管道安装,电弧焊,无缝钢管,单根,Φ108x8mm以内千米3830.61264.91499.532066.1653.0362-687管道安装,电弧焊,无缝钢管,单根,Φ108x9mm以内千米3873.741272.42518.722082.653.3512-688管道安装,电弧焊,无缝钢管,单根,Φ108x10mm以内千米4217.81390.22574.22253.3858.292-689管道安装,电弧焊,无缝钢管,单根,Φ108x12mm以内千米5204.131693.21704.942805.9870.9942-690管道安装,电弧焊,无缝钢管,单根,Φ108x14mm以内千米5829.511894.55845.373089.5979.4362-691管道安装,电弧焊,无缝钢管,单根,Φ114x4mm以内千米3145.131068.89275.881800.3644.8172-692管道安装,电弧焊,无缝钢管,单根,Φ114x5mm以内千米3231.671095.86324.481811.3345.9482-693管道安装,电弧焊,无缝钢管,单根,Φ114x6mm以内千米3351.541134.45383.761833.3347.5662-694管道安装,电弧焊,无缝钢管,单根,Φ114x7mm以内千米3802.461309.22439.792053.4554.8942-695管道安装,电弧焊,无缝钢管,单根,Φ114x8mm以内千米3960.591321.29481.482157.8255.42-696管道安装,电弧焊,无缝钢管,单根,Φ114x9mm以内千米4036.471331.93524.982179.5655.8462-697管道安装,电弧焊,无缝钢管,单根,Φ114x10mm以内千米4370.231450.27592.622327.3460.8082-698管道安装,电弧焊,无缝钢管,单根,Φ114x12mm以内千米5603.771793.69771.333038.7575.2072-699管道安装,电弧焊,无缝钢管,单根,Φ114x14mm以内千米6475.132018.88947.053509.284.6492-700管道安装,电弧焊,无缝钢管,单根,Φ127x4mm以内千米3551.691136.67327.862087.1647.6592-701管道安装,电弧焊,无缝钢管,单根,Φ127x5mm以内千米3818.761164.91397.82256.0548.8432-702管道安装,电弧焊,无缝钢管,单根,Φ127x6mm以内千米3787.541235.64424.522127.3851.809
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-703管道安装,电弧焊,无缝钢管,单根,Φ127x7mm以内千米4269.711407.03505.162357.5258.9952-704管道安装,电弧焊,无缝钢管,单根,Φ127x8mm以内千米4645.991423.94558.752663.359.7042-705管道安装,电弧焊,无缝钢管,单根,Φ127x9mm以内千米4681.11442.95615.15262360.5012-706管道安装,电弧焊,无缝钢管,单根,Φ127x10mm以内千米5136.161584.4705.592846.1766.4322-707管道安装,电弧焊,无缝钢管,单根,Φ127x12mm以内千米6338.751863.16889.563586.0378.122-708管道安装,电弧焊,无缝钢管,单根,Φ127x14mm以内千米7274.812118.741085.574070.588.8362-709管道安装,电弧焊,无缝钢管,单根,Φ133x4mm以内千米3689.711177.36345.742166.6149.3652-710管道安装,电弧焊,无缝钢管,单根,Φ133x5mm以内千米3916.581220.95417.892277.7451.1932-711管道安装,电弧焊,无缝钢管,单根,Φ133x6mm以内千米4179.81271.23470.42438.1753.3012-712管道安装,电弧焊,无缝钢管,单根,Φ133x7mm以内千米4564.861471.71541.492551.6661.7072-713管道安装,电弧焊,无缝钢管,单根,Φ133x8mm以内千米4773.161486.28591.552695.3362.3182-714管道安装,电弧焊,无缝钢管,单根,Φ133x9mm以内千米5014.871498.97640.482875.4262.852-715管道安装,电弧焊,无缝钢管,单根,Φ133x10mm以内千米5516.031664.92765.983085.1369.8082-716管道安装,电弧焊,无缝钢管,单根,Φ133x12mm以内千米6568.541920.55935.543712.4580.5262-717管道安装,电弧焊,无缝钢管,单根,Φ133x14mm以内千米7673.922147.641164.774361.5190.0482-718管道安装,电弧焊,无缝钢管,单根,Φ133x16mm以内千米7973.172256.161311.464405.5594.5982-719管道安装,电弧焊,无缝钢管,单根,Φ159x5mm以内千米4491.161410.73488.692591.7459.152-720管道安装,电弧焊,无缝钢管,单根,Φ159x6mm以内千米4686.881471.09545.852669.9461.6812-721管道安装,电弧焊,无缝钢管,单根,Φ159x7mm以内千米5501.921711.12631.53159.371.7452-722管道安装,电弧焊,无缝钢管,单根,Φ159x8mm以内千米5567.771732.03692.583143.1672.6222-723管道安装,电弧焊,无缝钢管,单根,Φ159x9mm以内千米5596.941746.39749.093101.4673.2242-724管道安装,电弧焊,无缝钢管,单根,Φ159x10mm以内千米6367.571916.25843.73607.6280.3462-725管道安装,电弧焊,无缝钢管,单根,Φ159x12mm以内千米7532.682141.111092.144299.4389.7742-726管道安装,电弧焊,无缝钢管,单根,Φ159x14mm以内千米8759.752428.551413.224917.98101.8262-727管道安装,电弧焊,无缝钢管,单根,Φ159x16mm以内千米9672.12692.331615.935363.84112.8862-728管道安装,电弧焊,无缝钢管,单根,Φ168x5mm以内千米4703.681487502.042714.6462.3482-729管道安装,电弧焊,无缝钢管,单根,Φ168x6mm以内千米4961.511550.54592.062818.9165.012
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-730管道安装,电弧焊,无缝钢管,单根,Φ168x7mm以内千米5503.091806.26670.913025.9275.7342-731管道安装,电弧焊,无缝钢管,单根,Φ168x8mm以内千米6255.641827.55736.833691.2676.6272-732管道安装,电弧焊,无缝钢管,单根,Φ168x9mm以内千米5957.221844.61795.643316.9777.3422-733管道安装,电弧焊,无缝钢管,单根,Φ168x10mm以内千米6381.132023.55893.593463.9984.8452-734管道安装,电弧焊,无缝钢管,单根,Φ168x12mm以内千米8061.192264.411158.244638.5494.9442-735管道安装,电弧焊,无缝钢管,单根,Φ168x14mm以内千米9166.825691417.655180.15107.7152-736管道安装,电弧焊,无缝钢管,单根,Φ168x16mm以内千米10326.962849.291840.555637.12119.4672-737管道安装,电弧焊,无缝钢管,单根,Φ168x18mm以内千米11685.373071.692042.566571.12128.7922-738管道安装,电弧焊,无缝钢管,单根,Φ194x6mm以内千米5545.751750.3668.23127.2573.3882-739管道安装,电弧焊,无缝钢管,单根,Φ194x7mm以内千米6239.532044.76773.383421.3985.7342-740管道安装,电弧焊,无缝钢管,单根,Φ194x8mm以内千米6854.852097.35887.743869.7687.9392-741管道安装,电弧焊,无缝钢管,单根,Φ194x10mm以内千米7783.042172.281030.824579.9491.0812-742管道安装,电弧焊,无缝钢管,单根,Φ194x12mm以内千米8820.762302.61336.575181.5996.5452-743管道安装,电弧焊,无缝钢管,单根,Φ194x14mm以内千米10183.862586.391730.095867.38108.4442-744管道安装,电弧焊,无缝钢管,单根,Φ194x16mm以内千米11419.412863.721976.056579.64120.0722-745管道安装,电弧焊,无缝钢管,单根,Φ194x18mm以内千米13716.53344.462477.637894.41140.2292-746管道安装,电弧焊,无缝钢管,单根,Φ194x20mm以内千米14727.583589.452901.48236.731150.5012-747管道安装,电弧焊,无缝钢管,单根,Φ219x6mm以内千米6223.812012.96752.373458.4884.4012-748管道安装,电弧焊,无缝钢管,单根,Φ219x7mm以内千米6797.842186.81869.393741.6491.692-749管道安装,电弧焊,无缝钢管,单根,Φ219x8mm以内千米7646.912306.841002.944337.1396.7232-750管道安装,电弧焊,无缝钢管,单根,Φ219x10mm以内千米8060.882408.041335.144317.7100.9662-751管道安装,电弧焊,无缝钢管,单根,Φ219x12mm以内千米10450.462587.251507.936355.28108.482-752管道安装,电弧焊,无缝钢管,单根,Φ219x14mm以内千米11408.982936.441846.316626.23123.1212-753管道安装,电弧焊,无缝钢管,单根,Φ219x16mm以内千米12631.323252.782230.557147.99136.3852-754管道安装,电弧焊,无缝钢管,单根,Φ219x18mm以内千米14889.343748.342663.898477.11157.1632-755管道安装,电弧焊,无缝钢管,单根,Φ219x20mm以内千米16401.674083.143124.489194.05171.2012-756管道安装,电弧焊,无缝钢管,单根,Φ245x6mm以内千米5464.551624.14711.973128.4468.098
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-757管道安装,电弧焊,无缝钢管,单根,Φ245x7mm以内千米5892.521740.12778.283374.1272.9612-758管道安装,电弧焊,无缝钢管,单根,Φ245x8mm以内千米6422.781870.13874.693677.9678.4122-759管道安装,电弧焊,无缝钢管,单根,Φ245x10mm以内千米6951.241933.281201.53816.4681.062-760管道安装,电弧焊,无缝钢管,单根,Φ245x12mm以内千米8104.232060.641267.844775.7586.42-761管道安装,电弧焊,无缝钢管,单根,Φ245x14mm以内千米9983.382357.831601.096024.4698.8612-762管道安装,电弧焊,无缝钢管,单根,Φ245x16mm以内千米10414.682568.791846.585999.31107.7062-763管道安装,电弧焊,无缝钢管,单根,Φ245x18mm以内千米12003.222948.222192.616862.39123.6152-764管道安装,电弧焊,无缝钢管,单根,Φ245x20mm以内千米13489.893242.292658.027589.58135.9452-765管道安装,电弧焊,无缝钢管,单根,Φ245x22mm以内千米15183.823477.92929.48776.52145.8242-766管道安装,电弧焊,无缝钢管,单根,Φ273x6mm以内千米6108.821817.82771.533519.4776.2192-767管道安装,电弧焊,无缝钢管,单根,Φ273x7mm以内千米6263.391890.52817.363555.5179.2672-768管道安装,电弧焊,无缝钢管,单根,Φ273x8mm以内千米6938.052030.47935.763971.8285.1352-769管道安装,电弧焊,无缝钢管,单根,Φ273x10mm以内千米7514.162120.551299.484094.1388.9122-770管道安装,电弧焊,无缝钢管,单根,Φ273x12mm以内千米8901.8592267.81390.265243.895.0862-771管道安装,电弧焊,无缝钢管,单根,Φ273x14mm以内千米11268.972673.161914.076681.74112.0822-772管道安装,电弧焊,无缝钢管,单根,Φ273x16mm以内千米11815.132837.582034.936942.62118.9762-773管道安装,电弧焊,无缝钢管,单根,Φ273x18mm以内千米14998.263407.712780.58810.05142.8812-774管道安装,电弧焊,无缝钢管,单根,Φ273x20mm以内千米15122.953638.823069.398414.74152.5712-775管道安装,电弧焊,无缝钢管,单根,Φ273x22mm以内千米16879.953878.613296.989704.36162.6252-776管道安装,电弧焊,无缝钢管,单根,Φ325x6mm以内千米6947.051924.36921.634101.0680.6862-777管道安装,电弧焊,无缝钢管,单根,Φ325x7mm以内千米7632.772039.81058.554534.4285.5262-778管道安装,电弧焊,无缝钢管,单根,Φ325x8mm以内千米8219.3112340.191215.54663.6298.1212-779管道安装,电弧焊,无缝钢管,单根,Φ325x10mm以内千米9157.442362.991551.545242.9199.0772-780管道安装,电弧焊,无缝钢管,单根,Φ325x12mm以内千米10428.822653.221656.876118.73111.2462-781管道安装,电弧焊,无缝钢管,单根,Φ325x14mm以内千米13281.123141.572288.027851.53131.7222-782管道安装,电弧焊,无缝钢管,单根,Φ325x16mm以内千米13937.73335.162423.658178.89139.8392-783管道安装,电弧焊,无缝钢管,单根,Φ325x18mm以内千米17770.164025.053327.6510417.46168.765
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-784管道安装,电弧焊,无缝钢管,单根,Φ325x20mm以内千米19122.024374.383862.1810885.46183.4122-785管道安装,电弧焊,无缝钢管,单根,Φ325x22mm以内千米19932.094583.333922.4111426.35192.1732-786管道安装,电弧焊,无缝钢管,单根,Φ377x6mm以内千米7998.262231.571030.614736.0893.5672-787管道安装,电弧焊,无缝钢管,单根,Φ377x7mm以内千米8817.4812365.441211.885240.1699.182-788管道安装,电弧焊,无缝钢管,单根,Φ377x8mm以内千米9495.862713.81393.885388.18113.7862-789管道安装,电弧焊,无缝钢管,单根,Φ377x10mm以内千米10226.282740.221480.46005.66114.8942-790管道安装,电弧焊,无缝钢管,单根,Φ377x12mm以内千米12058.113076.791905.727075.6129.0062-791管道安装,电弧焊,无缝钢管,单根,Φ377x14mm以内千米15108.523643.112637.638827.78152.7512-792管道安装,电弧焊,无缝钢管,单根,Φ377x16mm以内千米16048.73867.612794.919386.18162.1642-793管道安装,电弧焊,无缝钢管,单根,Φ377x18mm以内千米20571.694667.643843.2212060.83195.7082-794管道安装,电弧焊,无缝钢管,单根,Φ377x20mm以内千米22655.675072.734463.0913119.85212.6932-795管道安装,电弧焊,无缝钢管,单根,Φ426x6mm以内千米8990.6412521.831133.545335.27105.7372-796管道安装,电弧焊,无缝钢管,单根,Φ426x7mm以内千米9916.512673.111338.385905.02112.082-797管道安装,电弧焊,无缝钢管,单根,Φ426x8mm以内千米10683.233066.781544.086072.37128.5862-798管道安装,电弧焊,无缝钢管,单根,Φ426x10mm以内千米11508.453096.641641.836769.98129.8382-799管道安装,电弧焊,无缝钢管,单根,Φ426x12mm以内千米13578.9634772122.487979.48145.7862-800管道安装,电弧焊,无缝钢管,单根,Φ426x14mm以内千米17025.824116.962949.589959.28172.6192-801管道安装,电弧焊,无缝钢管,单根,Φ426x16mm以内千米18088.414370.663127.3210590.43183.2562-802管道安装,电弧焊,无缝钢管,单根,Φ426x18mm以内千米22786.365060.094113.3513612.92212.1632-803管道安装,电弧焊,无缝钢管,单根,Φ426x20mm以内千米25554.45732.545012.4714809.39240.3582-804管道安装,电弧焊,螺旋焊缝钢管,单根,Φ219x6以内千米4451.51413.28564.652473.5759.2572-805管道安装,电弧焊,螺旋焊缝钢管,单根,Φ219x7以内千米4818.061524.73630.782662.5563.932-806管道安装,电弧焊,螺旋焊缝钢管,单根,Φ219x8以内千米5328.151602.36716.633009.1667.1852-807管道安装,电弧焊,螺旋焊缝钢管,单根,Φ245x6以内千米4976.131523.8623.22829.1363.8912-808管道安装,电弧焊,螺旋焊缝钢管,单根,Φ245x7以内千米5354.821604.91714.273035.6467.2922-809管道安装,电弧焊,螺旋焊缝钢管,单根,Φ245x8以内千米6104.351720.18801.183582.9972.1252-810管道安装,电弧焊,螺旋焊缝钢管,单根,Φ273x6以内千米5550.341695.95704.933149.4671.109
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-811管道安装,电弧焊,螺旋焊缝钢管,单根,Φ273x7以内千米5655.631731.34748.913175.3872.5932-812管道安装,电弧焊,螺旋焊缝钢管,单根,Φ273x8以内千米6339.51868.43855.633615.4478.3412-813管道安装,电弧焊,螺旋焊缝钢管,单根,Φ325x7以内千米6940.281878.26968.584093.4478.7532-814管道安装,电弧焊,螺旋焊缝钢管,单根,Φ325x8以内千米7900.662149.241063.134688.2990.1152-815管道安装,电弧焊,螺旋焊缝钢管,单根,Φ377x7以内千米7356.171992.211033.574330.3983.5312-816管道安装,电弧焊,螺旋焊缝钢管,单根,Φ377x8以内千米8350.4492243.311180.134927.0194.0592-817管道安装,电弧焊,螺旋焊缝钢管,单根,Φ426x7以内千米8104.612088.91209.764805.9587.5852-818管道安装,电弧焊,螺旋焊缝钢管,单根,Φ426x8以内千米9089.282357.071300.755431.4698.8292-819管道安装,电弧焊,螺旋焊缝钢管,单根,Φ480x7以内千米9273.052274.771289.015709.2795.3782-820管道安装,电弧焊,螺旋焊缝钢管,单根,Φ480x8以内千米10029.792505.561473.336050.9105.0552-821管道安装,电弧焊,螺旋焊缝钢管,单根,Φ480x9以内千米10225.042610.881504.576109.59109.4712-822管道安装,电弧焊,螺旋焊缝钢管,单根,Φ508x7以内千米9447.812433.751400.995613.07102.0442-823管道安装,电弧焊,螺旋焊缝钢管,单根,Φ508x8以内千米10987.432792.671603.456591.31117.0932-824管道安装,电弧焊,螺旋焊缝钢管,单根,Φ508x9以内千米11677.952823.361846.417008.18118.382-825管道安装,电弧焊,螺旋焊缝钢管,单根,Φ530x7以内千米9931.852517.131463.345951.38105.542-826管道安装,电弧焊,螺旋焊缝钢管,单根,Φ530x8以内千米11405.192894.171675.716835.31121.3492-827管道安装,电弧焊,螺旋焊缝钢管,单根,Φ530x9以内千米12135.252913.951941.347279.96122.1782-828管道安装,氩电联焊,无缝钢管,二接一,Φ48x3.5以内千米1286.76499.49122.44664.8320.9432-829管道安装,氩电联焊,无缝钢管,二接一,Φ48x4以内千米1332.37518.76128.02685.5921.7512-830管道安装,氩电联焊,无缝钢管,二接一,Φ48x5以内千米1358.87525.99139.3693.5822.0542-831管道安装,氩电联焊,无缝钢管,二接一,Φ60x3以内千米1486.36588.12145.04753.224.6592-832管道安装,氩电联焊,无缝钢管,二接一,Φ60x4以内千米1544.65613.83148.8278225.7372-833管道安装,氩电联焊,无缝钢管,二接一,Φ60x5以内千米1582.76624.44165.2793.1226.1822-834管道安装,氩电联焊,无缝钢管,二接一,Φ60x6以内千米1641.69646.34178.09817.2627.12-835管道安装,氩电联焊,无缝钢管,二接一,Φ60x7以内千米1769.74664.25199.4906.0927.8512-836管道安装,氩电联焊,无缝钢管,二接一,Φ60x8以内千米1873.86676.31214.81982.7428.3572-837管道安装,氩电联焊,无缝钢管,二接一,Φ60x9以内千米1941.5706.13231.321004.0529.607
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-838管道安装,氩电联焊,无缝钢管,二接一,Φ60x10以内千米2016.52717.5247.851051.1730.0842-839管道安装,氩电联焊,无缝钢管,二接一,Φ76x3.5以内千米1624.76629.59166.54828.6326.3982-840管道安装,氩电联焊,无缝钢管,二接一,Φ76x4以内千米1697.86657.78174.9865.1827.582-841管道安装,氩电联焊,无缝钢管,二接一,Φ76x5以内千米1750.03672.07195.13882.8328.1792-842管道安装,氩电联焊,无缝钢管,二接一,Φ76x6以内千米1823.51697.04213.38913.0929.2262-843管道安装,氩电联焊,无缝钢管,二接一,Φ76x7以内千米1993.38725.37238.411029.630.4142-844管道安装,氩电联焊,无缝钢管,二接一,Φ76x8以内千米2118.81734.77258.71125.3430.8082-845管道安装,氩电联焊,无缝钢管,二接一,Φ76x9以内千米2198.25783.97284.331129.9532.8712-846管道安装,氩电联焊,无缝钢管,二接一,Φ76x10以内千米2328.81801.55306.181221.0833.6082-847管道安装,氩电联焊,无缝钢管,二接一,Φ76x12以内千米2730.66927.22353.071450.3738.8772-848管道安装,氩电联焊,无缝钢管,二接一,Φ89x3.5以内千米1757.82655.02184.93917.8727.4642-849管道安装,氩电联焊,无缝钢管,二接一,Φ89x4mm以内千米1791.98665.73194.09932.1627.9132-850管道安装,氩电联焊,无缝钢管,二接一,Φ89x5mm以内千米1852.5680.82218.37953.3128.5462-851管道安装,氩电联焊,无缝钢管,二接一,Φ89x6mm以内千米1938.36707.7239.32991.3429.6732-852管道安装,氩电联焊,无缝钢管,二接一,Φ89x7mm以内千米2196.13798.9268.81128.4333.4972-853管道安装,氩电联焊,无缝钢管,二接一,Φ89x8mm以内千米2353.36816.1292.51244.7634.2182-854管道安装,氩电联焊,无缝钢管,二接一,Φ89x9mm以内千米2388.09820.34318.161249.5934.3962-855管道安装,氩电联焊,无缝钢管,二接一,Φ89x10以内千米2592.06885.19348.941357.9337.1152-856管道安装,氩电联焊,无缝钢管,二接一,Φ89x12以内千米3090.241049.76405.171635.3144.0152-857管道安装,氩电联焊,无缝钢管,二接一,Φ89x14以内千米3441.961158.28466.561817.1248.5652-858管道安装,氩电联焊,无缝钢管,二接一,Φ108x4以内千米2068.68776.84226.851064.9932.5722-859管道安装,氩电联焊,无缝钢管,二接一,Φ108x5以内千米2143.51794.16260.581088.7733.2982-860管道安装,氩电联焊,无缝钢管,二接一,Φ108x6以内千米2248.36827.26284.51136.634.6862-861管道安装,氩电联焊,无缝钢管,二接一,Φ108x7以内千米2565.91939.283211305.6339.3832-862管道安装,氩电联焊,无缝钢管,二接一,Φ108x8以内千米2760.45961.3350.121449.0340.3062-863管道安装,氩电联焊,无缝钢管,二接一,Φ108x9以内千米2803.81966.66381.781455.3740.5312-864管道安装,氩电联焊,无缝钢管,二接一,Φ108x10以内千米3059.181047.64420.551590.9943.926
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-865管道安装,氩电联焊,无缝钢管,二接一,Φ108x12以内千米3675.621251.55490.41933.6752.4762-866管道安装,氩电联焊,无缝钢管,二接一,Φ108x14以内千米4118.511388.26567.112163.1458.2082-867管道安装,氩电联焊,无缝钢管,二接一,Φ114x4以内千米2133.95803.58234.61095.7733.6932-868管道安装,氩电联焊,无缝钢管,二接一,Φ114x5以内千米2218.27823.61270.321124.3434.5332-869管道安装,氩电联焊,无缝钢管,二接一,Φ114x6以内千米2330.72859.82295.541175.3636.0512-870管道安装,氩电联焊,无缝钢管,二接一,Φ114x7以内千米2662.41975.89335.831350.6940.9182-871管道安装,氩电联焊,无缝钢管,二接一,Φ114x8以内千米2870.04999.63366.651503.7641.9132-872管道安装,氩电联焊,无缝钢管,二接一,Φ114x9以内千米2919.651006.3400.131513.2242.1932-873管道安装,氩电联焊,无缝钢管,二接一,Φ114x10以内千米3186.451091.64439.671655.1445.7712-874管道安装,氩电联焊,无缝钢管,二接一,Φ114x12以内千米3842.141308.36513.692020.0954.8582-875管道安装,氩电联焊,无缝钢管,二接一,Φ114x14以内千米4313.071453.82595.362263.8960.9572-876管道安装,氩电联焊,无缝钢管,二接一,Φ127x4以内千米2580.02849.49290.981439.5535.6182-877管道安装,氩电联焊,无缝钢管,二接一,Φ127x5以内千米2672.74872330.761469.9836.5622-878管道安装,氩电联焊,无缝钢管,二接一,Φ127x6以内千米2797.39911.093591527.338.2012-879管道安装,氩电联焊,无缝钢管,二接一,Φ127x7以内千米3171.31042.65403.951724.743.7172-880管道安装,氩电联焊,无缝钢管,二接一,Φ127x8以内千米3400.541068.17438.461893.9144.7872-881管道安装,氩电联焊,无缝钢管,二接一,Φ127x9以内千米3459.411076.97476.111906.3345.1562-882管道安装,氩电联焊,无缝钢管,二接一,Φ127x10以内千米3761.031173.28520.372067.3849.1942-883管道安装,氩电联焊,无缝钢管,二接一,Φ127x12以内千米4496.911416.17603.692477.0559.3782-884管道安装,氩电联焊,无缝钢管,二接一,Φ127x14以内千米5029.431580.87695.812752.7566.2842-885管道安装,氩电联焊,无缝钢管,二接一,Φ133x4以内千米2647.06876.25301.551469.2636.742-886管道安装,氩电联焊,无缝钢管,二接一,Φ133x5以内千米2746.19900.08343.231502.8837.7392-887管道安装,氩电联焊,无缝钢管,二接一,Φ133x6以内千米2878.37941.88373.181563.3139.4922-888管道安装,氩电联焊,无缝钢管,二接一,Φ133x7以内千米3269.981079.31419.911770.7645.2542-889管道安装,氩电联焊,无缝钢管,二接一,Φ133x8以内千米3497.411106.85442.961947.646.4092-890管道安装,氩电联焊,无缝钢管,二接一,Φ133x9以内千米3571.811115.75495.681960.3846.7822-891管道安装,氩电联焊,无缝钢管,二接一,Φ133x10以内千米3874.821207.88536.092130.8550.645
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-892管道安装,氩电联焊,无缝钢管,二接一,Φ133x12以内千米4534.861342.64629.252562.9756.2952-893管道安装,氩电联焊,无缝钢管,二接一,Φ133x14以内千米4964.241497.33726.212740.762.7812-894管道安装,氩电联焊,无缝钢管,二接一,Φ133x16以内千米5645.911650.63852.363142.9269.2092-895管道安装,氩电联焊,无缝钢管,二接一Φ159x4.5以内千米2959.46995.55378.881585.0341.7422-896管道安装,氩电联焊,无缝钢管,二接一,Φ159x5以内千米3069.161023.69396.031649.4442.9222-897管道安装,氩电联焊,无缝钢管,二接一,Φ159x6以内千米3227.281074.01430.361722.9145.0322-898管道安装,氩电联焊,无缝钢管,二接一,Φ159x7以内千米3692.261238.7483.711969.8551.9372-899管道安装,氩电联焊,无缝钢管,二接一,Φ159x8以内千米3991.261273.28531.262186.7253.3872-900管道安装,氩电联焊,无缝钢管,二接一,Φ159x9以内千米4066.521285.04578.792202.6953.882-901管道安装,氩电联焊,无缝钢管,二接一,Φ159x10以内千米4443.531407.53627.772408.2359.0162-902管道安装,氩电联焊,无缝钢管,二接一,Φ159x12以内千米5223.721560.48732.152931.0965.4292-903管道安装,氩电联焊,无缝钢管,二接一,Φ159x14以内千米5869.821749.97854.293265.5673.3742-904管道安装,氩电联焊,无缝钢管,二接一,Φ159x16以内千米6589.171937.361009.973641.8481.2312-905管道安装,氩电联焊,无缝钢管,二接一,Φ168x5以内千米3188.421066.5423.461698.4644.7172-906管道安装,氩电联焊,无缝钢管,二接一,Φ168x6以内千米3355.791119.78459.431776.5846.9512-907管道安装,氩电联焊,无缝钢管,二接一,Φ168x7以内千米3850.21294.98515.762039.4654.2972-908管道安装,氩电联焊,无缝钢管,二接一,Φ168x8以内千米4169.521330.83571.372267.3255.82-909管道安装,氩电联焊,无缝钢管,二接一,Φ168x9以内千米4246.561344.52617.122284.9256.3742-910管道安装,氩电联焊,无缝钢管,二接一,Φ168x10以内千米4683.821474.43705.922503.4761.8212-911管道安装,氩电联焊,无缝钢管,二接一,Φ168x12以内千米5481.711638.4783.793059.5268.6962-912管道安装,氩电联焊,无缝钢管,二接一,Φ168x14以内千米6186.951839.77908.243438.9477.1392-913管道安装,氩电联焊,无缝钢管,二接一,Φ168x16以内千米6926.182039.251073.423813.5185.5032-914管道安装,氩电联焊,无缝钢管,二接一,Φ168x18以内千米7784.612199.451228.254356.9192.222-915管道安装,氩电联焊,无缝钢管,二接一,Φ194x6以内千米3763.781263.22527.61972.9652.9652-916管道安装,氩电联焊,无缝钢管,二接一,Φ194x7以内千米4334.561465.03592.312277.2261.4272-917管道安装,氩电联焊,无缝钢管,二接一,Φ194x8以内千米4697.371508.42645.452543.563.2462-918管道安装,氩电联焊,无缝钢管,二接一,Φ194x10以内千米5191.781599.12774.972817.6967.049
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-919管道安装,氩电联焊,无缝钢管,二接一,Φ194x12以内千米6042.31672.39905.283464.6370.1212-920管道安装,氩电联焊,无缝钢管,二接一,Φ194x14以内千米6841.371879.691050.643911.0478.8132-921管道安装,氩电联焊,无缝钢管,二接一,Φ194x16以内千米7674.222082.991243.274347.9687.3372-922管道安装,氩电联焊,无缝钢管,二接一,Φ194x18以内千米8838.592398.361424.85015.43100.562-923管道安装,氩电联焊,无缝钢管,二接一,Φ194x20以内千米9634.752591.781611.395431.58108.672-924管道安装,氩电联焊,无缝钢管,二接一,Φ219x6以内千米4230.411465.11593.912171.3961.432-925管道安装,氩电联焊,无缝钢管,二接一,Φ219x7以内千米4781.171598.19667.042515.9467.012-926管道安装,氩电联焊,无缝钢管,二接一,Φ219x8以内千米5229.451683.5727.252818.770.5872-927管道安装,氩电联焊,无缝钢管,二接一,Φ219x10以内千米5800.841795.88874.013130.9575.2992-928管道安装,氩电联焊,无缝钢管,二接一,Φ219x12以内千米6818.441930.851021.943865.6580.9582-929管道安装,氩电联焊,无缝钢管,二接一,Φ219x14以内千米7728.422166.81187.244374.3890.8512-930管道安装,氩电联焊,无缝钢管,二接一,Φ219x16以内千米8680.512399.141406.44874.97100.5932-931管道安装,氩电联焊,无缝钢管,二接一,Φ219x18以内千米9947.682734.141613.535600.01114.6392-932管道安装,氩电联焊,无缝钢管,二接一,Φ219x20以内千米10861.242956.181826.756078.31123.9492-933管道安装,氩电联焊,无缝钢管,单根,Φ48x3.5mm以内千米1772.37724.49180.46867.4230.3772-934管道安装,氩电联焊,无缝钢管,单根,Φ48x4mm以内千米1858.18760.74190.35907.0931.8972-935管道安装,氩电联焊,无缝钢管,单根,Φ48x5mm以内千米1907.04773.81210.89922.3432.4452-936管道安装,氩电联焊,无缝钢管,单根,Φ60x3.5mm以内千米2096.32870.95218.221007.1536.5182-937管道安装,氩电联焊,无缝钢管,单根,Φ60x4.0mm以内千米2209.54919.54227.361062.6438.5552-938管道安装,氩电联焊,无缝钢管,单根,Φ60x5.0mm以内千米2280.68938.64258.11083.9439.3562-939管道安装,氩电联焊,无缝钢管,单根,Φ60x6.0mm以内千米2390.6979.21281.791129.641.0572-940管道安装,氩电联焊,无缝钢管,单根,Φ60x7.0mm以内千米2636.571012.5322.651301.4242.4532-941管道安装,氩电联焊,无缝钢管,单根,Φ60x8.0mm以内千米2834.971034.71351.721448.5443.3842-942管道安装,氩电联焊,无缝钢管,单根,Φ60x9.0mm以内千米2968.181091.02383.191493.9745.7452-943管道安装,氩电联焊,无缝钢管,单根,Φ60x10mm以内千米3106.981112.1414.831580.0546.6292-944管道安装,氩电联焊,无缝钢管,单根,Φ76x3.5mm以内千米2362.64949.52260.831152.2939.8122-945管道安装,氩电联焊,无缝钢管,单根,Φ76x4mm以内千米2501.491003.01275.71222.7842.055
