- 161.00 KB
- 41页
- 1、本文档共5页,可阅读全部内容。
- 2、本文档内容版权归属内容提供方,所产生的收益全部归内容提供方所有。如果您对本文有版权争议,可选择认领,认领后既往收益都归您。
- 3、本文档由用户上传,本站不保证质量和数量令人满意,可能有诸多瑕疵,付费之前,请仔细先通过免费阅读内容等途径辨别内容交易风险。如存在严重挂羊头卖狗肉之情形,可联系本站下载客服投诉处理。
- 文档侵权举报电话:19940600175。
钢结构厂房施工组织设计编制日期:年月日编制单位:贵州冶金建设公司七分公司qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
目录第一卷概况4第一章1.1编制依据4第二章1.2工程概况4第三章1.3主要技术规范、规程4第四章1.4施工条件5第五章1.5工程特点5第二卷主要工程数量6第三卷施工组织及进度安排7第一章3.1施工队伍部署及任务划分7第二章3.2主要施工机具及劳动力配备8第三章3.3工程总体进度安排8第四卷主要工程施工方案和施工技术措施10第一章4.1施工准备10第二章4.2钢结构及围护施工11第一节4.2.1主构件制作11第二节4.2.2屋面檩条、墙面檩条制作19第三节4.2.3其它附件制作20第四节4.2.4彩板的选型、加工21第五节4.2.5钢结构、围护门窗安装22第五卷工程创优规划和工程质量保证措施30第一章5.1工程质量创优目标30第二章5.2质量创优制度30第三章5.3质量保证体系31第四章5.4保证质量主要施工技术措施32第六卷工期、安全保证措施33第一章6.1保证工期的主要措施33第一节6.1.1组织措施33第二节6.1.2技术措施34第二章6.2安全保证措施35第一节6.2.1指导思想35第二节6.2.3安全生产责任制35第三节6.2.4安全生产教育35第四节6.2.5主要安全技术措施和保证制度36第五节6.2.6消防、治安措施38第六节6.2.7安全技术检查制度39第八卷环境保护及文明施工40qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
第一卷概况1.1编制依据1.1.1贵州奇特钢结构有限公司厂房工程施工招标文件、设计图纸、工程量清单;1.1.2现行建安工程施工及验收规范、工程质量检验评定标准;1.1.3现场调查资料;1.1.4相关工程施工经验。1.2工程概况本工程贵州奇特钢结构有限公司厂房厂房,总建筑面积2834.5m2(其中A栋厂房557.2㎡,B栋厂房828㎡,C栋厂房789㎡,D栋厂房660.3㎡)。厂房位于贵阳市白云区。该厂房长度分别为A栋38m、B栋53m、C栋54m、D栋45m。跨度均为14m。柱间距A栋1-5轴为7.5m、5-6轴为8m;B栋1-7轴为7.5m、7-8轴为8m;C栋1-7轴为7.5m、7-8轴为8m;D栋1-7轴为7.5m。檐口标高8.85m。厂房结构型式为实腹式门式钢架,钢材采用Q345B钢,高强度螺栓采用H-T-B(10.9级)摩擦型高强度螺栓。屋面、墙体檩条均采用C型钢檩条,1.2m以下为240厚MU10非粘土烧结普通砖,M7.5的水泥砂浆砌筑。1.2m以上采用压型彩板围护。1.3主要技术规范、规程(1)《钢结构工程施工及验收规范》(2)《屋面工程技术规范》qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
(3)《建筑工程质量检验评定标准》(4)《钢结构工程质量评定标准》(5)《门式刚架轻型房屋钢结构技术规程》(6)《建筑结构焊接规程》1.4施工条件该厂房工程位于贵阳市白云区,施工区域比较狭窄,必须加强现场施工工序的合理安排,按流水作业的方式组织施工。现场平整已完成,施工用水、用电已接通,具备了开工条件。1.5工程特点(1)本工程涉及到土建、钢结构、水、电安装等专业,工程交叉重叠施工作业多。(2)钢结构构件制作标准高、要求严,投入设备多,应在工厂内制作,增加运输工作量。(4)施工时需做好周围建筑物、电线、电缆等的安全防护工作。(5)本工程在在施工时要加强对职工的安全教育,做好现场文明施工和防火工作。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
第二卷主要工程数量根据业主提供的工程数量清单,整理汇总主要工程数量如下:序号工程项目单位数量备注一钢结构及围护1钢柱t24.32钢屋面梁t15.76钢檩条t26.37彩板屋面m226608彩板墙体m21313.12序号工程项目单位数量备注9铁板天沟m38010彩板门m2161.2811塑钢窗m2759.6qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
