• 3.79 MB
  • 133页

某大学学生公寓毕业设计(含计算书、部分结构设计图、施工组织设计、外文文献及翻译)

  • 133页
  • 当前文档由用户上传发布,收益归属用户
  1. 1、本文档共5页,可阅读全部内容。
  2. 2、本文档内容版权归属内容提供方,所产生的收益全部归内容提供方所有。如果您对本文有版权争议,可选择认领,认领后既往收益都归您。
  3. 3、本文档由用户上传,本站不保证质量和数量令人满意,可能有诸多瑕疵,付费之前,请仔细先通过免费阅读内容等途径辨别内容交易风险。如存在严重挂羊头卖狗肉之情形,可联系本站下载客服投诉处理。
  4. 文档侵权举报电话:19940600175。
山东建筑大学毕业设计说明书目录摘要···································································ⅣABSTRACT······························································Ⅴ1前言2建筑设计2.1设计基本资料····························································22.1.1工程概况·····························································22.1.2地质、水文、气象资料···················································22.2建筑设计说明···························································32.2.1设计概要····························································32.2.2建筑立面剖面设计·····················································42.2.3抗震设计····························································4-125- 山东建筑大学毕业设计说明书2.2.4防火设计····························································52.2.5细部构造总说明······················································52.3建筑细部具体构造做法···················································62.3.1屋面做法····························································62.3.2楼面做法····························································62.3.3内墙面做法··························································72.3.4散水做法····························································73结构设计3.1结构的选型及布置························································83.1.1结构的选型··························································83.1.2柱网布置-125- 山东建筑大学毕业设计说明书·····························································83.1.3初选构件尺寸·························································93.2荷载统计······························································93.2.1竖向荷载计算························································93.2.2水平荷载计算························································163.3内力分析······························································193.3.1恒荷载作用下的内力计算··············································193.3.2活荷载作用下的内力计算·············································283.3.3风荷载作用下的内力计算··············································383.3.4水平地震作用下的内力计算············································423.4内力组合···································-125- 山东建筑大学毕业设计说明书··························503.4.1荷载组合···························································503.4.2框架梁的内力组合··················································513.4.3框架柱的内力组合···················································553.5梁、柱截面设计·························································603.5.1框架梁截面设计·····················································603.5.2挑梁设计···························································663.5.3框架柱的截面设计···················································683.6板的设计······························································803.6.1双向板的设计·······················································803.6.2单向板的设计-125- 山东建筑大学毕业设计说明书·······················································843.7基础设计······························································863.7.1桩的设计···························································863.7.2承台设计···························································923.8楼梯的设计···························································964施工组织设计4.1编制说明······························································1004.1.1编制依据··························································1004.1.2编制范围·························································1004.2工程概况·····························································1004.2.1工程特点··························································1004.2.2-125- 山东建筑大学毕业设计说明书工程概况··························································1004.3施工总平面布置·······················································1014.3.1施工总平面布置设想················································1014.3.2施工现场布置·····················································1014.4施工总体部署·························································1024.4.1施工总进度计划···················································1024.4.2施工分段··························································1024.4.3施工顺序··························································1024.4.4定额计算人工及工日···············································1024.5主要施工方法技术措施·················································1034.5.1-125- 山东建筑大学毕业设计说明书工程施工测量方案··················································1034.5.2基础工程··························································1064.5.3模板工程·························································1084.5.4混凝土工程·······················································1084.5.5垂直运输和脚手架·················································1094.5.6砌体工程·························································1094.5.7门窗工程·························································1104.5.8装饰工程·························································1104.5.9水电安装工程·····················································1114.6主要施工技术措施·····················································1134.6.1-125- 山东建筑大学毕业设计说明书质量保证措施······················································1134.6.2安全施工措施······················································1204.6.3文明施工措施·····················································1214.6.4冬雨季施工措施···················································122结论···································································123谢辞·································································124参考文献······························································125摘要本工程为全现浇混凝土框架结构,工程所在地区的抗震设防等级为7-125- 山东建筑大学毕业设计说明书度,需要进行抗震设计。抗震设计与非抗震设计有许多不同之处,其根本区别在于非抗震结构在外荷载作用下结构处于弹性状态,仅有微小裂缝,构件设计主要是满足承载力要求。而抗震结构在地震作用下,为了有良好的耗能能力以及在强震下结构不倒塌,其构件应有足够的延性。要设计延性框架结构,需满足“强柱弱梁,强剪弱弯,强节点弱构件”的要求,并进行相应的内力调整,然后由调整后的内力值进行配筋计算。本工程采用桩基础,采用的桩为复合载体夯扩桩。该桩是一种新型桩,具有单桩竖向极限承载力高,施工工艺简单,施工质量易控制,且在施工过程中,具有无污染、低噪声等特点,并可消纳大量建筑碎砖、混土块等建筑垃圾,变废为宝,保护环境,利国利民。关键词:框架结构;现浇混凝土;桩基础;复和载体夯扩桩;抗震设计-125- 山东建筑大学毕业设计说明书DesignoftheApartmentBuildingforUniversityStudents(scheme4)ABSTRACTThisprojectiscompletelycast-in-placeconcreteframestructure,theanti-seismicofprojectsitedistrictsetupdefensesgradeis7degrees,needtocarryoutanti-seismicdesign,anti-seismicdesignandnotanti-seismicdesigntheplacethathasalotofdifferences,itdistinguishesatalltolieinnotanti-seismicstructureinoutsideloadrole,takeoffstructuretobeinflexiblestate,thereissmallcrackonly,componentdesignistosatisfytobearforcerequirementmainly.Andanti-seismicstructureisbeingseismictotakeaffect,tohavegoodconsumecanabilityaswellasinstrongshakestructuredonotcollapse;itscomponentshouldhaveenoughductility.Todesignductilityframestructure,needtosatisfytherequirementof“strongcolumnweakbeam,itisstrongtocutweakcurved,strongnodeweakcomponent",andgooncorrespondingforceadjustment,thenfromadjustmentafterforcevaluematchtendoncalculation.Thisprojectadoptsstakefoundation,thestakeofadoptingiscompoundcarrierrammerexpandstake.Thisstakeisakindofnewstake,havesinglestaketoerecttolimitbearforceisthecharacteristicssuchasfreefromcontaminationandlownoisehigh,constructiontechnologyissimple,constructionqualityeasycontrolhasjustinconstructioncourse,andcaneliminatetofitplentyofbuildingsthebuildingrubbishessuchasbrokenbrickandconcretepiece,changetoabandonfortreasure,protectenvironmental,sharpcountrysharpthepeople.Keywords:framestructure;cast-in-placeconcrete;pilefoundation;answerwithcarrierrammerexpandpile;anti-seismicdesign-125- 山东建筑大学毕业设计说明书1前言本设计的目的是综合应用所学的基础课、技术基础课及专业课知识和相应技能,来解决在具体的土木工程设计中所遇到的问题。在建筑设计方面:要求建筑物简单明快、具有时代感;突显个人特色,并要注意与周围环境相协调;建筑布局要合理,便于使用。在结构设计方面:要求选择合理的结构体系,运用合理的理论知识,使建筑物满足安全性、实用性、耐久性的功能要求。本设计的指导思想是根据设计任务书的要求和一些必要的基础资料,结合基地环境、技术条件和建筑设计的要求,对结构体系、总体布置、空间组合等进行合理的安排,然后再进行结构设计、构件设计和构造设计等具体结构设计。本设计解决的问题有:建筑设计方面:(1)环境、体型(2)与人的活动有关的空间组织(3)建筑技术问题(4)建筑外观与室内布置。