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-946管道安装,氩电联焊,无缝钢管,单根,Φ76x5mm以内千米2598.891028.84313.671256.3843.1382-947管道安装,氩电联焊,无缝钢管,单根,Φ76x6mm以内千米2737.631075.4347.611314.6245.092-948管道安装,氩电联焊,无缝钢管,单根,Φ76x7mm以内千米3058.111128.39395.41534.3247.3122-949管道安装,氩电联焊,无缝钢管,单根,Φ76x8mm以内千米3301.181145.25433.51722.4348.0192-950管道安装,氩电联焊,无缝钢管,单根,Φ76x9mm以内千米3453.091238.96482.781731.3551.9482-951管道安装,氩电联焊,无缝钢管,单根,Φ76x10mm以内千米3701.591270.87524.611906.1153.2862-952管道安装,氩电联焊,无缝钢管,单根,Φ76x12mm以内千米4474.451512.11615.052347.2963.4012-953管道安装,氩电联焊,无缝钢管,单根,Φ89x3.5mm以内千米2617.23998.15295.191323.8941.8512-954管道安装,氩电联焊,无缝钢管,单根,Φ89x4mm以内千米2680.551017.54311.491351.5242.6642-955管道安装,氩电联焊,无缝钢管,单根,Φ89x5mm以内千米2793.481044.77357.291391.4243.8062-956管道安装,氩电联焊,无缝钢管,单根,Φ89x6mm以内千米2956.011094.86396.261464.8945.9062-957管道安装,氩电联焊,无缝钢管,单根,Φ89x7mm以内千米3449.721268.75452.641728.3353.1972-958管道安装,氩电联焊,无缝钢管,单根,Φ89x8mm以内千米3750.061300.4497.551952.1154.5242-959管道安装,氩电联焊,无缝钢管,单根,Φ89x9mm以内千米3815.371307.6546.61961.1754.8262-960管道安装,氩电联焊,无缝钢管,单根,Φ89x10mm以内千米4206.871431.31606.052169.5160.0132-961管道安装,氩电联焊,无缝钢管,单根,Φ89x12mm以内千米5163.651746.11714.582702.9673.2122-962管道安装,氩电联焊,无缝钢管,单根,Φ89x14mm以内千米5839.331953.27833.943052.1281.8982-963管道安装,氩电联焊,无缝钢管,单根,Φ108x4mm以内千米3158.511207.31374.961576.2450.6212-964管道安装,氩电联焊,无缝钢管,单根,Φ108x5mm以内千米3292.221238.7431.241622.2851.9372-965管道安装,氩电联焊,无缝钢管,单根,Φ108x6mm以内千米3490.331300.56475.651714.1254.5312-966管道安装,氩电联焊,无缝钢管,单根,Φ108x7mm以内千米4098.971514.36545.642038.9763.4952-967管道安装,氩电联焊,无缝钢管,单根,Φ108x8mm以内千米4339.241555.14600.952183.1565.2052-968管道安装,氩电联焊,无缝钢管,单根,Φ108x9mm以内千米4552.781564.3661.572326.9165.5892-969管道安装,氩电联焊,无缝钢管,单根,Φ108x10mm以内千米5043.2311719.04736.592587.672.0772-970管道安装,氩电联焊,无缝钢管,单根,Φ108x12mm以内千米6227.062109.03871.63246.4388.4292-971管道安装,氩电联焊,无缝钢管,单根,Φ108x14mm以内千米7078.832370.191020.853687.7999.3792-972管道安装,氩电联焊,无缝钢管,单根,Φ114x4mm以内千米3284.111258.4390.351635.3652.763
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-973管道安装,氩电联焊,无缝钢管,单根,Φ114x5mm以内千米3435.251294.84449.951690.4654.2912-974管道安装,氩电联焊,无缝钢管,单根,Φ114x6mm以内千米3646.651361.21496.81788.6457.0742-975管道安装,氩电联焊,无缝钢管,单根,Φ114x7mm以内千米4283.81584574.242125.5666.4152-976管道安装,氩电联焊,无缝钢管,单根,Φ114x8mm以内千米4680.861628.26632.82419.868.2712-977管道安装,氩电联焊,无缝钢管,单根,Φ114x9mm以内千米4774.971639.9696.912438.1668.7592-978管道安装,氩电联焊,无缝钢管,单根,Φ114x10mm以内千米5287.071802.85773.342710.8875.5912-979管道安装,氩电联焊,无缝钢管,单根,Φ114x12mm以内千米6546.792217.62916.423412.7592.9822-980管道安装,氩电联焊,无缝钢管,单根,Φ114x14mm以内千米7452.272495.51075.373881.4104.6332-981管道安装,氩电联焊,无缝钢管,单根,Φ127x4mm以内千米3865.471359.09465.42040.9856.9852-982管道安装,氩电联焊,无缝钢管,单根,Φ127x5mm以内千米4031.611400.23531.932099.4558.712-983管道安装,氩电联焊,无缝钢管,单根,Φ127x6mm以内千米4267.641473.5584.482209.6661.7822-984管道安装,氩电联焊,无缝钢管,单根,Φ127x7mm以内千米4985.031724.47670.952589.6172.3052-985管道安装,氩电联焊,无缝钢管,单根,Φ127x8mm以内千米5423.151772.08736.612914.4674.3012-986管道安装,氩电联焊,无缝钢管,单根,Φ127x9mm以内千米5535.431787.75808.732938.9574.9582-987管道安装,氩电联焊,无缝钢管,单根,Φ127x10mm以内千米6114.441971.68894.313248.4582.672-988管道安装,氩电联焊,无缝钢管,单根,Φ127x12mm以内千米7527.922436.611055.464035.85102.1642-989管道安装,氩电联焊,无缝钢管,单根,Φ127x14mm以内千米8552.182751.51234.784565.9115.3672-990管道安装,氩电联焊,无缝钢管,单根,Φ133x4mm以内千米3993.441409.92484.912098.6159.1162-991管道安装,氩电联焊,无缝钢管,单根,Φ133x5mm以内千米4171.311453.8554.742162.7760.9562-992管道安装,氩电联焊,无缝钢管,单根,Φ133x6mm以内千米4421.911532.08610.122279.7164.2382-993管道安装,氩电联焊,无缝钢管,单根,Φ133x7mm以内千米5172.591794.31700.432677.8575.2332-994管道安装,氩电联焊,无缝钢管,单根,Φ133x8mm以内千米5606.261845.56742.823017.8877.3822-995管道安装,氩电联焊,无缝钢管,单根,Φ133x9mm以内千米5748.811861.28845.163042.3778.0412-996管道安装,氩电联焊,无缝钢管,单根,Φ133x10mm以内千米6348.642055.58922.833370.2386.1882-997管道安装,氩电联焊,无缝钢管,单根,Φ133x12mm以内千米7599.032294.111104.074200.8596.1892-998管道安装,氩电联焊,无缝钢管,单根,Φ133x14mm以内千米8640.822589.591292.874758.36108.5782-999管道安装,氩电联焊,无缝钢管,单根,Φ133x16mm以内千米9742.092882.771543.235316.09120.871
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1000管道安装,氩电联焊,无缝钢管,单根,Φ159x4.5以内千米4656.351641.31616.822398.2268.8182-1001管道安装,氩电联焊,无缝钢管,单根,Φ159x5mm以内千米4783.581690.01648.592444.9870.862-1002管道安装,氩电联焊,无缝钢管,单根,Φ159x6mm以内千米5084.031784.5713.552585.9874.8222-1003管道安装,氩电联焊,无缝钢管,单根,Φ159x7mm以内千米5975.562098.7816.083060.7887.9962-1004管道安装,氩电联焊,无缝钢管,单根,Φ159x8mm以内千米6548.862163.24907.973477.6590.7022-1005管道安装,氩电联焊,无缝钢管,单根,Φ159x9mm以内千米6692.962185.42999.283508.2691.6322-1006管道安装,氩电联焊,无缝钢管,单根,Φ159x10mm以内千米7415.042417.911093.483903.65101.382-1007管道安装,氩电联焊,无缝钢管,单根,Φ159x12mm以内千米8915.242709.291297.324908.63113.5972-1008管道安装,氩电联焊,无缝钢管,单根,Φ159x14mm以内千米10202.573071.311536.125595.14128.7762-1009管道安装,氩电联焊,无缝钢管,单根,Φ159x16mm以内千米11547.623429.491842.856275.28143.7942-1010管道安装,氩电联焊,无缝钢管,单根,Φ168x5mm以内千米5044.341782.57690.552571.2274.7412-1011管道安装,氩电联焊,无缝钢管,单根,Φ168x6mm以内千米5362.461882.39758.932721.1478.9262-1012管道安装,氩电联焊,无缝钢管,单根,Φ168x7mm以内千米6310.912216.76867.283226.8792.9462-1013管道安装,氩电联焊,无缝钢管,单根,Φ168x8mm以内千米6923.632283.38974.963665.2995.7392-1014管道安装,氩电联焊,无缝钢管,单根,Φ168x9mm以内千米7171.762306.841166.223698.796.7232-1015管道安装,氩电联焊,无缝钢管,单根,Φ168x10mm以内千米7843.592555.341169.714118.54107.1422-1016管道安装,氩电联焊,无缝钢管,单根,Φ168x12mm以内千米9442.432867.061387.255188.12120.2122-1017管道安装,氩电联焊,无缝钢管,单根,Φ168x14mm以内千米10799.423251.521630.425917.48136.3322-1018管道安装,氩电联焊,无缝钢管,单根,Φ168x16mm以内千米12225.963632.4519566637.51152.3042-1019管道安装,氩电联焊,无缝钢管,单根,Φ168x18mm以内千米13881.913938.352261.147682.42165.132-1020管道安装,氩电联焊,无缝钢管,单根,Φ194x6mm以内千米6043.382134.72872.883035.7889.5062-1021管道安装,氩电联焊,无缝钢管,单根,Φ194x7mm以内千米7138.882520.16997.793620.93105.6672-1022管道安装,氩电联焊,无缝钢管,单根,Φ194x8mm以内千米7833.452601.011099.624132.82109.0572-1023管道安装,氩电联焊,无缝钢管,单根,Φ194x10mm以内千米8781.4812770.81350.754659.93116.1762-1024管道安装,氩电联焊,无缝钢管,单根,Φ194x12mm以内千米10416.372908.21604.085904.09121.9372-1025管道安装,氩电联焊,无缝钢管,单根,Φ194x14mm以内千米11954.023303.751888.276762138.5222-1026管道安装,氩电联焊,无缝钢管,单根,Φ194x16mm以内千米13561.473691.882268.097601.5154.796
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1027管道安装,氩电联焊,无缝钢管,单根,Φ194x18mm以内千米15760.854275.952625.928858.981179.2852-1028管道安装,氩电联焊,无缝钢管,单根,Φ194x20mm以内千米17302.64645.052998.949658.61194.7612-1029管道安装,氩电联焊,无缝钢管,单根,Φ219x6mm以内千米6825.012448.18985.963390.87102.6492-1030管道安装,氩电联焊,无缝钢管,单根,Φ219x7mm以内千米7880.932701.061127.234052.64113.2522-1031管道安装,氩电联焊,无缝钢管,单根,Φ219x8mm以内千米8740.052862.451242.744634.86120.0192-1032管道安装,氩电联焊,无缝钢管,单根,Φ219x10mm以内千米9837.13073.981527.515235.61128.8882-1033管道安装,氩电联焊,无缝钢管,单根,Φ219x12mm以内千米11793.213329.671815.316648.23139.6092-1034管道安装,氩电联焊,无缝钢管,单根,Φ219x14mm以内千米13544.593780.22138.67625.79158.4992-1035管道安装,氩电联焊,无缝钢管,单根,Φ219x16mm以内千米15382.494223.862570.848587.79177.1012-1036管道安装,氩电联焊,无缝钢管,单根,Φ219x18mm以内千米17826.764865.452979.279982.04204.0022-1037管道安装,氩电联焊,无缝钢管,单根,Φ219x20mm以内千米19596.425289.453405.6310901.34221.782-1038管道安装,氩电联焊,无缝钢管,单根,Φ245x6mm以内千米5918.991969.03899.283050.6882.5592-1039管道安装,氩电联焊,无缝钢管,单根,Φ245x7mm以内千米6574.522043.681023.013507.8385.6892-1040管道安装,氩电联焊,无缝钢管,单根,Φ245x8mm以内千米7438.722349.631124.853964.2498.5172-1041管道安装,氩电联焊,无缝钢管,单根,Φ245x10mm以内千米8338.132521.681369.474446.98105.7312-1042管道安装,氩电联焊,无缝钢管,单根,Φ245x12mm以内千米9919.772726.751622.825570.2114.3292-1043管道安装,氩电联焊,无缝钢管,单根,Φ245x14mm以内千米11340.673086.091907.366347.22129.3962-1044管道安装,氩电联焊,无缝钢管,单根,Φ245x16mm以内千米12836.723438.882286.817111.03144.1882-1045管道安装,氩电联焊,无缝钢管,单根,Φ245x18mm以内千米14825.053952.42646.578226.08165.7192-1046管道安装,氩电联焊,无缝钢管,单根,Φ245x20mm以内千米16280.044293.453024.878961.72180.0192-1047管道安装,氩电联焊,无缝钢管,单根,Φ245x22mm以内千米18598.944906.283354.710337.96205.7142-1048管道安装,氩电联焊,无缝钢管,单根,Φ273x6mm以内千米6463.372170.49981.983310.991.0062-1049管道安装,氩电联焊,无缝钢管,单根,Φ273x7mm以内千米7339.772387.811120.293831.67100.1182-1050管道安装,氩电联焊,无缝钢管,单根,Φ273x8mm以内千米8172.282591.761233.84346.72108.6692-1051管道安装,氩电联焊,无缝钢管,单根,Φ273x10mm以内千米9031.52782.891365.154883.46116.6832-1052管道安装,氩电联焊,无缝钢管,单根,Φ273x12mm以内千米10945.073013.141790.746141.19126.3372-1053管道安装,氩电联焊,无缝钢管,单根,Φ273x14mm以内千米12542.393417.232109.67015.56143.28
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1054管道安装,氩电联焊,无缝钢管,单根,Φ273x16mm以内千米14220.723813.592534.597872.54159.8992-1055管道安装,氩电联焊,无缝钢管,单根,Φ273x18mm以内千米16453.874389.832938.439125.61184.062-1056管道安装,氩电联焊,无缝钢管,单根,Φ273x20mm以内千米18093.674773.293365.839954.55200.1382-1057管道安装,氩电联焊,无缝钢管,单根,Φ273x22mm以内千米20773.885482.733795.5411495.61229.8842-1058管道安装,氩电联焊,无缝钢管,单根,Φ325x6mm以内千米7332.542320.491173.853838.297.2952-1059管道安装,氩电联焊,无缝钢管,单根,Φ325x7mm以内千米8214.4812526.861338.324349.3105.9482-1060管道安装,氩电联焊,无缝钢管,单根,Φ325x8mm以内千米9457.6312916.091473.865067.68122.2682-1061管道安装,氩电联焊,无缝钢管,单根,Φ325x10mm以内千米10474.733129.621630.315714.8131.2212-1062管道安装,氩电联焊,无缝钢管,单根,Φ325x12mm以内千米12581.273545.991813.737221.55148.6792-1063管道安装,氩电联焊,无缝钢管,单根,Φ325x14mm以内千米14823.984031.292521.618271.08169.0272-1064管道安装,氩电联焊,无缝钢管,单根,Φ325x16mm以内千米16839.074506.793030.939301.35188.9642-1065管道安装,氩电联焊,无缝钢管,单根,Φ325x18mm以内千米19527.495201.263516.3410809.89218.0822-1066管道安装,氩电联焊,无缝钢管,单根,Φ325x20mm以内千米21504.855663.84027.0711813.98237.4762-1067管道安装,氩电联焊,无缝钢管,单根,Φ325x22mm以内千米24773.866514.534601.413657.93273.1462-1068管道安装,氩电联焊,螺旋焊缝钢管,Φ219x6mm以内千米4856.641690.08702.822463.7470.8632-1069管道安装,氩电联焊,螺旋焊缝钢管,Φ219x7mm以内千米55321852.07794.882885.0577.6552-1070管道安装,氩电联焊,螺旋焊缝钢管,Φ219x8mm以内千米6081.751955.72870.453255.5882.0012-1071管道安装,氩电联焊,螺旋焊缝钢管,Φ245x6mm以内千米5376.541828.48767.372780.6976.6662-1072管道安装,氩电联焊,螺旋焊缝钢管,Φ245x7mm以内千米5995.051991.26879.33124.4983.4912-1073管道安装,氩电联焊,螺旋焊缝钢管,Φ245x8mm以内千米6635.12154.35944.773535.9890.3292-1074管道安装,氩电联焊,螺旋焊缝钢管,Φ273x6mm以内千米5917.092019.02905.042993.0384.6552-1075管道安装,氩电联焊,螺旋焊缝钢管,Φ273x7mm以内千米6534.62191.22959.843383.5491.8752-1076管道安装,氩电联焊,螺旋焊缝钢管,Φ273x8mm以内千米7265.42363.391054.093847.9299.0942-1077管道安装,氩电联焊,螺旋焊缝钢管,Φ325x7mm以内千米7341.8512317.11146.683878.0797.1532-1078管道安装,氩电联焊,螺旋焊缝钢管,Φ325x8mm以内千米8453.072668.121259.194525.76111.8712-1079管道安装,氩电联焊,螺旋焊缝钢管,Φ377x7mm以内千米8477.82492.871333.844651.09104.5232-1080管道安装,氩电联焊,螺旋焊缝钢管,Φ377x8mm以内千米9569.4492808.891464.035296.53117.773
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1081管道安装,氩电联焊,螺旋焊缝钢管,Φ426x7mm以内千米9223.992639.361476.325108.31110.6652-1082管道安装,氩电联焊,螺旋焊缝钢管,Φ426x8mm以内千米10441.152978.081623.565839.51124.8672-1083管道安装,氩电联焊,螺旋焊缝钢管,Φ480x7mm以内千米9956.632870.511636.465449.66120.3572-1084管道安装,氩电联焊,螺旋焊缝钢管,Φ480x8mm以内千米11543.033314.121819.76409.21138.9572-1085管道安装,氩电联焊,螺旋焊缝钢管,Φ480x9mm以内千米11905.743369.842005.886530.02141.2932-1086管道安装,氩电联焊,螺旋焊缝钢管,Φ508x7mm以内千米10648.273037.31759.445851.53127.352-1087管道安装,氩电联焊,螺旋焊缝钢管,Φ508x8mm以内千米12327.613506.591953.336867.69147.0272-1088管道安装,氩电联焊,螺旋焊缝钢管,Φ508x9mm以内千米12718.033569.462150.446998.13149.6632-1089管道安装,氩电联焊,螺旋焊缝钢管,Φ530x7mm以内千米11037.583147.131837.876052.58131.9552-1090管道安装,氩电联焊,螺旋焊缝钢管,Φ530x8mm以内千米12793.833640.22040.217113.42152.6292-1091管道安装,氩电联焊,螺旋焊缝钢管,Φ530x9mm以内千米13214.973706.312258.687249.98155.4012-1092注(热)采高温高压管道安装,Φ76x7mm以内千米10729.771621.47395.48712.967.9862-1093注(热)采高温高压管道安装,Φ76x8mm以内千米12160.641772.06433.59955.0874.32-1094注(热)采高温高压管道安装,Φ76x9mm以内千米12366.681869.43482.7810014.4778.3832-1095注(热)采高温高压管道安装,Φ76x10mm以内千米13664.161972.73524.6111166.8282.7142-1096注(热)采高温高压管道安装,Φ89x8mm以内千米14210.392037.43497.5511675.4185.4272-1097注(热)采高温高压管道安装,Φ89x9mm以内千米14331.542048.43546.611736.5185.8882-1098注(热)采高温高压管道安装,Φ89x10mm以内千米15964.322246.6606.0513111.6794.1972-1099注(热)采高温高压管道安装,Φ89x12mm以内千米20133.332785.99714.5816632.76116.8132-1100注(热)采高温高压管道安装,Φ108x9mm以内千米17381.412466.71661.5714253.13103.4262-1101注(热)采高温高压管道安装,Φ108x10mm以内千米19438.72728.08736.5915974.03114.3852-1102注(热)采高温高压管道安装,Φ108x12mm以内千米24582.353387.53871.620323.22142.0352-1103注(热)采高温高压管道安装,Φ108x14mm以内千米28087.253829.211020.8523237.19160.5542-1104注(热)采高温高压管道安装,Φ114x10mm以内千米20520.642869.49773.3416877.81120.3142-1105注(热)采高温高压管道安装,Φ114x12mm以内千米25999.593571.37916.4221511.8149.7432-1106注(热)采高温高压管道安装,Φ114x14mm以内千米29722.364040.881075.3724606.11169.4292-1107注(热)采高温高压管道安装,Φ127x10mm以内千米23328.643175.34894.3119258.99133.138
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1108注(热)采高温高压管道安装,Φ127x12mm以内千米28946.883923.251055.4623968.17164.4972-1109注(热)采高温高压管道安装,Φ127x14mm以内千米33686.244494.081234.7827957.38188.4312-1110注(热)采高温高压管道安装,Φ133x10mm以内千米24647.443335.14922.8320389.47139.8382-1111注(热)采高温高压管道安装,Φ133x12mm以内千米30644.083895.161104.0725644.85163.3192-1112注(热)采高温高压管道安装,Φ133x14mm以内千米35034.544418.471292.8729323.2185.2612-1113注(热)采高温高压管道安装,Φ133x16mm以内千米39491.874940.051543.2333008.59207.132-1114低、中压管件安装,电弧焊,外径48mm个16.367.232.696.440.3032-1115低、中压管件安装,电弧焊,外径60mm个23.5410.264.119.170.432-1116低、中压管件安装,电弧焊,外径76mm个31.3612.526.3612.480.5252-1117低、中压管件安装,电弧焊,外径89mm个35.0313.057.3114.670.5472-1118低、中压管件安装,电弧焊,外径114mm个55.1820.3911.3123.480.8552-1119低、中压管件安装,电弧焊,外径133mm个64.323.6613.1427.50.9922-1120低、中压管件安装,电弧焊,外径159mm个76.5728.1915.3733.011.1822-1121低、中压管件安装,电弧焊,外径168mm个91.131.1520.5139.441.3062-1122低、中压管件安装,电弧焊,外径194mm个102.8134.1323.0245.661.4312-1123低、中压管件安装,电弧焊,外径219mm个120.7239.3829.6451.71.6512-1124低、中压管件安装,电弧焊,外径273mm个141.3945.231.6564.541.8952-1125低、中压管件安装,电弧焊,外径325mm个224.6353.4537.15134.032.2412-1126低、中压管件安装,电弧焊,外径377mm个256.1957.7942.52155.882.4232-1127低、中压管件安装,电弧焊,外径426mm个286.0262.1547.72176.152.6062-1128低、中压管件安装,电弧焊,外径480mm个321.8969.7653.19198.942.9252-1129低、中压管件安装,电弧焊,外径530mm个355.0876.8958.35219.843.2242-1130低、中压管件安装,氩电联焊,外径48mm个16.788.163.415.210.3422-1131低、中压管件安装,氩电联焊,外径60mm个24.6611.574.888.210.4852-1132低、中压管件安装,氩电联焊,外径76mm个32.6314.17.311.230.5912-1133低、中压管件安装,氩电联焊,外径89mm个36.3414.628.4513.270.6132-1134低、中压管件安装,氩电联焊,外径114mm个57.6122.9412.7321.940.962
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1135低、中压管件安装,氩电联焊,外径133mm个67.0426.6914.8425.511.1192-1136低、中压管件安装,氩电联焊,外径159mm个79.9731.7917.4430.741.3332-1137低、中压管件安装,氩电联焊,外径168mm个95.0835.0422.6237.421.4692-1138低、中压管件安装,氩电联焊,外径194mm个107.1738.3525.5143.311.6082-1139低、中压管件安装,氩电联焊,外径219mm个125.7744.1732.4849.121.8522-1140低、中压管件安装,氩电联焊,外径273mm个147.5550.8235.2561.482.1312-1141低、中压管件安装,氩电联焊,外径325mm个231.960.241.5130.22.5242-1142低、中压管件安装,氩电联焊,外径377mm个264.0265.0247.59151.412.7262-1143低、中压管件安装,氩电联焊,外径426mm个294.3869.8853.49171.012.932-1144低、中压管件安装,氩电联焊,外径480mm个331.478.4959.73193.183.2912-1145低、中压管件安装,氩电联焊,外径530mm个365.6786.5365.6213.543.6282-1146高压管件安装,电弧焊,外径60mm个31.1512.336.712.120.5172-1147高压管件安装,电弧焊,外径76mm个41.8414.889.5217.440.6242-1148高压管件安装,电弧焊,外径89mm个54.8418.9412.4223.480.7942-1149高压管件安装,电弧焊,外径108mm个86.6529.1420.337.211.2222-1150高压管件安装,电弧焊,外径114mm个91.630.7721.3939.441.292-1151高压管件安装,电弧焊,外径127mm个99.7331.7223.8244.191.332-1152高压管件安装,电弧焊,外径133mm个103.8532.5824.8946.381.3662-1153高压管件安装,电弧焊,外径159mm个161.7746.2741.2274.281.942-1154高压管件安装,电弧焊,外径168mm个192.0453.5449.9588.552.2452-1155高压管件安装,电弧焊,外径194mm个246.5267.7365.1113.692.842-1156高压管件安装,电弧焊,外径219mm个375.1976.5373.65225.013.2092-1157高压管件安装,电弧焊,外径245mm个421.0785.7282.43252.923.5942-1158高压管件安装,电弧焊,外径273mm个47195.5292.09283.394.0052-1159高压管件安装,电弧焊,外径325mm个671.21134.61128.75407.855.6442-1160高压管件安装,氩电联焊,外径60mm个32.4713.867.3311.280.5812-1161高压管件安装,氩电联焊,外径76mm个43.4916.6710.3216.50.699
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1162高压管件安装,氩电联焊,外径89mm个57.2121.2513.3422.620.8912-1163高压管件安装,氩电联焊,外径108mm个91.232.7921.2437.171.3752-1164高压管件安装,氩电联焊,外径114mm个96.2634.6322.3939.241.4522-1165高压管件安装,氩电联焊,外径127mm个104.6435.6824.9843.981.4962-1166高压管件安装,氩电联焊,外径133mm个108.9636.6126.1246.231.5352-1167高压管件安装,氩电联焊,外径159mm个170.3252.1142.2875.932.1852-1168高压管件安装,氩电联焊,外径168mm个202.2860.2950.8291.172.5282-1169高压管件安装,氩电联焊,外径194mm个260.0176.4265.88117.713.2042-1170高压管件安装,氩电联焊,外径219mm个390.886.4374.61229.763.6242-1171高压管件安装,氩电联焊,外径245mm个438.796.8183.58258.314.0592-1172高压管件安装,氩电联焊,外径273mm个490.69107.9593.43289.314.5262-1173高压管件安装,氩电联焊,外径325mm个701.28152.52122.9425.866.3952-1174石油沥青补口补伤,普通级,无缝钢管,二接一,48mm千米553.45211.07163.34179.048.852-1175石油沥青补口补伤,普通级,无缝钢管,二接一,60mm千米591.42211.07201.31179.048.852-1176石油沥青补口补伤,普通级,无缝钢管,二接一,76mm千米641.52211.07251.41179.048.852-1177石油沥青补口补伤,普通级,无缝钢管,二接一,89mm千米682.99211.07292.88179.048.852-1178石油沥青补口补伤,普通级,无缝钢管,二接一,108mm千米721.8211.07331.69179.048.852-1179石油沥青补口补伤,普通级,无缝钢管,二接一,114mm千米739.71211.07349.6179.048.852-1180石油沥青补口补伤,普通级,无缝钢管,二接一,127mm千米930.97294.45387.16249.3612.3462-1181石油沥青补口补伤,普通级,无缝钢管,二接一,133mm千米948.88294.45405.07249.3612.3462-1182石油沥青补口补伤,普通级,无缝钢管,二接一,159mm千米1025.61294.45481.8249.3612.3462-1183石油沥青补口补伤,普通级,无缝钢管,二接一,168mm千米1053.19294.45509.38249.3612.3462-1184石油沥青补口补伤,普通级,无缝钢管,二接一,194mm千米1129.73294.45585.92249.3612.3462-1185石油沥青补口补伤,普通级,无缝钢管,二接一,219mm千米1203.13294.45659.32249.3612.3462-1186石油沥青补口补伤,普通级,无缝钢管,单根,48mm千米1075.34437.24301.44336.6618.3332-1187石油沥青补口补伤,普通级,无缝钢管,单根,60mm千米1144.5437.24370.6336.6618.3332-1188石油沥青补口补伤,普通级,无缝钢管,单根,76mm千米1236.65437.24462.75336.6618.333
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1189石油沥青补口补伤,普通级,无缝钢管,单根,89mm千米1310.93437.24537.03336.6618.3332-1190石油沥青补口补伤,普通级,无缝钢管,单根,108mm千米1383437.24609.1336.6618.3332-1191石油沥青补口补伤,普通级,无缝钢管,单根,114mm千米1415.53437.24641.63336.6618.3332-1192石油沥青补口补伤,普通级,无缝钢管,单根,127mm千米1793.21610.11713.07470.0325.5812-1193石油沥青补口补伤,普通级,无缝钢管,单根,133mm千米1824.49610.11744.35470.0325.5812-1194石油沥青补口补伤,普通级,无缝钢管,单根,159mm千米1965.79610.11885.65470.0325.5812-1195石油沥青补口补伤,普通级,无缝钢管,单根,168mm千米2014.11610.11933.97470.0325.5812-1196石油沥青补口补伤,普通级,无缝钢管,单根,194mm千米2155.58610.111075.44470.0325.5812-1197石油沥青补口补伤,普通级,无缝钢管,单根,219mm千米2371.76655.881210.69505.1927.52-1198石油沥青补口补伤,普通级,无缝钢管,单根,245mm千米2294.81665.651160.35468.8127.912-1199石油沥青补口补伤,普通级,无缝钢管,单根,273mm千米2425.34665.651290.88468.8127.912-1200石油沥青补口补伤,普通级,无缝钢管,单根,325mm千米2667.05665.651532.59468.8127.912-1201石油沥青补口补伤,普通级,螺旋焊缝钢管,219mm千米1892.66610.11812.52470.0325.5812-1202石油沥青补口补伤,普通级,螺旋焊缝钢管,245mm千米2121.98622.171060.5439.3126.0872-1203石油沥青补口补伤,普通级,螺旋焊缝钢管,273mm千米2240.3622.171178.82439.3126.0872-1204石油沥青补口补伤,普通级,螺旋焊缝钢管,325mm千米2460.89622.171399.41439.3126.0872-1205石油沥青补口补伤,普通级,螺旋焊缝钢管,377mm千米2662.62622.171601.14439.3126.0872-1206石油沥青补口补伤,普通级,螺旋焊缝钢管,426mm千米3254.01681.422091.65480.9428.5712-1207石油沥青补口补伤,普通级,螺旋焊缝钢管,480mm千米3517.17681.422354.81480.9428.5712-1208石油沥青补口补伤,普通级,螺旋焊缝钢管,508mm千米3653.13681.422490.77480.9428.5712-1209石油沥青补口补伤,普通级,螺旋焊缝钢管,530mm千米3760.37681.422598.01480.9428.5712-1210石油沥青补口补伤,加强级,无缝钢管,二接一,48mm千米634.69222.07224.29188.339.3112-1211石油沥青补口补伤,加强级,无缝钢管,二接一,60mm千米684.69222.07274.29188.339.3112-1212石油沥青补口补伤,加强级,无缝钢管,二接一,76mm千米750.93222.07340.53188.339.3112-1213石油沥青补口补伤,加强级,无缝钢管,二接一,89mm千米804.9222.07394.5188.339.3112-1214石油沥青补口补伤,加强级,无缝钢管,二接一,108mm千米857.67222.07447.27188.339.3112-1215石油沥青补口补伤,加强级,无缝钢管,二接一,114mm千米880.44222.07470.04188.339.311