第三卷施工组织及进度安排3.1施工队伍部署及任务划分项目经理部拟设在浦镇车辆厂厂区内,经理部负责按项目法管理组织施工,并建立工程创优、进度控制、安全生产等责权利相结合的管理机制。根据本工程特点,拟设1个项目队,队伍布置及任务划分为:钢构项目队:负责钢构件的制作、安装,以及屋面、墙体、门窗等项目的制作、安装工作。3.2主要施工机具及劳动力配备3.2.1主要施工机具配备表序号设备名称数量规格型号出厂日期备注一制造加工设备1直条火焰切割机1台2H钢组立机1台3龙门焊机1台4翼缘矫正机1台5折弯机1台6剪板机1台7摇臂钻1台8磁力钻5台9交流焊机2台10气体保护焊机12台11半自动切割机1台12空气压缩机2台13等离子气割机1台qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
14行车5台15数控坐标钻床1台3.2.2主要劳动力配备表根据本工程特点,拟在施工时配备劳动力如下表,并在施工过程中及时予以调整,确保工期进度需要。序号工种人数序号工种人数1电焊工2292钣金工15103电工2114油漆工6125136147158163.3工程总体进度安排3.3.1施工进度策划开工前组织现场管理、技术人员进场,进行搭建临设,现场布置、技术准备等工作。接到开工通知后,立即组织施工人员、设备,进场展开施工。开工后,钢结构件的加工制作在加工厂内展开,随预埋件的进展,承台浇注及时跟进,到10月7日具备钢结构进场安装条件,确保钢结构安装按期开工;钢构安装开始后抓紧桩基收尾,清出场地为后续构件进场做好准备。此阶段重点抓住钢结构的安装工作,在钢结构的安装进行过程中,围护系统安装随后跟上,其间穿插土建、水、电qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
的安装。主体完工后,着手地坪施工、调整、检查等工作,为竣工交验做好各项准备。3.3.2进度安排原则及主要控制工期:进度安排的总体原则是:突出重点,合理安排,精心组织,有序施工。各主要工程项目开、竣工日期见下表:各主要工程项目开、竣工日期安排表序号工程项目名称开工日期竣工日期备注1钢结构制作2011-9-72011-10-62钢结构主体安装2011-10-72011-11-233围护系统安装2011-11-242011-12-34门窗安装2011-12-42011-12-75竣工交验2011-12-7qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
第四卷主要工程施工方案和施工技术措施4.1施工准备施工准备是迅速形成施工能力,掀起施工高潮的关键,为此我单位十分重视,在签订合同阶段就对本工程进行了较认真细致的调查和详细的阅读文件、研究方案、制定措施。在合同签订后施工队伍和机械设备已经落实,并进行了必要的准备。在设计方案审核通过后将立即行动,调集队伍,开展现场的各项施工准备工作,在15日内编制出各工程项目的详细的实施性施工组织设计报请监理工程师审批。4.1.1图纸会审由单位项目经理主持,召集相关专业的技术人员和制作安装、施工经验比较丰富的技师、领工员,依据有关规范,对图纸各部尺寸、规格、型号、相互关系等进行校核、分解、放大样,发现问题及时收集汇总,书面报请监理、设计和业主单位给予解决,并形成图纸会审纪要。4.1.2测量放线根据业主提供的基线座标和水准点,用精密仪器进行联测复核,确认无误后进行轴、柱十字线控制定位测量,并埋设固定桩橛,确保定位准确。对桩基、承台、砖砌体、钢立柱安装和各种孔洞等工程施工时,均严格按照设计尺寸和规范要求进行轴线、水平测量,以保证各部位的定位准确、标高无误、尺寸正确。4.1.3编制质量计划或实施性施工组织设计qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
在项目经理组织下,按照ISO9002标准,依据我单位质量管理程序文件要求,编制项目质量计划和实施性施工组织设计,明确各部门、各岗位的工作标准和各分项分部工程所要达到的质量目标,使质量工作在各个工序、各个环节得到具体量化,使各专业现场施工做到统一安排、统一规划、互相配合、协调开展。确定该项目中的特殊/关键工序,并为此分别编制作业指导书或工艺卡,用以指导和控制现场施工。4.1.4机具、材料供应按照施工顺序,做好机械设备和材料供应工作,5日内土建工程所用机械设备必须进场,并做好各种材料的进场准备工作,完成地材检验和桩基砼试配、模板设计,为土建工程的早日施工做好一切准备。4.1.5岗前培训对拟参加本工程施工的技术人员、管理人员和技术工人进行技术交底,组织学习招标文件、技术规范和有关规定,明确各自职责,掌握有关标准和方法,自觉以各自的工作质量来保证工程质量。4.2钢结构及围护施工本工程钢结构部分在工厂制作,安装、围护在现场施工。4.2.1主构件制作应用于本工程的钢立柱、吊车梁、牛腿的截面均为“H”型截面。焊接“H”型钢尺寸及焊接变形控制是技术关键,主构件制作工艺流程框图见附图:(1)原材料检验该工程钢柱、钢梁材质为Q345Bqualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