结构设计方面:(1)结构形式(2)结构材料(3)结构的安全性、实用性和耐久性(4)结构的连接构造。施工组织设计方面:(1)施工平面布置(2)施工进度计划的编制(3)施工段的划分(4)施工工序的合理划分(5)施工的保证措施。结构设计是在建筑设计的基础上进行的,但在建筑方案的设计阶段就应考虑到主体结构方案。通过协调二者的关系,力争将合理的结构形式与建筑使用和美观需要统一起来。-125- 山东建筑大学毕业设计说明书2建筑设计2.1设计基本资料2.1.1工程概况工程名称:某大学学生公寓建筑面积:4973.22m2建筑总高度:23.45m(室外地坪算起)建筑层数:六层结构类型:框架结构设计使用年限:50年地面粗糙度:B类抗震等级:三级设防烈度:7度,第一组别,设计地震基本加速度值为0.1g结构重要性系数:1.02.1.2地质、水文、气象资料(1)最大冻土深度:0.50m(2)基本风压:0.45(3)基本雪压:0.3(4)主导风向:夏季为南、西南风;冬季为东北风(5)地下水:无侵蚀性,地下水位距地面1.50m(6)地质资料:建设场区地势平坦,根据岩土工程勘察报告,场地工程地质和水文地质状况如下:第一层:粘土,分布普遍,厚度0.8~1.5m,平均1.3m,;第二层:粉土,分布普遍,厚度层厚1.1~2.1m,平均1.7m,层位较稳定,土质较均匀,地基承载力特征值,,;第三层:粉质粘土,分布普遍,层厚0.6~1.5m,平均1.3m,地基承载力特征值,,;第四层:粉土,分布普遍,层厚0.9~3.1m,平均1.94m,地基承载力特征值,,;-125- 山东建筑大学毕业设计说明书第五层:粉质粘土,分布普遍,层厚1.1~2.3m,平均1.61m,地基承载力特征值,,;第六层:粉质粘土,分布普遍,层厚1.9~3.4m,平均2.74m,地基承载力特征值,(),根据场地临近工程的试桩结果,桩体施工时的三击贯入度16cm)。水文地质:地下水埋藏较浅,位于地表面下1.5m地下水对混凝土及混凝土中钢筋均无侵蚀性。2.2建筑设计说明2.2.1设计概要本设计是学生公寓,应根据建筑使用性质、建设规模与标准的不同,确定各类用房。有二人宿舍、四人宿舍、小商店、接待室等等组成,应根据使用要求和具体条件确定。宿舍建筑应根据使用要求,结合基地面积、结构选型等情况按建筑模数确定开间和进深,并为今后改造和灵活分隔创造条件,故本建筑选取开间为3.9m,进深为7.2m。(1)房间使用面积、形状、大小的确定一个房间使用面积基本包括:家具、设备所占的面积;人们使用家具、设备所占活动面积;以及行走、交通所需的面积。充分利用框架结构的优越性,并考虑到柱网布置的要求,宿舍的开间取为3.9m,进深为7.2m,厕所布置在建筑朝向较差的一面,并设置公用的前室,前室内置洗手槽。厕所有不向邻室对流的直接自然风和天然采光,卫生洁具数量按《规范》要求确定。(2)门窗大小及位置的确定宿舍门洞口宽根据人流的多少和搬进房间设备的大小取门宽为900mm,开启方向朝房间内侧;走道端部的门采用等宽双扇门,大厅的门采用三个双扇双向弹簧门。(3)窗的大小以及位置的确定房间中的窗大小和位置的确定,主要是考虑到室内采光和通风的要求。本次设计中,宿舍的窗户,考虑《规范》要求窗地比≥1:7,窗宽取为2700mm,高度取为1800mm。厕所内开窗高2400m,并配置机械通风设备。(4)交通联系部分的平面设计-125- 山东建筑大学毕业设计说明书一幢建筑物除了有满足各种使用功能的房间以外,还需要有把各个使用房间及室内外有机联系起来的交通联系部分,以保证使用便利和安全疏散。在多层建筑中,楼梯是必不可少的一部分,是楼层人流疏散的必经之路,楼梯的数量、位置及形式应满足使用方便和安全疏散的要求,注重建筑环境空间的艺术效果。设计楼梯时,还应使其符合《建筑设计防火规范》、《民用建筑设计通则》和其他有关单项建筑设计规范的规定。考虑防火要求,多层建筑应设封闭楼梯间,且应靠外墙设置,能直接天然采光和自然通风,楼梯的门是可以阻挡烟气入侵的双向弹簧门。考虑结构楼梯平面形式的选用,主要依据其使用性质和重要程度来决定。本设计所有楼梯选取现浇板板式双跑楼梯。作为主要交通用的楼梯梯段净宽应根据楼梯使用过程中人流股数确定,一般按每股人流宽度0.55m+0~0.15m计算,并不应少于两股人流。楼梯平台部位的净高不应小于2m,楼梯梯段部位的净高不应小于2.2m楼梯梯段净高为自踏步前缘线量至直上方凸出物下缘间的铅垂高度。楼梯坡度的选择要从攀登效率,、节省空间、便于人流疏散等方面考虑。因而本建筑楼梯踏步高度选用150mm,踏面选用300mm。走廊作为水平的交通联系其主要功能是连接同一层内的各个房间、楼梯、门厅等,以解决建筑物中水平联系和疏散的问题,要求其宽度满足人流通畅和建筑防火的要求。考虑到柱截面尺寸和基础布置,适当放大取走道宽2.7m,净宽2.20m,可让三人并行通过。2.2.2建筑立面剖面设计立面设计是在满足房间的使用要求和技术经济条件下,运用建筑造型和立面构图的一些规律,结合平面的内部空间组合进行的。进行立面设计设计时要考虑房屋的内部空间关系,相邻立面的协调,各立面墙面的处理和门窗安排,满足立面形式美观要求,同时还应考虑各入口,雨篷等细部构件的处理。考虑设计的是学生宿舍,立面尽量明快简洁、具有时代感。在建筑的南立面采用不同颜色的面砖装饰。建筑剖面考虑的是建筑物各部分高度,建筑层数和空间结构体系。确定房间净高时,主要考虑房间的使用性质,室内采光通风及设备设置和结构类型。综合考虑这些因素,取房间层高为3.3m。2.2.3抗震设计《建筑抗震设计规范》规定,抗震设防烈度为6度及以上地区的建筑,必须进行抗震设计。该地区抗震设防烈度为7度,必须进行抗震设防。-125- 山东建筑大学毕业设计说明书建筑根据其使用功能的重要性分为甲类、乙类、丙类、丁四个抗震设防类别。甲类建筑应属于重大建筑工程和地震时可能发生严重次生灾害的建筑;乙类建筑应属于地震时使用功能不能中断或需要尽快恢复的建筑;丙类建筑应属于除甲、乙、丁类以外的一般建筑,丁类建筑应属于抗震次要建筑。本工程的抗震设防类别为丙类。丙类建筑,地震作用和抗震措施均应符合本地区抗震设防的要求。本设计属于框架结构,7度设防,高度小于30m,所以为三级框架。防震逢的最小宽度应符合下列要求:(1)框架结构房屋的防震缝宽度,当高度不超过15m时可采用70mm;超过15m时,6度、7度、8度和9相应每增加高度5m、4m、3m和2m,宜增加宽度20mm。(2)防震缝两侧结构类型不同时,宜按需要较宽防震缝的结构类型和较低房屋2.2.4防火设计疏散楼梯是安全疏散道路中一个主要组成部分,应设明显指示标志,并宜布置在易于寻找的位置。但电梯不能作为疏散楼梯用。疏散楼梯的多少,可按宽度指标结合疏散路线的距离及安全出口的数目确定。故在电梯附近设一个楼梯,在建筑物的西端设一个楼梯。2.2.5细部构造总说明(1)勒脚勒脚是墙身接近室外地面的部分,一般情况下,其高度为室内地坪与室外地面的高差部分。它起着保护墙身和增加建筑物立面美观的作用。由于它容易受到外界的碰撞和雨、雪的侵蚀,遭到破坏,同时地表水和地下水的毛细作用所形成的地潮也会造成对勒脚部位的侵蚀。所以,在构造上必须采取相应的防护措施。勒脚防潮层:分为水平防潮层和垂直防潮层。当室内地坪出现高差或室内地坪低于室外地面时,要同时设置水平防潮层和垂直防潮层。本工程只设水平防潮层。水平防潮层根据材料的不同,一般有油毡防潮层、防水砂浆防潮层、配筋细石混凝土防潮层。本工程选择防水砂浆防潮层,在标高-0.06m处设防潮层。(2)散水为保护墙基不受雨水的侵蚀,常在外墙四周将地面做成向外倾斜的坡面,以使将屋面水排至远处,这一坡面称散水。散水坡度约3%~5%,宽一般为600mm~1000mm,纵向每隔10米做一道伸缩缝,散水与外墙设20宽缝,其缝内均填沥青砂浆。。本工程做散水,宽度800mm,坡度3%,做法详见施工说明。(3)楼地面工程①-125- 山东建筑大学毕业设计说明书浇水磨石楼地面面层应分格,除特殊注明外,一般普通水磨石面层用厚玻璃条分隔;彩色水磨石面层用2厚铜条分格,分格大小酌情处理。②室内经常有水房间(包括室外阳台)应设地漏,楼地面用1:2.5水泥砂浆(掺3%防水粉)作不小于1%排水坡度坡向地漏,最薄处为20厚,地面最高点标高低于同层房间地面标高20。③特殊注明外,门外踏步、坡道的混凝土垫层厚度做法同地面。(4)屋面工程①屋面防水等级为二级,具体做法详见《建筑做法说明》②基层与突出屋面结构(女儿墙、墙、变形缝、管道、天沟、檐口)的转角处水泥砂浆粉刷均做成圆弧或圆角。③凡管道穿屋面等屋面留洞孔位置须检查核实后再做防水材料,避免做防水材料后再凿洞。④高屋面雨水排至低屋面时,应在雨水管下方屋面铺放一块490×490×30细石混凝土板保护。2.3建筑细部具体构造做法2.3.1屋面做法20厚1:3水泥砂浆3厚改性沥青防水卷材胶黏剂一层3厚改性沥青防水卷材30厚1:3水泥砂浆100厚憎水膨胀珍珠岩块1:8水泥膨胀珍珠岩最薄处40厚,2%找坡100厚现浇钢筋混凝土屋面板2.3.2楼面做法`(1)铺地砖楼面8~10厚地砖25厚1:2干硬性水泥砂浆现浇钢筋混凝土楼板(2)卫生间楼面5厚水泥细砂浆-125- 山东建筑大学毕业设计说明书15厚1:2干硬性水泥砂浆40厚C20细石混凝土20厚1:2水泥砂浆20厚的聚合物水泥砂浆60厚加气混凝土填充层100厚钢筋混凝土楼面板2.3.3内墙面做法混合砂浆抹面加气混凝土界面处理剂一道8厚1:3水泥砂浆打底扫毛8厚1:1:6水泥石灰膏砂浆扫毛7厚1:0.3:3水泥石膏砂浆压实抹光。刷内墙涂料2.3.4散水做法混凝土散水50厚C15混凝土撒1:1水泥砂子,压实赶光150厚3:7灰土垫层素土夯实向外坡3%-125- 山东建筑大学毕业设计说明书3结构设计3.1结构的选型及布置3.1.1结构的选型本工程为某大学学生公寓,结构的控制高度为20.75m。包括7800mm×8400mm大面积的活动室,平面布置比较灵活,且结构形式规则,宜采用框架结构和砌体结构。本工程选用填充墙为轻质砌块的框架结构。由于本工程所在地区的抗震设防等级为7度,采用轻质砌块作为填充墙的框架结构,自振周期长,结构影响系数小,自重小,相应的地震力亦小,对抗震有利,且同时考虑到经济合理的要求,故本工程选用本工程选用填充墙为轻质砌块的框架结构。3.1.2柱网布置框架结构的柱网尺寸,即平面框架的柱距与跨度和层高。首先要满足生产工艺行业其它实用功能的要求;其次是满足建筑平面功能的要求,还要做到柱网平面简单规则,受力合理,同时施工方便,故本工程柱网的平面布置(如图3.1)。本工程采用3900mm的柱距。图3.1柱网布置-125- 山东建筑大学毕业设计说明书3.1.3初选构件尺寸(1)初选柱截面尺寸据一般经验,多层框架层数在八层以下,初选截面时,可取柱高=400mm~600mm,宽=400mm~500mm,地震区为防止产生剪切破坏,要求柱宽且大于等于400mm,本工程选择400mm×500mm,500mm×500mm(门厅处)两种截面。(2)初选梁截面尺寸本工程为全现浇框架结构体系。考虑节点刚度影响,框架梁初选高度,一般矩形梁取,且框架梁宽,该工程框架为纵横向承重,根据梁跨度可初步确定:横向框架梁:边跨250mm×600mm中跨250mm×400mm纵向框架梁:250mm×400mm挑梁:250mm×400mm横向次梁:250mm×500mm室内卫生间次梁:150mm×300mm(3)楼板厚度双向板的厚度不宜小于80mm,由于挠度不另作验算,双向板的板厚与短跨跨长的比值,应满足刚度要求:,即,取100mm。室内卫生间双向板取为80mm。单向板的厚度,即,也取100mm,阳台处单向板板厚取80mm。3.2荷载统计3.2.1竖向荷载计算(1)屋面恒载①屋面框架梁线荷载标准值:屋面恒荷载边跨:20厚1:3水泥砂浆3厚改性沥青防水卷材胶黏剂一层-125- 山东建筑大学毕业设计说明书3厚改性沥青防水卷材30厚1:3水泥砂浆100厚憎水膨胀珍珠岩块1:8水泥膨胀珍珠岩最薄处40厚,2%找坡100厚现浇钢筋混凝土屋面板合计:中跨走廊:卷材防水膨胀珍珠岩保温屋面纸面石膏板吊顶合计:边跨框架梁AB,CD自重:0.25×0.60×25=3.75kN/m梁侧粉刷:2×(0.60-0.10)×0.02×17=0.34kN/m合计:4.09kN/m中跨框架梁BC自重:0.25×0.40×25=2.5kN/m梁侧粉刷:2×(0.40-0.10)×0.02×17=0.2kN/m合计:2.7kN/m因此,作用在顶层框架梁上的线荷载为:②屋面框架节点集中荷载标准值挑梁连系梁自重0.25×0.40×3.9×25=9.75kN一侧贴瓷砖,一侧粉刷0.50×0.40×3.9+0.02×(0.40-0.08)×3.9×17=1.20kN合计:10.95kN0.6m高女儿墙自重0.6×3.9×0.24×7.5=4.21kN合计:6.18kN连系梁传来屋面自重1.2/2×3.9×4.91=11.49kN故挑梁端处的集中荷载:28.62kN-125- 山东建筑大学毕业设计说明书边柱连系梁自重0.25×0.40×3.9×25=9.75kN粉刷0.02×(0.40-0.10)×2×3.9×17=0.80kN合计:10.55kN门连窗过梁自重及粉刷2.56kN连系梁传来屋面自重1.2/2×3.9×4.91=11.49kN0.5×3.9×0.5×3.9×4.91=18.67kN故顶层边节点集中荷载43.27kN连系梁传来屋面自重0.5×3.9×0.5×3.9×4.91=18.67kN0.5×(3.9+3.9-2.7)×2.7×0.5×5.03=17.32kN故顶层中节点集中荷载46.54kN(2)楼面恒载①楼面框架梁线荷载标准值楼面1恒荷载8~10厚地砖25厚1:2干硬性水泥砂浆现浇钢筋混凝土楼板合计:楼面2恒荷载5厚水泥细砂浆15厚1:2干硬性水泥砂浆40厚C20细石混凝土20厚1:2水泥砂浆20厚的聚合物水泥砂浆60厚加气混凝土填充层100厚钢筋混凝土楼面板合计:室内卫生间的楼面板厚为80mm故楼面恒载为边跨框架梁及梁侧粉刷4.09kN/m边跨填充墙自重0.20×(3.3-0.6)×7.5=4.05kN/m-125- 山东建筑大学毕业设计说明书墙面粉刷(3.3-0.6)×0.02×2×17=1.84kN/m合计:5.89kN/m中跨框架梁及梁侧粉刷2.7kN/m因此,作用在中间层框架梁上的线荷载为:挑梁框架梁自重2.7kN/m挑梁上填充墙自重0.20×(3.3-0.4)×7.5=4.35kN/m墙面粉刷(3.3-0.4)×0.02×2×17=1.97kN/m合计:6.32kN/m②楼面框架节点集中荷载标准值挑梁连系梁自重10.95kN塑钢窗自重2.7×1.8×0.25=1.22kN窗下墙体自重0.24×1.10×3.9×7.5=7.72kN粉刷2×0.02×0.9×3.9×17=2.39kN窗边墙体自重1.20×(3.3-1.5)×0.24×7.5=3.89kN粉刷1.20×(3.3-1.5)×0.02×2×17=1.47kN连系梁传来楼面自重0.5×1.2×3.9×3.82=8.94kN故挑梁端处的集中荷载为36.58kN边柱连系梁自重10.55kN门窗过梁自重2.4×0.2×0.2×25=2.4kN粉刷2.4×0.02×17×0.2=0.16kN塑钢门帘窗自重(1.8×2.4+0.9×0.9)×0.25=1.28kN墙体自重0.2×[(3.9-0.45-2.4)×(3.3-0.4)+1.5×0.9]×7.5=6.59kN粉刷[(3.9-0.45-2.4)×(3.3-0.4)+1.5×0.9]×0.02×17=1.49kN框架柱自重0.4×0.5×3.3×25=16.50kN粉刷0.6×0.02×3.3×17=0.67kN连系梁传来楼面自重0.5×3.9×3.82=8.94kN-125- 山东建筑大学毕业设计说明书0.5×3.9×0.5×3.9×3.18=12.09kN故中间层边节点集中荷载44.17kN(包括柱子自重的节点集中荷载60.67kN)中柱连系梁自重10.55kN内纵墙自重(3.9-0.45)×(3.3-0.4)×0.20×7.5=15.01kN粉刷(3.9-0.45)×(3.3-0.4)×2×0.02×17=6.80kN扣除门洞重加上门重-2.4×1.0×(2.18-0.2)=-4.75kN框架柱自重16.50kN室内卫生间横次梁传给中框架梁及纵次梁的集中荷载(如图3.2):梁上填充墙自重0.12×(3.3-0.3)×2×7.5=5.4kN粉刷2×0.02×(3.3-0.3)×2×17=4.08kN次梁自重0.3×0.15×2×25=2.25kN粉刷(0.3-0.1)×2×0.02×17×2=0.27kN纵次梁上所受荷载:纵次梁自重0.3×0.15×3.9×25=4.39kN粉刷0.02×17×(0.3-0.1)×3.9=0.27kN梁上填充墙自重0.12×(3.3-0.3)×1.8×7.5=4.86kN粉刷0.02×17×(3.3-0.3)×1.8×2=3.67kN图3.2纵次梁计算简图则传给左框架梁的集中荷载为18.5kN则传给右框架梁的集中荷载为24.45kN连系梁传来的楼面自重:0.5×(3.9+3.9-2.7)×0.5×2.7×3.30=11.36kN故中间层中节点集中荷载为58kN(包括柱子的自重的集中荷载为74.5kN)(3)屋面活载:-125- 山东建筑大学毕业设计说明书不上人屋面,屋面均布活荷载为0.5kN/m(4)雪荷载:本工程所在地为济南,雪荷载为0.3kN/m(5)楼面活荷载计算室内卫生间横次梁传给中框架梁及纵次梁的集中荷载:0.5×[0.5×(2+2-1.8)×0.5×1.8×2+0.5×2×0.5×2×2]=1.99kN纵次梁上的荷载(如图3.3)图3.3纵次梁的计算简图则传给左框架梁的集中荷载为6.71kN则传给右框架梁的集中荷载为6.71kN则恒荷载及活荷载作用下的计算简图(如图3.4,图3.5):-125- 山东建筑大学毕业设计说明书图3.4恒荷载作用下的计算简图图3.5活荷载作用下的计算简图-125- 山东建筑大学毕业设计说明书3.2.2水平荷载计算(1)风荷载的计算:风压标准值计算公式为:因结构高度H=20.25m,可取=1.0,对于矩形截面=1.3计算过程见表3.1:表3.1风荷载计算过程层次Z(m)(kN/m)A61.01.320.251.250.458.786.4251.01.316.951.180.4512.878.8841.01.313.651.100.4512.878.2831.01.310.351.010.4512.877.6021.01.37.051.00.4512.877.5311.01.33.751.00.4513.758.04(2)地震作用的计算重力荷载代表值为:结构和构配件自重标准值和各可变荷载组合值之和。