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1216石油沥青补口补伤,加强级,无缝钢管,二接一,127mm千米1093.11309.74521.08262.2912.9872-1217石油沥青补口补伤,加强级,无缝钢管,二接一,133mm千米1117.47309.74545.44262.2912.9872-1218石油沥青补口补伤,加强级,无缝钢管,二接一,159mm千米1219.39309.74647.36262.2912.9872-1219石油沥青补口补伤,加强级,无缝钢管,二接一,168mm千米1253.72309.74681.69262.2912.9872-1220石油沥青补口补伤,加强级,无缝钢管,二接一,194mm千米1355.64309.74783.61262.2912.9872-1221石油沥青补口补伤,加强级,无缝钢管,二接一,219mm千米1453.81309.74881.78262.2912.9872-1222石油沥青补口补伤,加强级,无缝钢管,单根,48mm千米1227.23460.26412.53354.4419.2982-1223石油沥青补口补伤,加强级,无缝钢管,单根,60mm千米1319.38460.26504.68354.4419.2982-1224石油沥青补口补伤,加强级,无缝钢管,单根,76mm千米1440.78460.26626.08354.4419.2982-1225石油沥青补口补伤,加强级,无缝钢管,单根,89mm千米1540.47460.26725.77354.4419.2982-1226石油沥青补口补伤,加强级,无缝钢管,单根,108mm千米1636.32460.26821.62354.4419.2982-1227石油沥青补口补伤,加强级,无缝钢管,单根,114mm千米1679.77460.26865.07354.4419.2982-1228石油沥青补口补伤,加强级,无缝钢管,单根,127mm千米2090.74639.87957.81493.0626.8292-1229石油沥青补口补伤,加强级,无缝钢管,单根,133mm千米2134.02639.871001.09493.0626.8292-1230石油沥青补口补伤,加强级,无缝钢管,单根,159mm千米2322.2639.871189.27493.0626.8292-1231石油沥青补口补伤,加强级,无缝钢管,单根,168mm千米2385.86639.871252.93493.0626.8292-1232石油沥青补口补伤,加强级,无缝钢管,单根,194mm千米2574.03639.871441.1493.0626.8292-1233石油沥青补口补伤,加强级,无缝钢管,单根,219mm千米2842.82690.391620.57531.8628.9472-1234石油沥青补口补伤,加强级,无缝钢管,单根,245mm千米2713681.421550.64480.9428.5712-1235石油沥青补口补伤,加强级,无缝钢管,单根,273mm千米2887.65681.421725.29480.9428.5712-1236石油沥青补口补伤,加强级,无缝钢管,单根,325mm千米3208.24681.422045.88480.9428.5712-1237石油沥青补口补伤,加强级,螺旋焊缝钢管,219mm千米2180.44639.871087.92452.6526.8292-1238石油沥青补口补伤,加强级,螺旋焊缝钢管,245mm千米2527.38650.461417.81459.1127.2732-1239石油沥青补口补伤,加强级,螺旋焊缝钢管,273mm千米2686.11650.461576.54459.1127.2732-1240石油沥青补口补伤,加强级,螺旋焊缝钢管,325mm千米2978.74650.461869.17459.1127.2732-1241石油沥青补口补伤,加强级,螺旋焊缝钢管,377mm千米3245.42650.462135.85459.1127.2732-1242石油沥青补口补伤,加强级,螺旋焊缝钢管,426mm千米4011.03715.52790.34505.1930
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1243石油沥青补口补伤,加强级,螺旋焊缝钢管,480mm千米4360.83715.53140.14505.19302-1244石油沥青补口补伤,加强级,螺旋焊缝钢管,508mm千米4541.63715.53320.94505.19302-1245石油沥青补口补伤,加强级,螺旋焊缝钢管,530mm千米4683.98715.53463.29505.19302-1246石油沥青补口补伤,特加强级,无缝钢管,二接一,48mm千米720.25233.83288.39198.039.8042-1247石油沥青补口补伤,特加强级,无缝钢管,二接一,60mm千米782.45233.83350.59198.039.8042-1248石油沥青补口补伤,特加强级,无缝钢管,二接一,76mm千米864.67233.83432.81198.039.8042-1249石油沥青补口补伤,特加强级,无缝钢管,二接一,89mm千米933.08233.83501.22198.039.8042-1250石油沥青补口补伤,特加强级,无缝钢管,二接一,108mm千米996.4401233.83564.58198.039.8042-1251石油沥青补口补伤,特加强级,无缝钢管,二接一,114mm千米1025.67233.83593.81198.039.8042-1252石油沥青补口补伤,特加强级,无缝钢管,二接一,127mm千米1261.72326.72658.16276.8413.6992-1253石油沥青补口补伤,特加强级,无缝钢管,二接一,133mm千米1291.11326.72687.55276.8413.6992-1254石油沥青补口补伤,特加强级,无缝钢管,二接一,159mm千米1418.39326.72814.83276.8413.6992-1255石油沥青补口补伤,特加强级,无缝钢管,二接一,168mm千米1462.31326.72858.75276.8413.6992-1256石油沥青补口补伤,特加强级,无缝钢管,二接一,194mm千米1589.57326.72986.01276.8413.6992-1257石油沥青补口补伤,特加强级,无缝钢管,二接一,219mm千米1712.38326.721108.82276.8413.6992-1258石油沥青补口补伤,特加强级,无缝钢管单根,48mm千米1388.93485.82528.87374.2420.372-1259石油沥青补口补伤,特加强级,无缝钢管单根,60mm千米1503.9485.82643.84374.2420.372-1260石油沥青补口补伤,特加强级,无缝钢管单根,76mm千米1655.79485.82795.73374.2420.372-1261石油沥青补口补伤,特加强级,无缝钢管单根,89mm千米1779.63485.82919.57374.2420.372-1262石油沥青补口补伤,特加强级,无缝钢管单根,108mm千米1897.69485.821037.63374.2420.372-1263石油沥青补口补伤,特加强级,无缝钢管单根,114mm千米1951.88485.821091.82374.2420.372-1264石油沥青补口补伤,特加强级,无缝钢管单根,127mm千米2399.37672.691208.56518.1228.2052-1265石油沥青补口补伤,特加强级,无缝钢管单根,133mm千米2453.56672.691262.75518.1228.2052-1266石油沥青补口补伤,特加强级,无缝钢管单根,159mm千米2688.45672.691497.64518.1228.2052-1267石油沥青补口补伤,特加强级,无缝钢管单根,168mm千米2769.04672.691578.23518.1228.2052-1268石油沥青补口补伤,特加强级,无缝钢管单根,194mm千米3002.48672.691811.67518.1228.2052-1269石油沥青补口补伤,特加强级,无缝钢管单根,219mm千米3291.88709.062036.81546.0129.73
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1270石油沥青补口补伤,特加强级,无缝钢管单根,245mm千米3118.03715.51947.86454.67302-1271石油沥青补口补伤,特加强级,无缝钢管单根,273mm千米3334.14715.52163.97454.67302-1272石油沥青补口补伤,特加强级,无缝钢管单根,325mm千米3736.44715.52566.27454.67302-1273石油沥青补口补伤,特加强级,螺旋焊缝钢管,219mm千米2512.4672.691366.85472.8628.2052-1274石油沥青补口补伤,特加强级,螺旋焊缝钢管,245mm千米2941.49681.421779.13480.9428.5712-1275石油沥青补口补伤,特加强级,螺旋焊缝钢管,273mm千米3139.2681.421976.84480.9428.5712-1276石油沥青补口补伤,特加强级,螺旋焊缝钢管,325mm千米3506.56681.422344.2480.9428.5712-1277石油沥青补口补伤,特加强级,螺旋焊缝钢管,377mm千米3838.32681.422675.96480.9428.5712-1278石油沥青补口补伤,特加强级,螺旋焊缝钢管,426mm千米4779.97753.163494.95531.8631.5792-1279石油沥青补口补伤,特加强级,螺旋焊缝钢管,480mm千米5214.63753.163929.61531.8631.5792-1280石油沥青补口补伤,特加强级,螺旋焊缝钢管,508mm千米5440.45753.164155.43531.8631.5792-1281石油沥青补口补伤,特加强级,螺旋焊缝钢管,530mm千米5617.57753.164332.55531.8631.5792-1282防腐管道补口补伤,现场人工沥青防腐,普通平方米32.234.2927.130.810.182-1283防腐管道补口补伤,现场人工沥青防腐,加强平方米44.334.5338.990.810.192-1284防腐管道补口补伤,现场人工沥青防腐,特加强平方米56.484.7750.90.810.22-1285环氧煤沥青补口补伤,普通级,无缝钢管,二接一,48mm千米392.3987.82155.84148.733.6822-1286环氧煤沥青补口补伤,普通级,无缝钢管,二接一,60mm千米431.3787.82194.82148.733.6822-1287环氧煤沥青补口补伤,普通级,无缝钢管,二接一,76mm千米550.14112.6246.78190.764.7212-1288环氧煤沥青补口补伤,普通级,无缝钢管,二接一,89mm千米592.33112.6288.97190.764.7212-1289环氧煤沥青补口补伤,普通级,无缝钢管二接一,108mm千米789.12181.83350.65256.647.6242-1290环氧煤沥青补口补伤,普通级,无缝钢管二接一,114mm千米808.61181.83370.14256.647.6242-1291环氧煤沥青补口补伤,普通级,无缝钢管二接一,127mm千米850.84181.83412.37256.647.6242-1292环氧煤沥青补口补伤,普通级,无缝钢管二接一,133mm千米870.3181.83431.83256.647.6242-1293环氧煤沥青补口补伤,普通级,无缝钢管二接一,159mm千米954.7181.83516.23256.647.6242-1294环氧煤沥青补口补伤,普通级,无缝钢管二接一,168mm千米1032.25201.84545.48284.938.4632-1295环氧煤沥青补口补伤,普通级,无缝钢管二接一,194mm千米1116.67201.84629.9284.938.4632-1296环氧煤沥青补口补伤,普通级,无缝钢管二接一,219mm千米1194.34201.84707.57284.938.463
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1297环氧煤沥青补口补伤,普通级,无缝钢管,单根,48mm千米721.33161.37286.35273.616.7662-1298环氧煤沥青补口补伤,普通级,无缝钢管,单根,60mm千米792.89161.37357.91273.616.7662-1299环氧煤沥青补口补伤,普通级,无缝钢管,单根,76mm千米1011.2207.04453.36350.88.6812-1300环氧煤沥青补口补伤,普通级,无缝钢管,单根,89mm千米1088.75207.04530.91350.88.6812-1301环氧煤沥青补口补伤,普通级,无缝钢管,单根,108mm千米1450.64334.35644.24472.0514.0192-1302环氧煤沥青补口补伤,普通级,无缝钢管,单根,114mm千米1486.43334.35680.03472.0514.0192-1303环氧煤沥青补口补伤,普通级,无缝钢管,单根,127mm千米1563.99334.35757.59472.0514.0192-1304环氧煤沥青补口补伤,普通级,无缝钢管,单根,133mm千米1599.78334.35793.38472.0514.0192-1305环氧煤沥青补口补伤,普通级,无缝钢管,单根,159mm千米1754.86334.35948.46472.0514.0192-1306环氧煤沥青补口补伤,普通级,无缝钢管,单根,168mm千米1896.22370.721002.13523.3715.5442-1307环氧煤沥青补口补伤,普通级,无缝钢管,单根,194mm千米2051.34370.721157.25523.3715.5442-1308环氧煤沥青补口补伤,普通级,无缝钢管,单根,219mm千米2200.46370.721306.37523.3715.5442-1309环氧煤沥青补口补伤,普通级,无缝钢管,单根,245mm千米2210.14417.381287.57505.1917.52-1310环氧煤沥青补口补伤,普通级,无缝钢管,单根,273mm千米2357.3417.381434.73505.1917.52-1311环氧煤沥青补口补伤,普通级,无缝钢管,单根,325mm千米2630.57417.381708505.1917.52-1312环氧煤沥青补口补伤,普通级,螺旋焊缝钢管,219mm千米1426.39248.87876.43301.0910.4352-1313环氧煤沥青补口补伤,普通级,螺旋焊缝钢管,245mm千米1842.38301.271176.57364.5412.6322-1314环氧煤沥青补口补伤,普通级,螺旋焊缝钢管,273mm千米1976.86301.271311.05364.5412.6322-1315环氧煤沥青补口补伤,普通级,螺旋焊缝钢管,325mm千米2514.31431.41560.75522.1618.0882-1316环氧煤沥青补口补伤,普通级,螺旋焊缝钢管,377mm千米2764.07431.41810.51522.1618.0882-1317环氧煤沥青补口补伤,普通级,螺旋焊缝钢管,426mm千米3646.46569.82386.78689.8823.8912-1318环氧煤沥青补口补伤,普通级,螺旋焊缝钢管,480mm千米3949569.82689.32689.8823.8912-1319环氧煤沥青补口补伤,普通级,螺旋焊缝钢管,508mm千米4183.4604.882846.2732.3225.3622-1320环氧煤沥青补口补伤,普通级,螺旋焊缝钢管,530mm千米4306.65604.882969.45732.3225.3622-1321环氧煤沥青补口补伤,加强级,无缝钢管,二接一,48mm千米475.11140.5185.88148.735.8912-1322环氧煤沥青补口补伤,加强级,无缝钢管,二接一,60mm千米521.53140.5232.3148.735.8912-1323环氧煤沥青补口补伤,加强级,无缝钢管,二接一,76mm千米665.1180.16294.18190.767.554
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1324环氧煤沥青补口补伤,加强级,无缝钢管,二接一,89mm千米715.35180.16344.43190.767.5542-1325环氧煤沥青补口补伤,加强级,无缝钢管二接一,108mm千米940.89272.75411.5256.6411.4362-1326环氧煤沥青补口补伤,加强级,无缝钢管二接一,114mm千米963.74272.75434.35256.6411.4362-1327环氧煤沥青补口补伤,加强级,无缝钢管二接一,127mm千米1013.26272.75483.87256.6411.4362-1328环氧煤沥青补口补伤,加强级,无缝钢管二接一,133mm千米1036.09272.75506.7256.6411.4362-1329环氧煤沥青补口补伤,加强级,无缝钢管二接一,159mm千米1135.07272.75605.68256.6411.4362-1330环氧煤沥青补口补伤,加强级,无缝钢管二接一,168mm千米1227.67302.75639.99284.9312.6942-1331环氧煤沥青补口补伤,加强级,无缝钢管二接一,194mm千米1326.66302.75738.98284.9312.6942-1332环氧煤沥青补口补伤,加强级,无缝钢管二接一,219mm千米1417.76302.75830.08284.9312.6942-1333环氧煤沥青补口补伤,加强级,无缝钢管,单根,48mm千米873.33258.18341.54273.6110.8252-1334环氧煤沥青补口补伤,加强级,无缝钢管,单根,60mm千米958.5599258.18426.77273.6110.8252-1335环氧煤沥青补口补伤,加强级,无缝钢管,单根,76mm千米1222.5331.25540.45350.813.8892-1336环氧煤沥青补口补伤,加强级,无缝钢管,单根,89mm千米1314.86331.25632.81350.813.8892-1337环氧煤沥青补口补伤,加强级,无缝钢管,单根,108mm千米1729.59501.52756.02472.0521.0282-1338环氧煤沥青补口补伤,加强级,无缝钢管,单根,114mm千米1771.56501.52797.99472.0521.0282-1339环氧煤沥青补口补伤,加强级,无缝钢管,单根,127mm千米1862.52501.52888.95472.0521.0282-1340环氧煤沥青补口补伤,加强级,无缝钢管,单根,133mm千米1904.49501.52930.92472.0521.0282-1341环氧煤沥青补口补伤,加强级,无缝钢管,单根,159mm千米2086.38501.521112.81472.0521.0282-1342环氧煤沥青补口补伤,加强级,无缝钢管,单根,168mm千米2255.21556.091175.75523.3723.3162-1343环氧煤沥青补口补伤,加强级,无缝钢管,单根,194mm千米2437.13556.091357.67523.3723.3162-1344环氧煤沥青补口补伤,加强级,无缝钢管,单根,219mm千米2612.01556.091532.55523.3723.3162-1345环氧煤沥青补口补伤,加强级,无缝钢管,单根,245mm千米2542.14536.631500.32505.1922.52-1346环氧煤沥青补口补伤,加强级,无缝钢管,单根,273mm千米2713.57536.631671.75505.1922.52-1347环氧煤沥青补口补伤,加强级,无缝钢管,单根,325mm千米3031.92536.631990.1505.1922.52-1348环氧煤沥青补口补伤,加强级,螺旋焊缝钢管,219mm千米1745.4372.661057.1315.6415.6252-1349环氧煤沥青补口补伤,加强级,螺旋焊缝钢管,245mm千米2205.59451.891370.97382.7318.9472-1350环氧煤沥青补口补伤,加强级,螺旋焊缝钢管,273mm千米2362.26451.891527.64382.7318.947
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1351环氧煤沥青补口补伤,加强级,螺旋焊缝钢管,325mm千米2951.24616.281812.8522.1625.842-1352环氧煤沥青补口补伤,加强级,螺旋焊缝钢管,377mm千米3241.26616.282102.82522.1625.842-1353环氧煤沥青补口补伤,加强级,螺旋焊缝钢管,426mm千米4270.48813.982767.02689.4834.1292-1354环氧煤沥青补口补伤,加强级,螺旋焊缝钢管,480mm千米4621.17813.983117.71689.4834.1292-1355环氧煤沥青补口补伤,加强级,螺旋焊缝钢管,508mm千米4896864.133299.55732.3236.2322-1356环氧煤沥青补口补伤,加强级,螺旋焊缝钢管,530mm千米5038.86864.133442.41732.3236.2322-1357环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,48mm千米565.15175.63240.79148.737.3642-1358环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,60mm千米625.14175.63300.78148.737.3642-1359环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,76mm千米796.71225.22380.73190.769.4432-1360环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,89mm千米861.71225.22445.73190.769.4432-1361环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,108mm千米1117.85333.35527.86256.6413.9772-1362环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,114mm千米1147.14333.35557.15256.6413.9772-1363环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,127mm千米1210.55333.35620.56256.6413.9772-1364环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,133mm千米1239.84333.35649.85256.6413.9772-1365环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,159mm千米1366.72333.35776.73256.6413.9772-1366环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,168mm千米1475.6370.03820.64284.9315.5152-1367环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,194mm千米1602.52370.03947.56284.9315.5152-1368环氧煤沥青补口补伤,特加强级,无缝钢管,二接一,219mm千米1719.25370.031064.29284.9315.5152-1369环氧煤沥青补口补伤,特加强级,无缝钢管,单根,48mm千米1038.72322.74442.37273.6113.5322-1370环氧煤沥青补口补伤,特加强级,无缝钢管,单根,60mm千米1148.92322.74552.57273.6113.5322-1371环氧煤沥青补口补伤,特加强级,无缝钢管,单根,76mm千米1464.35414.06699.49350.817.3612-1372环氧煤沥青补口补伤,特加强级,无缝钢管,单根,89mm千米1583.74414.06818.88350.817.3612-1373环氧煤沥青补口补伤特加强级,无缝钢管,单根,108mm千米2054.76612.97969.74472.0525.7012-1374环氧煤沥青补口补伤特加强级,无缝钢管,单根,114mm千米2108.58612.971023.56472.0525.7012-1375环氧煤沥青补口补伤特加强级,无缝钢管,单根,127mm千米2225.12612.971140.1472.0525.7012-1376环氧煤沥青补口补伤特加强级,无缝钢管,单根,133mm千米2278.96612.971193.94472.0525.7012-1377环氧煤沥青补口补伤特加强级,无缝钢管,单根,159mm千米2512.05612.971427.03472.0525.701
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1378环氧煤沥青补口补伤特加强级,无缝钢管,单根,168mm千米2710.74679.651507.72523.3728.4972-1379环氧煤沥青补口补伤特加强级,无缝钢管,单根,194mm千米2943.85679.651740.83523.3728.4972-1380环氧煤沥青补口补伤特加强级,无缝钢管,单根,219mm千米3168.01679.651964.99523.3728.4972-1381环氧煤沥青补口补伤特加强级,无缝钢管,单根,245mm千米3077.34655.881916.27505.1927.52-1382环氧煤沥青补口补伤特加强级,无缝钢管,单根,273mm千米3296.2655.882135.13505.1927.52-1383环氧煤沥青补口补伤特加强级,无缝钢管,单根,325mm千米3762.3715.52541.61505.19302-1384环氧煤沥青补口补伤,特加强级,螺旋焊缝钢管,219mm千米2096.63456.251318.27322.1119.132-1385环氧煤沥青补口补伤,特加强级,螺旋焊缝钢管,245mm千米2692.89552.321750.5739023.1582-1386环氧煤沥青补口补伤,特加强级,螺旋焊缝钢管,273mm千米2892.82552.321950.539023.1582-1387环氧煤沥青补口补伤,特加强级,螺旋焊缝钢管,325mm千米3572.04739.542310.34522.1631.0082-1388环氧煤沥青补口补伤,特加强级,螺旋焊缝钢管,377mm千米3941.53739.542679.83522.1631.0082-1389环氧煤沥青补口补伤,特加强级,螺旋焊缝钢管,426mm千米5190.23976.83523.55689.8840.9562-1390环氧煤沥青补口补伤,特加强级,螺旋焊缝钢管,480mm千米5636.76976.83970.08689.8840.9562-1391环氧煤沥青补口补伤,特加强级,螺旋焊缝钢管,508mm千米5970.831036.954201.56732.3243.4782-1392环氧煤沥青补口补伤,特加强级,螺旋焊缝钢管,530mm千米6152.761036.954383.49732.3243.4782-1393聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,48mm千米930.5601246.3336.29347.9710.3272-1394聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,60mm千米1014.64246.3420.37347.9710.3272-1395聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,76mm千米1126.71246.3532.44347.9710.3272-1396聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,89mm千米1217.82246.3623.55347.9710.3272-1397聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,108mm千米1416.65273.61756.67386.3711.4722-1398聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,114mm千米1458.67273.61798.69386.3711.4722-1399聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,127mm千米1549.75273.61889.77386.3711.4722-1400聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,133mm千米1591.76273.61931.78386.3711.4722-1401聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,159mm千米1856.17307.741113.97434.4612.9032-1402聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,168mm千米1919.19307.741176.99434.4612.9032-1403聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,194mm千米2101.39307.741359.19434.4612.9032-1404聚乙稀胶粘带补口补伤普通级,无缝钢管二接一,219mm千米2276.52307.741534.32434.4612.903
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1405聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,48mm千米1710.05452.84617.84639.3718.9872-1406聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,60mm千米1864.53452.84772.32639.3718.9872-1407聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,76mm千米2070.46452.84978.25639.3718.9872-1408聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,89mm千米2237.79452.841145.58639.3718.9872-1409聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,108mm千米2601.06502.111390.07708.8821.0532-1410聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,114mm千米2678.4502.111467.41708.8821.0532-1411聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,127mm千米2845.7502.111634.71708.8821.0532-1412聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,133mm千米2922.95502.111711.96708.8821.0532-1413聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,159mm千米3410.78565.62046.58798.623.7152-1414聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,168mm千米3526.59565.62162.39798.623.7152-1415聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,194mm千米3861.3565.62497.1798.623.7152-1416聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,219mm千米4183.1565.62818.9798.623.7152-1417聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,245mm千米3559.31514.752317.49727.0721.5832-1418聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,273mm千米3824.19514.752582.37727.0721.5832-1419聚乙稀胶粘带补口补伤普通级,无缝钢管,单根,325mm千米4316.1514.753074.28727.0721.5832-1420聚乙稀胶粘带补口补伤,普通级,螺旋焊缝钢管,219mm千米3110.96505.641891.19714.1321.2012-1421聚乙稀胶粘带补口补伤,普通级,螺旋焊缝钢管,245mm千米3335.48505.642115.71714.1321.2012-1422聚乙稀胶粘带补口补伤,普通级,螺旋焊缝钢管,273mm千米3577.29505.642357.52714.1321.2012-1423聚乙稀胶粘带补口补伤,普通级,螺旋焊缝钢管,325mm千米4026.29505.642806.52714.1321.2012-1424聚乙稀胶粘带补口补伤,普通级,螺旋焊缝钢管,377mm千米4475.35505.643255.58714.1321.2012-1425聚乙稀胶粘带补口补伤,普通级,螺旋焊缝钢管,426mm千米5141.51606.363678.76856.3925.4242-1426聚乙稀胶粘带补口补伤,普通级,螺旋焊缝钢管,480mm千米5607.76606.364145.01856.3925.4242-1427聚乙稀胶粘带补口补伤,普通级,螺旋焊缝钢管,508mm千米5849.55606.364386.8856.3925.4242-1428聚乙稀胶粘带补口补伤,普通级,螺旋焊缝钢管,530mm千米6039.57606.364576.82856.3925.4242-1429聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,48mm千米1060.97287.34425.66347.9712.0482-1430聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,60mm千米1167.39287.34532.08347.9712.0482-1431聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,76mm千米1309.26287.34673.95347.9712.048
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1432聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,89mm千米1424.55287.34789.24347.9712.0482-1433聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,108mm千米1663.33319.21957.75386.3713.3842-1434聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,114mm千米1716.51319.211010.93386.3713.3842-1435聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,127mm千米1831.77319.211126.19386.3713.3842-1436聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,133mm千米1884.99319.211179.41386.3713.3842-1437聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,159mm千米2203.46359.041409.96434.4615.0542-1438聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,168mm千米2283.27359.041489.77434.4615.0542-1439聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,194mm千米2513.87359.041720.37434.4615.0542-1440聚乙稀胶粘带补口补伤加强级,无缝钢管二接一,219mm千米2735.55359.041942.05434.4615.0542-1441聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,48mm千米1949.72528.33782.02639.3722.1522-1442聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,60mm千米2145.21528.33977.51639.3722.1522-1443聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,76mm千米2405.87528.331238.17639.3722.1522-1444聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,89mm千米2617.68528.331449.98639.3722.1522-1445聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,108mm千米3054.17585.781759.51708.8824.5612-1446聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,114mm千米3151.96585.781857.3708.8824.5612-1447聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,127mm千米3363.73585.782069.07708.8824.5612-1448聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,133mm千米3461.51585.782166.85708.8824.5612-1449聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,159mm千米4048.9659.882590.42798.627.6682-1450聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,168mm千米4195.5659.882737.02798.627.6682-1451聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,194mm千米4619.12659.883160.64798.627.6682-1452聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,219mm千米5026.44659.883567.96798.627.6682-1453聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,245mm千米4260.32600.542932.71727.0725.182-1454聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,273mm千米4595.49600.543267.88727.0725.182-1455聚乙稀胶粘带补口补伤加强级,无缝钢管,单根,325mm千米5217.99600.543890.38727.0725.182-1456聚乙稀胶粘带补口补伤,加强级,螺旋焊缝钢管,219mm千米3697.74589.932393.68714.1324.7352-1457聚乙稀胶粘带补口补伤,加强级,螺旋焊缝钢管,245mm千米3981.94589.932677.88714.1324.7352-1458聚乙稀胶粘带补口补伤,加强级,螺旋焊缝钢管,273mm千米4288589.932983.94714.1324.735