钢。材料进厂时,必须附有材料质检证明书、合格证(原件)。并按国家现行有关标准的规定进行抽样检验,保证项目为材料屈服点和五大元素含量,检验结果与竣工资料一起存档待查。表面检验:钢材表面有锈蚀、麻点和划痕等缺陷时,其深度不得大于该钢材厚度负偏差的1/2,钢材表面锈蚀等级应符合现行国家标准《涂装前钢材表面锈蚀等级和除锈等级》的规定。(2)下料构件下料按放样尺寸号料。放样和号料应根据工艺要求预留制作时焊接收缩余量及切割边缘加工等加工余量。气割前将钢材切割区域表面的铁锈、污物等清除干净,气割后应清除熔渣和飞溅物。不应有明显的损伤划痕,钢板不平时应预先校平后再进行切割。翼缘板、腹板需拼接时,应按长度方向进行拼接,然后下料。构件上、下翼板,等截面的腹板采用自动直条火焰切割机进行下料,变截面腹板采用半自动火焰切割机下料。下料过程严格执行工艺卡,减少切割变形,确保质量。标识清楚,割渣必须清理干净。下料后,由专职质检员对构件进行检测。检测工具:卷尺、平台、塞规。允许偏差:项目允许偏差(mm)构件宽度、长度±3.0切割面平面度0.05t(t为切割面厚度)且不大于2.0割纹深度0.2qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
局部缺口深度1.0依据工艺要求,进行焊缝坡口处理,坡口表面须清理干净,下料后各构件须堆放平整。(3)组立构件组立在全自动组立机上进行。组立前须核实待组立件与设计图纸是否相同,并检验CO2气体的纯度,焊丝的规格、材质。先将腹板与翼板组立、点焊成“T”型,再点焊成“H”型,点焊采用CO2气体保护焊。腹板采用二次定位,先由机械系统粗定位,再由液压系统精确定位,保证腹板对中性。组立后由专职质检员对构件进行检测,检测工具:卷尺、角度尺、塞尺。允许偏差:项目允许偏差(mm)翼板与腹板缝隙1.5对接间隙±1.0腹板偏移翼板中心±3.0对接错位t/10且不大于3.0翼缘板垂直度b/100(且≤3.0)(b为翼板宽度)构件组立后,须堆放平整,工序转移过程中慢起慢放以减小构件变形。(4)焊接qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
焊接工序是本工艺流程的一道重要工序,应严格控制焊接变形、焊接质量。焊接在自动龙门埋弧焊机上进行,操作人员必须经过培训,持证上岗。焊接所用的焊丝、焊剂必须符合国家规范和设计要求,焊剂使用前应按要求烘烤。根据钢板的厚度,选用焊接电流、焊接速度、焊丝的直径,根据材质选用焊丝的材质和焊剂的牌号。焊接前由技术人员制定焊接工艺卡,并在第一次码施焊后对焊接工艺进行评定,根据评定报告修改焊接工艺卡,直到满足各项要求。焊接人员须严格按照焊接工艺进行焊接。焊接时采用引收弧板,不得在焊缝外母材上进行引弧。本工程构件多采用“船形”焊,有利于提高焊缝质量,控制变形。焊接后由专职质检员对焊缝进行超声波探伤,不得有未焊透、夹渣、裂纹等缺陷。焊缝外观不得有气孔、咬边、偏焊等超差缺陷。如有上述缺陷,必须用碳弧气刨或角向磨光机将缺陷彻底清除后再补焊。焊后工件须有序堆放,以减小变形。(5)变形矫正本工程焊接变形矫正在翼缘矫正机和压力机上进行:翼板对腹板的垂直度在翼缘矫正机上矫正,根据腹板和翼缘板的厚度选择矫正压力和压辊的直径。挠度矫正在压力机上进行。局部弯曲、扭曲用火焰校正,缓冷、加热温度根据钢材性能选定但不得超过900℃。工人必须持证上岗。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
矫正后,由专职质检员检测有关参数,检测工具:卷尺、平台、游标卡尺。构件各项参数允许偏差如下:项目允许偏差弯曲矢高L/1000且≤5.0(L为构件长度)翼板对腹板的垂直度b/100≤3.0(b为翼板宽度)扭曲h/250且≤5.0(h为腹板高度)若遇构件变形较大难以矫正的构件,及时反馈给技术人员,由技术人员对焊接工艺卡进行评定,重新编制工艺卡,以减少焊接变形。(6)端头板、肋板、墙托、檩托制作端头板厚度一般在12.00mm以上,又因数量较大,选择使用仿形火焰切割机进行下料。墙托板、檩托板用剪板机下料。切割前将钢材切割区域表面的铁锈、污物等清除干净,气割后清除熔渣和飞溅物。切割后,端头板长度、宽度误差必须在规范允许偏差内。端头板磨擦面采用砂轮打磨,磨擦面打磨范围不小于螺栓孔直径的4倍,打磨方向宜与构件受力方向垂直。处理后的摩擦面按批做抗滑移系数实验,摩擦系数不小于0.35。端头板连接螺栓孔和墙托、檩托板孔用在数控钻床上加工,以确保端头板的互换性以便于安装。钢架所有联接副的端头板应进行配钻,并打钢印标记。肋板采用剪板机下料(厚度大于12mm采用火焰下料),并切角25×25mm,以便于肋板焊接。本工序由专职质检员对构件进行检验,检测工具:卷尺、游标卡尺、角度尺。允许偏差如下:项目允许偏差(mm)qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