其中,屋面均布活荷载的组合系数为0.5。楼面活荷载的组合系数为1.0。①突出屋面顶层:梁柱重力荷载标准值3.2梁柱重力荷载标准值类型bhγβn柱0.400.50251.102.700459.4横向梁0.300.60251.056.700263.32纵向梁0.300.60251.057.400269.93-125- 山东建筑大学毕业设计说明书类型bhγβn柱0.40.50251.103.300/246417.45连系梁0.250.40251.053.60017160.65纵框架梁0.250.40251.053.50036330.750.300.70251.057.400281.590.250.40251.057.000241.34挑梁0.250.40251.050.9502049.88边框架梁0.250.60251.056.70024633.15中框架梁0.250.40251.052.2001163.53墙体自重:2×(0.5+7.5×0.3+17×0.02)×(7.4+6.7)×2.1=183kN②顶层梁柱重力荷载标准值:表3.3顶层梁柱重力荷载标准值0.6m高的女儿墙自重:(0.5+7.5×0.3×17×0.02)×0.6×(3.9×11×2+19.5)=195.23kN挑梁连系梁上填充墙自重:(1/2)×(1.22+9.65+2.39+4.86+1.47)×17=166.52kN挑梁上填充墙自重:(1/2)×6.32×0.8×19=48.03kN纵向框架梁边跨填充墙自重:(1/2)×(2.4+0.16+1.28+6.59+1.49)×15=89.4kN(1/2)×22.16×2=22.16kN(1/2)×[1.8×1.5×0.25+3.09×(5×2.85-1.5×1.8)]=18.18kN横向边跨梁填充墙自重:(1/2)×3.09×2.65×7.3×4=119.55kN(1/2)×(0.2×7.5+2×0.02×17)×2.65×7.3×18=379.55kN室内卫生间隔墙自重:(1/2)×(5.4+4.08+8.53)×6=54.03kN纵向框架梁中跨填充墙自重:(1/2)×7.12×20=71.2kN则顶层重力荷载代表值为:-125- 山东建筑大学毕业设计说明书③标准层重力荷载代表值:标准层的柱为上下两层各一半即为顶层柱的重力的二倍。标准层的梁的重力和顶层的相同。填充墙的重力为上下两层各一半即为顶层重力的二倍。室内卫生间次梁自重:(2.25+0.27+4.39+0.27)×6=43.08kN则标准层重力荷载代表值为:④底层重力荷载代表值为:柱的重力荷载为:0.4×0.5×25×1.10×(3.30+4.25)×0.5×46=955.08kN底层梁的重力和标准层的相同。底层墙体自重;挑梁连系梁上填充墙自重;(1/2)×[3.09×(3.45×3.9-2.7×1.8)+1.22]×14=194.45kN挑梁上填充墙自重;(1/2)×2.18×0.8×3.45×18=54.15kN纵向框架梁边跨填充墙自重:(1/2)×[2.18×(3.5×3.45-1.5×2.4-0.9×0.9)+(1.5×2.4+0.9×0.9)×0.25]×14=124.69kN(1/2)×[1.8×1.5×0.25+3.09×(3.5×3.45-1.8×1.8)]×2=22.82kN(1/2)×[1.8×1.8×0.25+3.09×(3.5×3.45-1.8×1.8)]×2=28.11kN横向边跨梁填充墙自重:(1/2)×3.09×3.2×7.3×4=144.36kN(1/2)×2.18×3.2×7.3×18=458.32kN纵向框架梁中跨填充墙自重:-125- 山东建筑大学毕业设计说明书(1/2)×[(3.9-0.4)×(3.85-0.4)×(0.20×7.5+0.02×17×2)-2.18×2.4×1+2.4×1×0.2]×18=194.14kN则底层重力荷载代表值为:3.3内力分析3.3.1恒荷载作用下的内力计算恒载(竖向荷载)作用下的内力计算采用弯矩二次分配法,梁和柱的传递系数均为1/2,顶层柱的传递系数为1/3。底层的计算高度由室外地坪以下0.5m处算起,即:底层柱的高度为3.3+0.45+0.5=4.25m.。其中在求梁截面惯性矩时考虑到现浇楼板的作用,取(为不考虑楼板翼缘作用的梁截面惯性矩)AB,CD跨梁BC跨梁标准层的柱子底层柱(1)计算固端弯矩①顶层的固端弯矩的计算顶层边跨梁图3.5顶层边跨梁固端弯矩的计算简图把梯形荷载化作等效均布荷载-125- 山东建筑大学毕业设计说明书②标准层及底层固端弯矩的计算:图3.6标准层及底层固端弯矩的计算简图由静力计算手册查的:由于由于纵向框架梁的中心线与柱子的中心线不重合,以及悬挑的阳台,则框架节点处还作用有集中弯距顶层:底层及标准层:-125- 山东建筑大学毕业设计说明书(2)框架的内力计算过程(如图3.7):图3.7框架的内力计算过程-125- 山东建筑大学毕业设计说明书①恒荷载下的弯矩图(如图3.8):图3.8恒载弯矩图(②恒载作用下的剪力图(如图3.9)-125- 山东建筑大学毕业设计说明书图3.9恒载剪力图()-125- 山东建筑大学毕业设计说明书③恒载作用轴力图(如图3.10)图3.10恒载轴力图()(3)恒荷载作用下梁端弯矩调幅:-125- 山东建筑大学毕业设计说明书①以第五层计算为例(如图3.11):图3.11五层边跨梁计算简图横梁剪力是弯矩未调幅之前求得的则:梁的两端弯矩各调幅80%,则:设x处弯矩最大,则x处剪力为零由同理可得:1~4层边跨梁两端剪力及跨中最大弯矩-125- 山东建筑大学毕业设计说明书②顶层边跨梁(图3.12)图3.12顶层边跨梁计算简图按跨中为最大正弯矩③顶层中跨梁按简支梁计算的跨中弯矩(图3.13):-125- 山东建筑大学毕业设计说明书图3.13顶层中跨梁计算简图④标准层及底层中跨梁的跨中弯矩(图3.14):图3.14标准层及底层中跨梁计算简图框架梁在恒载作用下进行弯矩调幅并算到柱边的弯矩(如图3.15)-125- 山东建筑大学毕业设计说明书图3.15框架梁在恒载作用下进行弯矩调幅并算到柱边的弯矩3.3.2活荷载作用下的内力计算:活荷载(竖向荷载)作用下的内力计算同样采用弯矩二次分配法(1)求固端弯距:-125- 山东建筑大学毕业设计说明书①顶层边跨梁(图3.16)图3.16顶层边跨梁计算简图②顶层中跨梁(图3.17)图3.17顶层中跨梁计算简图(2)标准层及底层固端弯矩的计算①标准层及底层边跨梁(图3.18)图3.18标准层及底层边跨梁计算简图由静力计算手册查得:-125- 山东建筑大学毕业设计说明书②标准层及底层中跨梁(图3.19)图3.19标准层及底层中跨梁计算简图顶层边节点处的集中弯矩:1.17×1.2+3.07×(0.5/2-0.25/2)=1.79kN/m中节点处的集中弯矩:3.62×(0.5/2-0.25/2)=0.45kN/m标准层边节点处的集中弯矩:5.85×1.2+13.46×0.125=8.7kN/m中节点处的集中弯矩:12.71×0.125=1.59kN/m(3)框架的内力计算过程(如图3.20):-125- 山东建筑大学毕业设计说明书图3.20框架的内力计算过程①活荷载作用下的弯矩图(如图3.21):-125- 山东建筑大学毕业设计说明书图3.21活载弯矩图(②活荷载作用下的剪力图(如图3.22):-125- 山东建筑大学毕业设计说明书图3.22活载剪力图()③活荷载作用下的轴力图(如图3.23)-125- 山东建筑大学毕业设计说明书图3.23活载轴力图()(4)活荷载作用下梁端弯矩调幅:①顶层边跨梁(图3.23):-125- 山东建筑大学毕业设计说明书图3.23顶层边跨梁计算简图两端剪力:②顶层(标准层)中跨梁(图3.24):图3.24顶层(标准层)中跨梁两端剪力:②标准层及底层边跨梁(图3.25)图3.25标准层及底层边跨梁梁两端剪力:-125- 山东建筑大学毕业设计说明书由于求得的梁的跨中弯矩比最不利荷载的位置法的计算的结果要小,因此,对求得的跨中最大弯矩乘以1.2倍的系数:框架梁在活载作用下进行弯矩调幅并算到柱边的弯矩(如图3.26)-125- 山东建筑大学毕业设计说明书图3.26活载作用下进行弯矩调幅并算到柱边的弯矩()-125- 山东建筑大学毕业设计说明书3.3.3风荷载作用下的内力计算:(1)各层中柱和边柱分配的剪力计算表3.4各柱分配的剪力计算层数边柱中柱总剪力Kk60.990.3311.321.780.4711.896.4250.990.3313.161.780.4714.4915.340.990.3314.071.780.4716.9223.5830.990.3316.431.780.4719.1631.1820.990.3317.991.780.47111.3738.7111.280.54310.642.290.65012.7446.75(2)采用D值法计算的柱的上下端的弯矩见下表:表3.5柱端弯矩的计算过程层数边柱中柱njKynjKy6660.990.352.831.52661.780.3983.812.435650.990.406.264.17651.780.4398.316.504640.990.458.847.23641.780.4512.5610.283630.990.4511.679.55631.780.48915.4514.782620.990.5013.1813.18621.780.5018.7618.761611.280.62217.0928.13612.290.5524.3729.78(3)风荷载作用下的内里计算①则风荷载作用下的弯矩图(图3.27)-125- 山东建筑大学毕业设计说明书图3.27左风载弯矩图(风荷载作用下的剪力图(图3.28):-125- 山东建筑大学毕业设计说明书图3.28左风载剪力图()左风载下的轴力图(图3.29):-125- 山东建筑大学毕业设计说明书图3.29左风载轴力图()算至柱边的梁的弯矩图(图3.30):-125- 山东建筑大学毕业设计说明书图3.30算至柱边的梁的弯矩图(kN)3.3.4水平地震作用下的内力计算(1)结构水平地震作用计算简图(图3.31)-125- 山东建筑大学毕业设计说明书图3.31地震作用计算简图(2)框架柱侧移刚度计算梁的线刚度计算见表3.6表3.6梁的线刚度计算类别b(m)h(m)(m)1.52边横梁0.250.607.200走道梁0.250.402.700柱的线刚度计算见表3.7表3.7柱的线刚度计算层数14.2502~63.30072.70014.2502~63.300表3-125- 山东建筑大学毕业设计说明书3.8柱的侧移刚度的计算L类别层数Kn边框架1边柱0.960.49396344中柱1.710.5961163042~6边柱0.7410.270112704中柱1.330.399166604中框架1边柱1.280.5431060014中柱2.290.65012690142~6边柱0.990.3311382014中柱1.780.4711967014中框架1边柱1.020.5031229021.280.543105902中柱1.820.6671484022.290.6501269022~6边柱0.990.3311382020.790.283147502中柱1.420.4152164021.770.4691960027边柱0.610.234178504层数14568762~6720200771400表3.9柱的总的侧移刚度(3)自振周期:按经验公式计算(4)水平地震作用计算根据报告可知为7度,Ⅱ类场地-125- 山东建筑大学毕业设计说明书则总水平地震作用力为由于本工程的控制高度为23.100m<40mm,且沿高度质量和刚度分布比较均匀,故可以采用底部剪力法计算各层所分担的水平地震力表3.10各层水平地震力的计算层数i层水平地震作用力72.70023.45659.8215472.7870.98212.9463.30020.756577.33136479.60626.11697.0953.30017.458522.01148709.07682.221379.3143.30014.158522.01120586.44553.201932.5133.30010.858522.0192463.81424.192356.7023.3007.558522.0164341.18295.172651.8714.2504.258851.5336218.54166.162818.0323.4551400.47614271.422818.03(5)变形验算见表3.11-125- 山东建筑大学毕业设计说明书表3.11变形验算过程层数i层地震作用力层间位移顶点位移最大层间位移与层高之比顶点位移与总高之比7212.94714000.002980.02260.00368/3.3=1/896<1/4000.00617/4.25=1/688<1/4000.0226/23.45=1/1037<1/5006697.097202000.019751379.317202000.0177241932.517202000.0158032356.707202000.0131222651.877202000.0098512818.034568760.00617(6)横向地震下框架内力分析所计算一榀框架,各层柱子剪力及柱端弯矩计算如下表3.12表3.12柱端弯矩的计算层数边柱中柱VKyVKy60.019213.380.990.3528.7015.450.027319.041.780.38938.3924.4450.019226.480.990.4052.4334.950.027337.661.780.43969.7254.5640.01937.100.990.4567.3455.090.02752.761.780.4595.7678.3530.01945.250.990.4582.1367.200.02764.341.780.49108.5103.820.01950.920.990.5084.0284.020.02772.401.780.50119.4119.410.02364.811.280.62104.1171.30.02778.272.290.55149.6182.9①水平地震作用下的弯矩图(图3.32)-125- 山东建筑大学毕业设计说明书图3.32左地震弯矩图(②左地震作用下的剪力图(图3.33):-125- 山东建筑大学毕业设计说明书图3.33左地震剪力图()③左震下的轴力图(图3.34):-125- 山东建筑大学毕业设计说明书图3.34左震下的轴力图(kN)④左震下算至柱边的弯矩图(图3.35)-125- 山东建筑大学毕业设计说明书图3.35算至柱边的弯矩图(3.4内力组合3.4.1荷载组合(1)本设计采用的荷载组合为-125- 山东建筑大学毕业设计说明书①1.2恒+1.4活②1.35恒+1.40.7活③1.2恒+1.40.9(活+风)④1.2(恒+0.5活)+1.3地震(2)控制截面及不利内力框架梁的控制截面及不利内力为;支座截面:-Mmax,Vmax。跨中截面:Mmax框架柱控制截面为每层上下截面:每截面应组合:Mmax及相应N、VNmax及相应M、VNmin及相应M、V2.4.2框架梁的内力组合该设计内力组合有六种:①1.2恒+1.4活②1.35恒+1.40.7活③1.2恒+1.40.9(活+左风)④1.2恒+1.40.9(活+右风)⑤1.2(恒+0.5活)+1.3左地震⑥1.2(恒+0.5活)+1.3右地震-125- 山东建筑大学毕业设计说明书表3.13框架梁的内力组合表层数横梁截面内力恒载活载左风右风左震右震组合1组合2组合3组合4组合5组合66边跨梁左支座M-46-4.09-2.662.66-26.9826.98-60.97-66.16-63.75-57.05-92.8-22.6V64.835.10.69-0.76.96-6.9684.93692.51985.09183.35389.971.81跨中M78.675.970.35-0.43.64-3.64102.76112.06102.37101.49102.793.25V000000右支座M-41.5-4.22-1.961.96-19.6819.68-55.76-60.21-57.63-52.7-78-26.8V-63.1-5.14-0.690.69-6.966.96-82.94-90.25-83.09-81.35-87.9-69.8中跨梁左支座M-16-0.85-1.371.37-13.8713.87-20.43-22.47-22.03-18.58-37.8-1.72V12.140.911.24-1.212.57-12.615.84217.28117.27714.15231.46-1.23跨中M-8.35-0.260000-10.38-11.53-10.35-10.35-10.2-10.2V0000005边跨梁左支座M-64.2-16-7.37.3-63.763.7-99.34-102.3-106.3-87.9-169-3.75V73.8220.271.91-1.916.73-16.7116.96119.52116.53111.72122.579跨中M82.5129.280.05-0.10.31-0.31140140.08135.97135.84117116.2V000000右支座M-61.515.46-5.515.51-48.3648.36-52.14-67.86-61.25-47.37-127-1.64V-92.2-21.8-1.911.91-16.7316.73-141.1-145.8-140.5-135.7-145-102中跨梁左支座M-13.1-4.01-3.613.61-33.9133.91-21.3-21.57-25.29-16.19-62.225.99V8.773.653.52-3.530.83-30.815.63415.41719.55810.68852.79-27.4跨中M-7.58-1.640000-11.39-11.84-11.16-11.16-10.1-10.1V000000-125- 