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1459聚乙稀胶粘带补口补伤,加强级,螺旋焊缝钢管,325mm千米4856.33589.933552.27714.1324.7352-1460聚乙稀胶粘带补口补伤,加强级,螺旋焊缝钢管,377mm千米5424.72589.934120.66714.1324.7352-1461聚乙稀胶粘带补口补伤,加强级,螺旋焊缝钢管,426mm千米6220.05707.414656.25856.3929.6612-1462聚乙稀胶粘带补口补伤,加强级,螺旋焊缝钢管,480mm千米6810.231707.415246.43856.3929.6612-1463聚乙稀胶粘带补口补伤,加强级,螺旋焊缝钢管,508mm千米7116.26707.415552.46856.3929.6612-1464聚乙稀胶粘带补口补伤,加强级,螺旋焊缝钢管,530mm千米7356.771707.415792.97856.3929.6612-1465聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,48mm千米1191.39328.39515.03347.9713.7692-1466聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,60mm千米1320.14328.39643.78347.9713.7692-1467聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,76mm千米1491.81328.39815.45347.9713.7692-1468聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,89mm千米1631.28328.39954.92347.9713.7692-1469聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,108mm千米1910364.811158.82386.3715.2962-1470聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,114mm千米1974.35364.811223.17386.3715.2962-1471聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,127mm千米2113.79364.811362.61386.3715.2962-1472聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,133mm千米2178.22364.811427.04386.3715.2962-1473聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,159mm千米2550.74410.321705.96434.4617.2042-1474聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,168mm千米2647.32410.321802.54434.4617.2042-1475聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,194mm千米2926.33410.322081.55434.4617.2042-1476聚乙稀胶粘带补口补伤,特加强级,无缝钢管,二接一,219mm千米3194.56410.322349.78434.4617.2042-1477聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,48mm千米2189.36603.79946.2639.3725.3162-1478聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,60mm千米2425.85603.791182.69639.3725.3162-1479聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,76mm千米2741.26603.791498.1639.3725.3162-1480聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,89mm千米2997.54603.791754.38639.3725.3162-1481聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,108mm千米3507.3669.472128.95708.8828.072-1482聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,114mm千米3625.53669.472247.18708.8828.072-1483聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,127mm千米3881.79669.472503.44708.8828.072-1484聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,133mm千米4000.08669.472621.73708.8828.072-1485聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,159mm千米4687.02754.163134.26798.631.621
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1486聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,168mm千米4864.4754.163311.64798.631.6212-1487聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,194mm千米5376.95754.163824.19798.631.6212-1488聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,219mm千米5869.79754.164317.03798.631.6212-1489聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,245mm千米4961.33686.333547.93727.0728.7772-1490聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,273mm千米5366.78686.333953.38727.0728.7772-1491聚乙稀胶粘带补口补伤,特加强级,无缝钢管,单根,325mm千米6119.89686.334706.49727.0728.7772-1492聚乙稀胶粘带补口补伤,特加强级,螺旋焊缝钢管,219mm千米4284.53674.222896.18714.1328.2692-1493聚乙稀胶粘带补口补伤,特加强级,螺旋焊缝钢管,245mm千米4628.41674.223240.06714.1328.2692-1494聚乙稀胶粘带补口补伤,特加强级,螺旋焊缝钢管,273mm千米4998.71674.223610.36714.1328.2692-1495聚乙稀胶粘带补口补伤,特加强级,螺旋焊缝钢管,325mm千米5686.37674.224298.02714.1328.2692-1496聚乙稀胶粘带补口补伤,特加强级,螺旋焊缝钢管,377mm千米6374.08674.224985.73714.1328.2692-1497聚乙稀胶粘带补口补伤,特加强级,螺旋焊缝钢管,426mm千米7298.6808.475633.74856.3933.8982-1498聚乙稀胶粘带补口补伤,特加强级,螺旋焊缝钢管,480mm千米8012.71808.476347.85856.3933.8982-1499聚乙稀胶粘带补口补伤,特加强级,螺旋焊缝钢管,508mm千米8382.989808.476718.13856.3933.8982-1500聚乙稀胶粘带补口补伤,特加强级,螺旋焊缝钢管,530mm千米8673.97808.477009.11856.3933.8982-1501聚乙烯热收缩套补口补伤,无缝钢管,二接一,48mm千米1061.69239.19533.13289.3710.0292-1502聚乙烯热收缩套补口补伤,无缝钢管,二接一,60mm千米1141.26239.19612.7289.3710.0292-1503聚乙烯热收缩套补口补伤,无缝钢管,二接一,76mm千米1247.4239.19718.84289.3710.0292-1504聚乙烯热收缩套补口补伤,无缝钢管,二接一,89mm千米1333.6239.19805.04289.3710.0292-1505聚乙烯热收缩套补口补伤,无缝钢管,二接一,108mm千米1507.57260.87931.06315.6410.9382-1506聚乙烯热收缩套补口补伤,无缝钢管,二接一,114mm千米1547.33260.87970.82315.6410.9382-1507聚乙烯热收缩套补口补伤,无缝钢管,二接一,127mm千米1633.54260.871057.03315.6410.9382-1508聚乙烯热收缩套补口补伤,无缝钢管,二接一,133mm千米1673.35260.871096.84315.6410.9382-1509聚乙烯热收缩套补口补伤,无缝钢管,二接一,159mm千米1904.56287.341269.25347.9712.0482-1510聚乙烯热收缩套补口补伤,无缝钢管,二接一,168mm千米1964.25287.341328.94347.9712.0482-1511聚乙烯热收缩套补口补伤,无缝钢管,二接一,194mm千米2136.66287.341501.35347.9712.0482-1512聚乙烯热收缩套补口补伤,无缝钢管,二接一,219mm千米2302.44287.341667.13347.9712.048
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1513聚乙烯热收缩套补口补伤,无缝钢管,单根,48mm千米1950.71439.34979.51531.8618.4212-1514聚乙烯热收缩套补口补伤,无缝钢管,单根,60mm千米2096.9439.341125.7531.8618.4212-1515聚乙烯热收缩套补口补伤,无缝钢管,单根,76mm千米2291.84439.341320.64531.8618.4212-1516聚乙烯热收缩套补口补伤,无缝钢管,单根,89mm千米2450.21439.341479.01531.8618.4212-1517聚乙烯热收缩套补口补伤,无缝钢管,单根,108mm千米2771.03479.741710.53580.7620.1152-1518聚乙烯热收缩套补口补伤,无缝钢管,单根,114mm千米2844.12479.741783.62580.7620.1152-1519聚乙烯热收缩套补口补伤,无缝钢管,单根,127mm千米3002.49479.741941.99580.7620.1152-1520聚乙烯热收缩套补口补伤,无缝钢管,单根,133mm千米3075.64479.742015.14580.7620.1152-1521聚乙烯热收缩套补口补伤,无缝钢管,单根,159mm千米3499.57528.332331.87639.3722.1522-1522聚乙烯热收缩套补口补伤,无缝钢管,单根,168mm千米3609.25528.332441.55639.3722.1522-1523聚乙烯热收缩套补口补伤,无缝钢管,单根,194mm千米3926.03528.332758.33639.3722.1522-1524聚乙烯热收缩套补口补伤,无缝钢管,单根,219mm千米4230.64528.333062.94639.3722.1522-1525聚乙烯热收缩套补口补伤,无缝钢管,单根,245mm千米3525.91467.652492.05566.2119.6082-1526聚乙烯热收缩套补口补伤,无缝钢管,单根,273mm千米3777.6467.652743.74566.2119.6082-1527聚乙烯热收缩套补口补伤,无缝钢管,单根,325mm千米4245.02467.653211.16566.2119.6082-1528聚乙烯热收缩套补口补伤,螺旋焊缝钢管,219mm千米3033.61442.852054.86535.918.5682-1529聚乙烯热收缩套补口补伤,螺旋焊缝钢管,245mm千米3246.12442.852267.37535.918.5682-1530聚乙烯热收缩套补口补伤,螺旋焊缝钢管,273mm千米3475.03442.852496.28535.918.5682-1531聚乙烯热收缩套补口补伤,螺旋焊缝钢管,325mm千米3900.07442.852921.32535.918.5682-1532聚乙烯热收缩套补口补伤,螺旋焊缝钢管,377mm千米4325.1442.853346.35535.918.5682-1533聚乙烯热收缩套补口补伤,螺旋焊缝钢管,426mm千米4865.08505.913746.88612.2921.2122-1534聚乙烯热收缩套补口补伤,螺旋焊缝钢管,480mm千米5306.46505.914188.26612.2921.2122-1535聚乙烯热收缩套补口补伤,螺旋焊缝钢管,508mm千米5535.33505.914417.13612.2921.2122-1536聚乙烯热收缩套补口补伤,螺旋焊缝钢管,530mm千米5715.15505.914596.95612.2921.2122-1537聚乙烯胶粘带保护层,无缝钢管,二接一,48mm千米1731.73574.69809.07347.9724.0962-1538聚乙烯胶粘带保护层,无缝钢管,二接一,60mm千米1912.83574.69990.17347.9724.0962-1539聚乙烯胶粘带保护层,无缝钢管,二接一,76mm千米2118.86574.691196.2347.9724.096
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1540聚乙烯胶粘带保护层,无缝钢管,二接一,89mm千米2286.28574.691363.62347.9724.0962-1541聚乙烯胶粘带保护层,无缝钢管,二接一,108mm千米2633.16638.441608.35386.3726.7692-1542聚乙烯胶粘带保护层,无缝钢管,二接一,114mm千米2710.43638.441685.62386.3726.7692-1543聚乙烯胶粘带保护层,无缝钢管,二接一,127mm千米2877.87638.441853.06386.3726.7692-1544聚乙烯胶粘带保护层,无缝钢管,二接一,133mm千米2955.14638.441930.33386.3726.7692-1545聚乙烯胶粘带保护层,无缝钢管,二接一,159mm千米3417.74718.082265.2434.4630.1082-1546聚乙烯胶粘带保护层,无缝钢管,二接一,168mm千米3533.7718.082381.16434.4630.1082-1547聚乙烯胶粘带保护层,无缝钢管,二接一,194mm千米3868.56718.082716.02434.4630.1082-1548聚乙烯胶粘带保护层,无缝钢管,二接一,219mm千米4190.55718.083038.01434.4630.1082-1549聚乙烯胶粘带保护层,无缝钢管,单根,48mm千米3231.191056.651535.17639.3744.3042-1550聚乙烯胶粘带保护层,无缝钢管,单根,60mm千米3515.091056.651819.07639.3744.3042-1551聚乙烯胶粘带保护层,无缝钢管,单根,76mm千米3893.71056.652197.68639.3744.3042-1552聚乙烯胶粘带保护层,无缝钢管,单根,89mm千米4201.271056.652505.25639.3744.3042-1553聚乙烯胶粘带保护层,无缝钢管,单根,108mm千米4835.381171.582954.92708.8849.1232-1554聚乙烯胶粘带保护层,无缝钢管,单根,114mm千米4977.381171.583096.92708.8849.1232-1555聚乙烯胶粘带保护层,无缝钢管,单根,127mm千米5284.931171.583404.47708.8849.1232-1556聚乙烯胶粘带保护层,无缝钢管,单根,133mm千米5426.951171.583546.49708.8849.1232-1557聚乙烯胶粘带保护层,无缝钢管,单根,159mm千米6280.071319.764161.71798.655.3362-1558聚乙烯胶粘带保护层,无缝钢管,单根,168mm千米6493.0011319.764374.64798.655.3362-1559聚乙烯胶粘带保护层,无缝钢管,单根,194mm千米7108.241319.764989.88798.655.3362-1560聚乙烯胶粘带保护层,无缝钢管,单根,219mm千米7699.7911319.765581.43798.655.3362-1561聚乙烯胶粘带保护层,无缝钢管,单根,245mm千米6481.021201.094552.86727.0750.362-1562聚乙烯胶粘带保护层,无缝钢管,单根,273mm千米6967.81201.095039.64727.0750.362-1563聚乙烯胶粘带保护层,无缝钢管,单根,325mm千米7871.911201.095943.75727.0750.362-1564聚乙烯胶粘带保护层,螺旋焊缝钢管,219mm千米5640.991179.863747714.1349.472-1565聚乙烯胶粘带保护层,螺旋焊缝钢管,245mm千米6053.991179.864160714.1349.472-1566聚乙烯胶粘带保护层,螺旋焊缝钢管,273mm千米6498.81179.864604.81714.1349.47
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1567聚乙烯胶粘带保护层,螺旋焊缝钢管,325mm千米7324.851179.865430.86714.1349.472-1568聚乙烯胶粘带保护层,螺旋焊缝钢管,377mm千米8150.961179.866256.97714.1349.472-1569聚乙烯胶粘带保护层,螺旋焊缝钢管,426mm千米9306.5391414.837035.32856.3959.3222-1570聚乙烯胶粘带保护层,螺旋焊缝钢管,480mm千米10164.471414.837893.25856.3959.3222-1571聚乙烯胶粘带保护层,螺旋焊缝钢管,508mm千米10609.261414.838338.04856.3959.3222-1572聚乙烯胶粘带保护层,螺旋焊缝钢管,530mm千米10958.71414.838687.481856.3959.3222-1573聚乙烯热收缩套保护层,无缝钢管,二接一,48mm千米2733.02580.871523.98628.1724.3552-1574聚乙烯热收缩套保护层,无缝钢管,二接一,60mm千米2942.39580.871733.35628.1724.3552-1575聚乙烯热收缩套保护层,无缝钢管,二接一,76mm千米3221.48580.872012.44628.1724.3552-1576聚乙烯热收缩套保护层,无缝钢管,二接一,89mm千米3448.3580.872239.26628.1724.3552-1577聚乙烯热收缩套保护层,无缝钢管,二接一,108mm千米3889.48633.532570.79685.1626.5632-1578聚乙烯热收缩套保护层,无缝钢管,二接一,114mm千米3994.14633.532675.45685.1626.5632-1579聚乙烯热收缩套保护层,无缝钢管,二接一,127mm千米4221633.532902.31685.1626.5632-1580聚乙烯热收缩套保护层,无缝钢管,二接一,133mm千米4325.66633.533006.97685.1626.5632-1581聚乙烯热收缩套保护层,无缝钢管,二接一,159mm千米4912.87697.853460.6754.4229.262-1582聚乙烯热收缩套保护层,无缝钢管,二接一,168mm千米5069.97697.853617.7754.4229.262-1583聚乙烯热收缩套保护层,无缝钢管,二接一,194mm千米5523.58697.854071.31754.4229.262-1584聚乙烯热收缩套保护层,无缝钢管,二接一,219mm千米5959.82697.854507.55754.4229.262-1585聚乙烯热收缩套保护层,无缝钢管,单根,48mm千米5020.521066.982799.781153.7644.7372-1586聚乙烯热收缩套保护层,无缝钢管,单根,60mm千米5405.131066.983184.391153.7644.7372-1587聚乙烯热收缩套保护层,无缝钢管,单根,76mm千米5918.031066.983697.291153.7644.7372-1588聚乙烯热收缩套保护层,无缝钢管,单根,89mm千米6334.7311066.984113.991153.7644.7372-1589聚乙烯热收缩套保护层,无缝钢管,单根,108mm千米7148.051165.14723.11259.8548.8512-1590聚乙烯热收缩套保护层,无缝钢管,单根,114mm千米7340.41165.14915.451259.8548.8512-1591聚乙烯热收缩套保护层,无缝钢管,单根,127mm千米7757.11165.15332.151259.8548.8512-1592聚乙烯热收缩套保护层,无缝钢管,单根,133mm千米7949.451165.15524.51259.8548.8512-1593聚乙烯热收缩套保护层,无缝钢管,单根,159mm千米9028.431283.066357.961387.4153.797
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1594聚乙烯热收缩套保护层,无缝钢管,单根,168mm千米9316.871283.066646.41387.4153.7972-1595聚乙烯热收缩套保护层,无缝钢管,单根,194mm千米10150.341283.067479.871387.4153.7972-1596聚乙烯热收缩套保护层,无缝钢管,单根,219mm千米10951.721283.068281.251387.4153.7972-1597聚乙烯热收缩套保护层,无缝钢管,单根,245mm千米9069.521135.716705.961227.8547.6192-1598聚乙烯热收缩套保护层,无缝钢管,单根,273mm千米9730.021135.717366.461227.8547.6192-1599聚乙烯热收缩套保护层,无缝钢管,单根,325mm千米10956.841135.718593.281227.8547.6192-1600聚乙烯热收缩套保护层,螺旋焊缝钢管,219mm千米7794.271075.475555.831162.9745.0932-1601聚乙烯热收缩套保护层,螺旋焊缝钢管,245mm千米8353.371075.476114.931162.9745.0932-1602聚乙烯热收缩套保护层,螺旋焊缝钢管,273mm千米8955.521075.476717.081162.9745.0932-1603聚乙烯热收缩套保护层,螺旋焊缝钢管,325mm千米10073.761075.477835.321162.9745.0932-1604聚乙烯热收缩套保护层,螺旋焊缝钢管,377mm千米11192.11075.478953.661162.9745.0932-1605聚乙烯热收缩套保护层,螺旋焊缝钢管,426mm千米12245.811075.4710007.371162.9745.0932-1606聚乙烯热收缩套保护层,螺旋焊缝钢管,480mm千米13725.591228.6311168.731328.2351.5152-1607聚乙烯热收缩套保护层,螺旋焊缝钢管,508mm千米14327.791228.6311770.931328.2351.5152-1608聚乙烯热收缩套保护层,螺旋焊缝钢管,530mm千米14800.851228.6312243.991328.2351.5152-1609管道耐压试验,压缩空气试压,DN50千米758.0240.81239.45477.761.7112-1610管道耐压试验,压缩空气试压,DN100千米927.4951.09242.04634.362.1422-1611管道耐压试验,压缩空气试压,DN200千米1783.4100.17350.2313334.22-1612管道耐压试验,压缩空气试压,DN300千米2710.08162.18363.732184.176.82-1613管道耐压试验,压缩空气试压,DN400千米2880.29171.72376.672331.97.22-1614管道耐压试验,压缩空气试压,DN500千米3881.71231.35395.113255.259.72-1615管道水压试压,低、中压管道,DN50千米505.6441.7452.59411.311.752-1616管道水压试压,低、中压管道,DN100千米541.544.2266.22431.061.8542-1617管道水压试压,低、中压管道,DN200千米879.2170.12141.76667.332.942-1618管道水压试压,低、中压管道,DN300千米1108.586.22228.73793.553.6152-1619管道水压试压,低、中压管道,DN400千米1421.09108.76344.3968.034.562-1620管道水压试压,低、中压管道,DN500千米1825.24137.69494.921192.635.773
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1621管道水压试压,高压管道,DN50千米599.252.352.59494.312.1932-1622管道水压试压,高压管道,DN100千米633.8354.7866.22512.832.2972-1623管道水压试压,高压管道,DN200千米1011.0685.03141.76784.273.5652-1624管道水压试压,高压管道,DN300千米1238.48101.12228.73908.634.242-1625管道吹扫,压缩空气吹扫,DN50千米223.2218.721.89182.630.7842-1626管道吹扫,压缩空气吹扫,DN100千米280.4320.856.5203.130.8722-1627管道吹扫,压缩空气吹扫,DN200千米569.3537.78162.58368.991.5842-1628管道吹扫,压缩空气吹扫,DN300千米834.569954.57247.01532.992.2882-1629管道吹扫,压缩空气吹扫,DN400千米1187.7777.46353.68756.633.2482-1630管道吹扫,压缩空气吹扫,DN500千米1584.84107.42428.211049.214.5042-1631管道吹扫,压缩空气通球吹扫,DN200千米521.7647.3212.26462.181.9842-1632管道吹扫,压缩空气通球吹扫,DN300千米834.175.9416.44741.723.1842-1633管道吹扫,压缩空气通球吹扫,DN400千米1254.85114.4822.21118.174.82-1634管道吹扫,压缩空气通球吹扫,DN500千米1789.61150.2125.511613.896.2982-1635阳极导线联接测试桩安装,ZA-1净重51.4kg10个368.695.4231.7641.4442-1636阳极导线联接测试桩安装,ZA-2净重31.4kg10个356.9495.4220.141.4442-1637阳极导线联接测试桩安装,ZA-3净重33.1kg10个37995.4242.1641.4442-1638阳极导线联接测试桩安装,ZA-4净重9.8kg10个354.6485.86227.3441.443.62-1639阳极导线联接测试桩安装,ZA-5净重8.3kg10个341.1785.86213.8741.443.62-1640阳极导线联接管线安装,ZA-1净重51.4kg10个424.33100.17246.9177.254.22-1641阳极导线联接管线安装,ZA-2净重31.4kg10个413.21100.17235.7977.254.22-1642阳极导线联接管线安装,ZA-3净重33.1kg10个435.27100.17257.8577.254.22-1643埋地管道牺牲阳极安装,阳极导线联接管线ZA-4净重9.8kg10个410.9290.63243.0477.253.82-1644埋地管道牺牲阳极安装,阳极导线联接管线ZA-5净重8.3kg10个397.4590.63229.5777.253.82-1645埋地管道牺牲阳极保护,均压线安装m200.347.7107.8344.7722-1646埋地管道牺牲阳极保护,阳极接地调试组104.9495.409.5442-1647埋地管道牺牲阳极保护,标志桩、测试桩预制m31100.44304.33788.217.912.76
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1648埋地管道牺牲阳极保护,测试桩预埋件预制10个1506.8947.71459.19022-1649埋地管道牺牲阳极保护,标志桩安装0.05m3以内/个10个524.65166.9546.9310.872-1650埋地管道牺牲阳极保护,标志桩安装0.1m3以内/个10个1144.59221.8161.98860.89.32-1651埋地管道牺牲阳极保护,测试桩安装0.05m3以内/个10个1455.71477346.89631.82202-1652埋地管道牺牲阳极保护,测试桩安装0.1m3以内/个10个2882.1634.41348.591899.126.62-1653撬装式计量间制作,钢底盘t1085503.24176.61405.1521.12-1654撬装式计量间制作,钢骨架t1606.58773.93255.16577.4932.452-1655撬装式计量间制作,活动钢地板t485.73264.7479.41141.5811.12-1656撬装式计量间制作,墙面屋面钢板100m21928.28789.44326.36812.4833.12-1657撬装式计量间制作,钢门t2316.871032.711020.36263.843.32-1658撬装式计量间制作,地面铺橡胶板100m26547.91333.96214.010142-1659撬装式计量间制作,玻璃棉毡保温m3178.1731.01147.1601.32-1660撬装式计量间制作,硬泡沫塑料保温m3583.7532.91550.8401.382-1661撬装式计量间制作,纤维板墙面.天棚.间隔,单面100m24883.39591.964291.43024.822-1662撬装式计量间制作,纤维板墙面.天棚.间隔,双面100m27772.1849.786922.32035.632-1663撬装式计量间制作,木窗制作安装,五料内一玻一纱m2129.2331.2495.382.611.312-1664撬装式计量间制作,木窗制作安装,固定双玻m288.9820.5167.111.360.862-1665计量间安装座451.41117.3415.27318.84.922-1666计量间运输,基本运距20km座1460.1680.1429.71350.323.362-1667计量间运输,每增减5公里座120.985.720115.260.242-1668埋地管道交叉穿越,DN50处90.9445.325.8439.781.92-1669埋地管道交叉穿越,DN100处134.2564.6311.358.322.712-1670埋地管道交叉穿越,DN150处364.294.9214.64254.643.982-1671埋地管道交叉穿越,DN200处504.49129.5127.983475.432-1672埋地管道交叉穿越,DN250处654.02195.8126.71431.58.212-1673埋地管道交叉穿越,DN300处801.99236.3541.78523.869.912-1674埋地管道交叉穿越,DN350处927.23274.2845.01607.9411.5
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1675埋地管道交叉穿越,DN400处1066.04315.350.88699.8613.222-1676埋地管道交叉穿越,DN500处1320.18391.8659.88868.4416.432-1677井口计量间管道安装,低压钢管,螺纹连接,15mm以内10米12.2112.190.0200.5112-1678井口计量间管道安装,低压钢管,螺纹连接,20mm以内10米13.4813.450.0300.5642-1679井口计量间管道安装,低压钢管,螺纹连接,25mm以内10米15.4515.340.1100.6432-1680井口计量间管道安装,低压钢管,螺纹连接,32mm以内10米16.9516.810.1400.7052-1681井口计量间管道安装,低压钢管,螺纹连接,40mm以内10米18.4218.250.1700.7652-1682井口计量间管道安装,低压钢管,螺纹连接,50mm以内10米20.7120.510.200.862-1683井口计量间管道安装,低压碳钢管,电弧焊,25mm以内10米20.4412.780.57.160.5362-1684井口计量间管道安装,低压碳钢管,电弧焊,32mm以内10米23.7514.310.678.770.62-1685井口计量间管道安装,低压碳钢管,电弧焊,40mm以内10米26.5315.720.7810.030.6592-1686井口计量间管道安装,低压碳钢管,电弧焊,50mm以内10米31.1717.551.0912.530.7362-1687井口计量间管道安装,低压碳钢管,电弧焊,65mm以内10米45.9122.473.3920.050.9422-1688井口计量间管道安装,低压碳钢管,电弧焊,80mm以内10米53.9626.593.9123.461.1152-1689井口计量间管道安装,低压碳钢管,电弧焊,100mm以内10米70.1629.726.4234.021.2462-1690井口计量间管道安装,低压碳钢管,电弧焊,125mm以内10米83.1235.066.7641.31.472-1691井口计量间管道安装,低压碳钢管,电弧焊,150mm以内10米102.1241.248.7252.161.7292-1692井口计量间管道安装,低压碳钢管,电弧焊,200mm以内10米136.5547.2714.0975.191.9822-1693井口计量间管道安装,中压管道,电弧焊,25mm以内10米26.9716.890.779.310.7082-1694井口计量间管道安装,中压管道,电弧焊,32mm以内10米31.3519.011.0611.280.7972-1695井口计量间管道安装,中压管道,电弧焊,40mm以内10米36.0521.231.2113.610.892-1696井口计量间管道安装,中压管道,电弧焊,50mm以内10米43.0923.522.0217.550.9862-1697井口计量间管道安装,中压管道,电弧焊,65mm以内10米55.9628.693.6323.641.2032-1698井口计量间管道安装,中压管道,电弧焊,80mm以内10米69.4235.516.3327.581.4892-1699井口计量间管道安装,中压管道,电弧焊,100mm以内10米87.6640.649.637.421.7042-1700井口计量间管道安装,中压管道,电弧焊,125mm以内10米102.6741.0211.1650.491.722-1701井口计量间管道安装,中压管道,电弧焊,150mm以内10米121.5743.9315.0462.61.842