零件长度、宽度±3.0螺栓孔直径+1.0螺栓孔园度2.0垂直度0.03t且≤2.0(t为板厚)同一组内任意两孔间距±1.0相邻两组端孔间距离±1.5(7)钢柱、屋架梁制作将矫正好的H型钢在放好线的平台大样上进行端头板切割、修整,并将腹板、翼缘板按规范要求开坡口。采用端头切割机进行切割,切割尺寸依据设计文件和施工工艺卡进行控制,切割端面与H型钢中心线角度要严格控制,检测后如超出规范允许偏差范围,必须修整。端头板、墙托、檩托、肋板点焊时,确保端头板与H型钢中心线吻合,位置尺寸准确,严格控制偏差。点焊工作在专用胎具上进行,以便进一步控制端头板、墙托、檩托板与“H”型钢的角度。焊接前,在烘烤箱内将焊条按规定的温度和时间烘烤,随取随用。在工位上焊接时应将烘烤好的焊条放在手提式保温桶内100~1500C保温。焊接采用手工对称施焊,严格按施工工艺卡进行焊接,焊后将焊渣清理干净,并打上焊工编号待查。焊接成形后的构件,用摇臂钻或磁力钻制孔,由专职检测员对端头板焊缝做无损检测,超出规范要求,须进行修整,并将检验报告归档。立柱制作的允许偏差如下:项目允许偏差±L/15000qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
柱底面到柱端与屋面梁连接最上一个安装孔距离(L)±15.0柱底面到牛腿支承面距离(L1)±L1/2000±8.0牛腿面的翅曲2.0柱脚底平面度5.0墙托的直线度与“H”型钢中心偏差小于2.0mm屋面梁的允许偏差如下:项目允许偏差梁长度(L)端部有凸缘支座板0-0.5其它形式±L/2500±10.0端部高度(h)±2.0两端最外侧安装孔距离(L1)±3.0拱度10.0-5.0(8)试拼装所有钢立柱、屋面梁在出厂前必须在自由状态经过试拼装。测量试拼装后的主要尺寸,消除误差。预拼装检查合格后,标注中心线,控制基准线等标记,必要时设置定位器。构件试拼装的允许偏差:项目允许偏差mmqualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
跨度最外端两安装孔与两端支承面最外侧距离+5.0-10.0接口截面错位2.0拱度L/2000(L为构件长度)预拼装单元总长±5.0节点处杆件轴线错位3.0预拼装记录须整理成资料,已备安装用。(9)抛丸除锈本工程防腐要求较高,所有钢构件均采用全自动抛丸机进行喷丸除锈,表面应达到Sa2.5级。抛丸除锈后,构件应在4小时之内进行喷漆保护,喷漆为氯磺化聚乙烯防腐涂料,二道底漆。上一道油漆完全干后,方可喷下道漆,最扣喷防火漆。油漆厚度必须达到设计要求。所有端头板,底板均不能喷漆,并加以保护。涂料必须有质量证明书或试验报告。(10)复检、编号、包装、发运各工序完工后,对构件进行全面检测,测量数据整理成资料存档,合格品发放合格证并编号。构件包装时,采用木块等柔性材料作垫层,以保护涂层不受损伤,确保构件不变形,不损坏、不散失。螺纹部分加防锈剂并包裹。以下资料随构件一起发运。①产品合格证②qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
施工图和设计变更文件,设计变更的内容在施工图中相应部位说明。③制作中技术问题处理协议文件。④钢材、高强度螺栓、涂料、焊剂、焊丝等质量证明书或试验报告。⑤焊接工艺评定报告。⑥高强度螺栓磨擦面抗滑移试验报告,焊缝无损检验报告,涂层检测资料。⑦构件验收记录⑧预拼装记录⑨构件发运、包装清单4.2.2屋面檩条、墙面檩条制作制作工艺:原材料检验下料轧制成形检验、编号、包装(1)原材料检验原材料必须附有质检证明书、合格证(原件),并按国家现行有关标准进行理化试验,检验资料存档待查。(2)下料依据设计尺寸用开卷机下料,剪切面应平整。下料后,由专职质检员进行检验,采用卷尺和游标卡尺检测,并整理检验记录。允许偏差如下:qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
项目允许偏差(mm)零件长度、宽度±3.0边缘缺棱角1.0(3)轧制成形构件在檩条成形机上轧制成形,在冲床上冲孔。成形檩条进行严格检测,各项参数整理成资料,当误差超出允许范围时,须立即对机器进行调整。各项参数合格后进行批量生产。(4)编号、包装本构件按规格包装采用铁皮包扎,构件与构件之间用软木将其隔开,以防止包扎后的构件之间相互碰损。4.2.3其它附件制作其它附件主要有:系杆、水平支撑、柱间支撑、拉条、隅撑、雨蓬支架等,制作工艺流程如下:原材料检验下料钻孔组装、焊接表面除锈喷漆包装(1)原材料检验附件材质以Q235B为主,材料进厂时,必须附有材料质检证明书、合格证(原件)。并按国家现行有关标准规定进行理化试验,检验结果存档待查。(2)下料qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