山东建筑大学毕业设计说明书续表3.134边跨梁左支座M-62.9-16.3-12.212.2-95.8395.83-98.36-101-111.4-80.72-21039.27V73.9520.283.28-3.325.86-25.9117.13119.71118.43110.16134.567.29跨中M82.9928.560.23-0.21.91-1.91139.57140.03135.86135.28119.2114.2V000000右支座M-61.5-16.1-9.829.82-77.4277.42-96.3-98.77-106.4-81.68-18417.22V-92.5-21.7-3.283.28-25.8625.86-141.4-146.1-142.5-134.2-158-90.4中跨梁左支座M-13-3.7-6.866.86-54.1254.12-20.83-21.23-28.95-11.67-88.252.49V8.773.656.24-6.249.21-49.215.63415.41722.9857.260676.69-51.3跨中M-7.55-1.550000-11.23-11.71-11.01-11.01-9.99-9.99V0000003边跨梁左支座M-62.9-16.3-17.817.8-128.8128.8-98.36-101-118.4-73.71-25382.18V73.5920.284.62-4.633.54-33.5116.7119.22119.68108.04144.156.87跨中M82.9928.560.28-0.32.05-2.05139.57140.03135.93135.22119.4114.1V000000右支座M-61.5-16.1-13.213.2-95.8995.89-96.3-98.77-110.7-77.4-20841.23V-92.5-21.7-4.624.62-33.5433.54-141.4-146.1-144.2-132.5-168-80.4中跨梁左支座M-13-3.7-9.279.27-67.2967.29-20.83-21.23-31.99-8.63-10569.61V8.773.658.42-8.461.17-61.215.63415.41725.7324.513892.24-66.8跨中M-7.55-1.550000-11.23-11.71-11.01-11.01-9.99-9.99V000000-125- 山东建筑大学毕业设计说明书续表3.132边跨梁左支座M-63.1-16.4-21.321.3-141.6141.6-98.68-101.3-123.2-69.56-27098.57V74.0720.255.76-5.838.31-38.3117.23119.84121.66107.14150.851.23跨中M82.7528.60.47-0.53.15-3.15139.34139.74135.93134.74120.6112.4V000000右支座M-61.7-16.1-17.317.3-115115-96.68-99.17-116.2-72.65-23365.73V-92.5-21.8-5.765.76-38.3138.31-141.4-146.2-145.7-131.1-174-74.2中跨梁左支座M-12.9-3.67-12.112.1-80.3980.39-20.62-21.01-35.33-4.883-12286.83V8.773.6510.98-1173.08-73.115.63415.41728.9581.2882107.7-82.3跨中M-7.41-1.30000-10.71-11.28-10.53-10.53-9.67-9.67V0000001边跨梁左支座M-60.3-15.2-28.828.8-176.4176.4-93.63-96.32-127.8-55.18-311147.8V71.5720.267.55-7.646.98-47114.25116.47120.92101.9159.136.97跨中M87.0729.951.98-22.14-2.14146.41146.9144.72139.73125.2119.7V000000右支座M-50.4-14.9-22.222.2-138.4138.4-81.28-82.58-107.1-51.25-249110.5V-92-21.8-7.557.55-46.9846.98-140.8-145.5-147.3-128.3-184-62.3中跨梁左支座M-15.7-4.4-15.515.5-96.8996.89-25.05-25.56-44-4.864-147104.4V8.773.6514.12-1488.08-88.115.63415.41732.914-2.668127.2-102跨中M-10.3-2.030000-15.14-15.83-14.86-14.86-13.5-13.5V-125- 山东建筑大学毕业设计说明书3.4.3框架柱的内力组合该设计同样有以下六种组合①1.2恒+1.4活②1.35恒+1.40.7活③1.2恒+1.40.9(活+左风)④1.2恒+1.40.9(活+右风)⑤1.2(恒+0.5活)+1.3左地震⑥1.2(恒+0.5活)+1.3右地震-125- 山东建筑大学毕业设计说明书表3.14框架柱的内力组合表边柱层数截面内力类别恒荷载活荷载左风右风左震右震组合1组合2组合3组合4组合5组合66上M35.754.91-2.832.83-28.728.749.7753.0745.5252.658.5483.16N123.629.34-0.690.69-6.966.96161.4176159.2161145163下M-25.77-7.691.52-1.5215.45-15.5-41.7-42.3-38.7-42.5-15-55.6N140.989.34-0.690.69-6.966.96182.3199.5180.1181.8166183.8V-18.64-3.821.32-1.3213.38-13.4-27.7-28.9-25.5-28.8-7.3-42.15上M21.179.68-6.266.26-52.452.4338.9638.0729.7145.49-3799.37N30848.92-2.62.6-23.723.69438.1463.7428434.5368429.7下M-22.7-9.014.17-4.1734.95-34.6-39.9-39.5-33.3-43.812.8-77.6N325.3648.92-2.62.6-23.723.69458.9487.2448.8455.3389450.6V-13.29-5.663.16-3.1626.48-26.5-23.9-23.5-19.1-27.115.1-53.84上M22.79.01-8.848.84-67.367.3439.8539.4727.4549.73-55120.2N492.1588.51-5.885.88-49.649.55714.5751.1694.7709.5579708.1下M-22.7-9.017.23-7.2355.09-55.1-39.9-39.5-29.5-47.739-104N509.5188.51-5.885.88-49.649.55735.3774.6715.5730.3600728.9V-13.76-5.464.87-4.8737.1-37.1-24.2-23.9-17.3-29.528.4-68-125- 山东建筑大学毕业设计说明书续表3.144上M22.79.01-8.848.84-67.367.3439.8539.4727.4549.73-55120.2N492.1588.51-5.885.88-49.649.55714.5751.1694.7709.5579708.1下M-22.7-9.017.23-7.2355.09-55.1-39.9-39.5-29.5-47.739-104N509.5188.51-5.885.88-49.649.55735.3774.6715.5730.3600728.9V-13.76-5.464.87-4.8737.1-37.1-24.2-23.9-17.3-29.528.4-683上M22.79.01-11.711.67-82.182.1339.8539.4723.8953.3-74139.4N676.3128.1-10.510.5-83.183.09990.91039959.7986.2780996.4下M-22.51-8.929.55-9.5567.2-67.2-39.5-39.1-26.2-50.355-120N693.66128.1-10.510.5-83.183.0910121062980.610078011017V-13.7-5.336.43-6.4345.25-45.3-23.9-23.7-15.1-31.339.2-78.52上M23.19.19-13.213.18-8484.0240.5940.1922.6955.91-76142.5N860.43167.7-16.316.26-121121.412671326122312649751291下M-27.03-10.813.18-13.284.02-84-47.5-47-29.4-62.670.3-148N877.79167.7-16.316.26-121121.412881349124412859961312V-15.19-6.057.99-7.9950.92-50.9-26.7-26.4-15.8-35.944.3-88.11上M15.285.8-17.117.09-104104.126.4626.314.11147.18-114157.2N1045.1207.2-23.823.81-168168.4154416141485154511601597下M-7.64-2.928.13-28.1171.3-177-13.2-13.222.62-48.3212-241N1062.4207.2-23.823.81-168168.4156516371506156611801618V-5.39-2.0510.64-10.664.81-64.8-9.34-9.294.355-22.576.6-92-125- 山东建筑大学毕业设计说明书续表3.14中柱层数截面内力类别恒荷载活荷载左风右风左震右震组合1组合2组合3组合4组合5组合66上M-46.76-5.34-3.813.81-38.438.39-63.6-68.4-67.6-58.04-109.2-9.41N106.139.67-0.550.55-5.615.61140.9152.8138.8140.23125.87140.5下M41.468.52.43-2.4324.44-24.461.6564.363.5257.486.62423.08N123.499.67-0.550.55-5.615.61161.7176.2159.7161.07146.7161.3V26.734.191.89-1.8919.04-1937.9440.1939.7434.97459.3429.8385上M-41.47-11.1-8.318.31-69.769.72-65.3-66.9-74.2-53.3-147.134.2N284.7847.78-2.162.16-19.719.71408.6431.3399.2404.66344.78396下M41.6410.356.5-6.554.56-54.664.4666.3671.254.819127.11-14.8N302.1447.78-2.162.16-19.719.71429.5454.7420425.49365.61416.9V25.186.514.49-4.4937.66-37.739.3340.3744.0832.76183.08-14.84上M-41.64-10.4-12.612.56-95.895.76-64.5-66.4-78.8-47.18-180.768.31N463.6685.88-5.125.12-43.143.14676.6710.1658.1671.05551.84664下M41.6410.3510.28-10.378.35-78.464.4666.3675.9650.056158.03-45.7N481.0285.88-5.125.12-43.143.14697.5733.5679691.88572.67684.8V25.246.276.92-6.9252.76-52.839.0740.2246.9129.469102.64-34.5-125- 山东建筑大学毕业设计说明书续表3.143上M-41.64-10.4-15.515.45-109108.5-64.5-66.4-82.5-43.5-19784.87N642.54124-8.928.92-70.870.77944.6988.9916938.5753937.4下M41.2910.2614.78-14.8103.8-10463.9165.881.143.85191-79.3N659.9124-8.928.92-70.870.77965.51012936.9959.3774958.3V25.136.259.16-9.1664.34-64.338.9140.0549.5726.49118-49.72上M-42.45-10.5-18.818.76-119119.4-65.7-67.6-87.9-40.6-21397.98N821.44162.4-14.114.14-106105.512131268117312089461220下M48.7912.1218.76-18.8119.4-11975.5277.7497.4650.18221-89.4N838.8162.4-14.114.14-106105.512341292119312299671241V27.656.8711.37-11.472.4-72.442.844.0656.1627.51131-56.81上M-25.23-6.38-24.424.37-150149.6-39.2-40.3-69-7.61-229160.4N994.82200.2-20.720.71-147146.6147415391420147211231505下M12.623.1929.78-29.8183-18319.6120.1656.69-18.4255-221N1017.2200.2-20.720.71-147146.6150115691447149911501531V8.912.2512.47-12.578.27-78.313.8414.2329.24-2.19114-89.7-125- 山东建筑大学毕业设计说明书3.5梁、柱截面计算3.5.1框架梁截面计算以第一层边框架粱为例,说明计算方法及过程。梁板柱整体浇注,采用C30混凝土,纵向受力钢筋采用HRB335,查表可得,保护层厚度取25mm,故令,(1)粱的正截面受弯承载力计算支座弯矩由跨间弯矩取控制截面,即跨中正弯矩,没有考虑地震组合,故不进行抗震调整。当粱下部受拉时,按T形截面设计,当粱上部受拉时,按矩形截面设计翼缘计算宽度当按跨度考虑时,按梁间距考虑,;,此种情况不起控制作用,取。下部跨间截面按单筋T形截面计算属于第一类T形截面。实配钢筋3Ф20,-125- 山东建筑大学毕业设计说明书,同时,满足将下部跨间截面的3Ф20,钢筋伸入支座,作为支座负弯矩下的受压钢筋,下面再计算相应的受拉钢筋。即支座A上部。单筋矩形截面求正截面受弯承载力按下式计算:假定受拉钢筋放两排,则实配钢筋5Ф20,支座B上部:实配钢筋2Ф20,3Ф18,框架粱的支座处纵向受拉钢筋的最小配筋百分率为-125- 山东建筑大学毕业设计说明书支座处:其他各梁正截面配筋如下表所示:表3.15梁的正截面配筋层次截面M实配钢筋6支座A-69.584243Ф16(603)0.43B-60.223652Ф16(402)0.29AB跨间112.066652Ф18,1Ф16(712)0.50支座-28.332672Ф16(402)0.29BC跨间2Ф16(402)0.445支座A-127.037974Ф16(804)0.57B-95.545893Ф16(603)0.43AB跨间135.978072Ф20,1Ф16(829)0.59支座-46.634024713Ф16(603)0.670.66BC跨间19.501792Ф16(402)0.294支座A-157.4282910392Ф20,2Ф18(1139)0.690.80B-138.068298693Ф20(941)0.880.67AB跨间140.038313Ф20(941)0.67支座-66.174026683Ф20(941)0.431.03BC跨间39.373642Ф16(402)0.493支座A-189.6182912524Ф20(1256)0.660.93B-156.0782910302Ф20,2Ф16(1030)0.810.76AB跨间140.038313Ф20(941)0.59支座-80.625098142Ф20,2Ф16(1030)0.610.59BC跨间52.214852Ф18(509)0.562支座A-202.2794113353Ф20,2Ф16(1343)0.70.99B-174.9594111554Ф20(1256)0.750.93AB跨间139.748302Ф20,1Ф16(829)0.59支座-91.646049264Ф20(1256)0.641.03BC跨间65.126063Ф16(603)0.661支座A-233.1294115395Ф20(1570)0.601.11B-186.9694112742Ф20,3Ф18(1391)0.681.03AB跨间146.908733Ф20(941)0.59支座-110.6176311182Ф20,3Ф18(1391)0.551.67BC跨间78.327323Ф18(763)0.84-125- 山东建筑大学毕业设计说明书(2)梁斜截面受剪承载力计算:①框架梁剪力的调整由于考虑地震作用,满足“强剪弱弯”的原则,对于考虑地震作用组合框架梁梁端剪力设计值按下式进行调整:以一层边跨粱为例说明:按简支粱计算的重力荷载代表值产生的剪力设计值:恒荷载作用下(图3.36):图3.36恒载下的计算简图活荷载作用下(图3.37):图3.37活载下的计算简图其他楼层各梁剪力调整见下表3.16-125- 山东建筑大学毕业设计说明书表3.16梁剪力调整层数截面6AB左81.59AB右81.59BC左28.79BC右28.795AB左125.71AB右139.39BC左50.76BC右50.764AB左134AB右153.31BC左73.09BC右73.093AB左143.34AB右162.65BC左87.65BC右87.652AB左144.86AB右168.45BC左102.12BC右102.121AB左161.03AB右177.55BC左120.34BC右120.34-125- 山东建筑大学毕业设计说明书②梁AB(一层)由边跨梁跨高比:满足要求.