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1702井口计量间管道安装,中压管道,电弧焊,200mm以内10米181.3561.0125.8894.462.5582-1703井口计量间管道安装,中压管道,氩电联焊,25mm以内10米24.6618.61.644.420.782-1704井口计量间管道安装,中压管道,氩电联焊,32mm以内10米28.5721.062.145.370.8832-1705井口计量间管道安装,中压管道,氩电联焊,40mm以内10米32.7623.612.456.70.992-1706井口计量间管道安装,中压管道,氩电联焊,50mm以内10米45.7926.832.716.261.1252-1707井口计量间管道安装,中压管道,氩电联焊,65mm以内10米60.5332.726.1221.691.3722-1708井口计量间管道安装,中压管道,氩电联焊,80mm以内10米71.4939.047.1225.331.6372-1709井口计量间管道安装,中压管道,氩电联焊,100mm以内10米91.7345.3210.5435.871.92-1710井口计量间管道安装,中压管道,氩电联焊,125mm以内10米108.9846.9412.2749.771.9682-1711井口计量间管道安装,中压管道,氩电联焊,150mm以内10米127.7149.0815.6562.982.0582-1712井口计量间管道安装,中压管道,氩电联焊,200mm以内10米190.0967.8825.9996.222.8462-1713井口计量间管道安装,高压钢管,电弧焊,25mm以内10米73.4753.041.3919.042.2242-1714井口计量间管道安装,高压钢管,电弧焊,32mm以内10米92.1167.54222.572.8322-1715井口计量间管道安装,高压钢管,电弧焊,40mm以内10米100.1572.432.3325.393.0372-1716井口计量间管道安装,高压钢管,电弧焊,50mm以内10米111.4478.083.5829.783.2742-1717井口计量间管道安装,高压钢管,电弧焊,65mm以内10米129.5685.246.1338.193.5742-1718井口计量间管道安装,高压钢管,电弧焊,80mm以内10米153.2491.378.6853.193.8312-1719井口计量间管道安装,高压钢管,电弧焊,100mm以内10米212.77120.314.677.875.0442-1720井口计量间管道安装,高压钢管,电弧焊,125mm以内10米286.05142.6524.55118.855.9812-1721井口计量间管道安装,高压钢管,电弧焊,150mm以内10米384.12181.538.32164.37.612-1722井口计量间管道安装,高压钢管,电弧焊,200mm以内10米542.06228.6359.42254.019.5862-1723井口计量间管道安装,碳钢管,氩电联焊,25mm以内10米74.5955.53.7715.322.3272-1724井口计量间管道安装,碳钢管,氩电联焊,32mm以内10米92.870.64.7717.432.962-1725井口计量间管道安装,碳钢管,氩电联焊,40mm以内10米100.6975.775.5119.413.1772-1726井口计量间管道安装,碳钢管,氩电联焊,50mm以内10米115.6781.044.0430.593.3982-1727井口计量间管道安装,碳钢管,氩电联焊,65mm以内10米133.188.486.4438.183.712-1728井口计量间管道安装,碳钢管,氩电联焊,80mm以内10米155.1694.858.1752.143.977
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1729井口计量间管道安装,碳钢管,氩电联焊,100mm以内10米217.51125.0714.3178.135.2442-1730井口计量间管道安装,碳钢管,氩电联焊,125mm以内10米292.03148.324.74118.996.2182-1731井口计量间管道安装,碳钢管,氩电联焊,150mm以内10米389.62188.338.1163.227.8952-1732井口计量间管道安装,碳钢管,氩电联焊,200mm以内10米549.52237.6459.08252.89.9642-1733组装化井口安装,卡箍安装,DN100mm以内付7.936.341.5900.2662-1734组装化井口安装,卡箍安装,DN200mm以内付11.929.522.400.3992-1735组装化井口安装,井口组合阀安装套100.8231.323.965.61.3132-1736组装化井口安装,过滤器安装,50kg以内台13.179.32.441.430.392-1737组装化井口安装,过滤器安装,100kg以内台30.4818.69.911.970.782-1738组装化井口安装,过滤器安装,100kg以上台69.4535.8917.615.961.5052-1739井口加药装置制作套802.06256.2285.83460.0110.7432-1740井口加药装置安装套172.8156.9818.897.032.3892-1741金属软管安装,80mm以内个30.1812.2416.441.50.5132-1742金属软管安装,150mm以内个53.829.2419.325.241.2262-1743金属软管安装,200mm以内个83.8644.6531.597.621.8722-1744低压管道安装,有缝钢管,螺纹连接,15mm以内10米10.2910.160.1300.4262-1745低压管道安装,有缝钢管,螺纹连接,20mm以内10米11.3711.210.1600.472-1746低压管道安装,有缝钢管,螺纹连接,25mm以内10米13.0612.780.2800.5362-1747低压管道安装,有缝钢管,螺纹连接,32mm以内10米14.35140.3500.5872-1748低压管道安装,有缝钢管,螺纹连接,40mm以内10米15.615.190.4100.6372-1749低压管道安装,有缝钢管,螺纹连接,50mm以内10米17.5817.080.500.7162-1750低压管道安装,碳钢管,电弧焊,15mm以内10米9.688.180.21.30.3432-1751低压管道安装,碳钢管,电弧焊,20mm以内10米10.838.850.251.730.3712-1752低压管道安装,碳钢管,电弧焊,25mm以内10米13.410.660.52.240.4472-1753低压管道安装,碳钢管,电弧焊,32mm以内10米15.411.950.672.780.5012-1754低压管道安装,碳钢管,电弧焊,40mm以内10米17.0213.090.783.150.5492-1755低压管道安装,碳钢管,电弧焊,50mm以内10米19.714.641.093.970.614
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1756低压管道安装,碳钢管,电弧焊,65mm以内10米26.5318.753.394.390.7862-1757低压管道安装,碳钢管,电弧焊,80mm以内10米31.2522.163.915.180.9292-1758低压管道安装,碳钢管,电弧焊,100mm以内10米76.4824.766.4245.31.0382-1759低压管道安装,碳钢管,电弧焊,125mm以内10米92.829.226.7656.821.2252-1760低压管道安装,碳钢管,电弧焊,150mm以内10米103.3134.378.7260.221.4412-1761低压管道安装,碳钢管,电弧焊,200mm以内10米133.4439.3814.0979.971.6512-1762低压管道安装,碳钢管,电弧焊,250mm以内10米180.9249.6621.38109.882.0822-1763低压管道安装,碳钢管,电弧焊,300mm以内10米191.2755.1421.6114.532.3122-1764低压管道安装,碳钢管,电弧焊,350mm以内10米226.1460.4632.07133.612.5352-1765低压管道安装,碳钢管,电弧焊,400mm以内10米253.0569.1935.87147.992.9012-1766低压管道安装,碳钢管,电弧焊,450mm以内10米299.7984.3648.53166.93.5372-1767低压管道安装,碳钢管,电弧焊,500mm以内10米329.35101.2954.24173.824.2472-1768低压管道安装,碳钢管,氩电联焊,15mm以内10米11.379.230.481.660.3872-1769低压管道安装,碳钢管,氩电联焊,20mm以内10米12.810.020.62.180.422-1770低压管道安装,碳钢管,氩电联焊,25mm以内10米15.9412.091.072.780.5072-1771低压管道安装,碳钢管,氩电联焊,32mm以内10米18.5213.621.373.530.5712-1772低压管道安装,碳钢管,氩电联焊,40mm以内10米20.6214.981.594.050.6282-1773低压管道安装,碳钢管,氩电联焊,50mm以内10米21.2817.342.191.750.7272-1774低压管道安装,碳钢管,氩电联焊,65mm以内10米32.0621.664.126.280.9082-1775低压管道安装,碳钢管,氩电联焊,80mm以内10米37.9225.574.827.531.0722-1776低压管道安装,碳钢管,氩电联焊,100mm以内10米87.3730.797.5948.991.2912-1777低压管道安装,碳钢管,氩电联焊,125mm以内10米102.9633.398.0661.511.42-1778低压管道安装,碳钢管,氩电联焊,150mm以内10米115.4936.859.8368.811.5452-1779低压管道安装,碳钢管,氩电联焊,200mm以内10米150.9142.1915.4293.31.7692-1780低压管道安装,碳钢管,氩电联焊,250mm以内10米197.5353.2618.93125.342.2332-1781低压管道安装,碳钢管,氩电联焊,300mm以内10米213.9759.622.44131.932.4992-1782低压管道安装,碳钢管,氩电联焊,350mm以内10米259.4871.8432.17155.473.012
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1783低压管道安装,碳钢管,氩电联焊,400mm以内10米282.9374.8236172.113.1372-1784低压管道安装,碳钢管,氩电联焊,450mm以内10米334.1290.9947.68195.453.8152-1785低压管道安装,碳钢管,氩电联焊,500mm以内10米367.09108.853.18205.114.5622-1786低压管道安装,碳钢板卷管,电弧焊,200mm以内10米125.2633.9114.5276.831.4222-1787低压管道安装,碳钢板卷管,电弧焊,250mm以内10米142.7539.6117.5385.611.6612-1788低压管道安装,碳钢板卷管,电弧焊,300mm以内10米161.0847.0120.2593.821.9712-1789低压管道安装,碳钢板卷管,电弧焊,350mm以内10米196.4957.3431.94107.212.4042-1790低压管道安装,碳钢板卷管,电弧焊,400mm以内10米219.0866.5935.63116.862.7922-1791低压管道安装,碳钢板卷管,电弧焊,450mm以内10米254.4881.5239.63133.333.4182-1792低压管道安装,碳钢板卷管,电弧焊,500mm以内10米289.8595.1443.78150.933.9892-1793低压管道安装,碳钢板卷管,电弧焊,600mm以内10米394.55114.7957.26222.54.8132-1794低压管道安装,碳钢板卷管,电弧焊,700mm以内10米452.72134.7570.21247.765.652-1795低压管道安装,碳钢板卷管,电弧焊,800mm以内10米523.79154.1989.13280.476.4652-1796低压管道安装,碳钢板卷管,电弧焊,900mm以内10米583.05172.9699.79310.37.2522-1797低压管道安装,碳钢板卷管,电弧焊,1000mm以内10米696.44193.52121.4381.528.1142-1798低压管道安装,碳钢板卷管,电弧焊,1200mm以内10米964.49262.18192.42509.8910.9932-1799低压管道安装,碳钢板卷管,电弧焊,1400mm以内10米1180.31319.73264.72595.8613.4062-1800低压管道安装,碳钢板卷管,电弧焊,1600mm以内10米1396.74379.64304.72712.3815.9182-1801低压管道安装,碳钢板卷管,电弧焊,1800mm以内10米1653.19446.54341.78864.8718.7232-1802低压管道安装,不锈钢管,电弧焊,15mm以内10米14.3512.240.991.120.5132-1803低压管道安装,不锈钢管,电弧焊,20mm以内10米16.2513.621.261.370.5712-1804低压管道安装,不锈钢管,电弧焊,25mm以内10米18.7715.341.721.710.6432-1805低压管道安装,不锈钢管,电弧焊,32mm以内10米21.3717.152.142.080.7192-1806低压管道安装,不锈钢管,电弧焊,40mm以内10米26.2318.843.354.040.792-1807低压管道安装,不锈钢管,电弧焊,50mm以内10米29.8321.084.044.710.8842-1808低压管道安装,不锈钢管,电弧焊,65mm以内10米38.36276.195.171.1322-1809低压管道安装,不锈钢管,电弧焊,80mm以内10米56.4631.917.317.251.338
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1810低压管道安装,不锈钢管,电弧焊,100mm以内10米70.6935.6611.7523.281.4952-1811低压管道安装,不锈钢管,电弧焊,125mm以内10米133.9942.0713.6278.31.7642-1812低压管道安装,不锈钢管,电弧焊,150mm以内10米156.7249.4922.23852.0752-1813低压管道安装,不锈钢管,电弧焊,200mm以内10米201.1356.6931.38113.062.3772-1814低压管道安装,不锈钢管,电弧焊,250mm以内10米287.7671.561.64154.622.9982-1815低压管道安装,不锈钢管,电弧焊,300mm以内10米339.1879.486.34173.443.3292-1816低压管道安装,不锈钢管,氩电联焊,50mm以内10米36.1523.85.436.920.9982-1817低压管道安装,不锈钢管,氩电联焊,65mm以内10米46.730.897.048.771.2952-1818低压管道安装,不锈钢管,氩电联焊,80mm以内10米51.4932.918.410.181.382-1819低压管道安装,不锈钢管,氩电联焊,100mm以内10米63.5339.2111.0713.251.6442-1820低压管道安装,不锈钢管,氩电联焊,125mm以内10米124.1344.4812.9166.741.8652-1821低压管道安装,不锈钢管,氩电联焊,150mm以内10米144.1652.3319.7172.122.1942-1822低压管道安装,不锈钢管,氩电联焊,200mm以内10米195.4168.8330.1396.452.8862-1823低压管道安装,不锈钢管,氩电联焊,250mm以内10米282.282.3556.59143.263.4532-1824低压管道安装,不锈钢管,氩电联焊,300mm以内10米329.0295.8878.76154.384.022-1825低压管道安装,不锈钢管,氩电联焊,350mm以内10米373.95108.3792.88172.74.5442-1826低压管道安装,不锈钢管,氩电联焊,400mm以内10米419.3120.49106.2192.615.0522-1827低压管道安装,塑料管,热风焊,20mm以内10米13.5810.850.082.650.4552-1828低压管道安装,塑料管,热风焊,25mm以内10米14.9611.610.113.240.4872-1829低压管道安装,塑料管,热风焊,32mm以内10米16.9712.710.144.120.5332-1830低压管道安装,塑料管,热风焊,40mm以内10米20.4814.640.195.650.6142-1831低压管道安装,塑料管,热风焊,50mm以内10米26.0519.270.256.530.8082-1832低压管道安装,塑料管,热风焊,75mm以内10米36.5926.070.4410.081.0932-1833低压管道安装,塑料管,热风焊,90mm以内10米43.2629.650.5813.031.2432-1834低压管道安装,塑料管,热风焊,110mm以内10米54.7136.940.9216.851.5492-1835低压管道安装,塑料管,热风焊,125mm以内10米59.6441.120.9617.561.7242-1836低压管道安装,塑料管,热风焊,150mm以内10米78.9951.331.825.862.152
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1837低压管道安装,玻璃钢管(胶泥),25mm以内10米15.812.523.2800.5252-1838低压管道安装,玻璃钢管(胶泥),40mm以内10米23.8118.565.2500.7782-1839低压管道安装,玻璃钢管(胶泥),50mm以内10米29.9623.46.5600.9812-1840低压管道安装,玻璃钢管(胶泥),80mm以内10米43.4733.0610.4101.3862-1841低压管道安装,玻璃钢管(胶泥),100mm以内10米53.6841.1712.5101.7262-1842低压管道安装,玻璃钢管(胶泥),125mm以内10米66.9952.814.1902.2142-1843低压管道安装,玻璃钢管(胶泥),150mm以内10米83.4563.719.7502.6712-1844埋地给排水承插铸铁管安装,石棉水泥接口,50mm以内10米15.8310.43.052.380.4362-1845埋地给排水承插铸铁管安装,石棉水泥接口,75mm以内10米22.8514.123.964.770.5922-1846埋地给排水承插铸铁管安装,石棉水泥接口,100mm以内10米28.6618.155.155.360.7612-1847埋地给排水承插铸铁管安装,石棉水泥接口,125mm以内10米36.3121.116.268.940.8852-1848埋地给排水承插铸铁管安装,石棉水泥接口,150mm以内10米39.9523.547.478.940.9872-1849埋地给排水承插铸铁管安装,石棉水泥接口,200mm以内10米47.3326.2410.3710.721.12-1850埋地给排水承插铸铁管安装,水泥接口,50mm以内10米14.5910.142.072.380.4252-1851埋地给排水承插铸铁管安装,水泥接口,75mm以内10米39.3432.052.524.771.3442-1852埋地给排水承插铸铁管安装,水泥接口,100mm以内10米49.6141.282.975.361.7312-1853埋地给排水承插铸铁管安装,水泥接口,125mm以内10米59.4346.913.588.941.9672-1854埋地给排水承插铸铁管安装,水泥接口,150mm以内10米65.3552.064.358.942.1832-1855埋地给排水承插铸铁管安装,水泥接口,200mm以内10米72.6555.955.9810.722.3462-1856预应力混凝土管安装,DN300mm以内10米151.4233.7729.3888.271.4162-1857预应力混凝土管安装,DN400mm以内10米190.5748.7337.54104.32.0432-1858预应力混凝土管安装,DN500mm以内10米241.4263.4449.27128.712.662-1859预应力混凝土管安装,DN600mm以内10米296.5978.3957.22160.983.2872-1860预应力混凝土管安装,DN700mm以内10米358.93102.264.08192.654.2852-1861预应力混凝土管安装,DN800mm以内10米436.22126.4364.08245.715.3012-1862预应力混凝土管安装,DN900mm以内10米551.58164.4965.57321.526.8972-1863中压管道安装,碳钢管,电弧焊,15mm以内10米13.1411.350.321.470.476
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1864中压管道安装,碳钢管,电弧焊,20mm以内10米15.7512.740.632.380.5342-1865中压管道安装,碳钢管,电弧焊,25mm以内10米17.7314.070.772.890.592-1866中压管道安装,碳钢管,电弧焊,32mm以内10米20.4715.841.063.570.6642-1867中压管道安装,碳钢管,电弧焊,40mm以内10米23.1617.71.214.250.7422-1868中压管道安装,碳钢管,电弧焊,50mm以内10米27.1519.62.025.530.8222-1869中压管道安装,碳钢管,电弧焊,65mm以内10米34.9323.93.637.41.0022-1870中压管道安装,碳钢管,电弧焊,80mm以内10米42.3628.246.337.791.1842-1871中压管道安装,碳钢管,电弧焊,100mm以内10米94.8231.559.653.671.3232-1872中压管道安装,碳钢管,电弧焊,125mm以内10米113.734.1811.1668.361.4332-1873中压管道安装,碳钢管,电弧焊,150mm以内10米123.0436.6115.0471.391.5352-1874中压管道安装,碳钢管,电弧焊,200mm以内10米172.7450.8524.7797.122.1322-1875中压管道安装,碳钢管,电弧焊,250mm以内10米236.8562.3237.13137.42.6132-1876中压管道安装,碳钢管,电弧焊,300mm以内10米255.7266.441.96147.362.7842-1877中压管道安装,碳钢管,电弧焊,350mm以内10米302.3378.7158.08165.543.32-1878中压管道安装,碳钢管,电弧焊,400mm以内10米361.2793.6175.85191.813.9252-1879中压管道安装,碳钢管,电弧焊,450mm以内10米427.23118.3492.66216.234.9622-1880中压管道安装,碳钢管,电弧焊,500mm以内10米482.32138.54107.16236.625.8092-1881中压管道安装,碳钢管,电弧焊,55010米530.42152.43117.88260.116.3912-1882中压管道安装,碳钢管,电弧焊,60010米578.48166.26128.59283.636.9712-1883中压管道安装,碳钢管,电弧焊,65010米626.66180.14139.31307.217.5532-1884中压管道安装,碳钢管,电弧焊,70010米674.77193.97150.02330.788.1332-1885中压管道安装,碳钢管,氩电联焊,15mm以内10米14.9812.450.681.850.5222-1886中压管道安装,碳钢管,氩电联焊,20mm以内10米17.8713.761.332.780.5772-1887中压管道安装,碳钢管,氩电联焊,25mm以内10米20.715.51.643.560.652-1888中压管道安装,碳钢管,氩电联焊,32mm以内10米24.0617.532.144.390.7352-1889中压管道安装,碳钢管,氩电联焊,40mm以内10米27.3119.682.455.180.8252-1890中压管道安装,碳钢管,氩电联焊,50mm以内10米3122.372.75.930.938
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1891中压管道安装,碳钢管,氩电联焊,65mm以内10米41.0127.265.977.781.1432-1892中压管道安装,碳钢管,氩电联焊,80mm以内10米48.6132.536.949.141.3642-1893中压管道安装,碳钢管,氩电联焊,100mm以内10米105.9137.7810.2957.841.5842-1894中压管道安装,碳钢管,氩电联焊,125mm以内10米126.8339.1411.9875.711.6412-1895中压管道安装,碳钢管,氩电联焊,150mm以内10米141.3640.915.385.161.7152-1896中压管道安装,碳钢管,氩电联焊,200mm以内10米197.4956.5724.67116.252.3722-1897中压管道安装,碳钢管,氩电联焊,250mm以内10米268.9269.436.13163.392.912-1898中压管道安装,碳钢管,氩电联焊,300mm以内10米283.7874.240.07169.513.1112-1899中压管道安装,碳钢管,氩电联焊,350mm以内10米338.4787.754.86195.913.6772-1900中压管道安装,碳钢管,氩电联焊,400mm以内10米402.38104.0171.05227.324.3612-1901中压管道安装,碳钢管,氩电联焊,450mm以内10米465.27111.9590.56262.764.6942-1902中压管道安装,碳钢管,氩电联焊,500mm以内10米536.23152.9599.74283.546.4132-1903中压管道安装,碳钢管,氩电联焊,550mm以内10米589.98168.24109.71312.037.0542-1904中压管道安装,碳钢管,氩电联焊,600mm以内10米643.63183.53119.69340.417.6952-1905中压管道安装,碳钢管,氩电联焊,650mm以内10米697.31198.81129.66368.848.3362-1906中压管道安装,碳钢管,氩电联焊,700mm以内10米751.57214.13139.63397.818.9782-1907中压管道安装,不锈钢管,电弧焊,15mm以内10米19.0415.51.522.020.652-1908中压管道安装,不锈钢管,电弧焊,20mm以内10米20.215.911.92.390.6672-1909中压管道安装,不锈钢管,电弧焊,25mm以内10米22.3716.462.753.160.692-1910中压管道安装,不锈钢管,电弧焊,32mm以内10米25.3618.223.393.750.7642-1911中压管道安装,不锈钢管,电弧焊,40mm以内10米30.3820.614.944.830.8642-1912中压管道安装,不锈钢管,电弧焊,50mm以内10米42.7428.437.956.361.1922-1913中压管道安装,不锈钢管,电弧焊,65mm以内10米58.8138.0913.776.951.5972-1914中压管道安装,不锈钢管,电弧焊,80mm以内10米74.1440.414.0719.671.6942-1915中压管道安装,不锈钢管,电弧焊,100mm以内10米99.2147.225.2426.771.9792-1916中压管道安装,不锈钢管,电弧焊,125mm以内10米171.9848.0129.6894.292.0132-1917中压管道安装,不锈钢管,电弧焊,150mm以内10米200.2654.1941.97104.12.272
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1918中压管道安装,不锈钢管,电弧焊,200mm以内10米290.3680.6666.1143.63.3822-1919中压管道安装,不锈钢管,电弧焊,250mm以内10米403.8596.85109.09197.914.0612-1920中压管道安装,不锈钢管,电弧焊,300mm以内10米503.49115.15160.09228.254.8282-1921中压管道安装,不锈钢管,氩电联焊,50mm以内10米44.8529.747.177.941.2472-1922中压管道安装,不锈钢管,氩电联焊,65mm以内10米63.3440.2312.2210.891.6872-1923中压管道安装,不锈钢管,氩电联焊,80mm以内10米72.9845.5514.7212.711.912-1924中压管道安装,不锈钢管,氩电联焊,100mm以内10米92.551.323.6117.592.1512-1925中压管道安装,不锈钢管,氩电联焊,125mm以内10米166.1654.527.9283.742.2852-1926中压管道安装,不锈钢管,氩电联焊,150mm以内10米188.1758.6938.8790.612.4612-1927中压管道安装,不锈钢管,氩电联焊,200mm以内10米280.2585.4370.68124.143.5822-1928中压管道安装,不锈钢管,氩电联焊,250mm以内10米386.33100.43114.81171.094.2112-1929中压管道安装,不锈钢管,氩电联焊,300mm以内10米460.44117.37151.86191.214.9212-1930中压管道安装,不锈钢管,氩电联焊,350mm以内10米581.75138.38215.65227.725.8022-1931中压管道安装,不锈钢管,氩电联焊,400mm以内10米722.04160.13295.16266.756.7142-1932高压管道安装,碳钢管,电弧焊,15mm以内10米41.8536.990.524.341.5512-1933高压管道安装,碳钢管,电弧焊,20mm以内10米47.0540.350.845.861.6922-1934高压管道安装,碳钢管,电弧焊,25mm以内10米62.5544.191.3916.971.8532-1935高压管道安装,碳钢管,电弧焊,32mm以内10米76.5556.29218.262.362-1936高压管道安装,碳钢管,电弧焊,40mm以内10米82.0560.362.3319.362.5312-1937高压管道安装,碳钢管,电弧焊,50mm以内10米89.0965.062.9121.122.7282-1938高压管道安装,碳钢管,电弧焊,65mm以内10米99.571.033.8724.62.9782-1939高压管道安装,碳钢管,电弧焊,80mm以内10米158.2476.156.2275.873.1932-1940高压管道安装,碳钢管,电弧焊,100mm以内10米211.22100.2411.2699.724.2032-1941高压管道安装,碳钢管,电弧焊,125mm以内10米266.69118.8915.73132.074.9852-1942高压管道安装,碳钢管,电弧焊,150mm以内10米337.36151.2623.63162.476.3422-1943高压管道安装,碳钢管,电弧焊,200mm以内10米438.27190.5433.76213.977.9892-1944高压管道安装,碳钢管,电弧焊,250mm以内10米550.08220.851.08278.29.258
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1945高压管道安装,碳钢管,电弧焊,300mm以内10米609.31240.1774.88294.2610.072-1946高压管道安装,碳钢管,电弧焊,350mm以内10米755.5280.7189.07385.7211.772-1947高压管道安装,碳钢管,电弧焊,400mm以内10米880.1321.55117.38441.1713.4822-1948高压管道安装,碳钢管,电弧焊,450mm以内10米1098.51370.84158569.6715.5492-1949高压管道安装,碳钢管,电弧焊,500mm以内10米1250.47417.42202.83630.2217.5022-1950高压管道安装,碳钢管,氩电联焊,15mm以内10米44.5538.161.375.021.62-1951高压管道安装,碳钢管,氩电联焊,20mm以内10米52.66422.618.051.7612-1952高压管道安装,碳钢管,氩电联焊,25mm以内10米70.2446.253.7720.221.9392-1953高压管道安装,碳钢管,氩电联焊,32mm以内10米85.7658.844.7722.152.4672-1954高压管道安装,碳钢管,氩电联焊,40mm以内10米92.5463.155.5123.882.6482-1955高压管道安装,碳钢管,氩电联焊,50mm以内10米93.9567.543.522.912.8322-1956高压管道安装,碳钢管,氩电联焊,65mm以内10米104.8573.724.6426.493.0912-1957高压管道安装,碳钢管,氩电联焊,80mm以内10米164.4479.047.2578.153.3142-1958高压管道安装,碳钢管,氩电联焊,100mm以内10米220.16104.2212.61103.334.372-1959高压管道安装,碳钢管,氩电联焊,125mm以内10米269.6123.5717.29128.745.1812-1960高压管道安装,碳钢管,氩电联焊,150mm以内10米346.87156.9325.43164.516.582-1961高压管道安装,碳钢管,氩电联焊,200mm以内10米455.92198.0336.1221.798.3032-1962高压管道安装,碳钢管,氩电联焊,250mm以内10米573.26229.8454.47288.959.6372-1963高压管道安装,碳钢管,氩电联焊,300mm以内10米629.6249.0777.68302.8510.4432-1964高压管道安装,碳钢管,氩电联焊,350mm以内10米778.93290.8792.84395.2212.1962-1965高压管道安装,碳钢管,氩电联焊,400mm以内10米905.89332.85121.61451.4313.9562-1966高压管道安装,碳钢管,氩电联焊,450mm以内10米1123.35382.72162.28578.3516.0472-1967高压管道安装,碳钢管,氩电联焊,500mm以内10米1280.48431.02208.12641.3418.0722-1968高压管道安装,不锈钢管,电弧焊,15mm以内10米46.7339.212.5251.6442-1969高压管道安装,不锈钢管,电弧焊,20mm以内10米51.7142.263.75.751.7722-1970高压管道安装,不锈钢管,电弧焊,25mm以内10米59.7246.326.077.331.9422-1971高压管道安装,不锈钢管,电弧焊,32mm以内10米81.9159.317.6152.487
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1972高压管道安装,不锈钢管,电弧焊,40mm以内10米95.1364.3210.220.612.6972-1973高压管道安装,不锈钢管,电弧焊,50mm以内10米105.4769.2814.1822.012.9052-1974高压管道安装,不锈钢管,电弧焊,65mm以内10米134.9788.9820.4425.553.7312-1975高压管道安装,不锈钢管,电弧焊,80mm以内10米229123.0735.3970.545.162-1976高压管道安装,不锈钢管,电弧焊,100mm以内10米270.36126.5545.2598.565.3062-1977高压管道安装,不锈钢管,电弧焊,125mm以内10米340.68136.5791.65112.465.7262-1978高压管道安装,不锈钢管,电弧焊,150mm以内10米407.93153.24106.03148.666.4252-1979高压管道安装,不锈钢管,电弧焊,200mm以内10米639.02238.14175.93224.959.9852-1980高压管道安装,不锈钢管,电弧焊,250mm以内10米882.05287.25269.26325.5412.0442-1981高压管道安装,不锈钢管,电弧焊,300mm以内10米1148.61345.66414.24388.7114.4932-1982高压管道安装,不锈钢管,电弧焊,350mm以内10米1384.36389.95493.2501.2116.352-1983高压管道安装,不锈钢管,电弧焊,400mm以内10米1711.67464.98664.85581.8419.4962-1984高压管道安装,不锈钢管,氩电联焊,15mm以内10米48.6839.263.166.261.6462-1985高压管道安装,不锈钢管,氩电联焊,20mm以内10米55.3242.384.78.241.7772-1986高压管道安装,不锈钢管,氩电联焊,25mm以内10米66.2746.727.611.951.9592-1987高压管道安装,不锈钢管,氩电联焊,32mm以内10米90.3859.849.5920.952.5092-1988高压管道安装,不锈钢管,氩电联焊,40mm以内10米106.7365.2512.9328.552.7362-1989高压管道安装,不锈钢管,氩电联焊,50mm以内10米103.5269.247.8526.432.9032-1990高压管道安装,不锈钢管,氩电联焊,65mm以内10米142.0789.6521.2831.143.7592-1991高压管道安装,不锈钢管,氩电联焊,80mm以内10米187.23123.428.6235.215.1742-1992高压管道安装,不锈钢管,氩电联焊,100mm以内10米287.74132.2249.09106.435.5442-1993高压管道安装,不锈钢管,氩电联焊,125mm以内10米360.55148.4291.56120.576.2232-1994高压管道安装,不锈钢管,氩电联焊,150mm以内10米430.32160.75111.34158.236.742-1995高压管道安装,不锈钢管,氩电联焊,200mm以内10米672.55248.42184.72239.4110.4162-1996高压管道安装,不锈钢管,氩电联焊,250mm以内10米921.9199299.65280.18342.0912.5642-1997高压管道安装,不锈钢管,氩电联焊,300mm以内10米1209.07360.59439.46409.0215.1192-1998低压碳钢管件连接,螺纹连接,15mm以内10个22.9420.652.2900.866
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-1999低压碳钢管件连接,螺纹连接,20mm以内10个28.725.882.8201.0852-2000低压碳钢管件连接,螺纹连接,25mm以内10个37.2433.14.1401.3882-2001低压碳钢管件连接,螺纹连接,32mm以内10个43.7838.455.3301.6122-2002低压碳钢管件连接,螺纹连接,40mm以内10个53.3547.156.201.9772-2003低压碳钢管件连接,螺纹连接,50mm以内10个73.6666.147.5202.7732-2004低压碳钢管件连接,电弧焊,15mm以内10个33.6215.672.4415.510.6572-2005低压碳钢管件连接,电弧焊,20mm以内10个43.5420.533.1419.870.8612-2006低压碳钢管件连接,电弧焊,25mm以内10个63.1431.675.3926.081.3282-2007低压碳钢管件连接,电弧焊,32mm以内10个76.3937.956.3532.091.5912-2008低压碳钢管件连接,电弧焊,40mm以内10个89.58457.5337.051.8872-2009低压碳钢管件连接,电弧焊,50mm以内10个109.9353.6610.3245.952.252-2010低压碳钢管件连接,电弧焊,65mm以内10个171.6967.8129.7974.092.8432-2011低压碳钢管件连接,电弧焊,80mm以内10个198.7177.234.786.813.2372-2012低压碳钢管件连接,电弧焊,100mm以内10个248.0883.2657.61107.213.4912-2013低压碳钢管件连接,电弧焊,125mm以内10个276.3193.1161.71121.493.9042-2014低压碳钢管件连接,电弧焊,150mm以内10个367.3129.8483.73153.735.4442-2015低压碳钢管件连接,电弧焊,200mm以内10个515.77167.64128.04220.097.0292-2016低压碳钢管件连接,电弧焊,250mm以内10个770.38234.06223.4312.929.8142-2017低压碳钢管件连接,电弧焊,300mm以内10个905.42265.78262.58377.0611.1442-2018低压碳钢管件连接,电弧焊,350mm以内10个1157.41369.63375.2412.5815.4982-2019低压碳钢管件连接,电弧焊,400mm以内10个1372.61417.14425.27530.217.492-2020低压碳钢管件连接,电弧焊,450mm以内10个1660.62489.95541.6762920.5432-2021低压碳钢管件连接,电弧焊,500mm以内10个1851.93545.38591.47715.0822.8672-2022低压碳钢管件连接,氩电联焊,15mm以内10个42.9116.775.620.540.7032-2023低压碳钢管件连接,氩电联焊,20mm以内10个55.3921.977.1626.260.9212-2024低压碳钢管件连接,氩电联焊,25mm以内10个79.3733.5811.8733.921.4082-2025低压碳钢管件连接,氩电联焊,32mm以内10个96.5940.3114.441.881.69