对较大构件,下料前必须进行放样,并根据工艺要求预留制作安装时焊接收缩余量及切割加工余量。放样偏差必须符合国家规范,下料采用火焰切割,切割后表面熔渣必须清理干净。设计有螺栓孔的构件在下料后钻孔,钻孔尺寸须符合国家有关标准。(3)组装、焊接下料后,依据设计文件,将构件组装、焊接。所使用的焊条必须有质量检验证书或合格证。焊工须持证上岗。对于长焊缝采用分段焊,以减小变形。(4)表面除锈、喷漆所有构件均采用全自动抛丸机进行抛丸除锈,表面达到Sa2.5级,抛丸除锈4小时内进行喷漆保护,采用氯磺化聚乙烯防腐涂料。二道底漆,构件一道油漆完全干后方可喷二道漆,最后喷防火漆。防腐涂料必须有质量证明书及试验报告。(5)构件复检、编号、包装、发运各工序完工之后,须对构件全面检测,符合国家规范及设计要求,发放合格证书。并将构件编号,归类包装后运送工地。4.2.4彩板的选型、加工根据设计要求,本工程屋面、墙面均采用彩色压型板,屋面板宽840mm,墙面板宽900mm。彩钢板采购严格按规格采购,要有材料质检证明,合格证原料。在彩板压型机上,把彩钢板根据需要的长度切断。压型板的尺寸偏差符合规范要求。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
彩板檐沟、包边板、泛水板根据其展开面尺寸,将彩卷板按尺寸在开卷机上开卷,在包边机上轧制,性能符合设计要求。压型板、包边板、泛水板成型后按规格包装、标识、堆放。4.2.5钢结构、围护门窗安装为了提高安装精度。和安装时的安全性采用单元安装,其工艺流程见附图。(1)安装准备组织工人学习有关安装图纸和有关安装的施工规范,依据施工组织平面图,做好现场建筑物的防护、对作业范围内空中电缆设明显标志。做好现场的三通一平工作。清扫立柱基础的灰土,若在雨季,排除施工现场的积水。(2)定位测量土建队应向安装队提供以下资料.①基础砼标号②基础周围回填土夯实情况③基础轴线标志,标高基准点④每个基础轴线偏移量⑤每个基础标高偏差⑥地脚螺栓螺纹保护情况qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
依据土建队有关资料,安装队对基础的水平标高,轴线,间距进行复测。符合国家规范后方可进行下道工序。并在基础表面标明纵横两轴线的十字交叉线,作为立柱安装的定位基准。支承面地脚螺栓的允许偏差:项目允许偏差(mm)支承面标高±3.0水平度L/1000(L为基础长度)地脚螺栓螺栓中心偏移5.0螺栓露出长度+20.0~0螺纹长度+20.0~0(3)构件进场依据安装顺序分单元成套供应,构件运输时根据长度、重量选用车辆,构件在运输车上要垫平、超长要设标志、绑扎要稳固、两端伸出长度、绑扎方法、构件与构件之间垫块,保证构件运输不产生变形,不损伤涂层。装卸及吊装工作中,钢丝绳与构件之间均须垫块加以保护。依据现场平面图,将构件堆放到指定位置。构件存放场地须平整坚实,无积水,构件堆放底层垫无油枕木,各层钢构件支点须在同一垂直线上,以防钢构件被压坏和变形。构件堆放后,设有明显标牌,标明构件的型号、规格、数量以便安装。以两榀钢架为一个单元,第一单元安装时应选择在靠近山墙,有柱间支撑处.(4)立柱安装立柱安装前对构件质量进行检查,变形、缺陷超差时,处理后才能安装。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
吊装前清除表面的油污、泥沙、灰尘等杂物。为消除立柱长度制造误差对立柱标高的影响,吊装前,从立柱顶端向下量出理论标高为1m的截面,并作一明显标记,便于校正立柱标高时使用。在立柱下底板上表面,做通过立柱中心的纵横轴十字交叉线。吊装前复核钢丝绳、吊具强度并检查有无缺陷和安全隐患。吊装时,由专人指挥。安装时,将立柱上十字交叉线与基础上十字交叉线重合,确定立柱位置,拧上地脚螺栓。先用水平仪校正立柱的标高。以立柱上“1m”标高处的标记为准。标高校正后,用垫块垫实。拧紧地脚螺丝.用两台经纬仪从两轴线校正立柱的垂直度,达到要求后,使用双螺帽将螺栓拧紧。对于单根不稳定结构的立柱,须加风缆临时保护措施。设计有柱间支撑处,安装柱间支撑,以增强结构稳定性。(5)吊车梁安装:吊车梁安装前,应对梁进行检查,变形、缺陷超差时,处理后才能安装。清除吊车梁表面的油污,泥沙,灰尘等杂物。吊车梁吊装采用单片吊装,在起吊前按要求配好调整板、螺栓并在两端拉揽风绳。吊装就位后应及时与牛腿螺栓连接,并将梁上缘与柱之间连接板连接,用水平仪和带线调正,符合规范后将螺丝拧紧。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
(6)屋面梁安装屋面梁安装过程为:地面拼装→检验→空中吊装。地面拼装前对构件进行检查,构件变形、缺陷超出允许偏差时,须进行处理。并检查高强度螺栓连接磨擦面,不得有泥砂等杂物,磨擦面必须平整、干燥,不得在雨中作业。地面拼装时采用无油枕木将构件垫起,构件两侧用木杠支撑,增强稳定性。连接用高强度螺栓须检查其合格证,并按出厂批号复验扭矩系数。长度和直径须满足设计要求。高强度螺栓应自由穿入孔内,不得强行敲打,不得气割扩孔。穿入方向要一致。高强度螺栓由带有公斤数电动扳手从中央向外拧紧,拧紧时分初拧和终拧。初拧宜为终拧的50%。终拧扭矩如下:Tc=K.Pc.d(Pc=P+ΔP)Tc—终拧扭矩(N.m)P—高强度螺栓设计预拉力(KN)ΔP—预拉力损失值(KN)10%Pd—高强度螺栓螺纹直径K—扭矩系数在终拧1h以后,24h以内,检查螺栓扭矩,应在理论检查扭矩±10%以内。高强度螺栓接触面有间隙时,小于1.0mm间隙可不处理;1.0—3.0mmqualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