由中跨梁跨高比:在边跨横梁上作用一个48.9kN的集中力,占总剪力值:48.9/(76.31+94.71)=0.29<0.75故按均布荷载小的斜截面受剪承载力公式计算:箍筋的最小配箍率:梁AB(一层)梁端箍筋加密区取双肢箍Ф10,s取加密区的长度非加密区配置2Ф10@200.其他各层梁的斜截面配筋见下表3.17-125- 山东建筑大学毕业设计说明书表3.17梁的斜截面配筋层数梁加密区箍筋加密区箍筋长度非加密区箍筋6AB81.592肢Ф8@1009002肢Ф8@200BC45.582肢Ф8@1006002肢Ф8@2005AB139.392肢Ф8@1009002肢Ф8@200BC50.762肢Ф8@1006002肢Ф8@2004AB153.312肢Ф8@1009002肢Ф8@200BC73.092肢Ф8@1006002肢Ф8@2003AB162.652肢Ф10@1009002肢Ф10@200BC87.652肢Ф8@1006002肢Ф8@2002AB168.452肢Ф10@1009002肢Ф10@200BC102.122肢Ф10@1006002肢Ф10@2001AB177.552肢Ф10@1009002肢Ф10@200BC120.342肢Ф10@1006002肢Ф10@2003.5.2挑梁的设计挑梁根部处的内力组合(表3.18)表3.18内力组合层次类型恒载活载1.2恒+1.4活1.35恒+1.4×0.7活顶层M36.221.4045.4250.27V31.861.1739.8744.49标准层M50.757.0270.7375.39V47.405.8565.0769.72(1)以挑梁边梁为例说明:①正截面受弯承载力计算-125- 山东建筑大学毕业设计说明书按矩形截面设计:求计算系数:②斜截面受剪承载力计算:验算截面条件:配置箍筋:仅需按构造配置箍筋,选配Ф8@200-125- 山东建筑大学毕业设计说明书其他各层的配筋如表3.19:表3.19挑梁的配筋层次MV实配箍筋实配纵筋650.2744.490.112487Ф8@2003Ф16(603)575.3944.490.173754Ф8@2004Ф16(804)475.3944.490.173754Ф8@2002Ф20,1Ф18(884)375.3944.490.173754Ф8@2004Ф20(1256)275.3944.490.173754Ф8@2003Ф20,2Ф16(1343)175.3944.490.173754Ф8@2005Ф20(1570)3.5.3框架柱的截面设计(1)剪跨比和轴压比验算(表3.20)表3.20剪跨比和轴压比验算柱号层数bN边柱640046014.383.15642.054176.0404.30>20.067<0.9540046014.399.37153.768487.184.02>20.17<0.9440046014.3120.18868.02774.583.84>20.27<0.9340046014.3139.41578.4631038.543.86>20.36<0.9240046014.3148.1288.051349.323.66>20.47<0.9140046014.3241.4691.951637.355.71>20.57<0.9中柱640046014.3109.22359.34161.284>2.056<0.9540046014.3147.07283.08454.713.85>20.159<0.9440046014.3158.03102.64733.543.35>20.256<0.9340046014.3197.23117.551012.373.65>20.354<0.9240046014.3212.51131.421291.543.52>20.452<0.9140046014.3228.61113.791569.454.37>20.55<0.9由上表可知剪跨比和轴压比验算满足要求。(1)柱正截面承载力计算:以第二层中柱为例B节点左右梁端弯矩-125- 山东建筑大学毕业设计说明书B节点上下柱端弯矩故对柱端组合弯矩不调整:取20mm和偏心方向截面尺寸的1/30,两者中的较大值,即500/30=16.67mm,故取20mm。柱的计算长度由水平荷载产生的弯矩设计值占总的弯矩1.3119.42/221.066=0.70<0.75故为大偏压情况此组内力组合为非地震内力组合,且无水平荷载作用,取则=1.11-125- 山东建筑大学毕业设计说明书故按构造配筋,且应满足故选-125- 山东建筑大学毕业设计说明书其它各层柱的配筋见下表:表3.21第六层柱的配筋层数计算项目边柱中柱6控制内力上端下端上端下端MN66.53130.4053.07176.048.54144.955.62183.8342.33199.4815.45165.73109.22125.8768.36152.75109.22125.8786.62146.7064.30176.1986.62146.70530321.579302.60212.2113.2887.72467.53887.72610.46384.95610.461.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.041.071.281.071.111.201.031.051.031.041.061.04761.20554311.12533.78444.56135.56910.08489.89910.08632.82407.31632.820.050.070.060.080.050.060.050.060.070.06偏心情况大大小大大小大大大大大大()125<064<0<02593525930<030实配钢筋-125- 山东建筑大学毕业设计说明书表3.22第五层柱的配筋层数计算项目边柱中柱5控制内力上端下端上端下端MN79.50343.8038.07463.7429.56294.5362.09360.4639.47487.1810.23311.19117.66275.8266.88431.28117.66275.82101.69292.4966.36454.71101.69292.49251102120192101534471754473681663681.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.091.221.191.121.221.421.051.131.051.061.131.064833343524243332856794076796003986000.130.110.140.110.160.110.110.170.11偏心情况大小大大小小大大大大大大()150<0<0<0<0<0531<0531395<0395实配钢筋表2.24第三层柱的配筋层数计算项目边柱中柱3控制内力上端下端上端下端MN111.54797.1539.471038.5459.30624.3295.781061.9839.131061.9844.00640.99157.78602.7566.36988.93157.78602.75152.54619.4165.801012.37152.54619.4116058115282872822662661.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.141.391.191.081.261.081.081.08392290.36347.36514.36319.36514.36498.36498.360.300.230.230.240.24偏心情况大小小小小小大小大大小大-125- 山东建筑大学毕业设计说明书()35<0<0<0<0<0505<0505416<0416实配钢筋表2.25第二层柱的配筋层数计算项目边柱中柱2控制内力上端下端上端下端MN113.91032.7540.191325.8960.79780.23118.501049.4147.051349.3256.26796.90170.01756.7867.641268.11170.01756.78176.85773.4477.741291.54176.85773.44130661332452452492491.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.171.341.171.091.091.091.09362.30298.36365.36477.36477.36481.36481.360.390.580.290.290.290.29偏心情况大小小小小小大小大大小大()<0<0<0<0<0<0482<0482578<0578实配钢筋-125- 山东建筑大学毕业设计说明书表2.26第一层柱的配筋1控制内力上端下端上端下端MN125.741277.8426.311613.9290.83927.61222.121294.5115.131637.35194.88944.28182.89898.6340.311539.23182.89898.63234.51920.1223.19234.51920.121181182262232232752751.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.01.201.201.101.111.111.091.09351.74351.74458.36456.68456.68508.74508.740.710.350.360.340.340.350.35偏心情况小小大小小大大小大大小大()<0<0<0<0<0606537<0537943<0943实配钢筋-125- 山东建筑大学毕业设计说明书(3)柱斜截面受剪承载力计算以第一层边柱为例进行说明:考虑地震作用组合的框架柱的剪力值,按下列公式计算:上柱柱端弯矩设计值:抗震等级为三级的柱下端弯矩设计值:则  有剪跨比故按构造配置箍筋由一层柱底的轴压比由规范可知:柱箍筋加密区的箍筋最小配箍特征值则箍筋加密区箍筋的体积配箍率-125- 山东建筑大学毕业设计说明书箍筋的最大间距取min(8d,100)取100mm-125- 山东建筑大学毕业设计说明书考虑地震作用组合的框架柱剪力设计值的计算(见表3.27)表3.27考虑地震作用组合的框架柱剪力设计值柱号边柱中柱层次123456123456157.17142.46139.42120.1999.3783.16-228.61-212.51-197.23-180.67-147.07-109.22-277.66-148.12-119.72-104.26-77.61-55.62293.14221.07190.67158.03127.1186.62131.04118.38105.5883.1372.1056.54157.24176.64158.03137.99101.5579.79111.38100.6389.7470.6661.2948.06133.65150.15134.33117.2986.3267.82-125- 山东建筑大学毕业设计说明书各层柱箍筋计算结果见表3.28:表3.28各层柱箍筋计算柱号层次实配箍筋加密区非加密区边柱648.06526.24183.83789.36<00.41%561.29<00.41%470.66526.24728.93<00.41%389.74526.241017.27789.36<00.442100.63526.241311.76789.36<00.571111.38526.241618.14789.36<00.68中柱667.82526.24146.70<00.41%586.32526.24365.61<00.41%4117.29526.24572.67>0.00020.41%3134.33526.24774.27>0.00020.41%2150.15526.24966.80789.36>0.00040.421133.65526.241150..15789.36>0.00020.443.6板的设计3.6.1双向板的设计按塑性铰线法设计采用C30混凝土,与梁柱整体浇注,板中钢筋采用HPB235。板区格划分如图3.38-125- 山东建筑大学毕业设计说明书图3.38板的区格划分(1)荷载设计值:A,B,E区格:C区格:D区格:F区格:(2)计算跨度:由于板与梁整体连接,故计算跨度取(3)设计参数:考虑到应尽量使按塑性绞线法得出的;两个方向跨中弯矩的比值与按弹性理论得出的比值相接近,以期在使用阶段两个方向的截面应力较接近,宜取,同时考虑到节约钢材及配筋方便,根据经验,取,通常取(1)弯矩计算:①A区格:四边连续-125- 山东建筑大学毕业设计说明书代入虚功方程:-125- 山东建筑大学毕业设计说明书其他区格的弯矩见表3.29:表3.29弯矩的计算过程区格ABCDEF3.651.81.62.73.93.94.81.93.93.97.27.24.81.91.83.97.27.22.191.621.2641.300.9750.9759.63.83.67.815.615.69.63.83.67.815.615.64.383.232.532.351.951.954.383.232.532.351.951.951.8840.3300.3881.2042.8873.8551.1300.2960.3070.5780.7220.9643.7680.6600.7762.4085.7747.713.7680.6600.7762.4085.7747.712.2600.5920.6141.1561.4441.9282.2600.5920.6141.1561.4441.928(5)板的配筋截面有效高度:假定选用钢筋,,则方向跨中截面=100-15-8/2=81mm,方向=100-15-8-8/2=73mm支座截面=81mm,为便于计算,取=0.95,选用C30混凝土,HPB235钢筋,。-125- 山东建筑大学毕业设计说明书配筋结果见表3.30表3.30板的配筋跨中ABC811.884117251731.13078251D811.20475251730.57840251E812.887179251730.72250251F813.855239251730.96467251支座A-A813.768234251A-BA-C812.302142.5251D-D812.302142.5251D-C812.408149251E-D812.408149251E-AE-B815.774358387A-阳台812.260140251B-B810.59237251C-C810.61438251F-F817.71477厕所-走道811.9281192513.6.2单向板的设计(1)阳台处,按单向板设计。-125- 山东建筑大学毕业设计说明书板的计算跨度,取1m板带作为计算单元:板的弯矩:端支座跨中板的配筋计算板厚80mm,=80-20=60mm,板宽b=1000mm,C30混凝土,HPB235钢筋表3.31截面弯矩截面端支座跨中弯矩设计值-0.5110.584按最小配筋率配筋(2)接待室楼面按单向板设计,适当增加沿长跨方向的分布钢筋①计算简图(如图3.39)板的计算跨度,取1m板带作为计算单元图3.39接待室楼面计算简图②弯矩设计值-125- 山东建筑大学毕业设计说明书③正截面受弯承载力计算板厚=100mm,=100-20=80mm表3.31配筋计算过程截面A1B2弯矩设计值()-2.2852.611-3.3242.2850.0250.0290.0360.0250.0250.0290.0370.025计算配筋()137158202137实际配筋()最小配筋率3.7基础设计根据对上部结构和工程地质勘察报告的研究和分析,采用天然地基上的浅基础不能满足上部结构对地基基础的要求。本工程采用复合载体夯扩桩基。3.7.1桩的设计:(1)桩身长度-125- 山东建筑大学毕业设计说明书根据工程地质勘察报告,选择第六层粉质粘土层作为被加固土层,承台高度取800mm,故桩长=1.7+1.3+1.94+1.614+0.2=6.75m,桩身混凝土强度等级为C25,钢筋笼长度为6.75m..(2)桩身直径:桩身直径选取350mm,纵筋采用,箍筋采用螺旋绕扎,桩身上部2m范围内箍筋加密,间距150mm,每隔2m设一道焊接加劲箍筋,纵筋伸入承台的锚固长度不得小于30d=3012=360mm。取400mm。(3)桩端持力层:由技术规程可知,被加固为桩端至桩端下2m深度范围内的土层,故本工程的桩端持力层为粉质粘土层。