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2026低压碳钢管件连接,氩电联焊,40mm以内10个11347.816.7548.452.0042-2027低压碳钢管件连接,氩电联焊,50mm以内10个136.6956.123.0757.522.3522-2028低压碳钢管件连接,氩电联焊,65mm以内10个195.8573.5335.3886.943.0832-2029低压碳钢管件连接,氩电联焊,80mm以内10个227.6884.2441.56101.883.5322-2030低压碳钢管件连接,氩电联焊,100mm以内10个307.37108.7665.84132.774.562-2031低压碳钢管件连接,氩电联焊,125mm以内10个337.23118.6571.01147.574.9752-2032低压碳钢管件连接,氩电联焊,150mm以内10个475.27160.15102.98212.146.7152-2033低压碳钢管件连接,氩电联焊,200mm以内10个676.47211.67156.44308.368.8752-2034低压碳钢管件连接,氩电联焊,250mm以内10个955.91298.94256.54400.4312.5342-2035低压碳钢管件连接,氩电联焊,300mm以内10个1130.01341.68302.5485.8314.3262-2036低压碳钢管件连接,氩电联焊,350mm以内10个1477.79407.43436.72633.6417.0832-2037低压碳钢管件连接,氩电联焊,400mm以内10个1669.4460.42490.32718.6619.3052-2038低压碳钢管件连接,氩电联焊,450mm以内10个2128.3543.64624.2960.4622.7942-2039低压碳钢管件连接,氩电联焊,500mm以内10个2369604.24679.841084.9225.3352-2040低压碳钢板卷管件连接,电弧焊,200mm以内10个439.67146.03142.45151.196.1232-2041低压碳钢板卷管件连接,电弧焊,250mm以内10个541.63181.12171.57188.947.5942-2042低压碳钢板卷管件连接,电弧焊,300mm以内10个649.36224.64197.63227.099.4192-2043低压碳钢板卷管件连接,电弧焊,350mm以内10个907.4301286.41313.5307.5212.0092-2044低压碳钢板卷管件连接,电弧焊,400mm以内10个1026.4323.29350.52352.5913.5552-2045低压碳钢板卷管件连接,电弧焊,450mm以内10个1159.44369.44390.6399.415.492-2046低压碳钢板卷管件连接,电弧焊,500mm以内10个1288.16409.15432.44446.5717.1552-2047低压碳钢板卷管件连接,电弧焊,600mm以内10个1708.32481.27607.63619.4220.1792-2048低压碳钢板卷管件连接,电弧焊,700mm以内10个1980.37550.1699.04731.2323.0652-2049低压碳钢板卷管件连接,电弧焊,800mm以内10个2418.99632.38874.26912.3526.5152-2050低压碳钢板卷管件连接,电弧焊,900mm以内10个2736.76708.87978.711049.1829.7222-2051低压碳钢板卷管件连接,电弧焊,1000mm以内10个3159.63796.831147.221215.5833.412-2052低压碳钢板卷管件连接,电弧焊,1200mm以内10个3899.3974.131400.311524.8640.844
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2053低压碳钢板卷管件连接,电弧焊,1400mm以内10个4797.691156.961946.841693.8948.512-2054低压碳钢板卷管件连接,电弧焊,1600mm以内10个5552.121322.272242.151987.755.4412-2055低压碳钢板卷管件连接,电弧焊,1800mm以内10个6160.131490.312513.532156.2962.4872-2056低压不锈钢管件连接,电弧焊,15mm以内10个44.3119.6511.7512.910.8242-2057低压不锈钢管件连接,电弧焊,20mm以内10个56.6826.6614.5615.461.1182-2058低压不锈钢管件连接,电弧焊,25mm以内10个75.7234.9420.9619.821.4652-2059低压不锈钢管件连接,电弧焊,32mm以内10个91.4542.1925.523.761.7692-2060低压不锈钢管件连接,电弧焊,40mm以内10个151.1666.9237.6446.62.8062-2061低压不锈钢管件连接,电弧焊,50mm以内10个176.5876.8744.8454.873.2232-2062低压不锈钢管件连接,电弧焊,65mm以内10个243.6598.0568.5777.034.1112-2063低压不锈钢管件连接,电弧焊,80mm以内10个348.24108.7378.28161.234.5592-2064低压不锈钢管件连接,电弧焊,100mm以内10个443.33119.87126.26197.25.0262-2065低压不锈钢管件连接,电弧焊,125mm以内10个560.25133.66152.05274.545.6042-2066低压不锈钢管件连接,电弧焊,150mm以内10个759.26165.28244.82349.166.932-2067低压不锈钢管件连接,电弧焊,200mm以内10个1054.69223.86343.19487.649.3862-2068低压不锈钢管件连接,电弧焊,250mm以内10个1618.5304.95674.17639.3812.7862-2069低压不锈钢管件连接,电弧焊,300mm以内10个2050.52369.6944.11736.8115.4972-2070低压不锈钢管件连接,氩电联焊,50mm以内10个247.2179.3561.99105.873.3272-2071低压不锈钢管件连接,氩电联焊,65mm以内10个337.84102.5180.72154.614.2982-2072低压不锈钢管件连接,氩电联焊,80mm以内10个387.25116.1796.5174.584.8712-2073低压不锈钢管件连接,氩电联焊,100mm以内10个510.39156.93126.5226.966.582-2074低压不锈钢管件连接,氩电联焊,125mm以内10个633.17177.13150.7305.347.4272-2075低压不锈钢管件连接,氩电联焊,150mm以内10个852.38218.18229.43404.779.1482-2076低压不锈钢管件连接,氩电联焊,200mm以内10个1245.19306.73414.32524.1412.8612-2077低压不锈钢管件连接,氩电联焊,250mm以内10个1706.55380.12658.97667.4615.9382-2078低压不锈钢管件连接,氩电联焊,300mm以内10个2150.41455.42916.81778.1819.0952-2079低压不锈钢管件连接,氩电联焊,350mm以内10个2464.32518.071082.1864.1521.722
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2080低压不锈钢管件连接,氩电联焊,400mm以内10个2837.11579.411237.221020.4824.2942-2081低压塑料管件连接,热风焊,20mm以内10个38.8316.980.6621.190.7122-2082低压塑料管件连接,热风焊,25mm以内10个47.1120.420.825.890.8562-2083低压塑料管件连接,热风焊,32mm以内10个59.4825.51.0232.961.0692-2084低压塑料管件连接,热风焊,40mm以内10个8134.461.4645.081.4452-2085低压塑料管件连接,热风焊,50mm以内10个100.0645.891.9152.261.9242-2086低压塑料管件连接,热风焊,75mm以内10个148.0864.23.2880.62.6922-2087低压塑料管件连接,热风焊,90mm以内10个192.8584.074.4104.383.5252-2088低压塑料管件连接,热风焊,110mm以内10个254.78107.217.3140.274.4952-2089低压塑料管件连接,热风焊,125mm以内10个257.9110.337.3140.274.6262-2090低压塑料管件连接,热风焊,150mm以内10个372.2157.5113.33201.366.6042-2091中压碳钢管件连接,电弧焊,15mm以内10个40.0922.82.9314.360.9562-2092中压碳钢管件连接,电弧焊,20mm以内10个61.2631.155.7524.361.3062-2093中压碳钢管件连接,电弧焊,25mm以内10个77.5340.747.0729.721.7082-2094中压碳钢管件连接,电弧焊,32mm以内10个94.0948.348.8936.862.0272-2095中压碳钢管件连接,电弧焊,40mm以内10个114.2861.8710.1442.272.5942-2096中压碳钢管件连接,电弧焊,50mm以内10个145.4170.7617.2257.432.9672-2097中压碳钢管件连接,电弧焊,65mm以内10个242.5789.0674.3879.133.7342-2098中压碳钢管件连接,电弧焊,80mm以内10个240.3894.2852.9493.163.9532-2099中压碳钢管件连接,电弧焊,100mm以内10个330.82120.3281.84128.665.0452-2100中压碳钢管件连接,电弧焊,125mm以内10个370.73124.3195.72150.75.2122-2101中压碳钢管件连接,电弧焊,150mm以内10个469.16149.16128.84191.166.2542-2102中压碳钢管件连接,电弧焊,200mm以内10个691.59178.99224.28288.327.5052-2103中压碳钢管件连接,电弧焊,250mm以内10个937.63214.79345.15377.699.0062-2104中压碳钢管件连接,电弧焊,300mm以内10个1229.43257.75494.4477.2810.8072-2105中压碳钢管件连接,电弧焊,350mm以内10个1659.17309.29697.61652.2712.9682-2106中压碳钢管件连接,电弧焊,400mm以内10个2133.92371.15922.6840.1715.562
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2107中压碳钢管件连接,电弧焊,450mm以内10个2701.3445.371196.621059.3118.6742-2108中压碳钢管件连接,电弧焊,500mm以内10个3046.61534.451320.16119222.4092-2109中压碳钢管件连接,电弧焊,550mm以内10个3404.54640.871452.181311.4926.8712-2110中压碳钢管件连接,电弧焊,600mm以内10个3784.79769.621584.191430.9832.2692-2111中压碳钢管件连接,电弧焊,650mm以内10个4189.66923.541716.221549.938.7232-2112中压碳钢管件连接,电弧焊,700mm以内10个4625.871108.261848.231669.3846.4682-2113中压碳钢管件连接,氩电联焊,15mm以内10个50.3623.97.0819.381.0022-2114中压碳钢管件连接,氩电联焊,20mm以内10个76.4631.9614.0130.491.342-2115中压碳钢管件连接,氩电联焊,25mm以内10个96.4941.8817.1737.441.7562-2116中压碳钢管件连接,氩电联焊,32mm以内10个117.2549.6321.3846.242.0812-2117中压碳钢管件连接,氩电联焊,40mm以内10个141.2163.6124.4953.112.6672-2118中压碳钢管件连接,氩电联焊,50mm以内10个140.5567.8322.8749.852.8442-2119中压碳钢管件连接,氩电联焊,65mm以内10个212.5893.8749.269.513.9362-2120中压碳钢管件连接,氩电联焊,80mm以内10个248.21108.0257.4682.734.5292-2121中压碳钢管件连接,氩电联焊,100mm以内10个336.8128.4886.22122.15.3872-2122中压碳钢管件连接,氩电联焊,125mm以内10个409.03163.78101.1144.156.8672-2123中压碳钢管件连接,氩电联焊,150mm以内10个550.95182.62146.61221.727.6572-2124中压碳钢管件连接,氩电联焊,200mm以内10个881.05262.97248.27369.8111.0262-2125中压碳钢管件连接,氩电联焊,250mm以内10个1277.38348.28372.86556.2414.6032-2126中压碳钢管件连接,氩电联焊,300mm以内10个1656.28436.17524.42695.6918.2882-2127中压碳钢管件连接,氩电联焊,350mm以内10个2135.59503.35727.61904.6321.1052-2128中压碳钢管件连接,氩电联焊,400mm以内10个2625.38549.15951.41124.8323.0252-2129中压碳钢管件连接,氩电联焊,450mm以内10个3196.39591.031222.821382.5424.7812-2130中压碳钢管件连接,氩电联焊,500mm以内10个3551.99654.441349.711547.8427.442-2131中压碳钢管件连接,氩电联焊,550mm以内10个3907.5719.891484.681702.9330.1842-2132中压碳钢管件连接,氩电联焊,600mm以内10个4263.13785.381619.641858.1132.932-2133中压碳钢管件连接,氩电联焊,650mm以内10个4617.9850.781754.622012.535.672
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2134中压碳钢管件连接,氩电联焊,700mm以内10个4973.48916.221889.592167.6738.4162-2135中压不锈钢管件连接,电弧焊,15mm以内10个74.5335.2516.3122.971.4782-2136中压不锈钢管件连接,电弧焊,20mm以内10个86.7139.319.9127.51.6482-2137中压不锈钢管件连接,电弧焊,25mm以内10个123.6558.1929.4935.972.442-2138中压不锈钢管件连接,电弧焊,32mm以内10个148.5468.5936.2443.712.8762-2139中压不锈钢管件连接,电弧焊,40mm以内10个190.2481.2852.7656.23.4082-2140中压不锈钢管件连接,电弧焊,50mm以内10个258.8499.0785.5274.254.1542-2141中压不锈钢管件连接,电弧焊,65mm以内10个355.84106.42145.17104.254.4622-2142中压不锈钢管件连接,电弧焊,80mm以内10个480.88120.32163.52197.045.0452-2143中压不锈钢管件连接,电弧焊,100mm以内10个700.35156269.62274.736.5412-2144中压不锈钢管件连接,电弧焊,125mm以内10个868.84183.93316.73368.187.7122-2145中压不锈钢管件连接,电弧焊,150mm以内10个1108.26204.04448.73455.498.5552-2146中压不锈钢管件连接,电弧焊,200mm以内10个1793.29288.8833.28671.2112.1092-2147中压不锈钢管件连接,电弧焊,250mm以内10个2651.61372.21376.3903.1115.6062-2148中压不锈钢管件连接,电弧焊,300mm以内10个3680.12468.442039.81171.8819.6412-2149中压不锈钢管件连接,氩电联焊,50mm以内10个305.9696.2381.64128.094.0352-2150中压不锈钢管件连接,氩电联焊,65mm以内10个473.81135.97139.85197.995.7012-2151中压不锈钢管件连接,氩电联焊,80mm以内10个539.01155.31169.01214.696.5122-2152中压不锈钢管件连接,氩电联焊,100mm以内10个724.47186.17271.72266.587.8062-2153中压不锈钢管件连接,氩电联焊,125mm以内10个897.63235.04317.6344.999.8552-2154中压不锈钢管件连接,氩电联焊,150mm以内10个1118.51265.93442.4410.1811.152-2155中压不锈钢管件连接,氩电联焊,200mm以内10个1770.32365.38805.87599.0715.322-2156中压不锈钢管件连接,氩电联焊,250mm以内10个2591445.331312.55833.1218.6722-2157中压不锈钢管件连接,氩电联焊,300mm以内10个3577.23533.931931.361111.9422.3872-2158中压不锈钢管件连接,氩电联焊,350mm以内10个5016.52663.012886.551466.9627.7992-2159中压不锈钢管件连接,氩电联焊,400mm以内10个6615.91802.313930.861882.7433.642-2160高压碳钢管件连接,电弧焊,15mm以内10个71.8731.394.3336.151.316
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2161高压碳钢管件连接,电弧焊,20mm以内10个102.6544.348.8649.451.8592-2162高压碳钢管件连接,电弧焊,25mm以内10个141.6558.4814.7468.432.4522-2163高压碳钢管件连接,电弧焊,32mm以内10个170.4269.2121.3379.882.9022-2164高压碳钢管件连接,电弧焊,40mm以内10个195.0681.9724.7788.323.4372-2165高压碳钢管件连接,电弧焊,50mm以内10个236.0495.0238.41102.613.9842-2166高压碳钢管件连接,电弧焊,65mm以内10个306.68105.865.91134.974.4362-2167高压碳钢管件连接,电弧焊,80mm以内10个454.59124.2393.15237.215.2092-2168高压碳钢管件连接,电弧焊,100mm以内10个691.35203.42167.95319.988.5292-2169高压碳钢管件连接,电弧焊,125mm以内10个1118.82279.47282.31557.0411.7182-2170高压碳钢管件连接,电弧焊,150mm以内10个1420.9363.21321.98735.7115.2292-2171高压碳钢管件连接,电弧焊,200mm以内10个2118.02555.42467.551095.0523.2882-2172高压碳钢管件连接,电弧焊,250mm以内10个2980.63791.13647.281542.2233.1712-2173高压碳钢管件连接,电弧焊,300mm以内10个3641.45891.54866.951882.9637.3812-2174高压碳钢管件连接,电弧焊,350mm以内10个4446.86966.571259.192221.140.5272-2175高压碳钢管件连接,电弧焊,400mm以内10个5450.141128.751734.132587.2647.3272-2176高压碳钢管件连接,电弧焊,450mm以内10个6823.421378.032202.523242.8757.7792-2177高压碳钢管件连接,电弧焊,500mm以内10个8307.8591689.132736.673882.0670.8232-2178高压碳钢管件连接,氩电联焊,15mm以内10个91.0532.114.1844.771.3462-2179高压碳钢管件连接,氩电联焊,20mm以内10个153.7149.5129.3274.882.0762-2180高压碳钢管件连接,氩电联焊,25mm以内10个214.9666.5942.35106.022.7922-2181高压碳钢管件连接,氩电联焊,32mm以内10个258.6179.0253.44126.153.3132-2182高压碳钢管件连接,氩电联焊,40mm以内10个295.9993.0961.71141.193.9032-2183高压碳钢管件连接,氩电联焊,50mm以内10个267.97100.9143.73123.334.2312-2184高压碳钢管件连接,氩电联焊,65mm以内10个339.7711269.55158.224.6962-2185高压碳钢管件连接,氩电联焊,80mm以内10个486.58131.7788.46266.355.5252-2186高压碳钢管件连接,氩电联焊,100mm以内10个737.44213.93163.62359.898.972-2187高压碳钢管件连接,氩电联焊,125mm以内10个1181.34292.16284.62604.5612.25
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2188高压碳钢管件连接,氩电联焊,150mm以内10个1505.98376.28343.01786.6915.7772-2189高压碳钢管件连接,氩电联焊,200mm以内10个2249.17575.74499.641173.7924.142-2190高压碳钢管件连接,氩电联焊,250mm以内10个3072.04793.37689.281589.3933.2652-2191高压碳钢管件连接,氩电联焊,300mm以内10个4071.131153.08923.681994.3748.3472-2192高压碳钢管件连接,氩电联焊,350mm以内10个5230.581508.821320.842400.9263.2632-2193高压碳钢管件连接,氩电联焊,400mm以内10个6501.261886.771789.582824.9179.112-2194高压碳钢管件连接,氩电联焊,450mm以内10个8048.6412313.092258.023477.5396.9852-2195高压碳钢管件连接,氩电联焊,500mm以内10个9897.4492820.242795.94281.31118.2492-2196高压不锈钢管件连接,电弧焊,15mm以内10个119.1244.3429.1245.661.8592-2197高压不锈钢管件连接,电弧焊,20mm以内10个157.4757.1442.9357.42.3962-2198高压不锈钢管件连接,电弧焊,25mm以内10个225.775.5870.5979.533.1692-2199高压不锈钢管件连接,电弧焊,32mm以内10个281.2196.988.2996.024.0632-2200高压不锈钢管件连接,电弧焊,40mm以内10个343.64112.79118.43112.424.7292-2201高压不锈钢管件连接,电弧焊,50mm以内10个424.49130.91164.72128.865.4892-2202高压不锈钢管件连接,电弧焊,65mm以内10个563.91189.89205.92168.17.9622-2203高压不锈钢管件连接,电弧焊,80mm以内10个932.59233.9408.15290.549.8072-2204高压不锈钢管件连接,电弧焊,100mm以内10个1324.2309.93600.49413.7812.9952-2205高压不锈钢管件连接,电弧焊,125mm以内10个1976.93387.21026.26563.4716.2352-2206高压不锈钢管件连接,电弧焊,150mm以内10个2716464.651495.04756.3119.4822-2207高压不锈钢管件连接,电弧焊,200mm以内10个4469.06805.752489.421173.8933.7842-2208高压不锈钢管件连接,电弧焊,250mm以内10个6670.191082.583822.721764.8945.3912-2209高压不锈钢管件连接,电弧焊,300mm以内10个9623.051261.265894.72467.0952.8832-2210高压不锈钢管件连接,电弧焊,350mm以内10个11454.351490.967022.92940.4962.5142-2211高压不锈钢管件连接,电弧焊,400mm以内10个15128.291820.189480.143827.9776.3182-2212高压不锈钢管件连接,氩电联焊,15mm以内10个141.7144.636.5860.531.872-2213高压不锈钢管件连接,氩电联焊,20mm以内10个193.9158.8154.3880.722.4662-2214高压不锈钢管件连接,氩电联焊,25mm以内10个288.5180.4588.87119.193.373
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2215高压不锈钢管件连接,氩电联焊,32mm以内10个361.97103.06111.73147.184.3212-2216高压不锈钢管件连接,氩电联焊,40mm以内10个455.3120.59150.9183.815.0562-2217高压不锈钢管件连接,氩电联焊,50mm以内10个586.58145.77209.48231.336.1122-2218高压不锈钢管件连接,氩电联焊,65mm以内10个667.66200.17233.14234.358.3932-2219高压不锈钢管件连接,氩电联焊,80mm以内10个939.28240.65341.93356.710.092-2220高压不锈钢管件连接,氩电联焊,100mm以内10个1453.31314.08645.35493.8813.1692-2221高压不锈钢管件连接,氩电联焊,125mm以内10个2111.11388.681076.4646.0316.2972-2222高压不锈钢管件连接,氩电联焊,150mm以内10个2890.75487.491556.96846.320.442-2223高压不锈钢管件连接,氩电联焊,200mm以内10个4797.61821.492586.421389.734.4442-2224高压不锈钢管件连接,氩电联焊,250mm以内10个7087.631115.923945.172026.5446.7892-2225高压不锈钢管件连接,氩电联焊,300mm以内10个10204.391324.326057.462822.6155.5272-2226高压不锈钢管件连接,氩电联焊,350mm以内10个12037.421565.497196.973274.9665.6392-2227高压不锈钢管件连接,氩电联焊,400mm以内10个15878.511911.179706.224261.1280.1332-2228低压螺纹阀门安装,15mm以内个15.822.9610.472.390.1242-2229低压螺纹阀门安装,20mm以内个16.353.1710.792.390.1332-2230低压螺纹阀门安装,25mm以内个17.393.6511.352.390.1532-2231低压螺纹阀门安装,32mm以内个18.894.711.82.390.1972-2232低压螺纹阀门安装,40mm以内个20.735.1312.473.130.2152-2233低压螺纹阀门安装,50mm以内个22.316.0813.13.130.2552-2234低压法兰阀门安装,15mm以内个17.835.0810.362.390.2132-2235低压法兰阀门安装,20mm以内个18.215.0810.742.390.2132-2236低压法兰阀门安装,25mm以内个18.945.0811.472.390.2132-2237低压法兰阀门安装,32mm以内个19.85.611.812.390.2352-2238低压法兰阀门安装,40mm以内个21.355.612.623.130.2352-2239低压法兰阀门安装,50mm以内个22.776.4213.223.130.2692-2240低压法兰阀门安装,65mm以内个27.7910.1814.273.340.4272-2241低压法兰阀门安装,80mm以内个34.2314.3816.33.550.603
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2242低压法兰阀门安装,100mm以内个41.6319.1818.583.870.8042-2243低压法兰阀门安装,125mm以内个51.8224.2821.825.721.0182-2244低压法兰阀门安装,150mm以内个60.0727.8624.647.571.1682-2245低压法兰阀门安装,200mm以内个79.9243.6728.687.571.8312-2246低压法兰阀门安装,250mm以内个132.8564.7332.735.422.7142-2247低压法兰阀门安装,300mm以内个149.9178.3736.1235.423.2862-2248低压法兰阀门安装,350mm以内个173.0785.3143.9843.783.5772-2249低压法兰阀门安装,400mm以内个214.31102.8452.7658.714.3122-2250低压法兰阀门安装,450mm以内个248.34119.4965.7263.135.012-2251低压法兰阀门安装,500mm以内个278.71134.4469.9474.335.6372-2252低压法兰阀门安装,600mm以内个371.21174.6181.32115.287.3212-2253低压法兰阀门安装,700mm以内个459.98229.7592.24137.999.6332-2254低压法兰阀门安装,800mm以内个547.18272.46106.37168.3511.4242-2255低压法兰阀门安装,900mm以内个635.48317.94122.92194.6213.3312-2256低压法兰阀门安装,1000mm以内个738.61368.1137.36233.1515.4342-2257低压法兰阀门安装,1200mm以内个945.39478.6154.21312.5820.0672-2258低压法兰阀门安装,1400mm以内个1107.11547.17205.28354.6622.9422-2259低压法兰阀门安装,1600mm以内个1257.03634.84241381.1926.6182-2260低压法兰阀门安装,1800mm以内个1438.02753.18274.41410.4331.582-2261低压齿轮,液压传动,电动阀门安装,100mm以内个41.918.7719.263.870.7872-2262低压齿轮,液压传动,电动阀门安装,125mm以内个51.9723.6822.575.720.9932-2263低压齿轮,液压传动,电动阀门安装,150mm以内个59.3326.1925.577.571.0982-2264低压齿轮,液压传动,电动阀门安装,200mm以内个77.9640.8829.517.571.7142-2265低压齿轮,液压传动,电动阀门安装,250mm以内个130.4458.1933.3638.892.442-2266低压齿轮,液压传动,电动阀门安装,300mm以内个147.3570.8336.9339.592.972-2267低压齿轮,液压传动,电动阀门安装,350mm以内个179.2785.4845.1448.653.5842-2268低压齿轮,液压传动,电动阀门安装,400mm以内个222.17103.5353.9864.664.341
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2269低压齿轮,液压传动,电动阀门安装,450mm以内个255.56119.4267.0569.095.0072-2270低压齿轮,液压传动,电动阀门安装,500mm以内个284.13132.6571.280.285.5622-2271低压齿轮,液压传动,电动阀门安装,600mm以内个373.37166.2882.38124.716.9722-2272低压齿轮,液压传动,电动阀门安装,700mm以内个461.6214.693.93153.078.9982-2273低压齿轮,液压传动,电动阀门安装,800mm以内个558.69261.75108.56188.3810.9752-2274低压齿轮,液压传动,电动阀门安装,900mm以内个654.63310.26125.54218.8313.0092-2275低压齿轮,液压传动,电动阀门安装,1000mm以内个761.78361.64139.84260.315.1632-2276低压齿轮,液压传动,电动阀门安装,1200mm以内个970.36461.95157.16351.2519.3692-2277低压齿轮,液压传动,电动阀门安装,1400mm以内个1126.73520.86209.37396.521.8392-2278低压齿轮,液压传动,电动阀门安装,1600mm以内个1279.54607.7245.64426.225.482-2279低压齿轮,液压传动,电动阀门安装,1800mm以内个1448.55715.19279454.3629.9872-2280低压安全阀门安装,20mm以内个25.3410.9911.642.710.4612-2281低压安全阀门安装,25mm以内个26.6110.9912.912.710.4612-2282低压安全阀门安装,32mm以内个27.6511.5213.262.870.4832-2283低压安全阀门安装,40mm以内个29.6611.5214.593.550.4832-2284低压安全阀门安装,50mm以内个31.3212.0715.483.770.5062-2285低压安全阀门安装,65mm以内个40.219.0317.094.080.7982-2286低压安全阀门安装,80mm以内个44.5119.8920.224.40.8342-2287低压安全阀门安装,100mm以内个56.0327.6223.594.821.1582-2288低压安全阀门安装,125mm以内个71.934.11298.791.432-2289低压安全阀门安装,150mm以内个77.9535.1832.6610.111.4752-2290低压安全阀门安装,200mm以内个96.9548.7338.1110.112.0432-2291低压塑料阀门安装,20mm以内个24.66.3412.795.470.2662-2292低压塑料阀门安装,25mm以内个27.127.3213.566.240.3072-2293低压塑料阀门安装,32mm以内个28.737.9714.236.530.3342-2294低压塑料阀门安装,40mm以内个32.269.2815.867.120.3892-2295低压塑料阀门安装,50mm以内个37.4110.417.539.480.436
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2296低压塑料阀门安装,65mm以内个44.5113.8319.7510.930.582-2297低压塑料阀门安装,80mm以内个51.6215.1224.1212.380.6342-2298低压塑料阀门安装,100mm以内个62.0118.3629.2314.420.772-2299低压塑料阀门安装,125mm以内个81.0823.1636.0621.860.9712-2300低压塑料阀门安装,150mm以内个94.627.5541.3425.711.1552-2301中压法兰阀门安装,15mm以内个19.86.8910.362.550.2892-2302中压法兰阀门安装,20mm以内个20.186.8910.742.550.2892-2303中压法兰阀门安装,25mm以内个20.916.8911.472.550.2892-2304中压法兰阀门安装,32mm以内个22.237.6111.812.810.3192-2305中压法兰阀门安装,40mm以内个23.317.6112.623.080.3192-2306中压法兰阀门安装,50mm以内个25.478.813.223.450.3692-2307中压法兰阀门安装,65mm以内个29.1711.1914.273.710.4692-2308中压法兰阀门安装,80mm以内个34.5514.3316.33.920.6012-2309中压法兰阀门安装,100mm以内个41.9519.0818.584.290.82-2310中压法兰阀门安装,125mm以内个52.4324.0921.826.521.012-2311中压法兰阀门安装,150mm以内个60.9527.5724.648.741.1562-2312中压法兰阀门安装,200mm以内个80.8343.4128.688.741.822-2313中压法兰阀门安装,250mm以内个132.3463.0632.736.582.6442-2314中压法兰阀门安装,300mm以内个148.3375.6336.1236.583.1712-2315中压法兰阀门安装,350mm以内个173.2984.2143.9845.13.5312-2316中压法兰阀门安装,400mm以内个215.15102.252.7660.194.2852-2317中压法兰阀门安装,450mm以内个249.43118.9465.7264.774.9872-2318中压法兰阀门安装,500mm以内个280.11134.0469.9476.135.622-2319中压法兰阀门安装,550个306.98147.3576.0783.566.1782-2320中压法兰阀门安装,600个334.25160.8282.1991.246.7432-2321中压法兰阀门安装,650个361.23174.1188.3398.797.32-2322中压法兰阀门安装,700个388.71187.5894.45106.687.865