间隙,将高出的一侧磨成1:10斜面,打磨方向与受力方向垂直;大于3.0mm间隙加垫板,垫板处理方法与接触面同。梁的拼接以两柱间可以安装为一单元,单元拼接后须检验以下参数:①梁的直线度②与其它构件(例如立柱)联接孔的间距尺寸。当参数超出允许偏差时,在磨擦面加调整板加以调整。梁吊装时,两端拉揽风绳,制作专门吊具,以减小梁的变形,吊具要装拆方便。安装过程高强度螺栓连接与拧紧须符合规范要求。对于不稳定的单元,须加临时防护措施,方可拆卸吊具。(7)屋面檩条、墙檩条安装屋面檩条、墙檩条安装同时进行。檩条安装前,对构件进行检查,构件变形、缺陷超出允许偏差时,进行处理。构件表面的油污,泥沙等杂物清理干净。檩条安装须分清规格型号,必须与设计文件相符。屋面檩条采用相邻的数根檩条为一组,统一吊装,空中分散进行安装。同一跨安装完后,检测檩条坡度,须与设计的屋面坡度相符。檩条的直线度须控制在允许偏差范围内,超差的要加以调整。墙檩条安装后,检测其平面度、标高,超差的要加以调整。结构形成空间稳定性单元后,对整个单元安装偏差进行检测,超出允许偏差应立即调整。(8)其它附件安装qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
其它附件主要有:水平支撑、拉条、制动桁架、走道板、女儿墙、隅撑、门架、雨蓬、爬梯等。附件安装时,检查构件是否有超差变形、缺陷,规格型号应与设计文件相同,安装必须依据有关国家规范进行。(9)复检调整、焊接、补漆构件吊装完,对所有构件复检、调整,达到规范要求后,对需焊接部位进行现场施焊,对构件油漆损坏进行修补。(10)彩板进场在现场的堆料场,用枕木垫起,上面用塑料布铺垫,将运到现场的彩板按规格分开堆放、标识。用吊车卸料,并用专用彩板的吊具,防止外表油漆损伤和彩板变形。做好防护措施,防止行人在上踩和重物击落。(11)钢构件验收由于要进行下一道工序,组织本单位专业工程师、项目队长、班组长对钢构件进行自检,发现超差,及时调整。自检后写书面报告呈交建设单位,请求组织验收,验收合格,可进行屋面板安装。(12)屋面板安装安装前复测屋面檩条的坡度,合格后才能施工。①上板的垂直运输根据我们的经验,彩板的重量较轻的特性,采用架设空中斜钢索的运输方案。具体做法自制钢架固定在梁上高约1.5米。用6根Φqualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
8钢丝绳一头固定在钢架上,另一头固定在地面上,并在每个钢架上安一滑轮,用绞磨把面板运至屋面,由人工抬至施工部位。②屋面板固定屋面板采用瓦楞组装,第一排屋面瓦应顺屋面坡度方向放线,檐口伸置檐沟内120mm,屋面板檐口拉基准线施工,按规定打防水自攻螺丝。用防水盖盖好,再用道康宁胶密封。下一排屋面板扣在上排屋面板的波峰并用自攻螺丝固定,纵向应用道康宁胶密封。金属板端部错位控制在规范内,然后依次安装。屋脊盖板安装,应保证屋脊直线度,两边用防水堵条,用防水铆钉,铆接。屋檐包边板包边应保证直线度以及和屋脊的平行度,用防水铆钉铆接。所有的自攻螺丝要横直竖平,并将屋面上铁屑及时处理干净。(13)墙面板安装检查墙檩条的直线度,若有挠度,应用临时支撑调平檩条,墙板安排好后,拆除。搭设活动式脚手架,用专用吊绳沿墙面人工将墙面板立起,至安装位置。墙面采用企口安装,先安装砖墙上的泛水板,第一片墙板安装前应在墙梁上放线,保证墙面板波纹线的垂直度。第二片墙板必须插入第一片企口内,用带防水的自攻螺丝固定,用防水帽盖好,然后依次安装。所有自攻螺丝保证横直竖平。(14)包角板、窗户上缘泛水板、雨蓬安装qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
根据设计要求,墙角包边板,女儿墙包边板均采用防水铆钉拉铆,对接接头要整齐并打防水胶窗户泛水板,周边包板应用防水铆钉拉铆,对接时接头部位应打防水胶,保证直线度、墙包角板的垂直度整齐美观。雨蓬采用单层彩钢板,波峰、波谷搭接整齐,打自攻螺丝,周边安包边板。(15)门窗安装将运置现场的门窗,按规格堆放,保管好,防止损坏。用活动式脚手架辅助安装,先将窗框用自攻螺丝固定在框架上,用防水胶把四周的缝隙密封,然后再装窗门,自行开关窗安装好将所有连杆机构连接,再将电机安好,保证滑动自如,密封性好,水平标高和垂直度符合标准。按图纸尺寸把钢骨架制作好,然后用铆钉把彩钢板铆到骨架外表面,四周用彩钢板轧制成槽型包边,用铆钉铆接。安装时用水平仪控制将门滑道固定在雨蓬下面,保证直线度和水平度。地面轨道安装保证水平、直线度符合要求,且门滑道与地面轨道在一个平面内,校正好后用混凝土固定。用吊车将门吊起,门下边缘插入轨道后,将上面用螺栓拧紧。安装后门滑动自由,轻便,与墙面缝隙均匀,缝隙不大于5mm。所有安装完工后将屋面、墙面、门窗擦洗待交。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