(4)单桩极限承载力特征值按经验公式确定单桩竖向极限承载力特征值:等效桩端计算面积由被加固土层为粉质粘土,三击贯入度为16m,查得:则:(5)桩顶作用效应计算:边柱传来的上部荷载为:恒载活载左风左震①正常使用极限状态下荷载效应的标准组合-125- 山东建筑大学毕业设计说明书M=7.64+2.9+0.628.13=27.42H=5.39+2.05+0.610.64=13.82N=1062.42+207.23+0.623.81=1283.94②承载能力极限状态下由永久荷载效应控制的基本组合M=1.357.64+1.40.72.9+1.40.628.13=36.79H=1.355.39+1.40.72.05+1.40.610.64=18.22N=1.351062.42+1.40.7207.23+1.40.623.81=1657.35③地震作用效应控制的组合M=1.2(7.64+2.9)+1.3177.33=243.18H=1.2(5.39+2.05)+1.364.81=93.18N=1.2(1062.42+207.23)+1.3168.38=1742.47中柱传来的上部荷载为:恒载活载左风左震①正常使用极限状态下荷载效应的标准组合=12.62+3.19+0.629.78=33.68=12.62+3.19-0.629.78=-2.06=8.91+2.25+0.612.47=18.64=8.91+2.25-0.612.47=3.68=1017.2+200.23+0.68.91+2.25+0.620.71=1229.86=1017.2+200.23+0.68.91+2.25-0.620.71=1205.00②承载能力极限状态下由永久荷载效应控制的基本组合-125- 山东建筑大学毕业设计说明书=1.3512.62+1.40.73.19+21.40.629.78=45.18=1.3512.62+1.40.73.19-21.40.629.78=-4.85=1.358.91+1.40.72.25+1.40.612.47=24.71=1.358.91+1.40.72.25-1.40.612.47=3.76=1.351017.2+1.40.7200.23+1.40.620.71=1586.84=1.351017.2+1.40.7200.23-1.40.620.71=1552.05③地震作用效应控制的组合=1.2(12.62+3.19)+1.3182.96=256.82=1.2(12.62+3.19)-1.3182.96=-218.88=1.2(8.91+2.25)+1.378.27=115.14=1.2(8.91+2.25)-1.378.27=-88.36=1.2(1017.2+200.23)+1.3146.64=1651.5=1.2(1017.2+200.23)-1.3146.64=1270.28(6)桩数确定按下式估算:边柱:选取3颗桩中柱:n=选取6颗桩(7)边柱下桩群的布置(如图3.40):-125- 山东建筑大学毕业设计说明书图3.40边柱下桩群的布置中柱下桩群的布置(如图3.41):图3.41中柱下桩群的布置(8)桩基竖向承载力计算ZJ-1-125- 山东建筑大学毕业设计说明书对荷载效应基本组合对地震控制的组合ZJ-2对荷载效应基本组合两个柱子上所受的力等效到两柱中间处的等效弯矩为:对地震控制的组合两个柱子上所受的力等效到两柱中间处的等效弯矩为:-125- 山东建筑大学毕业设计说明书(9)桩的承载力尚应满足桩身混凝土强度的要求=0.711.9/4=801.44>Ra满足要求3.7.2承台设计(1)受弯计算ZJ-1承台为等边三桩承台,则承台形心至承台边缘距离范围内板带的弯矩设计值:已知条件:承台保护层取70mm,=800-70=730mm则承台三边的每边配筋为346.07/(0.9300730)=1756ZJ-2计算截面取在柱边:已知条件:承台保护层取70mm,=700-70=630mm短边方向长边方向-125- 山东建筑大学毕业设计说明书(2)承台抗冲切计算ZJ-1(如图3.42)图3.42边柱下承台示意图由几何条件可得:ZJ-2柱对承台的冲切-125- 山东建筑大学毕业设计说明书桩对承台的冲切=[0.47(700+350/2)+0.64(700+520/2)]1.27520=677kN>满足要求(3)承台斜截面受剪承载力计算对柱边和桩边形成的斜截面进行受剪计算ZJ-1(如图3.43)图3.43ZJ-1示意图由几何条件可知:a=0.496+0.175=0.671m-125- 山东建筑大学毕业设计说明书ZJ-2(如图3.44)图3.44ZJ-2示意图另一柱边的验算(如图3.45)-125- 山东建筑大学毕业设计说明书图3.45ZJ-2示意图(1)局部受压计算由于承台的混凝土强度比柱子的混凝土强度低,故进行局部承压验算柱轴力设计值3.8楼梯的设计楼梯一般分为梁式楼梯,板式楼梯。当梯段的水平投影跨度不超过4m,荷载不太大时,宜采用板式楼梯。本工程楼梯采用板式楼梯。本工程层高3.300m,踏步尺寸150mm×300mm,采用C30混凝土,板采用HPB235钢筋,梁纵筋采用HRB335钢筋。(1)梯段板的设计:板厚h=(1/25~1/30)×3000=120~100,取h=110mm,板倾斜角取1m板带计算①荷载计算-125- 山东建筑大学毕业设计说明书表3.3荷载统计荷载种类荷载标准值(kN/m)恒荷载水磨石面层(0.3+0.15)×0.65/0.3=0.98三角形踏步0.5×0.3×0.15×25/0.3=1.88混凝土斜板0.11×25/0.894=3.08板底抹灰0.02×17/0.894=0.38小计6.32活荷载2恒荷载分项系数为1.2,活荷载分项系数为1.4总荷载设计值P=1.2×6.32+1.4×2.0=10.38kN/m②截面设计板水平计算跨度为弯矩设计值为板的有效高度为分布筋每级踏步1根(2)平台板设计设平台板厚h=80mm,取1m宽板带计算①荷载计算表3.34荷载统计荷载种类荷载标准值(kN/m)恒荷载水磨石面层0.6580厚的混凝土板0.08×25×1=2.0板底抹灰0.02×17×1=0.34小计2.99活荷载2.0总荷载设计值为:p=1.2×2.99+1.4×2.0=6.39kN/m②截面设计-125- 山东建筑大学毕业设计说明书平台板的计算跨度为m弯矩设计值为板的有效高度为(3)平台梁的设计取平台梁截面尺寸为200mm×350mm①荷载计算3.35荷载统计荷载种类荷载标准值(kN/m)恒荷载梁自重0.2×(0.35-0.08)×25=1.35梁侧粉刷0.02×(0.35-0.08)×2×17=0.184平台板传来2.99×2.1/2=3.14梯段板传来6.32×3.0/2=9.48小计14.15活荷载2.0×(3.0/2+2.1/0)=5.1总荷载设计值p=1.2×14.15+1.4×5.1=24.12kN/m②截面设计平台板的计算跨度为弯矩设计值为剪力设计值为截面按倒L形计算-125- 山东建筑大学毕业设计说明书按计算跨度考虑梁的有效高度为属第一类T形截面配置箍筋,则斜截面受剪承载力为-125- 山东建筑大学毕业设计说明书4施工组织设计4.1编制说明4.1.1编制依据(1)某大学学生公寓工程建筑施工图。某大学学生公寓工程结构施工图。(2)国家现行建筑安装工程施工及验收规范、规程.(3)与本工程有关的法律、法规、方针和政策。(4)与本工程有关的规程、规范、施工工艺、技术标准。(5)与该工程有关的全国通用标准图集和相关的地区标准图集。(6)《毕业任务书》及有关文件资料。4.1.2编制范围(1)±0.000以下基础工程包括:土方开挖、桩基础、基础梁、回填土。(2)±0.000以上上部建筑结构工程、装饰工程4.2工程概况4.2.1工程特点本工程位于某大学校园内,周围学术交流中心、操场、校园主次干道等,施工中做好文明施工工作,制定好防止大气及噪音污染措施,切实做好对周边环境的保护工作。4.2.2工程概况(1)说明本工程为某大学学生公寓,该学生公寓为六层。包括二人间宿舍(内设卫生间)、四人间宿舍;每层设活动室(底层为接待室)、公共卫生间、电梯两部、服务用房一间;底层设消防控制室一间、小商店一个。建筑高度最高为23.450m,建筑面积约为4973.22m2。该学生公寓为框架结构,抗震等级三级。基础采用桩基础,基础持力层为第六层粉质粘土层。框架填充墙-0.450m标高以下采用黄河泥沙粘土砖,-0.450m标高以上采用混凝土轻质砌块。该学生公寓楼地面做法:卫生间采用防滑地砖;其它均采用地砖。屋面做法:不上人保温屋面。外墙面做法:面砖饰面、外墙涂料。内墙做法:卫生间采用瓷砖墙面,其它均采用水泥砂浆面。顶棚做法:走廊、门厅、休息厅采用轻钢龙骨纸面石膏板;其它全部采用水泥石灰砂浆面。墙裙做法:走廊(高1.8m)、卫生间(伸入吊顶50mm)。油漆做法:所有内木门均采用浅灰色木材面油漆,楼梯扶手采用木材面油漆(色泽另定)。楼梯栏杆采用金属面油漆(色泽另定)。门窗工程:门采用铝合金地弹簧门;窗户采用塑钢推拉窗。-125- 山东建筑大学毕业设计说明书(2)工程地点该工程项目建设地点:位于某大学攀登路、学海路之间,博学路以西,场地为东西约80m,南北约100m的近矩形区域。(3)地质条件该场地地层分为六大类土层,第一层粘土,层厚为0.8~1.5m;第二层粉土,层厚为1.1~1.2m;第三层粉质粘土,层厚为0.6~1.5m;第四层粘土,层厚为0.9~3.1m;第五层粉质粘土,层厚1.1~2.3m;第六层粉质粘土,厚度为1.9~3.4m。4.3施工总平面布置4.3.1施工总平面布置设想(1)施工现场条件本工程进入施工现场主要通过校园道路再转入本工程内施工道路。本工程的施工用水主要靠建设单位已引进的供水管,接表后引入本施工现场。本工程的施工用电,从建设单位提供的配电房接出。(2)施工平面图的设置原则确保工程工期的原则方便施工,提高设备利用率的原则;充分发挥现场的有利条件,将各种成品和半成品堆场等尽可能布置在塔吊有效半径内。在不影响市容、校园交通的情况下,满足文明施工现场要求的原则。服从业主对总平面的管理,按业主要求进行总平面布置。4.3.2施工现场布置根据场地特点,现场设办公区、工人生活区和作业区以及传达室等,办公区有办公室、会议室等,生活区有职工宿舍、厕所等,作业区有材料堆放场地、木工棚、钢筋加工棚和搅拌机棚等。具体位置详见施工平面布置图。(1)生产性临时设施现场钢筋铁件加工间、地方材料(砂、石、砖)水泥堆场,小型仓库。平面尺寸详见总平面布置图。地方材料钢筋堆场为露天堆场,水泥堆场及其它临时设施均采用脚手架搭设,石棉瓦屋面。(2)办公、生活设施布置:办公用房设在东大门(主大门)进来,便于上级部门检查和项目部管理人员就近管理。职工宿舍、食堂等生活设施设在建筑建筑物西侧空地上。(3)施工道路及场地排水施工临时道路宽5m,出入口处道路宽8m。先用反铲碾压路基,铺100厚碎石面层,然后浇筑100mm厚混凝土面层。场区排水依据场地高程沿路边设排水沟。(4)施工用水现场给水干管选用DN100管,呈树枝状布置。考虑到现场防火需要,布置2只消防栓(出入口处及办公室附近)。(5)施工用电现场电路埋地敷设。为解决夜间施工照明,施工区设置4盏3000瓦金属卤化物大功率投光灯。(6)现场垂直运输施工现场配备1台塔式起重机,垂直运输设备选用一台QTZ50塔吊,按图示位置布置。(7)混凝土拌制与输送机械砼采用商品砼,拟投入以下设备:HBT60固定式砼泵:1台;砼运输灌车、砼汽车泵由混凝土公司配置;-125- 山东建筑大学毕业设计说明书砼布料机HGY13:1台。(8)现场维护整个施工区域实行封闭式管理,在施工区东面、西面各设一座大门。场区围护采用彩色压型板围护。4.4施工总体部署4.4.1施工总进度计划根据本工程的实际情况以及工程所经历的季节特点,经仔细研究后,确定总工期233天,具体主要节点目标为:(1)基础工程为44天(包括土方开挖、桩基础、回填土)。(2)主体施工以每层楼层为界,每个楼层分三个施工段,框架柱体施工工期9天。(3)装饰阶段工期以内外墙抹灰为主,合理进行安排,工期为129天。为了实现工期目标,各道工序在安排上要紧密结合,严格按施工进度计划和施工流水节拍进行。4.4.2施工分段为保证工程工期及工程质量,在施工安排上采取平面流水、立体交叉作业的施工部署。划分三个施工段。按三个施工段上的工程量基本相同划分。4.4.3施工顺序(1)施工原则原则:先地下、后地上;先主体、后围护;先结构、后装饰;先土建、后设备。(2)基础工程施工顺序平整场地→复合载体夯扩桩施工→土方开挖→桩基础承台、基础梁钢筋绑扎→桩基础承台、基础梁模板支护→桩基础承台、基础梁砼浇注→桩基础承台、基础梁养护→拆模→桩基础承台、基础梁拆模→回填土。(3)主体工程施工顺序柱弹线定位→柱钢筋绑扎→柱支模→梁、板支模、扎筋→浇砼→转入上一层流水作业……混凝土养护、拆模……→逐层围护墙砌筑、构造柱、圈梁扎筋、支模、浇砼→主体结顶。(4)屋面工程施工顺序屋面保温层→屋面结构找坡层→屋面找平层→SBS防水层→屋面保护层4.4.4定额计算人工及工日序号主要的施工项目工程量人工定额工日班次人数天数1桩身施工129.66496.73413.32115302机械挖土662.110.063.971143人工挖土34.852.287.951814承台、基础梁绑筋9.4176.9865.731201.55承台、基础梁支模371.652.0676.061201.56承台、基础梁砼浇筑192.757.07134.92251-125- 山东建筑大学毕业设计说明书7首层柱支模3242.8592.3422018首层柱绑筋4.7795.5026.2811019首层梁板梯支模1002.02.82282.56230210首层梁板梯绑筋6.9459.2664.31210111首层柱梁板砼浇筑157.6710.68168.3320112标准层柱绑筋3.3925.5017.13210113标准层柱支模2302.8561.04230114标准层梁板支模10022.82282.56230215标准层梁板绑筋6.9459.2664.31210116标准层柱梁板砼浇筑144.8610.68154.7320117首层墙砌筑2509.13225.75220518标准层墙砌筑1669.13149.9220519顶层墙砌筑213.89.13194.91220520首层墙面抹灰506.731.1658.78120321标准层墙面抹灰506.731.1658.78120322顶层墙面抹灰506.731.1658.78120323木门工程62.11.7110.6110224窗连门工程60.481.911.49110225塑钢门窗工程108.024.2045.36210326楼面16665.441.03154.64220927外墙2049.785.2168.892301828散水206.604.552.4722034.5主要施工方法技术措施4.5.1工程施工测量方案4.5.1.1平面控制网的建立{根据甲方提供的原始基准点,然后据已知坐标点利用如下公式:⊿x=X+cosα⊿y=Y+sinα-125- 山东建筑大学毕业设计说明书反算出控制线坐标,然后用全站仪精确放样出控制线位置,并加以保护。待建筑物出地面后,将控制线引测到建筑物内,并做好相应的控制点,加以保护,作为整个建筑物的永久性控制点。控制点上方开予留洞,传递控制线和高程。把其中两条相互垂直的控制线延长至马路或已有建筑物的墙体上,做好标记,作为复核点。控制线位置如下图所示:4.5.1.2各施工细部点详细放样(1)各楼层控制轴线的放样把控制轴线从预留洞口引测到各楼层上,必要时可放出轴线位置。每次传导时控制点必须相互复核,做好记录,检查点之间的距离、角度直至完全符合为止。(2)墙、柱及模板的放样柱中线墙、柱位置线模板控制线据控制轴线位置放样出墙、柱的位置、尺寸线,用于检查墙、柱钢筋位置,及时纠偏,以利于大模板位置就位。再在其周围放出模板控制线。放双线控制以保证墙、柱的截面尺寸及位置。然后放出柱中线,待柱拆除摸板后把此线引到柱面上,以确定上层梁的位置。如图示:(3)梁、板的放样待墙、柱拆模后,进行高程传递,立即在墙、柱上用墨线弹出+0.50M线,不得漏弹,再据此线向上引测出梁、板底、模板线。如图示:梁中线柱中线(4)门窗、洞口的放样-125- 山东建筑大学毕业设计说明书在放墙体线的同时弹出门窗洞口的平面位置,再在绑好的钢筋笼上放样出窗体洞口的高度,用油漆标注,放置窗体洞口成型模体。外墙门窗、洞口竖向弹出通线与平面位置校核,以控制门窗、洞口位置。(5)楼梯踏步的放样根据楼梯踏步的设计尺寸,在实际位置两边的墙上用墨线弹出,并弹出两条梯角平行线,以便纠偏。如图示:4.5.1.3高程测量在一层砼柱上设置一永久性标高点,其正上方紧靠留置预留洞,标高预留洞,用钢尺引测上去,并设置每层永久性的楼层标高基准点+1.00M标高点,用红油漆标注,不经许可,不得覆盖或破坏。以后,每层用经纬仪在预留洞处沿砼墙的竖向方向引一通长直线。以消除钢尺的垂直误差。为了尽可能避免因传导的次数而造成累计误差,在施工中高程每五层用钢尺复测一次,及时纠正误差。标高允许偏差:层高不大于±10mm,全高不大于±30mm。4.5.1.4误差依据依据中华人民共和国国家标准《工程测量规范》GB50026—2002、《建筑安装工程质量检验评定标准》。4.5.1.5仪器(1)经纬仪J2。测角精度2",测距精度2mm±2ppm。主要用于控制点的定位、检测以及建筑物整体位移、垂直度的控制。(2)垂准仪,测量精度为2mm/km。主要用于楼层控制点的引测。(3)自动安平水准仪LETAL3200。测量精度为1mm/km。主要用于楼层高程的引测及检测。(4)自动安平激光扫平仪。主要用于各楼层的标高控制及配合铅直仪作控制点的引测工作。-125- 山东建筑大学毕业设计说明书(5)50M钢尺。主要用于量距及配合水准仪引测高程。4.5.2基础工程4.5.2.1土方开挖(1)按图纸提供的建筑物定位尺寸和城建局给定的建筑四角坐标定位,标高由规定地点引至现场并做相应的永久性水准点。(2)采用反铲挖土机挖土,挖至设计标高200mm以上时改为人工开挖,严禁超挖扰动基底土层,否则做相应补救措施。挖土时,组建2至3人的测量小组一个,配备经纬仪一台、水准仪一台,随时控制基坑底标高。应注意施工前需要做好地面排水和降低地下水位的工作,挖出的土不要堆放在坡顶上,要立即转运到规定的距离之外。人工开挖时,两个操作间距应保持2~3米,并应从上而下逐层挖掘,挖土时要随时注意土壁变动情况,如发现有裂缝或部分塌落现象,要及时进行支撑或改缓放坡,并注意支撑的稳固和边坡的变化。4.5.2.2基础钢筋工程(1)钢筋的材质要求①钢筋进场时,应按现行国家标准《钢筋混凝土用热轧带肋钢筋》GB1499等的规定抽取作力学性能检验,其质量必须符合有关标准的规定。②钢筋的抗拉强度实测值与屈服强度实测值的比值不应小于1.25;钢筋的屈服强度实测值与强度标准值的比值不应大于1.3。③钢筋进场必须根据施工进度的要求,做到分期分批分类堆放。对每一批进场的钢筋,材料部门必须提供产品合格证和试验报告,项目部按规定抽样作复试,合格后方可使用。(2)钢筋加工①本工程的钢筋均根据施工图纸及现行施工规范的要求在现场配制。②受力钢筋的弯钩和弯折应符合下列规定:HPB235级钢筋末端应作180度弯钩,弯弧内直径不应小于钢筋直径的2.5倍;弯钩的平直部分长度不小于钢筋直径的3倍;所有梁、柱箍筋末端均应做成不小于135度的弯钩,弯钩端头平直部分长度不应小于10d。钢筋作不大于90度的弯折时,弯折处的弯弧内直径不应小于钢筋直径的5倍。(3)钢筋连接①基础拉梁采用对焊连接或电弧焊接。