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2323中压齿轮、液压传动、电动阀门安装,100mm以内个44.9121.4919.134.290.9012-2324中压齿轮、液压传动、电动阀门安装,125mm以内个56.127.1222.466.521.1372-2325中压齿轮、液压传动、电动阀门安装,150mm以内个64.2230.0525.438.741.262-2326中压齿轮、液压传动、电动阀门安装,200mm以内个85.2347.129.398.741.9752-2327中压齿轮、液压传动、电动阀门安装,250mm以内个138.7866.1633.2639.362.7742-2328中压齿轮、液压传动、电动阀门安装,300mm以内个156.7479.8536.8340.063.3482-2329中压齿轮、液压传动、电动阀门安装,350mm以内个191.4397.164549.274.0742-2330中压齿轮、液压传动、电动阀门安装,400mm以内个237.4118.1553.865.454.9542-2331中压齿轮、液压传动、电动阀门安装,450mm以内个273.42136.5466.8570.035.7252-2332中压齿轮、液压传动、电动阀门安装,500mm以内个304.39152.0270.9981.386.3742-2333中压齿轮、液压传动、电动阀门安装,600mm以内个396.68192.1179.45125.128.0552-2334中压齿轮、液压传动、电动阀门安装,700mm以内个473.91228.5892.24153.099.5842-2335中压齿轮、液压传动、电动阀门安装,800mm以内个578.34280.31109.29188.7411.7532-2336中压齿轮、液压传动、电动阀门安装,900mm以内个688.07335.07129.49223.5114.0492-2337中压安全阀门安装,20mm以内个27.0812.5211.642.920.5252-2338中压安全阀门安装,25mm以内个28.3512.5212.912.920.5252-2339中压安全阀门安装,32mm以内个29.7213.1213.263.340.552-2340中压安全阀门安装,40mm以内个31.3713.1214.593.660.552-2341中压安全阀门安装,50mm以内个33.3813.7115.484.190.5752-2342中压安全阀门安装,65mm以内个43.3821.6817.094.610.9092-2343中压安全阀门安装,80mm以内个47.7122.5620.224.930.9462-2344中压安全阀门安装,100mm以内个60.2731.2223.595.461.3092-2345中压安全阀门安装,125mm以内个77.4838.262910.221.6042-2346中压安全阀门安装,150mm以内个83.7939.3332.6611.81.6492-2347中压安全阀门安装,200mm以内个107.654.0939.1714.342.2682-2348高压法兰阀门安装,25mm以内个27.613.0910.54.010.5492-2349高压法兰阀门安装,32mm以内个33.3518.2910.684.380.767
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2350高压法兰阀门安装,40mm以内个36.2520.7510.754.750.872-2351高压法兰阀门安装,50mm以内个41.6625.0911.515.061.0522-2352高压法兰阀门安装,65mm以内个52.3633.5812.386.41.4082-2353高压法兰阀门安装,80mm以内个73.7544.8622.716.181.8812-2354高压法兰阀门安装,100mm以内个92.8159.2726.746.82.4852-2355高压法兰阀门安装,125mm以内个161.13106.1332.8222.184.452-2356高压法兰阀门安装,150mm以内个181.8117.0338.925.874.9072-2357高压法兰阀门安装,200mm以内个237.28154.5246.2636.56.4792-2358高压法兰阀门安装,250mm以内个270.72173.9453.0843.77.2932-2359高压法兰阀门安装,300mm以内个299.02195.0957.7146.228.182-2360高压焊接阀门安装(对焊、氩电联焊),50mm以内个70.0323.183.9542.90.9722-2361高压焊接阀门安装(对焊、氩电联焊),65mm以内个90.6833.16.8550.731.3882-2362高压焊接阀门安装(对焊、氩电联焊),80mm以内个108.4743.079.2356.171.8062-2363高压焊接阀门安装(对焊、氩电联焊),100mm以内个162.935734.5771.362.392-2364高压焊接阀门安装(对焊、氩电联焊),125mm以内个247.6970.2945.16132.242.9472-2365高压焊接阀门安装(对焊、氩电联焊),150mm以内个321.3585.3865.57170.43.582-2366高压焊接阀门安装(对焊、氩电联焊),200mm以内个472125.6497.01249.355.2682-2367高压焊接阀门安装(对焊、氩电联焊),250mm以内个614.27149.63131.32333.326.2742-2368高压焊接阀门安装(对焊、氩电联焊),300mm以内个818.75210.38173.95434.428.8212-2369低压碳钢法兰安装,螺纹连接,15mm以内付2.62.070.5300.0872-2370低压碳钢法兰安装,螺纹连接,20mm以内付3.152.480.6700.1042-2371低压碳钢法兰安装,螺纹连接,25mm以内付3.943.010.9300.1262-2372低压碳钢法兰安装,螺纹连接,32mm以内付4.483.530.9500.1482-2373低压碳钢法兰安装,螺纹连接,40mm以内付5.514.291.2200.182-2374低压碳钢法兰安装,螺纹连接,50mm以内付6.334.941.3900.2072-2375低压碳钢法兰安装,螺纹连接,65mm以内付10.28.491.7100.3562-2376低压碳钢平焊法兰安装,电弧焊,15mm以内付5.033.290.441.30.138
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2377低压碳钢平焊法兰安装,电弧焊,20mm以内付5.753.70.611.440.1552-2378低压碳钢平焊法兰安装,电弧焊,25mm以内付7.394.580.971.840.1922-2379低压碳钢平焊法兰安装,电弧焊,32mm以内付8.445.181.112.150.2172-2380低压碳钢平焊法兰安装,电弧焊,40mm以内付9.855.941.472.440.2492-2381低压碳钢平焊法兰安装,电弧焊,50mm以内付11.816.731.853.230.2822-2382低压碳钢平焊法兰安装,电弧焊,65mm以内付15.287.83.234.250.3272-2383低压碳钢平焊法兰安装,电弧焊,80mm以内付17.768.664.095.010.3632-2384低压碳钢平焊法兰安装,电弧焊,100mm以内付21.729.755.436.540.4092-2385低压碳钢平焊法兰安装,电弧焊,125mm以内付24.0510.356.816.890.4342-2386低压碳钢平焊法兰安装,电弧焊,150mm以内付27.0811.218.257.620.472-2387低压碳钢平焊法兰安装,电弧焊,200mm以内付54.2517.5515.2821.420.7362-2388低压碳钢平焊法兰安装,电弧焊,250mm以内付77.9123.5424.3330.040.9872-2389低压碳钢平焊法兰安装,电弧焊,300mm以内付95.6929.4328.6637.61.2342-2390低压碳钢平焊法兰安装,电弧焊,350mm以内付112.9132.7740.7939.351.3742-2391低压碳钢平焊法兰安装,电弧焊,400mm以内付129.0837.346.9344.851.5642-2392低压碳钢平焊法兰安装,电弧焊,450mm以内付153.0244.155.653.321.8492-2393低压碳钢平焊法兰安装,电弧焊,500mm以内付175.1250.3763.5861.172.1122-2394低压碳钢平焊法兰安装,电弧焊,600mm以内付171.5152.3562.9456.222.1952-2395低压碳钢平焊法兰安装,电弧焊,700mm以内付182.3658.296757.072.4442-2396低压碳钢平焊法兰安装,电弧焊,800mm以内付227.6571.3483.7772.542.9912-2397低压碳钢平焊法兰安装,电弧焊,900mm以内付256.4481.3593.7181.383.4112-2398低压碳钢平焊法兰安装,电弧焊,1000mm以内付306.695.66110.72100.224.0112-2399低压碳钢平焊法兰安装,电弧焊,1200mm以内付364.37112.17141.95110.254.7032-2400低压碳钢平焊法兰安装,电弧焊,1400mm以内付549.3151.97218.34178.996.3722-2401低压碳钢平焊法兰安装,电弧焊,1600mm以内付625.63169.72270.911857.1162-2402低压碳钢平焊法兰安装,电弧焊,1800mm以内付717.29206.95301.9208.448.6772-2403低压不锈钢平焊法兰安装,电弧焊,15mm以内付7.874.631.881.360.194
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2404低压不锈钢平焊法兰安装,电弧焊,20mm以内付9.525.442.471.610.2282-2405低压不锈钢平焊法兰安装,电弧焊,25mm以内付12.486.753.751.980.2832-2406低压不锈钢平焊法兰安装,电弧焊,32mm以内付14.197.614.22.380.3192-2407低压不锈钢平焊法兰安装,电弧焊,40mm以内付17.818.715.813.290.3652-2408低压不锈钢平焊法兰安装,电弧焊,50mm以内付19.89.566.613.630.4012-2409低压不锈钢平焊法兰安装,电弧焊,65mm以内付27.461210.564.90.5032-2410低压不锈钢平焊法兰安装,电弧焊,80mm以内付32.2213.1913.365.670.5532-2411低压不锈钢平焊法兰安装,电弧焊,100mm以内付40.9916.9317.0670.712-2412低压不锈钢平焊法兰安装,电弧焊,125mm以内付58.0220.0824.3113.630.8422-2413低压不锈钢平焊法兰安装,电弧焊,150mm以内付64.1621.726.9515.510.912-2414低压不锈钢平焊法兰安装,电弧焊,200mm以内付114.1833.2549.2131.721.3942-2415低压不锈钢平焊法兰安装,电弧焊,250mm以内付178.7742.4390.5945.751.7792-2416低压不锈钢平焊法兰安装,电弧焊,300mm以内付233.8652.57119.6361.662.2042-2417低压碳钢对焊法兰安装,电弧焊,15mm以内付5.423.650.411.360.1532-2418低压碳钢对焊法兰安装,电弧焊,20mm以内付6.464.270.461.730.1792-2419低压碳钢对焊法兰安装,电弧焊,25mm以内付8.535.370.892.270.2252-2420低压碳钢对焊法兰安装,电弧焊,32mm以内付10.196.341.052.80.2662-2421低压碳钢对焊法兰安装,电弧焊,40mm以内付11.67.041.393.170.2952-2422低压碳钢对焊法兰安装,电弧焊,50mm以内付13.667.871.83.990.332-2423低压碳钢对焊法兰安装,电弧焊,65mm以内付19.749.283.746.720.3892-2424低压碳钢对焊法兰安装,电弧焊,80mm以内付22.7910.234.657.910.4292-2425低压碳钢对焊法兰安装,电弧焊,100mm以内付29.6712.196.9410.540.5112-2426低压碳钢对焊法兰安装,电弧焊,125mm以内付36.4714.938.2813.260.6262-2427低压碳钢对焊法兰安装,电弧焊,150mm以内付45.2318.3410.4616.430.7692-2428低压碳钢对焊法兰安装,电弧焊,200mm以内付61.2821.2715.5624.450.8922-2429低压碳钢对焊法兰安装,电弧焊,250mm以内付88.7928.8624.9934.941.212-2430低压碳钢对焊法兰安装,电弧焊,300mm以内付103.7134.0328.9740.711.427
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2431低压碳钢对焊法兰安装,电弧焊,350mm以内付138.5545.2942.8650.41.8992-2432低压碳钢对焊法兰安装,电弧焊,400mm以内付159.1552.7348.9657.462.2112-2433低压碳钢对焊法兰安装,电弧焊,450mm以内付182.555962.2161.342.4742-2434低压碳钢对焊法兰安装,电弧焊,500mm以内付221.4673.4372.6375.43.0792-2435低压碳钢对焊法兰安装,氩电联焊,15mm以内付6.443.860.731.850.1622-2436低压碳钢对焊法兰安装,氩电联焊,20mm以内付7.714.530.862.320.192-2437低压碳钢对焊法兰安装,氩电联焊,25mm以内付10.235.681.543.010.2382-2438低压碳钢对焊法兰安装,氩电联焊,32mm以内付12.276.71.863.710.2812-2439低压碳钢对焊法兰安装,氩电联焊,40mm以内付14.17.472.314.320.3132-2440低压碳钢对焊法兰安装,氩电联焊,50mm以内付16.848.612.595.640.3612-2441低压碳钢对焊法兰安装,氩电联焊,65mm以内付22.279.974.317.990.4182-2442低压碳钢对焊法兰安装,氩电联焊,80mm以内付25.7811.075.339.380.4642-2443低压碳钢对焊法兰安装,氩电联焊,100mm以内付3513.837.6813.490.582-2444低压碳钢对焊法兰安装,氩电联焊,125mm以内付42.1916.69.2116.380.6962-2445低压碳钢对焊法兰安装,氩电联焊,150mm以内付55.0219.7511.9623.310.8282-2446低压碳钢对焊法兰安装,氩电联焊,200mm以内付80.3427.4317.6435.271.152-2447低压碳钢对焊法兰安装,氩电联焊,250mm以内付106.1329.9825.7650.391.2572-2448低压碳钢对焊法兰安装,氩电联焊,300mm以内付121.2732.4829.9658.831.3622-2449低压碳钢对焊法兰安装,氩电联焊,350mm以内付162.2346.4842.6773.081.9492-2450低压碳钢对焊法兰安装,氩电联焊,400mm以内付186.2754.4548.9382.892.2832-2451低压碳钢对焊法兰安装,氩电联焊,450mm以内付209.7659.9860.8288.962.5152-2452低压碳钢对焊法兰安装,氩电联焊,500mm以内付257.4277.1371.43108.863.2342-2453低压不锈钢对焊法兰安装,电弧焊,15mm以内付7.064.531.570.960.192-2454低压不锈钢对焊法兰安装,电弧焊,20mm以内付7.974.981.81.190.2092-2455低压不锈钢对焊法兰安装,电弧焊,25mm以内付8.985.392.511.080.2262-2456低压不锈钢对焊法兰安装,电弧焊,32mm以内付11.656.253.362.040.2622-2457低压不锈钢对焊法兰安装,电弧焊,40mm以内付19.089.595.194.30.402
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2458低压不锈钢对焊法兰安装,电弧焊,50mm以内付21.5210.266.135.130.432-2459低压不锈钢对焊法兰安装,电弧焊,65mm以内付32.4713.3610.728.390.562-2460低压不锈钢对焊法兰安装,电弧焊,80mm以内付40.3213.5911.0115.720.572-2461低压不锈钢对焊法兰安装,电弧焊,100mm以内付58.5719.8916.821.880.8342-2462低压不锈钢对焊法兰安装,电弧焊,125mm以内付72.2521.6120.7129.930.9062-2463低压不锈钢对焊法兰安装,电弧焊,150mm以内付91.4425.429.4736.571.0652-2464低压不锈钢对焊法兰安装,电弧焊,200mm以内付129.8133.3241.9654.531.3972-2465低压不锈钢对焊法兰安装,电弧焊,250mm以内付199.4847.8274.6577.012.0052-2466低压不锈钢对焊法兰安装,电弧焊,300mm以内付253.0557.55101.5693.942.4132-2467低压不锈钢对焊法兰安装,电弧焊,350mm以内付295.9366.49120.5108.942.7882-2468低压不锈钢对焊法兰安装,电弧焊,400mm以内付338.2375.46138.99123.783.1642-2469中压碳钢对焊法兰,电弧焊,15mm以内付6.234.250.541.440.1782-2470中压碳钢对焊法兰,电弧焊,20mm以内付8.165.180.772.210.2172-2471中压碳钢对焊法兰,电弧焊,25mm以内付9.995.821.22.970.2442-2472中压碳钢对焊法兰,电弧焊,32mm以内付11.286.21.373.710.262-2473中压碳钢对焊法兰,电弧焊,40mm以内付13.147.161.764.220.32-2474中压碳钢对焊法兰,电弧焊,50mm以内付14.667.112.425.130.2982-2475中压碳钢对焊法兰,电弧焊,65mm以内付21.578.255.417.910.3462-2476中压碳钢对焊法兰,电弧焊,80mm以内付25.069.166.589.320.3842-2477中压碳钢对焊法兰,电弧焊,100mm以内付33.110.359.8312.920.4342-2478中压碳钢对焊法兰,电弧焊,125mm以内付39.6412.6911.8215.130.5322-2479中压碳钢对焊法兰,电弧焊,150mm以内付45.8213.621517.20.5712-2480中压碳钢对焊法兰,电弧焊,200mm以内付69.9119.0624.1926.660.7992-2481中压碳钢对焊法兰,电弧焊,250mm以内付94.6324.2135.4834.941.0152-2482中压碳钢对焊法兰,电弧焊,300mm以内付123.4131.0849.3842.951.3032-2483中压碳钢对焊法兰,电弧焊,350mm以内付174.2146.269.2858.731.9372-2484中压碳钢对焊法兰,电弧焊,400mm以内付203.4151.5484.9266.952.161
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2485中压碳钢对焊法兰,电弧焊,450mm以内付255.4761.87109.5384.072.5942-2486中压碳钢对焊法兰,电弧焊,500mm以内付287.7874.46120.0293.33.1222-2487中压碳钢对焊法兰,电弧焊,550付316.8781.9132.03102.943.4342-2488中压碳钢对焊法兰,电弧焊,600付345.3589.34144.03111.983.7462-2489中压碳钢对焊法兰,电弧焊,650付374.4296.78156.03121.614.0582-2490中压碳钢对焊法兰,电弧焊,700付410.8112.1168.03130.674.72-2491中压碳钢对焊法兰,氩电联焊,15mm以内付8.045.150.961.930.2162-2492中压碳钢对焊法兰,氩电联焊,20mm以内付10.476.251.522.70.2622-2493中压碳钢对焊法兰,氩电联焊,25mm以内付13.167.232.223.710.3032-2494中压碳钢对焊法兰,氩电联焊,32mm以内付15.858.472.754.630.3552-2495中压碳钢对焊法兰,氩电联焊,40mm以内付18.489.93.335.250.4152-2496中压碳钢对焊法兰,氩电联焊,50mm以内付20.3710.923.316.140.4582-2497中压碳钢对焊法兰,氩电联焊,65mm以内付28.45136.339.120.5452-2498中压碳钢对焊法兰,氩电联焊,80mm以内付32.9414.487.7210.740.6072-2499中压碳钢对焊法兰,氩电联焊,100mm以内付44.0217.8911.2314.90.752-2500中压碳钢对焊法兰,氩电联焊,125mm以内付54.2523.0913.5917.570.9682-2501中压碳钢对焊法兰,氩电联焊,150mm以内付67.825.1117.3925.31.0532-2502中压碳钢对焊法兰,氩电联焊,200mm以内付100.8135.2727.4938.051.4792-2503中压碳钢对焊法兰,氩电联焊,250mm以内付134.9645.8639.6449.461.9232-2504中压碳钢对焊法兰,氩电联焊,300mm以内付173.2258.3454.1960.692.4462-2505中压碳钢对焊法兰,氩电联焊,350mm以内付221.7768.5275.178.152.8732-2506中压碳钢对焊法兰,氩电联焊,400mm以内付278.0283.7197.5596.763.512-2507中压碳钢对焊法兰,氩电联焊,450mm以内付342.7299.57125.22117.934.1752-2508中压碳钢对焊法兰,氩电联焊,500mm以内付385.75117.75137.36130.644.9372-2509中压碳钢对焊法兰,氩电联焊,550付424.6129.53151.1143.975.4312-2510中压碳钢对焊法兰,氩电联焊,600付462.82141.29164.83156.75.9242-2511中压碳钢对焊法兰,氩电联焊,650付501.76153.07178.58170.116.418
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2512中压碳钢对焊法兰,氩电联焊,700付540.09164.85192.32182.926.9122-2513中压不锈钢对焊法兰,电弧焊,15mm以内付10.035.912.221.90.2482-2514中压不锈钢对焊法兰,电弧焊,20mm以内付11.476.512.582.380.2732-2515中压不锈钢对焊法兰,电弧焊,25mm以内付15.067.614.223.230.3192-2516中压不锈钢对焊法兰,电弧焊,32mm以内付17.198.44.83.990.3522-2517中压不锈钢对焊法兰,电弧焊,40mm以内付22.4510.047.175.240.4212-2518中压不锈钢对焊法兰,电弧焊,50mm以内付27.5911.1610.086.350.4682-2519中压不锈钢对焊法兰,电弧焊,65mm以内付38.4113.4815.899.040.5652-2520中压不锈钢对焊法兰,电弧焊,80mm以内付54.8515.120.3619.390.6332-2521中压不锈钢对焊法兰,电弧焊,100mm以内付75.1520.4229.7724.960.8562-2522中压不锈钢对焊法兰,电弧焊,125mm以内付96.6521.0639.0336.560.8832-2523中压不锈钢对焊法兰,电弧焊,150mm以内付123.8424.9253.6545.271.0452-2524中压不锈钢对焊法兰,电弧焊,200mm以内付193.432.8793.0467.491.3782-2525中压不锈钢对焊法兰,电弧焊,250mm以内付280.9745.1144.9890.891.8912-2526中压不锈钢对焊法兰,电弧焊,300mm以内付385.4156.12212.46116.832.3532-2527中压不锈钢对焊法兰,电弧焊,350mm以内付535.9670.81313.79151.362.9692-2528中压不锈钢对焊法兰,电弧焊,400mm以内付702.6986.72426.35189.623.6362-2529中压不锈钢对焊法兰,氩电联焊,50mm以内付39.0214.6411.0113.370.6142-2530中压不锈钢对焊法兰,氩电联焊,65mm以内付52.118.0516.4717.580.7572-2531中压不锈钢对焊法兰,氩电联焊,80mm以内付65.3321.0822.222.050.8842-2532中压不锈钢对焊法兰,氩电联焊,100mm以内付86.4627.8632.0226.581.1682-2533中压不锈钢对焊法兰,氩电联焊,125mm以内付112.8532.1542.2938.411.3482-2534中压不锈钢对焊法兰,氩电联焊,150mm以内付140.8936.6857.1647.051.5382-2535中压不锈钢对焊法兰,氩电联焊,200mm以内付215.3347.6898.8468.811.9992-2536中压不锈钢对焊法兰,氩电联焊,250mm以内付303.5260.25152.8690.412.5262-2537中压不锈钢对焊法兰,氩电联焊,300mm以内付400.671.31218.02111.272.992-2538中压不锈钢对焊法兰,氩电联焊,350mm以内付548.4186.74321.19140.483.637
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2539中压不锈钢对焊法兰,氩电联焊,400mm以内付714.18103.49436.61174.084.3392-2540高压碳钢对焊法兰,电弧焊,25mm以内付21.3613.021.476.870.5462-2541高压碳钢对焊法兰,电弧焊,32mm以内付25.6815.552.1380.6522-2542高压碳钢对焊法兰,电弧焊,40mm以内付29.8318.512.468.860.7762-2543高压碳钢对焊法兰,电弧焊,50mm以内付35.2321.183.8210.230.8882-2544高压碳钢对焊法兰,电弧焊,65mm以内付48.428.336.5613.511.1882-2545高压碳钢对焊法兰,电弧焊,80mm以内付60.5333.829.317.411.4182-2546高压碳钢对焊法兰,电弧焊,100mm以内付86.8645.6516.6324.581.9142-2547高压碳钢对焊法兰,电弧焊,125mm以内付136.4767.0928.9340.452.8132-2548高压碳钢对焊法兰,电弧焊,150mm以内付181.3291.233.2456.883.8242-2549高压碳钢对焊法兰,电弧焊,200mm以内付238.77107.5448.4782.764.5092-2550高压碳钢对焊法兰,电弧焊,250mm以内付336.1142.567.16126.445.9752-2551高压碳钢对焊法兰,电弧焊,300mm以内付464.08188.6890.78184.627.9112-2552高压碳钢对焊法兰,氩电联焊,25mm以内付30.8214.294.8411.690.5992-2553高压碳钢对焊法兰,氩电联焊,32mm以内付39.1217.466.6515.010.7322-2554高压碳钢对焊法兰,氩电联焊,40mm以内付45.3220.687.6816.960.8672-2555高压碳钢对焊法兰,氩电联焊,50mm以内付38.4621.854.3512.260.9162-2556高压碳钢对焊法兰,氩电联焊,65mm以内付50.5228.696.5815.251.2032-2557高压碳钢对焊法兰,氩电联焊,80mm以内付65.2234.89.7620.661.4592-2558高压碳钢对焊法兰,氩电联焊,100mm以内付93.1747.0617.0129.11.9732-2559高压碳钢对焊法兰,氩电联焊,125mm以内付141.7568.4528.0845.222.872-2560高压碳钢对焊法兰,氩电联焊,150mm以内付188.8792.6334.1462.13.8842-2561高压碳钢对焊法兰,氩电联焊,200mm以内付248.19109.1449.2289.834.5762-2562高压碳钢对焊法兰,氩电联焊,250mm以内付348.07144.6568.22135.26.0652-2563高压碳钢对焊法兰,氩电联焊,300mm以内付473.42190.3590.4192.677.9812-2564高压不锈钢对焊法兰,电弧焊,25mm以内付27.9612.837.467.670.5382-2565高压不锈钢对焊法兰,电弧焊,32mm以内付34.6169.349.260.671
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2566高压不锈钢对焊法兰,电弧焊,40mm以内付42.5219.1312.4510.940.8022-2567高压不锈钢对焊法兰,电弧焊,50mm以内付56.4221.5422.3812.50.9032-2568高压不锈钢对焊法兰,电弧焊,65mm以内付84.6228.2935.0521.281.1862-2569高压不锈钢对焊法兰,电弧焊,80mm以内付106.2731.2952.8522.131.3122-2570高压不锈钢对焊法兰,电弧焊,100mm以内付163.0346.182.9833.951.9332-2571高压不锈钢对焊法兰,电弧焊,125mm以内付252.4959.39143.3749.732.492-2572高压不锈钢对焊法兰,电弧焊,150mm以内付309.5674.82169.9364.813.1372-2573高压不锈钢对焊法兰,电弧焊,200mm以内付474.45104.58248.14121.734.3852-2574高压不锈钢对焊法兰,电弧焊,250mm以内付662.9137.54344.43180.935.7672-2575高压不锈钢对焊法兰,电弧焊,300mm以内付913.46185.91469.99257.567.7952-2576高压不锈钢对焊法兰,氩电联焊,25mm以内付39.7213.2813.7912.650.5572-2577高压不锈钢对焊法兰,氩电联焊,32mm以内付49.7716.5817.3215.870.6952-2578高压不锈钢对焊法兰,氩电联焊,40mm以内付63.5820.1823.3420.060.8462-2579高压不锈钢对焊法兰,氩电联焊,50mm以内付66.0622.2524.5719.240.9332-2580高压不锈钢对焊法兰,氩电联焊,65mm以内付98.1529.2438.8230.091.2262-2581高压不锈钢对焊法兰,氩电联焊,80mm以内付125.7133.4457.534.771.4022-2582高压不锈钢对焊法兰,氩电联焊,100mm以内付182.7846.5189.746.571.952-2583高压不锈钢对焊法兰,氩电联焊,125mm以内付274.5159.39151.2263.92.492-2584高压不锈钢对焊法兰,氩电联焊,150mm以内付324.6874.63169.1480.913.1292-2585高压不锈钢对焊法兰,氩电联焊,200mm以内付518.48110.09262.49145.94.6162-2586高压不锈钢对焊法兰,氩电联焊,250mm以内付714.29144.01362.38207.96.0382-2587高压不锈钢对焊法兰,氩电联焊,300mm以内付981.85194.81493.34293.78.1682-2588碳钢板直管制作,电弧焊,200mm以内吨1538.88509.44189.99839.4521.362-2589碳钢板直管制作,电弧焊,250mm以内吨1312.3439.1161.42711.7818.4112-2590碳钢板直管制作,电弧焊,300mm以内吨1149.5382.22142.59624.6916.0262-2591碳钢板直管制作,电弧焊,350mm以内吨1099.23293.9210.04595.2912.3232-2592碳钢板直管制作,电弧焊,400mm以内吨990.15274.59184.68530.8811.513
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2593碳钢板直管制作,电弧焊,450mm以内吨889.6899262.47164.89462.3311.0052-2594碳钢板直管制作,电弧焊,500mm以内吨868.99252.26153.51463.2210.5772-2595碳钢板直管制作,电弧焊,600mm以内吨883.58249.21152.56481.8110.4492-2596碳钢板直管制作,电弧焊,700mm以内吨840.8244.32142.03454.4510.2442-2597碳钢板直管制作,电弧焊,800mm以内吨771.17215.15139.35416.679.0212-2598碳钢板直管制作,电弧焊,900mm以内吨736.39204.82132.76398.818.5882-2599碳钢板直管制作,电弧焊,1000mm以内吨644.82181.52119.98343.327.6112-2600碳钢板直管制作,电弧焊,1200mm以内吨598.3101172.03111.61314.677.2132-2601碳钢板直管制作,电弧焊,1400mm以内吨530.14156.22106.78267.146.552-2602碳钢板直管制作,电弧焊,1600mm以内吨505.19147.94104.26252.996.2032-2603碳钢板直管制作,电弧焊,1800mm以内吨489.48139.74100.97248.775.8592-2604碳钢板直管制作,埋弧自动焊,800mm以内吨724.84151.69367206.156.362-2605碳钢板直管制作,埋弧自动焊,900mm以内吨693.3144.65349.51199.146.0652-2606碳钢板直管制作,埋弧自动焊,1000mm以内吨616.54129.91314.46172.175.4472-2607碳钢板直管制作,埋弧自动焊,1200mm以内吨577.24124.62295.54157.085.2252-2608碳钢板直管制作,埋弧自动焊,1400mm以内吨550.49119.89286.99143.615.0272-2609碳钢板直管制作,埋弧自动焊,1600mm以内吨530.4113.07283.2134.134.7412-2610碳钢板直管制作,埋弧自动焊,1800mm以内吨517.07106.25276.43134.394.4552-2611碳钢板虾体弯头制作,电弧焊,200mm以内吨6061.962037.242394.481630.2485.4192-2612碳钢板虾体弯头制作,电弧焊,250mm以内吨5105.491723.41967.09141572.262-2613碳钢板虾体弯头制作,电弧焊,300mm以内吨4364.251452.561683.571228.1260.9042-2614碳钢板虾体弯头制作,电弧焊,350mm以内吨4144.381021.641693.091429.6542.8362-2615碳钢板虾体弯头制作,电弧焊,400mm以内吨3670.21896.211495.411278.5937.5772-2616碳钢板虾体弯头制作,电弧焊,450mm以内吨3216.01808.321304.341103.3533.8922-2617碳钢板虾体弯头制作,电弧焊,500mm以内吨2932.19747.11179.331005.7631.3252-2618碳钢板虾体弯头制作,电弧焊,600mm以内吨3221.361073.31283.22864.8445.0022-2619碳钢板虾体弯头制作,电弧焊,700mm以内吨2803.78959.771106.12737.8940.242
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2620碳钢板虾体弯头制作,电弧焊,800mm以内吨2328.18763.22946.94618.0232.0012-2621碳钢板虾体弯头制作,电弧焊,900mm以内吨2131.98701.17859.53571.2829.3992-2622碳钢板虾体弯头制作,电弧焊,1000mm以内吨1881.6611.25753.36516.9925.6292-2623碳钢板虾体弯头制作,电弧焊,1200mm以内吨1656.6515.92644.15496.5321.6322-2624碳钢板虾体弯头制作,电弧焊,1400mm以内吨1544.36430.33654.29459.7418.0432-2625碳钢板虾体弯头制作,电弧焊,1600mm以内吨1282.31342.08518.02422.2114.3432-2626碳钢板虾体弯头制作,电弧焊,1800mm以内吨1189.05310.88470.82407.3513.0352-2627碳钢管虾体弯制作,电弧焊,200mm以内10个926.87314.37346.77265.7313.1812-2628碳钢管虾体弯制作,电弧焊,250mm以内10个1421.05440.89582.23397.9318.4862-2629碳钢管虾体弯制作,电弧焊,300mm以内10个1689.41562.05677.92449.4423.5662-2630碳钢管虾体弯制作,电弧焊,350mm以内10个2251.51672.36987.14592.0128.1912-2631碳钢管虾体弯制作,电弧焊,400mm以内10个2512.4755.261103.54653.631.6672-2632碳钢管虾体弯制作,电弧焊,450mm以内10个3101.71884.411460757.337.0822-2633碳钢管虾体弯制作,电弧焊,500mm以内10个3430.15977.81571.72880.6340.9982-2634中压螺旋卷管虾体弯制作,电弧焊,200mm以内10个973.8199311.79412.94249.0913.0732-2635中压螺旋卷管虾体弯制作,电弧焊,250mm以内10个1291.33398.15565.26327.9216.6942-2636中压螺旋卷管虾体弯制作,电弧焊,300mm以内10个1470.96471.66608.14391.1619.7762-2637中压螺旋卷管虾体弯制作,电弧焊,350mm以内10个1898.86575.74844.14478.9824.142-2638中压螺旋卷管虾体弯制作,电弧焊,400mm以内10个2127.11644.4940.77541.9427.0192-2639中压螺旋卷管虾体弯制作,电弧焊,450mm以内10个2389.63733.361047.63608.6430.7492-2640中压螺旋卷管虾体弯制作,电弧焊,500mm以内10个3423.831051.881473.16898.7944.1042-2641碳钢、合金钢机械煨弯,低中压,20mm以内10个11.414.7706.640.22-2642碳钢、合金钢机械煨弯,低中压,32mm以内10个16.347.0409.30.2952-2643碳钢、合金钢机械煨弯,低中压,50mm以内10个53.8421.08032.760.8842-2644碳钢、合金钢机械煨弯,低中压,65mm以内10个72.729.45043.251.2352-2645碳钢、合金钢机械煨弯,低中压,80mm以内10个98.6539.88058.771.6722-2646碳钢、合金钢机械煨弯,低中压,100mm以内10个121.2449.85071.392.09