第五卷工程创优规划和工程质量保证措施5.1工程质量创优目标确保本工程创省部优质工程,力夺“扬子杯”。工程质量符合国家颁发的现行施工规范、规程和工程质量评定标准,保证一次验收合格率100%,优良率达到50%以上。5.2质量创优制度(1)创优领导责任制各级领导创优责任:项目经理对本工程项目的创优规划负责,督促、检查、领导本工程创优工作;领导分级负责,逐层保证,把创优成效列入领导和技术负责人业绩的重要考核内容。若本工程达不到创优目标,影响创优达标的行政领导和技术人员,两年内取消其晋升资格。(2)强化创优意识教育对质量认识要高起点、严要求,全体职工树立起“创优在我心中,质量在我手中”的观念,从每一道工序起步,从每项工程做起,确保开工必优,一次成优,总体创优。(3)建立工程质量创优奖励基金和创优保证金制度,把工程创优与经济效益密切结合起来。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
从合同总价中扣2%作为奖励基金和创优保证金。其中1%作为奖励基金由项目经理部集中掌握,用于奖励在创省部优工程中作出成绩的单位和个人;1%作为各项目队创优保证金,本工程竣工验收达到创优规划目标时,由项目经理部予以返还,达不到扣减。(4)建立创优检查制度项目经理部每月进行一次质量检查。创优检查由主要领导组织有关部门人员参加,外业量测、内业检查分别进行。外业量测对照有关验标对工程结构外廓尺寸及中线、水平进行实地量测,作出记录,作为评定质量等级的依据之一;内业分管理部门对口检查各项资料、记录、台帐、报表、签证、质量证书、设备状况等,是否清楚、齐全、完整、符合要求标准,经讨论评议后作出创优检查评定结果。凡一次检查合格率不足100%,且现场管理混乱,提出黄牌警告,通报批评;连续二次检查合格率达100%,且现场管理有序,给予奖励,通报表扬。5.3质量保证体系针对本工程的特点和创优目标,严格贯彻执行ISO9002质量标准,成立以项目经理为首的创优领导小组,把目标值分解到各部门,建立健全创优保证体系,进行方针目标管理,同时建立以班组为基础,技术人员为核心的QC活动小组,完善全面质量管理体系,使施工过程中每道工序质量均处于受控状态。在施工过程中,通过实施质量计划编制程序、施工过程控制程序等程序文件,从“人、机、料、法、环”诸方面加以控制,以设计文件及现行规范标准为依据,确保工程质量。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
5.4保证质量主要施工技术措施(1)组织工程技术人员,认真阅读图纸,确定施工中的关键工序,编制施工工艺卡。进行评定,在制作前对所有构件均在钢平台上放样,量取实际尺寸。(2)钢结构制作安装过程中,严格执行自检、互检、专检制度,每道工序必须在自检达到优良标准后,才能进行下一道工序,检验工作落实到人,对不符合质量目标的构件,及时标识返修,杜绝不合格品流入下道工序。(3)严格按设计图施工,认真落实岗位技术责任制和技术交底制度,技术交底工作必须简明易懂,实行施工工艺卡制度。施工工艺卡必须注明单项工程技术要点和注意事项,并标明工序和检测内容、标准,使施工工艺卡成为指导该工程的行为规范。(4)制定严格的材料管理制度,工程所需的原材料,半成品,构件必须是合格供应商提供的优质品,无证产品一律不准进厂。(5)减少工厂制作的手工焊接,尽量用自动化、半自动焊接,减少现场施工焊接,以保证焊接质量。(6)制定钢结构发运制度,加强运输过程中质量管理,减少因运输、吊装而产生的变形。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
第六卷工期、安全保证措施6.1保证工期的主要措施根据我单位的施工技术力量和现有的机械设备能力,经过详细研究招标文件、科学组织、合理安排,确保本工程施工工期。为了保证本工程按期、优质地完成,特制定工期保证措施如下:6.1.1组织措施(1)建立强有力的高效运转的生产指挥系统,统筹安排机械设备材料供应、劳力调配、组织施工生产。对控制工期的重点工程要靠前指挥,掌握形象进度,发现问题及时处理,适时组织阶段性施工生产高潮,紧张有序地按施工组织设计,均衡持续地展开施工,确保工期兑现。(2)我单位已对本标段作了较详细的施工调查,施工队伍、机械设备、物资供应等已作好相应准备。一旦中标将立即调迁施工队伍进场,早进点、快准备,千方百计创造条件尽早开工,尽快形成施工高潮。(3)组建精干高效的项目队,选派具有丰富经验的土建、钢构、设备安装施工队伍,担负本工程施工任务。配备、配套完整、性能良好的施工机械投入本工程,并加强机械设备的维修力量,保证机械完好率,努力提高机械设备的施工能力。大力推广和使用先进的施工技术,建立工期责任制和奖励制度,确保按期完成。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