②受力钢筋接头位置应相互错开,当采用搭接接头时,从任一接头中心到1.3倍搭接长度的区段范围内,有接头的钢筋面积应小于钢筋总面积的25%(受拉区)和50%(受压区)-125- 山东建筑大学毕业设计说明书。当采用焊接接头时,在任一焊接接头中心到长度为钢筋直径的35倍且不小于500mm的区段范围内,有接头的钢筋面积应小于总面积的50%。③需用焊接接头的部位,接头的质量、构造要求、接头钢筋的百分率应符合专门的规定。(4)钢筋安装①开始安装前,先按配料单核对成品钢筋的钢号、规格尺寸、形状、数量。如有错漏,及时纠正。做好基槽的降排水措施,使施工期间地下水位始终低于基底0.5米以上。②承台钢筋的绑扎:绑扎前先在垫层上弹好钢筋的分档位置线,按弹好的位置线摆放钢筋并进行绑扎,钢筋绑扎后应随即垫好保护层垫块。③地梁钢筋绑扎:先将主筋穿好箍筋,按规定的间距逐个分开,梁中箍筋应与主筋垂直,箍筋的接头应交叉设置,箍筋转角与纵向钢筋的交叉点均应扎牢。④柱插筋的固定:根据垫层上弹出的柱位置以及模板上的轴线来控制柱头插筋的位置。柱插筋根部用环箍在底板下部钢筋网片上点焊牢固,上部用管子临时固定。⑤钢筋的混凝土净保护层厚度为40mm。4.5.2.3基础模板工程基础模板采用组合钢模散支散拆方式进行,用φ48的钢管作支撑。定型组合钢模板是由多种规格的标准定型钢模板与连接件和支承件组合而成的模板体系。模板工程施工前,应编制模板支设方案,根据工程结构形式和特点及现场施工条件进行模板配板设计,确定模板平面布置、纵横钢楞规格、排列尺寸、柱箍形式及间距;梁板组装形式、支撑系统的形式、间距和布置;验算钢楞和支撑系统的强度、刚度和稳定性。绘制全套模板设计图,根据流水段的划分,确定模板的配制数量。所支模板及其支架必须满足强度、刚度和稳定性要求,支模必须做到接口平直,拼缝严密,在安装前模板表面应刷隔离剂。基础模板拆除时,混凝土达到的强度必须符合施工规范的规定,不得提早拆模,以免造成混凝土缺棱掉角。4.5.2.4基础混凝土浇筑基础混凝土设计强度为C30。采用商品混凝土,用混凝土泵车浇筑。混凝土分层铺设后,应随即用插入式振动器振捣密实,当混凝土坍落度大于15cm时,振捣一遍即可;当坍落度小于15cm时,应与普通混凝土一样振捣。振捣时确保快插慢拔,振动时间以不冒气泡为宜,插入点呈梅花状布置,插入深度为进入下层5~10cm为宜。承台及地梁面先用木抹子压实、抹平,最后用铁抹子压光,表面不得有松散混凝土。-125- 山东建筑大学毕业设计说明书4.5.2.5基槽及房心土回填建筑物外围基础墙砌好后,应尽快组织基础墙外侧的回填土,以便外架子的搭设。房心土的回填可在一层楼板模拆除、基础墙砌筑完毕后进行。土方回填时应严格选用回填土料,控制含水量、夯实遍数。不同的土回填时,应按土类有规则地分层铺填,严格控制每层铺土厚度,严禁汽车直接向基槽内倒土,并禁止用浇水、水撼方法使土下沉,代替夯实。管沟下部、机械夯压不到的边角部位、应用细粒土料回填,并仔细用人工夯实。室内地坪等部位的回填土,应有一段自然沉实的时间,测定沉降变化,稳定后再进行下道工序施工。4.5.3模板工程(1)模板安装前,先熟悉设计图纸;记住有关标高、中心线的数据;备好预埋件等。施工前检查上道工序质量,钢筋位置及放线位置是否正确。(2)模板安装与钢筋绑扎、水、电、暖等安装密切配合,互相创造条件,对预埋管、线和预埋件,应先在模板的相应部位划线作标记,然后将管、线和预埋件等在模板上加以固定。模板安装过程中,应随时检查模板的完好程度,对有缺陷的模板应及时更换,并予以修理。钢模拼缝处增设泡沫塑料片,钢模与垫层交接处的空隙,先用1:3水泥砂浆填塞,保证浇砼时不漏浆。(3)浇筑混凝土时,派专人观模,发现位移、鼓胀、下沉、漏浆、支撑松动、等现象,应及时采取有效措施予以处理。4.5.4混凝土工程商品混凝土的质量控制:(1)优选商品混凝土供应厂家,提前作混凝土的试配工作。(2)商品混凝土到达现场后,应对其进行开盘鉴定并现场取样,测试混凝土的出罐温度及坍落度,取混凝土浇筑量20~80%之间的混凝土制作标养试块。依据发货单,逐车验收混凝土从出站到浇筑地点的时间,依据商品混凝土站试验室提供的试配结果,控制混凝土的浇筑时间。凡超出规定时间的混凝土,不准在本工程使用。(3)在商品混凝土前三车到达施工现场时间内,应向搅拌站驻工地负责人索取水泥、砂、石试验单、外加剂质量证明及配合比通知单。浇后一个月内,搅拌站应提供混凝土强度报告、抗渗报告及商品混凝土合格证等。混凝土浇筑质量的控制:(1)-125- 山东建筑大学毕业设计说明书混凝土浇筑要根据施工条件、设计要求合理选择浇筑方案,确保商品砼能连续供应,合理配备移动输送管、振捣、抹平压光的操作人员,确保均匀、连续浇筑,避免出现施工缝和薄弱环节。(2)振捣混凝土时,不得振动钢筋、模板及预埋件,以免钢筋位移、模板变形或埋件脱落。操作时不得踩碰钢筋,如钢筋有踩弯或脱扣者应及时调直补好。(3)混凝土表面泌水和浮浆应排除,待表面无积水时,进行二次压实4.5.5垂直运输和脚手架(1)塔吊:结构施工阶段垂直运输以一台QTZ-63塔吊为主,该机为水平臂架、小车变幅、上回转自升式多用途塔机。性能及技术指标国内领先,国际先进水平。最大工作幅度48米,独立式起升高度为35米,附着式起升高度可达101米。其回转半径基本可覆盖整个工程。利用塔吊主要解决钢管、模板、钢筋以及部分砌块和砂浆的垂直和水平运输。塔吊的安装位置及装拆时的注意事项详见施工总平面布置及说明。塔式起重机的安装和拆卸是一项既复杂又危险的工作,所以要求工作之前必须针对塔吊类型特点,说明书要求,结合作业条件制定详细的施工方案,包括:作业程序、人员的数量和工作位置、合作业的起重机械类型及工作位置,地锚的埋设、索具的准备和现场作业环境的防护等。对于自升塔吊的顶升工作,必须有吊臂保持平衡状态的具体要求,和顶升过程中的顶升步骤及禁止回转作业的可靠措施。装和拆卸工作必须由专业队伍并取得市级有关部门核发的资格证书的人员担任,并设专人指挥。(2)脚手架:本工程采用落地式外脚手架,脚手架搭设必须符合以下要求:①杆件间距:立杆间距1.5米,大横杆步距1.8米,脚手架宽度宜1.0米。②施工荷载:脚手架上最多有4层脚手板和1~2层作业层。施工荷载按2kN/m2。③脚手架基础:立杆下部回填土分层夯实,按实际荷载进行设计计算,并绘制施工详图,采用浇筑砼地梁,高度不小于20cm,上面反铺12~16号槽钢。基础应有排水措施。④剪刀撑:应沿脚手架长度和高度连续设置。为增加脚手架刚度,沿全长每隔6跨设置一道横向剪刀撑,横向剪刀撑可作成“之”字形也可做成“十”字形。⑤架体外侧用密目安全网封闭,密目网应封挂在外排架立杆的里侧。4.5.6砌体工程本工程填充墙墙体材料除特殊注明者外,均选用砼砌块,采用M5-125- 山东建筑大学毕业设计说明书混合砂浆砌筑。砌体墙的拉结筋的设置、构造柱、过梁的配置要求详见《结构设计总说明》。砌体工程施工前须根据施工图和砌块尺寸、垂直灰缝的宽度、水平灰缝的厚度等,计算砌块的皮数和排数,以保证砌体的尺寸。砌筑前,应按施工图放出墙体的边线,将楼面局部找平,并立好皮数杆。皮数杆上注明门窗洞口、木砖、拉结筋、圈梁、过梁的尺寸标高。皮数杆应垂直、牢固、标高一致。常温下在砌筑前一天应将砌块浇水湿润,但砌块的含水率宜控制在5%~8%。砂浆配合比应经试验室确定,并准备好砂浆试模。4.5.7门窗工程(1)简述本工程门窗工程有多种形式如塑钢推拉窗、铝合金地弹簧。(2)门窗安装要点①门窗安装前,根据门窗图纸检查门窗的品种、规格、开启方向及组合杆、附件并对其外形及平整度检查校正,合格后方可安装。同时按设计要求检查洞口尺寸,如设计不符予以纠正后再安装,门窗的存放运输应符合规定要求。②门窗安装时,先用木楔在门窗框四角部位临时固定,然后用水平尺和线锤校正窗框前后、左右的垂直度和水平度,并用木楔进行调整。③门窗安装后,必须进行开启扇的校正工作,使其启闭灵活,无阻滞回弹现象后,方可安装五金零件。(3)门窗框扇安装过程中应符合下列规定:①不得在门窗框扇上安放脚手架、悬挂重物或在框扇内穿物起吊,以防门窗变形和损坏。②吊运时,表面应用非金属软质材料衬垫,选择牢靠、平稳的着力点,以免门窗表面擦伤。4.5.8装饰工程4.5.8.1外墙面砖、内墙瓷砖(1)施工准备面砖在施工前要选择色泽一致的砖,对规格严加检查,若尺寸有误或挠曲变形和面层上有杂质等均应挑出不用。面砖在粘贴前几小时充分浸水,以保证粘贴后不至于因吸走灰浆中水分而粘贴不牢,墙面也充分湿水。(2)施工顺序由下往上分层粘贴,先粘墙面砖,后粘阴角及阳角。(3)施工方法①弹竖线:对面墙面均应用墨斗弹出立线,在弹线之前应先检查每面墙的平整度及室内规矩尺寸。②弹水平线及表面平整线:是保证面层横平竖直、表面平整的关键。-125- 山东建筑大学毕业设计说明书③粘贴:根据设计要求确定砂浆配合比。粘结层厚度:在釉面砖背面满抹灰浆,四角刮或斜面,厚度5mm左右,边角必须满浆。④就位与固定:面砖就位后用灰匙木柄轻击砖面,使之与邻面平,粘贴5~10块,用靠尺板检查表面平整,并用灰匙把缝拨直。阳角拼缝可用阳角条,也可用切割机将釉面砖边沿切成45。斜角,保证接缝平直、密实。⑤排砖:根据设计要求确定面砖的接缝宽度,无要求时,接缝宽度为1~1.5mm,横竖缝宽度一致。⑥勾缝:勾缝用白水泥浆,待嵌缝材料硬化后,再清洗表面。⑦清缝:扫光表面灰,用竹签划缝,并用棉纱试净,粘完一面墙后要将横竖缝划出来。4.5.8.2内墙涂抹(1)抹灰砂浆品种符合设计要求。(2)砂浆采用机械搅拌,施工中严格控制配合比,砂浆的配合比和稠度等经检查合格方可使用。防水砂浆严格按照设计要求施工,不得随意变更配合比。(3)砂浆的生产量和使用量相配合,严禁硬化的砂浆捣碎后再次使用。(4)抹灰前,应对基底表面的平整度进行全面检查并凿毛,清除表面的积灰、污垢和油渍等,并洒水润湿。(5)检查门窗框的位置是否准确,与墙连接是否牢固,连接处的缝隙用水泥砂浆分层嵌塞密实。(6)室内墙面、柱面和门洞的阳角,宜用1:2水泥砂浆做护角,护角线高1.8m,阳角处做R=50的小圆角。(7)抹灰的程序:阴阳角找方→设置标筋→分层赶平→修整→表面压光。(8)涂抹水泥砂浆每遍厚度宜为5~7mm,涂抹混合砂浆每遍厚度宜为7~9mm。(9)抹灰工程验收:严格按照施工规范及质量评定标准进行验收。凡抹灰层空鼓处必须及时处理。处理方法是利用手提切割机沿空鼓部位周长切割,然后将空鼓部位凿除,这样处理可防止空鼓扩大。4.5.9水电安装工程(1)给排水系统安装①室内给排水管集中敷设于卫生间处,水源由市政给水管网双管路供给,供水主管在公寓楼四周形成环状,分别送至各层卫生间。②排水管污废水合流排入化粪池,由化粪池排至校园排水管网。-125- 山东建筑大学毕业设计说明书③雨水管道单独设置汇流入校园排水管网。④消防管道系统水源由市政给水管网双管路提供,在公寓楼四周形成环状,由主管分别送至各层消防栓箱处A部屋顶设有蓄水箱和二只消防加压水泵与整个消防管道形成一套完整的消防系统。(2)给排水安装质量标准①各种管道安装完毕所进行的水压试验、闭门试验和系统冲洗必须符合设计和施工规范要求。②各种管道隐蔽工程必须分部位在隐蔽前进行验收,各项指标必须符合设计要求和施工规范要求。③管道固定支架的位置和构造必须符合设计要求和规范规定,支座(墩)严禁铺设在冻土和未经处理的松土上。④管道的坡度必须符合设计要求和施工规范规定。⑤排水系统竣工后的通水试验结果,必须符合设计要求和施工规范规定。(2)电气安装工程①供电系统以二回路380/220V低压方式供电,采用电缆埋地敷设至D部首层配电室,其二路电源引自校园变电所变压器低压侧各母线段,供本工程的照明、动力及监控、综合布线等设备用电,低压配电屏选用GCK型抽屉式开关柜,低压民屏全部为下部进出线。②照明灯具以荧光灯为主,应急灯、安全出口灯、诱导灯均采用带蓄电池的灯具,应急时间不小于90min。③线路敷设照明及动力主干电缆沿电缆中桥架明敷,电缆桥架采用XQJ型托盘式桥架,照明分支线路除图中注明处,均采用BV-500-1×2.5mm2型电线穿焊接钢管暗敷。④防雷与接地采用TN-C-S系统,其接地电阻小于等于4欧。防雷沿A、B部屋面四周女儿墙敷设避雷带,利用砼柱或剪力墙内主筋作引下线,利用基础、地梁、底板内的钢筋作接地体,三者互相连接成可靠的防雷和接地系统,外加两组人工接地装置,其中一组作弱电系统接地,其接地电阻小于等于1欧。⑤弱电系统的综合布线,主机房设在D部二层,系统水平线缆采用AYAYA公司超五类四对非屏蔽双绞线,主干采用多模六芯光缆沿垂直、水平桥架及穿管暗敷方式布设,余穿焊接钢管暗敷于吊顶及房间顶板及墙壁内。⑥弱电系统的保安电视监控机房设在D部首层,全楼主要部位设保安电视摄像头共计106个,系统布线设同综合布线。-125- 山东建筑大学毕业设计说明书4.6主要的施工技术措施4.6.1质量保证措施(1)加强技术管理①项目部要认真及时编制好单项工程施工方案和作业计划,并按规定上报审批,获得批准后再开始实施。②施工中发现有关技术问题需修改设计图纸的,必须发书面联系单给建设、监理、设计单位,不获得同意前严禁擅自按修改进行施工。③工程技术资料必须及时收集、整理、归档,并做到正确、同步、齐全。(2)加强组织和制度管理:①严格执行分部、分项工程质量检验制度,每项工程完成后在质量员的指导监督促下,由单位工程施工员,具体组织班组质量员进行质量评定工作,每月及时填报质量评定表上交分公司工程管理部,以便抽查复核,一经发现问题,必须及时进行整改处理。②做好隐蔽验收工作,根据工序编制好分层、分段予检计划。隐蔽验收在组织验收前施工员应填写好验收单,及时通知建设、监理和设计单位进行验收,按照公司、项目部的规定做好各项技术资料的积累,由资料员汇总,及时归档。③建立班级自检、互检和交接检制度,由班级质量员、现场施工员在操作过程中及时进行自检、互检,若发现问题,及时纠正,并严格贯彻执行班组间、安装与土建间的交接质量检验制度,不合格要立即纠正,否则应停止施工下一道工序。④加强技术复核、技术交底制度,对定位灰线、轴线标高,必须进行严格复核,由观砌、翻样、施工员自复后,重点部位必要时提请技术负责人复核,再通知技监部门复核。对新材料、新结构、新工艺,施工前必须做到书面落实技术措施,交底要做好记录,交主管人签字。⑤加强对砼的拆模强度,轴线位移,砖砌体质量的控制,若出现问题,要做好记录并及时研究处理,贯彻质量样板制、挂牌制,三检制。(3)主要分项工程的质量保证措施土方施工质量保证措施1、土方开挖时严禁超挖,避免扰动原土层,测量员坚守岗位利用水准仪给出足够的准确的挖土标高。2、采用人工清理基底,保证基底标高的准确。3、测量基准点定期复测,保证其准确性。-125- 山东建筑大学毕业设计说明书4、及时同监理单位、设计单位进行地基验槽。5、隐蔽验收记录及技术复核记录要及时齐全。钢筋安装质量保证措施1、使用钢筋的型号及质量须达到设计要求和国家标准,须经技术监理部门认可后方可执行加工和绑扎。2、柱筋的预留长度和位置必须符合设计及规范要求且采取固定措施。3、在垫层面上画出绑扎控制线,以保证间距尺寸,其偏差值应控制在允许范围内,钢筋绑扎质量应符合规范要求。4、绑扎完的钢筋应注意保护,不能随意踩踏,工人操作时应注意安全。5、钢筋的锚固长度及焊接质量必须符合设计及规范要求。模板工程质量保证措施1、模板施工要有足够的强度、刚度和稳定性。2、模板要保证位置、标高、形状和几何尺寸准确。3、钢模板安装前应涂刷脱模剂。4、现场使用的模板及配件应按规格和数量逐项清点和检查,未经修复的部件不得使用。5、模板工程安装完毕必须经检查验收后,方可进行下道工序。④砼工程质量保证措施1、精心做好砼配合比,现场有专人负责控制原材料质量,专人负责做好材料计量工作。2、砼从搅拌机卸出至浇筑完毕的延续时间不超过规范要求。3、浇筑砼前,模板内的杂物、钢筋上的油污等应清理干净,模板的缝隙及孔洞应堵严。4、砼自高处倾落的自由高度不应超过2m,超过时采用串筒或溜管使砼下落。5、在浇筑与柱、墙连成整体的梁和板时,应在柱和墙浇筑完毕后停歇1~1.5h,再继续浇筑。6、在施工缝继续浇筑砼时,在已硬化的砼表面上,应清除水泥薄膜和松动石子以及软弱砼层,并加以充分湿润和冲洗干净,且不得积水。⑤砌筑工程质量保证措施1、.现场施工员加强监控、保证质量,避免返工。-125- 山东建筑大学毕业设计说明书2、拉结筋预埋正确,洞孔应做到预先留设,减少返工开凿现象。3、砂、砖、水泥按规定取样测试,不合格的材料不准使用。施工中按要求留置砂浆试块。4、墙砌体应做到当天砌筑,当天检查,当天验收。5、控制每天砌筑高度不超过1.8m,雨天及五级以上大风不宜施工。6、每天下班时,要做好防雨措施,以防雨水冲走砂浆。7、填充墙砌至框架梁底不符合模数时,采用实心砖斜嵌,墙角采用预制三角砼砌块填实。⑥抹灰工程质量保证措施1、抹灰前,砌体、砼等基体表面的灰尘、污垢和油渍等应清除干净,并洒水湿润。2、室内抹灰工程待上下水、煤气等管道安装后进行,抹灰前必须将管道穿越的墙洞和楼板洞填嵌密实。3、抹灰层在终凝前,应防止快干、水冲、撞击和振动,凝结后采取措施防止沾污和损坏。4、抹灰用的砂子应过筛,不得含有杂物。5、抹灰层在前一层抹灰层凝结后方可涂抹后一层,石灰砂浆的抹灰层,应待前一层7~8成干后,方可涂抹后一层。6、抹灰的面层在踢脚板、门窗贴脸板和挂镜线安装前涂抹,安装后与抹灰面连接如有缝隙,应用砂浆或腻子修补。7、罩面灰应分遍连续涂抹,表面赶平、修整、压光。⑦饰面砖工程质量保证措施1、饰面砖应镶贴在平整、粗糙、湿润、干净的基层上。2、饰面板应表面平整,边缘整齐,棱角无损坏,并具有产品合格证。3、饰面板镶贴前应先选砖预排,使拼缝均匀,在同一墙面上的横竖排列不宜有一行以上的非整砖,非整砖行应排在次要部位或阴角处。4、镶贴饰面砖基层表面,若遇突出和管道、灯具、卫生设备的支承等、应整砖套割吻合,不得用非整砖拼凑。5、饰面砖的镶贴形式和接缝宽度应符合设计要求。⑧屋面工程质量保证措施1、基层表面干燥后,方可进行防水涂膜的施工。-125- 山东建筑大学毕业设计说明书2、基层处理剂必须涂刷均匀,覆盖完全。3、防水涂膜的厚度必须满足设计及规范要求,涂层应厚薄均匀,表面平整。4、施工顺序应先作节点,附加层,然后再进行大面积涂布。5、屋面转角及立面的涂层,应薄涂多遍,不得有流涡、堆积现象。6、防水涂膜严禁在雨、雪天施工,五级风及其以上时或预计涂膜固化前有雨时不得施工。⑨主体结构消除质量通病措施1、结构工程各分项中断尺寸、垂直度、轴线位移三子项中的任何一个子项的实测值不得大于三位允许偏差值。