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2647低中压碳钢管中频煨弯,100mm以内10个427.2969.83134.28223.182.9282-2648低中压碳钢管中频煨弯,150mm以内10个461.4478.47139.14243.833.292-2649低中压碳钢管中频煨弯,200mm以内10个688.45103.32144441.134.3322-2650低中压碳钢管中频煨弯,250mm以内10个817.58125.31162530.275.2542-2651低中压碳钢管中频煨弯,300mm以内10个1107.92180.12180747.87.5522-2652低中压碳钢管中频煨弯,350mm以内10个1528.73261.351951072.3810.9582-2653低中压碳钢管中频煨弯,400mm以内10个1762.97303.092101249.8812.7082-2654高压碳钢管中频煨弯,100mm以内10个826.399.48201.42525.44.1712-2655高压碳钢管中频煨弯,150mm以内10个1232.28162.44208.71861.136.8112-2656高压碳钢管中频煨弯,200mm以内10个1347.97191.13216940.848.0142-2657高压碳钢管中频煨弯,250mm以内10个1625.61236.072431146.549.8982-2658高压碳钢管中频煨弯,300mm以内10个1796.09365.482701160.6115.3242-2659高压碳钢管中频煨弯,350mm以内10个2392.91486.13292.51614.2820.3832-2660高压碳钢管中频煨弯,400mm以内10个2836.38595.423151925.9624.9652-2661高压碳钢管中频煨弯,450mm以内10个3311.04743.17337.492230.3831.162-2662高压碳钢管中频煨弯,500mm以内10个4817.161170.72359.963286.4849.0872-2663碳钢板三通制作,电弧焊,200mm以内吨2886.481235.67470.271180.5451.812-2664碳钢板三通制作,电弧焊,250mm以内吨2237.42999.17375.51862.7441.8942-2665碳钢板三通制作,电弧焊,300mm以内吨1771.27843.36272.01655.935.3612-2666碳钢板三通制作,电弧焊,350mm以内吨1392.12563.05259.8569.2723.6082-2667碳钢板三通制作,电弧焊,400mm以内吨1329.68500.78268.7560.220.9972-2668碳钢板三通制作,电弧焊,450mm以内吨1204.23452.98245.32505.9318.9932-2669碳钢板三通制作,电弧焊,500mm以内吨1070.62398.08220.74451.816.6912-2670碳钢板三通制作,电弧焊,600mm以内吨977.2380.1193.88403.2215.9372-2671碳钢板三通制作,电弧焊,700mm以内吨916.26374.49175.65366.1215.7022-2672碳钢板三通制作,电弧焊,800mm以内吨844.05364.12153.27326.6615.2672-2673碳钢板三通制作,电弧焊,900mm以内吨888.78361.97178.9347.9115.177
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2674碳钢板三通制作,电弧焊,1000mm以内吨838.46310.19180.67347.613.0062-2675碳钢板三通制作,电弧焊,1200mm以内吨753.86275.47164.1314.2911.552-2676碳钢板三通制作,电弧焊,1400mm以内吨748.8266.52182.67299.6111.1752-2677碳钢板三通制作,电弧焊,1600mm以内吨644.39235.69143.63265.079.8822-2678碳钢板三通制作,电弧焊,1800mm以内吨610.59233.9130.79245.99.8072-2679碳钢板异径管制作,电弧焊,200mm以内吨5083.881991.26798.022294.683.4912-2680碳钢板异径管制作,电弧焊,250mm以内吨3857.851585.81585.131686.9166.4912-2681碳钢板异径管制作,电弧焊,300mm以内吨3131.461318.26465.951347.2555.2732-2682碳钢板异径管制作,电弧焊,350mm以内吨2360.48910.12547.45902.9138.162-2683碳钢板异径管制作,电弧焊,400mm以内吨2342.2813.48535.53993.1934.1082-2684碳钢板异径管制作,电弧焊,450mm以内吨2146.71727.09517.37902.2530.4862-2685碳钢板异径管制作,电弧焊,500mm以内吨2014.36654.32514.5845.5427.4352-2686碳钢板异径管制作,电弧焊,600mm以内吨1546.32530.14377.39638.7922.2282-2687碳钢板异径管制作,电弧焊,700mm以内吨1437.38498.3366573.0820.8932-2688碳钢板异径管制作,电弧焊,800mm以内吨1435.54437.03402.5159618.3242-2689碳钢板异径管制作,电弧焊,900mm以内吨1330.04399.2386.9543.9416.7382-2690碳钢板异径管制作,电弧焊,1000mm以内吨1255.14397.2361.2496.7416.6542-2691碳钢板异径管制作,电弧焊,1200mm以内吨1098.3318.21340.66439.4313.3422-2692碳钢板异径管制作,电弧焊,1400mm以内吨977.29275.49322.01379.7911.5512-2693碳钢板异径管制作,电弧焊,1600mm以内吨1141.42259.25393.83488.3410.872-2694碳钢板异径管制作,电弧焊,1800mm以内吨1065.77246.92373.65445.210.3532-2695低中压管道液压试验,100mm以内100米137.97104.9221.8611.194.3992-2696低中压管道液压试验,200mm以内100米191.43128.2446.4616.735.3772-2697低中压管道液压试验,300mm以内100米274.29173.7983.5216.987.2872-2698低中压管道液压试验,400mm以内100米352.52206.42123.5822.528.6552-2699低中压管道液压试验,500mm以内100米422.26246.75152.7422.7710.3462-2700低中压管道液压试验,600mm以内100米492.57265.55201.5225.511.134
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2701低中压管道液压试验,800mm以内100米624.36293.88304.7325.7512.3222-2702低中压管道液压试验,1000mm以内100米789.08324428.0137.0713.5852-2703低中压管道液压试验,1200mm以内100米980.72340.32600.6539.7514.2692-2704高压管道液压试验,50mm以内100米156.64106.0412.9937.614.4462-2705高压管道液压试验,100mm以内100米202.49125.9827.0449.475.2822-2706高压管道液压试验,200mm以内100米287.5153.8667.0166.636.4512-2707高压管道液压试验,300mm以内100米431.74208.45133.4589.848.742-2708高压管道液压试验,400mm以内100米527.51247.66172.32107.5310.3842-2709高压管道液压试验,500mm以内100米675.37296.15248.48130.7412.4172-2710低中压管道气压试验,50mm以内100米91.3854.6215.2121.552.292-2711低中压管道气压试验,100mm以内100米114.6564.826.2823.572.7172-2712低中压管道气压试验,200mm以内100米156.7879.9951.2125.583.3542-2713低中压管道气压试验,300mm以内100米217.8895.6194.6727.64.0092-2714低中压管道气压试验,400mm以内100米297.52126.21141.6929.625.2922-2715低中压管道气压试验,500mm以内100米332.37141.38159.3631.635.9282-2716低中压管道气压试验,600mm以内100米390.91158.6196.1836.136.652-2717低中压管道气压试验,800mm以内100米543.31183.98319.4239.917.7142-2718低中压管道气压试验,1000mm以内100米660.01219.56396.2644.199.2062-2719低中压管道气压试验,1200mm以内100米834.86287.99510.4236.4512.0752-2720低中压管道气压试验,1400mm以内100米1008.94338.5628.8441.614.1932-2721低中压管道气压试验,1600mm以内100米1180.01364.12763.5152.3815.2672-2722低中压管道气压试验,1800mm以内100米1406.12417.35920.867.9717.4992-2723低中压管道真空试验,50mm以内100米119.3279.9914.2125.123.3542-2724低中压管道真空试验,100mm以内100米147.9695.1625.2727.533.992-2725低中压管道真空试验,200mm以内100米198.21118.0650.2129.944.952-2726低中压管道真空试验,300mm以内100米267.39141.3893.6632.355.9282-2727低中压管道真空试验,400mm以内100米356.18186.94134.4734.777.838
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2728低中压管道真空试验,500mm以内100米400.81209.81153.8237.188.7972-2729低中压管道真空试验,550mm以内100米440.93230.8169.2140.929.6772-2730低中压管道真空试验,600mm以内100米480.96251.76184.5944.6110.5562-2731低中压管道真空试验,650mm以内100米521.08272.75199.9748.3611.4362-2732低中压管道真空试验,700mm以内100米561.14293.74215.3552.0512.3162-2733管道系统吹扫,水冲洗,50mm以内100米85.0757.3420.7372.4042-2734管道系统吹扫,水冲洗,100mm以内100米116.4762.9944.229.262.6412-2735管道系统吹扫,水冲洗,200mm以内100米205.8977.04111.3117.543.232-2736管道系统吹扫,水冲洗,300mm以内100米361.65104.22224.2333.24.372-2737管道系统吹扫,水冲洗,400mm以内100米520123.95357.5138.545.1972-2738管道系统吹扫,水冲洗,500mm以内100米693.96147.97490.7455.256.2042-2739管道系统吹扫,水冲洗,600mm以内100米954.23159.29715.3679.586.6792-2740管道系统吹扫,水冲洗,650mm以内100米1033.85172.55775.0586.257.2352-2741管道系统吹扫,水冲洗,700mm以内100米1113.27185.84834.6792.767.7922-2742管道系统吹扫,空气吹扫,50mm以内100米70.0332.8719.1418.021.3782-2743管道系统吹扫,空气吹扫,100mm以内100米91.8438.9732.8320.041.6342-2744管道系统吹扫,空气吹扫,200mm以内100米139.5948.0369.5122.052.0142-2745管道系统吹扫,空气吹扫,300mm以内100米201.6357.34121.9922.32.4042-2746管道系统吹扫,空气吹扫,400mm以内100米275.2375.68175.2324.323.1732-2747管道系统吹扫,空气吹扫,500mm以内100米310.3884.74199.3126.333.5532-2748管道系统吹扫,空气吹扫,600mm以内100米404.0995.16278.130.833.992-2749管道系统吹扫,空气吹扫,650mm以内100米437.79103.1301.2833.414.3232-2750管道系统吹扫,空气吹扫,700mm以内100米471.39111.02324.4535.924.6552-2751管道系统吹扫,蒸汽吹扫,50mm以内100米79.9247.5826.685.661.9952-2752管道系统吹扫,蒸汽吹扫,100mm以内100米152.3762.9983.475.912.6412-2753管道系统吹扫,蒸汽吹扫,200mm以内100米357.578.18273.166.163.2782-2754管道系统吹扫,蒸汽吹扫,300mm以内100米683.8493.59583.856.43.924
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2755管道系统吹扫,蒸汽吹扫,400mm以内100米1081.19113.29961.256.654.752-2756管道系统吹扫,蒸汽吹扫,500mm以内100米1568.79135.951425.946.95.72-2757管道系统吹扫,蒸汽吹扫,600mm以内100米2202.89184.672008.589.647.7432-2758管道系统吹扫,蒸汽吹扫,650mm以内100米2530.81200.052320.3210.448.3882-2759管道系统吹扫,蒸汽吹扫,700mm以内100米2818.2215.442591.5711.199.0332-2760管道系统清洗,碱洗,25mm以内100米147.1265.9548.4532.722.7652-2761管道系统清洗,碱洗,50mm以内100米196.5565.9591.1139.492.7652-2762管道系统清洗,碱洗,100mm以内100米321.7383.83191.446.53.5152-2763管道系统清洗,碱洗,200mm以内100米522.31124.62344.1753.525.2252-2764管道系统清洗,碱洗,300mm以内100米838.0601181.95535.53120.587.6292-2765管道系统清洗,碱洗,400mm以内100米1145.2265.09745.01135.111.1152-2766管道系统清洗,碱洗,500mm以内100米1438.6359.59929.39149.6215.0772-2767管道系统清洗,酸洗,25mm以内100米145.892.6820.432.723.8862-2768管道系统清洗,酸洗,50mm以内100米166.9892.6834.8139.493.8862-2769管道系统清洗,酸洗,100mm以内100米242.95118.0678.3946.54.952-2770管道系统清洗,酸洗,200mm以内100米399.95176.28170.1553.527.3912-2771管道系统清洗,酸洗,300mm以内100米658.19258.08279.53120.5810.8212-2772管道系统清洗,酸洗,400mm以内100米909.74359.59415.05135.115.0772-2773管道系统清洗,酸洗,500mm以内100米1192.62511.84531.16149.6221.4612-2774管道脱脂,DN25mm以内100米106.6344.4118.943.321.8622-2775管道脱脂,DN50mm以内100米126.3244.4130.0651.851.8622-2776管道脱脂,DN100mm以内100米182.8662.0860.1560.632.6032-2777管道脱脂,DN200mm以内100米283.3792.68121.2869.413.8862-2778管道脱脂,DN300mm以内100米472.71156.58177.89138.246.5652-2779管道脱脂,DN400mm以内100米619.63232.7232.4154.539.7572-2780管道脱脂,DN500mm以内100米708.25258.08279.35170.8210.8212-2781管道焊缝Χ光射线探伤80X300mm,管壁厚8mm以内10张348.19124.02107.24116.935.2
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2782管道焊缝Χ光射线探伤80X300mm,管壁厚15mm以内10张378.18124.02107.24146.925.22-2783管道焊缝Χ光射线探伤80X300mm,管壁厚21mm以内10张404.58124.02107.24173.325.22-2784管道焊缝Χ光射线探伤80X300mm,管壁厚21mm以上10张427.07124.02107.24195.815.22-2785管道焊缝Χ光射线探伤80X150mm,管壁厚8mm以内10张299.39124.0258.44116.935.22-2786管道焊缝Χ光射线探伤80X150mm,管壁厚16mm以内10张329.38124.0258.44146.925.22-2787管道焊缝Χ光射线探伤80X150mm,管壁厚22mm以内10张353.37124.0258.44170.915.22-2788管道焊缝Υ射线探伤80X300mm,管壁厚30mm以内10张514.69181.26101.13232.37.62-2789管道焊缝Υ射线探伤80X300mm,管壁厚40mm以内10张575.51242.08101.13232.310.152-2790管道焊缝Υ射线探伤80X150mm,管壁厚22mm以内10张465.36181.7452.33231.297.622-2791焊口超声波探伤,150mm以内10口230.619.68187.3623.560.8252-2792焊口超声波探伤,250mm以内10口33937.78255.9845.241.5842-2793焊口超声波探伤,350mm以内10口469.9258.24341.9369.752.4422-2794焊口超声波探伤,350以上mm以内10口594.2275.25428.8290.153.1552-2795管材表面超声波探伤,150mm以内10m2454.8861.91314.9178.062.5962-2796管材表面超声波探伤,250mm以内10m2565.9871.22404.9689.82.9862-2797管材表面超声波探伤,350mm以内10m2748.430181.9563.27103.263.4342-2798管材表面超声波探伤,450mm以内10m2983.81105.3745.78132.734.4152-2799管材表面超声波探伤,550mm以内10m21176.2128.69885.21162.35.3962-2800管材表面超声波探伤,650mm以内10m21389.9152.121046.01191.776.3782-2801管材表面超声波探伤,750mm以内10m21604.47176.131207.09221.257.3852-2802普通磁粉探伤,150mm以内10口126.811.9394.2620.610.52-2803普通磁粉探伤,250mm以内10口149.3820.4494.2634.680.8572-2804普通磁粉探伤,350mm以内10口170.428.2494.2647.91.1842-2805普通磁粉探伤,350以上mm以内10口180.2531.9194.2654.081.3382-2806荧光磁粉探伤,150mm以内10口61.9221.473.3437.110.92-2807荧光磁粉探伤,250mm以内10口102.5936.83.3462.451.5432-2808荧光磁粉探伤,350mm以内10口151.5350.823.3497.372.131
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2809荧光磁粉探伤,350以上mm以内10口158.1457.433.3497.372.4082-2810普通渗透探伤,108mm以内10口53.288.1144.60.570.342-2811普通渗透探伤,219mm以内10口105.8216.4688.231.130.692-2812普通渗透探伤,377mm以内10口185.1528.24154.951.961.1842-2813普通渗透探伤,529mm以内10口259.4839.64217.12.741.6622-2814普通渗透探伤,559mm以内10口275.9943.6229.373.021.8282-2815普通渗透探伤,630mm以内10口309.8247.96258.563.32.0112-2816普通渗透探伤,660mm以内10口327.2752.76270.883.632.2122-2817普通渗透探伤,720mm以内10口357.4358.03295.413.992.4332-2818荧光渗透探伤,108mm以内10口69.039.7358.620.680.4082-2819荧光渗透探伤,219mm以内10口136.6919.75115.571.370.8282-2820荧光渗透探伤,377mm以内10口239.5633.89203.312.361.4212-2821荧光渗透探伤,529mm以内10口335.2547.56284.393.31.9942-2822荧光渗透探伤,559mm以内10口356.3752.3300.443.632.1932-2823荧光渗透探伤,630mm以内10口400.2157.55338.673.992.4132-2824荧光渗透探伤,660mm以内10口422.5463.3354.854.392.6542-2825荧光渗透探伤,720mm以内10口461.3969.62386.944.832.9192-2826焊口预热及后热,碳钢管电加热片,Φ219×10~2010口1039.37176.73690.13172.517.412-2827焊口预热及后热,碳钢管电加热片,Φ273×10~2010口1240.23194.85852.96192.428.172-2828焊口预热及后热,碳钢管电加热片,Φ325×10~2010口1560.59199.391168.78192.428.362-2829焊口预热及后热,碳钢管电加热片,Φ377×10~2010口1974.65206.181469.23299.248.6452-2830焊口预热及后热,碳钢管电加热片,Φ426×10~2510口2602.79388.81834.47379.5216.3022-2831焊口预热及后热,碳钢管电加热片,Φ480×15~2510口2928.3436.172068.82423.3118.2882-2832焊口预热及后热,碳钢管电加热片,Φ530×15~2510口3403.73446.142519.68437.9118.7062-2833焊口预热及后热,碳钢管电加热片,Φ559×15~2510口3595.85471.372661.76462.7219.7642-2834焊口预热及后热,碳钢管电加热片,Φ630×15~2510口4052.78531.282999.99521.5122.2762-2835焊口预热及后热,碳钢管电加热片,Φ660×15~2510口4244.85556.523142.07546.2623.334
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2836焊口预热及后热,碳钢管电加热片,Φ720×15~2510口4632.5607.013429.67595.8225.4512-2837焊口预热及后热,碳钢管电感应,Φ219×10~2010口1588.14176.73437.09974.327.412-2838焊口预热及后热,碳钢管电感应,Φ273×10~2010口1728.66183.53533.331011.87.6952-2839焊口预热及后热,碳钢管电感应,Φ325×10~2010口1912.22188.06674.891049.277.8852-2840焊口预热及后热,碳钢管电感应,Φ377×10~2010口2056.52194.85774.921086.758.172-2841焊口预热及后热,碳钢管电感应,Φ426×10~2510口3313.64351.431024.81937.4114.7352-2842焊口预热及后热,碳钢管电感应,Φ480×15~2510口3487.37361.41147.341978.6315.1532-2843焊口预热及后热,碳钢管电感应,Φ530×15~2510口3961.3406.261329.082225.9617.0342-2844焊口预热及后热,碳钢管电感应,Φ559×15~2510口4185.4429.251404.282351.8717.9982-2845焊口预热及后热,碳钢管电感应,Φ630×15~2510口4717.42483.771582.742650.9120.2842-2846焊口预热及后热,碳钢管电感应,Φ660×15~2510口4941.55506.791657.942776.8221.2492-2847焊口预热及后热,碳钢管电感应,Φ720×15~2510口5389.77552.751808.373028.6523.1762-2848焊口热处理,碳钢电加热片,Φ219×20~30mm以内10口2397.83385.421761.61250.816.162-2849焊口热处理,碳钢电加热片,Φ273×20~30mm以内10口3165.03593.872184.34386.8224.92-2850焊口热处理,碳钢电加热片,Φ325×20~30mm以内10口3999.35593.873018.66386.8224.92-2851焊口热处理,碳钢电加热片,Φ377×20~30mm以内10口4499.8593.873519.11386.8224.92-2852焊口热处理,碳钢电加热片,Φ426×20~30mm以内10口5900.721834.494523.49542.7434.9892-2853焊口热处理,碳钢电加热片,Φ480×20~30mm以内10口6486.21834.495108.98542.7434.9892-2854焊口热处理,碳钢电加热片,Φ530×20~30mm以内10口7780.06876.856332.6570.6136.7652-2855焊口热处理,碳钢电加热片,Φ559×15~25mm以内10口7556.08926.486026.68602.9238.8462-2856焊口热处理,碳钢电加热片,Φ630×15~25mm以内10口8518.381044.26794.69679.4943.7822-2857焊口热处理,碳钢电加热片,Φ660×15~25mm以内10口8922.51093.817116.89711.845.8622-2858焊口热处理,碳钢电加热片,Φ720×15~25mm以内10口9730.661193.057761.25776.3650.0232-2859焊口热处理,碳钢管电感应,Φ219×30~50mm以内10口3142.33484.42877.891780.0220.3112-2860焊口热处理,碳钢管电感应,Φ273×30~50mm以内10口4473.02726.41074.722671.930.4572-2861焊口热处理,碳钢管电感应,Φ325×30~50mm以内10口4727.04726.41328.742671.930.4572-2862焊口热处理,碳钢管电感应,Φ377×30~50mm以内10口4922.66726.41524.362671.930.457
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2863焊口热处理,碳钢管电感应,Φ426×30~50mm以内10口6447.41996.931785.523664.9641.82-2864焊口热处理,碳钢管电感应,Φ480×30~50mm以内10口6656.74996.931994.853664.9641.82-2865焊口热处理,碳钢管电感应,Φ530×30~50mm以内10口7176.871053.572252.243871.0644.1752-2866焊口热处理,碳钢管电感应,Φ559×15~25mm以内10口7583.221113.22379.734090.2946.6752-2867焊口热处理,碳钢管电感应,Φ630×15~25mm以内10口8546.371254.632682.064609.6852.6052-2868焊口热处理,碳钢管电感应,Φ660×15~25mm以内10口8952.7311314.282809.554828.955.1062-2869焊口热处理,碳钢管电感应,Φ720×15~25mm以内10口9764.9611433.533064.465266.9760.1062-2870理化检查,硬度测定,管材10口137.0353.3363.7719.932.2362-2871理化检查,防腐层电火花检漏10m26.811.912.132.770.082-2872理化检查,光谱分析10个点229.9679.995.98143.993.3542-2873理化检查,超声波测厚10个点32.659.972.0220.660.4182-2874管道支架制作安装,一般管架20Kg以内100kg778.71422.34138.78217.5917.7082-2875管道支架制作安装,一般管架50Kg以内100kg447.72161.32149.71136.696.7642-2876管道支架制作安装,一般管架100Kg以内100kg580.95131.87268.98180.15.5292-2877管道支架制作安装,木垫式管架100kg412.95168.88166.9977.087.0812-2878管道支架制作安装,弹簧式管架100kg335.8149.3276.28110.26.2612-2879管口焊接充氩保护,管内局部充氩保护,50mm以内10口32.7213.5919.1300.572-2880管口焊接充氩保护,管内局部充氩保护,100mm以内10口42.4618.1324.3300.762-2881管口焊接充氩保护,管内局部充氩保护,200mm以内10口69.6529.4540.201.2352-2882管口焊接充氩保护,管内局部充氩保护,300mm以内10口106.4845.3261.1601.92-2883管口焊接充氩保护,管内局部充氩保护,400mm以内10口142.1956.6485.5502.3752-2884管口焊接充氩保护,管内局部充氩保护,500mm以内10口187.7174.77112.9403.1352-2885管口焊接充氩保护,管外充氩保护,50mm以内10口36.6521.7514.900.9122-2886管口焊接充氩保护,管外充氩保护,100mm以内10口49.732920.7301.2162-2887管口焊接充氩保护,管外充氩保护,200mm以内10口82.4447.1335.3101.9762-2888管口焊接充氩保护,管外充氩保护,300mm以内10口127.7972.555.2903.042-2889管口焊接充氩保护,管外充氩保护,400mm以内10口165.690.6374.9703.8
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2890管口焊接充氩保护,管外充氩保护,500mm以内10口212.14119.6392.5105.0162-2891柔性套管制作,50mm以内个155.2633.77103.517.991.4162-2892柔性套管制作,80mm以内个210.3240.33146.6923.31.6912-2893柔性套管制作,100mm以内个250.3351.21164.1934.932.1472-2894柔性套管制作,125mm以内个321.5358.46225.8737.22.4512-2895柔性套管制作,150mm以内个401.1167.07294.6139.432.8122-2896柔性套管制作,200mm以内个595.5474.77465.3455.433.1352-2897柔性套管制作,250mm以内个793.5692.23633.0368.33.8672-2898柔性套管制作,300mm以内个975.28108.3792.9973.994.5412-2899柔性套管制作,350mm以内个756.32126.88524.19105.255.322-2900柔性套管制作,400mm以内个898.6151.59625.03121.986.3562-2901柔性套管制作,450mm以内个1066.5176.73741.44148.337.412-2902柔性套管制作,500mm以内个1230.25200.75856.09173.418.4172-2903柔性套管制作,600mm以内个1544.34226.581113.9203.869.52-2904柔性套管制作,700mm以内个1723.1258.751237.77226.5810.8492-2905柔性套管制作,800mm以内个2192.66321.071561.8309.7913.4622-2906柔性套管制作,900mm以内个2495.61348.261812.96334.3914.6022-2907柔性套管制作,1000mm以内个2821.4401.942031.39388.0716.8532-2908柔性套管安装,50mm以内个9.68.850.7500.3712-2909柔性套管安装,150mm以内个11.199.971.2200.4182-2910柔性套管安装,200mm以内个14.9213.591.3300.572-2911柔性套管安装,300mm以内个16.6314.951.6800.6272-2912柔性套管安装,400mm以内个20.4618.362.100.772-2913柔性套管安装,500mm以内个27.7825.162.6201.0552-2914柔性套管安装,600mm以内个28.3125.163.1501.0552-2915柔性套管安装,800mm以内个31.827.434.3701.152-2916柔性套管安装,1000mm以内个38.0731.966.1101.34
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2917刚性套管制作,50mm以内个97.7614.2975.717.760.5992-2918刚性套管制作,80mm以内个121.1717.0195.059.110.7132-2919刚性套管制作,100mm以内个158.722.44122.5813.680.9412-2920刚性套管制作,125mm以内个212.8526.97170.615.281.1312-2921刚性套管制作,150mm以内个243.5828.79198.8315.961.2072-2922刚性套管制作,200mm以内个30635.58251.9518.471.4922-2923刚性套管制作,250mm以内个385.4444.65318.6722.121.8722-2924刚性套管制作,300mm以内个460.4852.8381.6925.992.2142-2925刚性套管制作,350mm以内个568.5165.71471.8930.912.7552-2926刚性套管制作,400mm以内个554.2975.46423.83553.1642-2927刚性套管制作,450mm以内个638.9585.19492.5861.183.5722-2928刚性套管制作,500mm以内个694.3490.63534.1469.573.82-2929刚性套管制作,600mm以内个872.47105.82678.8287.834.4372-2930刚性套管制作,700mm以内个982.58120.32766.9395.335.0452-2931刚性套管制作,800mm以内个1179.97147.27908.27124.436.1752-2932刚性套管制作,900mm以内个1413.72176.281090.02147.427.3912-2933刚性套管制作,1000mm以内个1597.96191.921248.01158.038.0472-2934刚性套管安装,50mm以内个49.1814.7434.4400.6182-2935刚性套管安装,150mm以内个75.3416.5558.7900.6942-2936刚性套管安装,200mm以内个93.2222.970.3200.962-2937刚性套管安装,300mm以内个136.2524.92111.3301.0452-2938刚性套管安装,400mm以内个166.1730.36135.8101.2732-2939刚性套管安装,500mm以内个199.1641.93157.2301.7582-2940刚性套管安装,600mm以内个228.6141.93186.6801.7582-2941刚性套管安装,800mm以内个291.2345.77245.4601.9192-2942刚性套管安装,1000mm以内个358.7853.26305.5202.2332-2943调节阀临时短管制作装拆,DN15mm个13.838.25.010.620.344
《石油建设安装工程预算定额》1-5册电子版定额号定额名称单位单价人工费材料费机械费工日2-2944调节阀临时短管制作装拆,DN25mm个18.9210.028.280.620.422-2945调节阀临时短管制作装拆,DN50mm个48.2711.2136.440.620.472-2946调节阀临时短管制作装拆,DN100mm个82.2913.3667.960.970.562-2947调节阀临时短管制作装拆,DN150mm个137.1323.13113.030.970.972-2948调节阀临时短管制作装拆,DN200mm个172.6426.71144.61.331.122-2949调节阀临时短管制作装拆,DN300mm个298.0543.41252.62.041.822-2950调节阀临时短管制作装拆,DN400mm个490.6855.09433.192.42.312-2951调节阀临时短管制作装拆,DN500mm个825.7160.34762.263.112.53'
您可能关注的文档
- 通信建设预算定额、工程费用定额及计算规则
- 配电网工程预算定额培训
- 浙江省建筑工程预算定额2010版(说明及计算规则)10-12章含注解
- 浙江省建筑工程预算定额2010版(说明及计算规则)10-12章含注解
- 浙江省建筑工程预算定额2010版(说明及计算规则)10-12章含注解
- 煤炭建设工程预算定额,煤炭建设井巷工程辅助综合定额
- 福建省公路隧道工程补充概、预算定额
- 福建省公路隧道工程补充概、预算定额
- 预算定额的运用
- 安装工程预算定额解释汇编(电气部分)
- 《浙江省建筑工程预算定额》2010版有关问题的解读
- 屋面工程 06电力预算定额章节说明
- 浙江建筑工程预算定额交底资料
- (土建部分)2001《北京市建设工程预算定额》定额解释及其答疑
- 全新正版-煤炭建设工程预算定额(2007基价)-货到付款
- 冶金企业检修工程预算定额
- 煤炭建设工程预算定额2007基价,煤炭工程建设定额,煤矿建设概预算定额
- 通信建设工程预算定额第1册通信电源设备安装工程