若超过此值,不论测点合格率多高,都必须经过处理并在处理后按GBJ300-88第305条规定确定其质量等级。2、砖墙上需留置过人或运输材料洞口时,洞口边离墙转角50cm以上。洞口两侧按规范临时间断处的要求设置拉结筋。洞口上应设钢筋砼过梁(梁板),洞口高度<1.70米,宽度<1.3米。3、在浇捣砼之前,砼构件钢筋交接点下应分点交叉绑扎1:2水泥砂浆砼块,保证钢筋保护层的厚度。有上、下二排受力筋的构件,承受负弯矩的钢筋均设置足够的支架,确保钢筋在正确有位置上。除单向受力板外,任何构件的钢筋交叉点全数扎。4、钢材的复验应按图纸所设计的品种、规格按质保书提供的等级(号)进行,不管复验结果如何,均不得超原保书等级(号)核定和使用。如复验结果低于原保书所提供的等级(号),但在规范允许值范围内,按复验结果使用。5、砼工程的立模限位不得采用先做方盘的做法。6、砼和砂浆试块,必须以单位工程在试块上进行编号并注明试块的制作日期,试块上的编号和制作日期必须与砼施工日记相符。7、基础回填前,主体结构的装饰工程之前,必须经建设、施工、设计、监理(质监)四个部门的人员组成结构进行中间验收。验收合格后方可进入下道工序施工。⑩装饰工程消除质量通病措施1、为防止墙面污染,凡突出墙面的部分,如窗台、挑沿、挑梁、沿沟、雨蓬、楼梯踏步等应做滴水线(槽),滴水槽深、宽各为10mm。不突出墙面的窗顶(窗天盘)也应做滴水槽(线)。滴水槽(线)应与抹灰操作同步进行,不得事后拍、刮条子。挑梁斜面上的槽(线)在距根部离墙50mm处做突出滴水槽(线)30mm截水。-125- 山东建筑大学毕业设计说明书2、凡突出屋面的女儿墙、过道间、电梯间、水箱等,墙与屋面交接处应做成园弧形的泛水。园弧形半径不小于100mm,在墙上离屋面高约250mm处再做凸出墙面60mm的滴水线。3、镶贴室内釉面砖墙面或墙裙禁止错缝(骑缝)粘贴,配件要求齐全,色泽均匀,规格一致,不得在缺棱掉角和裂缝等缺陷。墙面严禁空鼓,凡不用阳角条墙面,釉面砖应磨角对缝,不应采用缝压缝粘结,凸出墙面厚度,以一块釉面砖的厚度为准。4、外、内窗台的建筑标高应有20~30mm的高差,外低内高。5、室内外抹均应在阳角处做不少于二米高的水泥砂浆护角,门窗框边应做宽度不少于100mm宽的水泥砂浆护框线。6、凡以水泥砂浆为面层的抹灰工程,其打底材料必须采用水泥砂浆,禁止使用水泥混合砂浆打底。凸出墙(柱)面的宽度,墙裙、踏脚线等凸出厚度在5~8mm,其上口必须抹灰、压光。7、油漆工程必须按设计要求等级和施工规范规定的操作程序认真操作,不准偷工减料。8、为达到内墙和平顶涂料工程的美观和光洁,防止墙面的砂点、流堕、疙瘩等缺陷,严格按下列的程序进行施工。墙面清扫→满刮腻子→满打砂纸→修补→打砂纸→满披腻子→满打砂纸→清灰→一度→二度涂料。涂料在涂刷前必须用不少于80目的网筛过滤。楼地面工程消除质量通病措施1、用水泥砂浆做面层的楼、地面工程在其抹平、抹灰、压光操作过程中严禁撒干水泥灰,以防粘结不牢成灰、起砂。2、厕所、盥洗间、阳台、外走道等楼地面的建筑标高应较居室楼地面低20~30mm(设计有要求除外)。地漏应较楼地面低5~8mm,并做成盘形。易积水的楼地面四周,若设计无规定应用现浇砼上翻120mm,宽度不小于120mm。3、外墙砼散水坡与墙交接处,转角处应隔断,隔断缝隙用沥青灌缝并与散水坡面刮平。门窗工程消除质量通病措施1、木门易受碰撞的部位,必须采取防护措施,木门用料断面必须符合设计图纸的要求。2、门窗工程的五金规格和数量必须符合设计要求,安装位置正确,使用方便灵活,规格不符或数量不足应予以调换或补充。木螺钉的拧紧深度必须保证在木螺钉的二分之-125- 山东建筑大学毕业设计说明书一以上。3、塑钢窗表面严禁沾染泥浆(砂浆),框与墙(柱)间隙必须填塞密实。填塞材料应按下列要求进行:1、设计末注明按标准第10.4.7条执行。2、用水泥砂浆分层填塞间隙,间隙外表面留5~8mm深槽,撕去外露薄膜,用防水嵌缝油膏封填槽口。屋面1、泛水处屋面泛水外的涂膜防水层必须直接涂刷至女儿墙的压顶下,收头处理应用防水涂料多遍涂刷封严。2、落水头窝法专人负责窝凿除洞四壁松动物,清除干净垃圾和灰尘,支好底模,充分洒水湿润,刷一度107胶水浆;摊细石砼;最后对门口脚印处务必填补细石砼,使之满足向落水口泛水要求。厕所间地面与墙相接阴角处渗漏水在阳台地面两短边和厕所地面四边阴角处清除干净垃圾、灰尘,充分洒水湿润,随粉随刷一度107胶水泥浆(107胶掺量为水泥用量的15%),用1:2水泥砂浆分两皮一条三角带,两次间隔12小时以上。废水管、污水管、雨水管的立管与落水口堵塞1、立管上口堵塞用铁板封盖,随着立管高度增加而不断向上移盖。2、落水口也可用木塞塞住。地面污水废水管、雨水管及窨井渗漏,倒泛水,排水不畅。1、用“T”型水平尺或在管槽侧壁设标高控制,竹桩控制管子底和窨井底标高,保证足够泛水,在管顶拉统麻线,控制管子垂直度。2、管子底按有关规定做好砼管床:窨井底先捣50厚200#细石砼,再用1:2水泥砂浆粉刷,隔天成活,表面光滑。3、砌窨井的砖必须充分湿水,满刀铺头缝砂浆,满铺水平缝砂浆。4、管子接头处先座1:2水泥砂浆20厚,在管子接头四周先洒水,后用1:2水泥砂浆分皮嵌实。管子四周按规定用砼窝邦。接头嵌砂浆和管子窝绑后24小时中不得碰动管子。-125- 山东建筑大学毕业设计说明书5、污水窨井底必须粉成同镶接管子直径的半圆状,表面与管子口接头平光。产品保护措施1、外墙已完成粉刷或装饰的墙面,严禁从门窗洞口倒脏水和垃圾等物,以免污染墙面。2、已完成内墙面粉刷和装饰的房间,在做水泥时,应用塑膜、油毡或其他材料对墙加以保护。3、严禁在已做好的地面上拌和堆放砂浆,如有其他项目要施工则在地面上就库复盖材料进行保护。4、墙面及平顶刷白时,不能污染已装好的照明设备。5、在门窗油漆时,不得将油漆刷在墙面上小五金或其它表面上。6、木门樘安装后,应在脚80cm左右范围内钉上板条加以保护。7、塑钢窗的安装,应有可靠的保护措施,安装后并经过必要的保护才允许进行下一道工序的施工。8、所有已完成的踏步,应用小角铁或木板等其它保护方法对踏步口加以保护,以防损坏。9、禁止在已做完油漆的窗口运送材料或人员的进出。10、对块体地面铺砌完成后,一定要有一个养护时间,一般为2~3天。11、卫生设备、照明器具等要安装时,应事先与土建单位办好交接手续,以加强责任制。其它防治措施1、外窗盘等应进出一致,从左至右成一直线。2、雨蓬等的受力钢筋下面部都应设置钢筋支架,前要逐个进行钢筋工程隐蔽验收,并填入验收单内。当拆模时一定要有试块强度报告,确认达到设计强度时方可拆除,如上面还有临时荷载时,拆除后还得加上临时支撑。3、女儿墙应采用实心砖砌筑,压顶必须用钢筋砼,并应做成向内排水坡,坡度≥1.5%。4、对已完成的工程,如有部分需要修补时,按指定细心的师傅来做,并做详细交底,还得注意四周的色泽一致及产品保护工作。5、室外或外面墙平齐的玻璃幕墙安装完成后,应经冲水试验。确认没有渗漏后才称完成。-125- 山东建筑大学毕业设计说明书6、所有的雨蓬下表面应水平,上表面做出向外的坡度,雨水不得沿墙面流下。7、对建筑的脚手架及建筑物与脚手架的联接件,都应在施工组织设计中要有明确的设计和规定,以利外墙装饰工程的顺利进行。8、所有的翻样图应经校核由校核者签字后才能施工,严禁未校对施工或配料加工。4.6.2安全施工措施4.6.2.1防坠落措施(1)楼梯踏步及休息平台处,设两道防护栏杆。(2)使用的脚手架及搭设方案须经设计计算,并经技术负责人审批后方可搭设。外脚手架随施工进度上升,操作层脚手板必须满铺,架子外侧挂密目式安全网全封闭。各类架子搭设完毕必须经安全技术人员验收合格后方准交付使用。(3)龙门架支搭必须符合有关规定要求。缆风绳直径不小于12.5mm的钢丝绳,并按规定埋设地锚,首层进料口一侧搭设长度不小于2米的防护棚,另外三侧封闭.每层卸料平台设防护门,两侧设护身栏杆和挡脚板。龙门架吊笼口设安全门,两侧有防护措设施。吊笼定位托杠采用定型装置,吊笼运行中严禁乘人。(4)充分发挥安全"三宝"作用,进入施工现场人员一律戴安全帽,强制执行安全违章罚款制度。二米以上高空作业,无其它防护措施的,必须系安全带。4.6.1.2安全用电措施(1)临时用电按有关规定编制好施工方案,并建立现场线路、设施定期检查制度。现场电源采用TN-S系统,现场电线、电缆按规程架设,不得有直接绕钢管乱拖、乱接等现象。施工现场使用的机械电器设备必须绝缘良好,并有可靠的安全接地或接零,严禁没有经过培训或不懂机电设备的人使用和玩弄机电设备。(2)配电箱和开关箱要有门有锁并能防雨雪侵入,配电系统采取分级配电,动力与照明线路要分开设置并有标记,做到一机一闸一保险。配电箱统一编号,箱内开关电器标明用途。(3)加强夜间施工照明管理,确保施工部位的规定照度。职工宿舍照明全部使用36V低压电。电焊机单独设开关,外壳做保护接地或接零。一次线长度小于5米,二次线长度小于30米,两侧接线应压接牢固,并安装可靠防护罩。不得使用金属管道、脚手架、结构钢筋作回路地线。焊把线应无破损,绝缘良好。电焊机设置地点应防潮、防雨、防砸。4.6.1.3施工机具安全防护措施(1)卷扬机、搅拌机搭设防砸、防雨操作棚。停用或停电时,应切断电源。卷扬机吊笼应降至地面,搅拌机料斗应升起并挂好保险链。(2)机动翻斗车时速不超过5km,行车中严禁带人。-125- 山东建筑大学毕业设计说明书(3)蛙式打夯机必须两人操作。操作人员应戴绝缘手套和穿绝缘胶鞋。操作手柄应有绝缘措施。停用或停电时应切断电源。(4)圆锯、平刨各种安全防护装置应齐全。凡长度小于50cm,厚度大于锯盘半径的木料,严禁使用圆锯裁割,砂轮机应使用单向开关,并应装设不小于180度的防护罩和牢固的工件托架,严禁使用不圆、有裂纹、磨损剩余部分不足25mm的砂轮。(5)钢丝绳应有足够的安全储备,凡表面磨损、腐蚀、断丝超过标准、有死弯、断股、油芯外露的不得使用;吊钩应有防止脱钩保险装置;卡环在使用时,应使销轴和环底受力。(6)塔式起重机的基础必须能够承受工作状态和非工作状态下的最大荷载,并能满足起重机的稳定性要求。起重机的安装、顶升、拆卸必须按原厂规定进行,并制定安全作业措施,由专业队(组)在队(组长)负责统一指导下进行,并要有技术人员和安全人员在场监护。起重机必须安装行走、变幅、吊钩高度等限位器和力矩限制器等安全装置,并保证灵敏可靠。起重机的塔身上不得悬挂标语牌。4.6.1.4安全防火措施(1)制定逐级岗位防火责任制。工地设立义务消防组织,定期组织培训和演练,坚持安全检查及时消除火险隐患,下班后关好门窗,切断电源。(2)临时建筑搭建不占用防火间距和消防通。搭建临时易燃物品库房和住人工棚及伙房时应使用非燃烧材料。(3)工棚内人员不得卧床吸烟,吸烟时做到"三不落地"即:烟头、烟灰、火柴梗不落地。(4)配备足够的消防器材,并定期进行维护和保养,消防器材不得挪做它用。(5)电工、电气焊工等特种岗位人员应经消防专业知识培训合格后持证上岗,严禁无证操作和违章作业。电气焊作业前,特别是高空作业应对周围和下方的可燃材料进行清理,作业现场应配备灭火器材并有专人监护。(6)装修、装饰施工现场严禁吸烟,设立禁烟标志,并建立用火用电审批制度。(7)施工现场使用易燃易爆化学危险物品时,由专人保管和领取,用后及时归库。(8)施工现场的可燃杂物每天进行清理。4.6.3文明施工措施(1)遵守国家和地方的法令、法规和有关政策,不得擅自侵占道路、砍伐树木、毁坏绿地、停水停电、制定减少扰民的措施;(2)施工现场应按施工平面图的要求布置材料、构件和暂设工程;工地实行围挡封闭施工。(3)加强三废的治理措施(废水、建筑垃圾、有害气体)。-125- 山东建筑大学毕业设计说明书(4)施工场地或道路硬地化或半硬地化,经常清理现场,保持道路畅通、平整、干净;(5)确保生活区环境卫生,实行门前三包责任制,现场材料堆放整齐、有序;机具整洁、定点安放。(6)工完场清,现场干净。4.6.4冬雨季施工措施4.6.4.1雨季施工技术措施(1)浇捣砼前应与气象部门作好联系,尽可能避免在在暴雨天内浇捣砼。(2)如果浇捣砼时恰逢下雨,应随雨量大小,随时测定砂石含水量,调整砼配合比。(3)现场应准备足够的防雨应急材料(如油布、塑料薄膜),以防雨水冲刷新浇砼,确保砼质量。(4)做好施工现场的排水和四周的清理工作,防止积水和淤泥。(5)如在施工过程中突遇大暴雨,应估好人员配置,加强施工管理力量。确实无法施工时,可留设施工缝,但应做好施工缝的处理工作。4.6.4.2高温季节施工技术措施(1)在高温季节,浇捣完成的砼应及时加强养护,外露部分应覆盖草包。(2)砼应按气温与技术性能要求掺加缓凝剂。(3)气温高于20℃时,砼输送管的表面应包二层麻袋并用水保持湿润状态,避免输送管直接受阳光曝晒,使砼坍落度变小。4.6.4.3冬季施工技术措施(1)当室外日平均气温连续五天低于5℃或每日最低温度低于3℃时,应按冬期施工要求组织施工。(2)采用以蓄热法和掺化学剂相结合的防冻保温办法,并辅以调整砼配合比,控制砼水灰比等措施来保证砼质量。(3)根据实际情况,如有必要时可掺加外加剂(如硫酸钠、亚硝酸钠等),外露砼表面应用草包加塑料薄膜覆盖2-4层。做好清除积雪,凿除结冰层等措施。-125- 山东建筑大学毕业设计说明书结论两个多月的毕业设计结束了,通过这次毕业设计,使自己对大学四年学习的东西又系统的应用了一遍,感觉受益匪浅。通过这次毕业设计大体的了解了整个建筑从建筑设计到结构设计,及最后的施工组织设计的设计原则,设计方法。在设计的过程中,由于以前没用进行过系统的设计,对结构的一些截面尺寸的选择只是通过课本上说的范围内进行选择,缺乏科学性,致使在设计中走了不少的弯路。又由于本地区的抗震设防烈度为7度,结构设计需要采用抗震设计,刚开始时,由于没有抗震的设计的概念,致使梁柱截面选择的不好实现抗震设计中的“强柱弱梁”的设计概念,在后来进行截面设计时,为了实现强柱弱梁,在对梁端弯矩进行调整时,按照理论的要求,应该是在进行调整后梁端弯矩增大,柱端弯矩减小,但是在设计中,按照公式进行调整后,反而没有组合中的弯矩值大:1,可能是柱端的附加弯矩比较大;2,可能是梁的截面的选择可能过大。在则,在柱设计中,柱的配筋全部采用构造配筋,因此,截面尺寸选择有些不合理,故在今后的设计中要注意改进。结构的设计就是首先进行截面的选择,然后对截面进行验算。进行截面验算,就需要有控制内力,这就需要各种荷载对构件产生的内力进行组合,在本次设计中,得出了这样的结论:在多层建筑中,若要有地震作用力,不需要对风荷载进行组合,因为地震产生的水平力远大于风荷载产生的水平力,况且在多层建筑中,地震力与风荷载不同时考虑。故对风荷载产生的内力进行组合也不是起控制作用。恒载和活载及风载手算的结果与电算结果相差不大,而在计算地震的作用时,手算与PKPM软件电算结果误差有些大。可能的原因是由于手算计算地震力时,计算的结构的自振周期是采用经验公式的原因。通过这次毕业设计,近一步锻炼了自己思考问题,独立解决问题的能力。对建筑的设计每一步都应该有理可据,这就需要我们通过自己思考,询问老师,查阅资料等各种渠道获得,熟悉了各种规范,为以后的工作打下了坚实的基础。-125- 山东建筑大学毕业设计说明书谢辞转眼间,四年的大学生活即将结束。在这四年里,幸运的我遇到了这么多对我传道授业解惑的老师、团结友爱的同学,正是在各位师长的关怀及同学们的帮助下,很好的完成了自己的学业。非常感谢我的各位毕业设计指导老师——钟岱辉老师、吕树俭老师、李相云老师,各位师长对我的毕业设计进行了悉心的指导,并提出了很多宝贵的意见。也正是在各位老师的帮助下,使我能够顺利的完成毕业设计,让我把四年来所学的专业知识更系统地串联起来,更加牢固的掌握和运用,为日后的工作打下良好的基础。感谢各位老师对我的毕业设计进行指导,帮我解决了一些疑难问题,让我掌握的知识更加全面和完善。再次向所有辛勤教导我的师长、帮助我的同学致以最真挚的谢意!谢谢你-125- 山东建筑大学毕业设计说明书参考文献[1]建筑结构荷载规范(GB50009-2001),北京,中国建筑工业出版社,2001[2]混凝土结构设计规范(GB50010-2002),北京,中国建筑工业出版社,2002[3]建筑抗震设计规范(GB50011-2001),北京,中国建筑工业出版社,2001[4]建筑地基基础设计规范(GB50007-2002),北京,中国建筑工业出版社,2002[5]建筑工程山东省统一基价表补充预算定额,山东省建筑工程造价管理总站编印,1999[6]梁兴文、史庆轩主编,土木工程专业毕业设计指导,北京,科学出版社,2002[7]黄双华主编,房屋结构设计,重庆,重庆大学出版社,2001[8]刘昌辉编著,基础工程学,武汉,中国地质大学工程学院,2001[9] 方鄂华、钱稼茄等编著,高层建筑结构设计,北京,中国建筑供应出版社,2003年9月第一版[10]东南大学等主编,混凝土结构(第二版),北京,中国建筑工业出版社,2002[11]同济大学等编,房屋建筑学(第三版),北京,中国建筑工业出版社,1997[12]重庆建筑大学等,建筑施工(第三版),北京,中国建筑工业出版社,1997[13]沈蒲生、苏三庆主编,高等学校建筑工程专业毕业设计指导,北京,中国建筑工业出版社,2000年[14]唐岱新、孙伟民主编,高等学校建筑工程专业毕业设计指导,北京,中国建筑工业出版社,2000年6月第一版[15]杨永新等,简明基础工程,地震出版社,2002年8月第一版[16]杨顺安等,软土理论与工程,地质出版社,2000年9月第一版[17]颜宏亮编著,建筑构造设计,上海,同济大学出版社,1999年6月第一版[18]张述勇主编,工业与民用建筑专业毕业设计指导,北京,地震出版社,1998[19]董军、张伟郁等编著,土木工程专业毕业设计指南房屋建筑工程分册,北京,中国水利水电出版社,2002年3月第一版[20]丰定国、王社良主编,抗震结构设计,武汉,武汉工业大学出版社,2001[21]clouhgRW,PenzienJ.DynamicsofStructures.Newyork;mcGrawhill,Inc,1993[22]R.ParkandT.Paulay,ReinforcedConcreteStructures,1995[23]ACIBuildingCodeRequirementsforReinforcedConcrete(ACI318-83),1993[24]G.Winter,Designof9thEdition,2000-125-