(4)加强与地方有关部门和设计、监督的联系,大力宣传修建本工程的重大意义,以取得地方有关部门和周围群众的支持,创造良好的外部环境,为顺利开工、确保工期创造有利条件。(5)发挥政治工作优势,加强思想政治工作,充分调动各种积极因素,密切各方面的关系,排除障碍,保持良好的内部施工环境。(6)该工程施工期间节,假日较多(特别是春节、元旦),各级领导和技术人员要坚守岗位,细化安排,做好物资、机械准备,保证节日期间正常施工,确保工期目标的实现。6.1.2技术措施(1)优化施工组织设计,抓住控制工期的关键工序,制定分项工程工期、进度目标和保证措施。采取分部平行流水作业,细化分部工程,增加流水作业面。(2)推广新工艺、新技术的运用,缩短单项工程施工周期,加快施工速度。(3)强化质量意识,加强工程测试工作,确保工程质量,杜绝返工,减少返修,加快施工进度。(4)充分做好各项准备工作,保证工程连续均衡施工。(5)加强技术交底工作,严肃施工纪律,严格执行施组要求的各项施工方法及进度安排。(6)全面规划、统筹安排,如局部受阻,及时调整施工力量,不停顿施工,确保总工期与关键工期的实现。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
6.2安全保证措施6.2.1指导思想安全生产同质量、效益一样是创优工程不可缺少的重要环节,是关系到职工人身和国家财产不受损失的大事。在施工过程中要认真贯彻“安全第一,预防为主”的方针,坚持做到管生产必须管安全。加强职工安全生产教育,使每位生产者都能熟知安全生产知识,并在施工中切实执行,杜绝一切不安全因素,保证劳动者的安全与健康,确保本工程施工安全。6.2.2安全生产目标(1)无人身重伤及以上伤亡事故;(2)无等级火灾事故。6.2.3安全生产责任制建立安全生产管理网络,落实安全生产责任制,建立安全保证体系,项目经理部设专职安全检查工程师,各项目队设专职安全员,各工区设兼职安全员,做到分工明确,责任到人。6.2.4安全生产教育(1)工程开工前,对所有参加本工程施工人员进行安全生产教育,组织学习《钢结构工程施工安全技术规程》等有关规范和法规,并结合本工程,制定详细的安全生产措施。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
(2)坚持每周不少于两小时的安全教育,由主管工程师针对当时施工项目,结合有关规范、规程,上好安全技术课。(3)对特殊工种,如起重、电焊、机动车司机、电工等,需培训考试合格后,持证上岗。(4)安全生产教育须持之以恒,工地现场要有安全生产宣传牌、安全标志、警示牌,做到警钟长鸣。(5)班组长在每天点名分工时,必须对所派工作进行安全技术交底,重要工作由安全质量部部长亲自交底,并做好记录。6.2.5主要安全技术措施和保证制度(1)建立健全各级各部门的安全生产责任制,并落实到人,各项经济承包要有明确的安全指标和包括奖励办法在内的保证措施,签订安全生产协议书。(2)在编制施工组织设计、制定施工方案和下达施工计划时,必须同时制定和下达施工安全技术措施。无安全措施技术交底,不得施工。(3)生产工人要掌握本工种操作技能,熟悉安全技术操作规程,并考试合格,持证上岗。(4)进入施工现场必须戴安全帽,登高作业必须系好安全带,穿防滑鞋,工具应放置工具包内,每天有佩带袖章的安全员值班。现场有“五牌一图”qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
即:施工单位及工地名称牌、安全生产六大纪律宣传牌、防火须知牌、安全无重大事故计数牌、工地主要管理人员名单牌、施工总平面图。在主要施工部位、作业点、危险区、主要通道道口都必须挂有安全宣传标语或安全警示牌。(5)钢管、扣件、螺栓、临时电力线、缆等材料的质量必须符合规范规定要求。(6)中小型施工机具,都必须专人使用,专人保养,并挂安全操作牌。(7)操作平台设安全防护栏杆,施工范围用彩钢板全封闭围护,工作平台走道四周贯通,脚手架上下梯搭成斜梯,两侧设扶手。(8)从事高空作业人员要定期进行体格检查,患有心脏病、高血压、癫痫病等病症人员不得从事高空作业。爬梯空洞等处须设明显标志。(9)夜间施工要配备足够的照明,临时电力线必须由专职电工架设、管理,开关要有防雨设施且安设牢固,并装有漏电保护器。(10)吊机及各种大型施工机械,使用前要认真检查,确认良好,并经试运转正常后,方可使用。(11)吊装作业由专人统一指挥,吊装人员坚持岗位,吊装时设警戒线,吊车起吊时大臂作业范围内严禁站人,起重机械严禁带病作业,严禁非工作人员进入施工区。(12)安全通道必须畅通。(13)空中吊装时,构件两端要系好风缆,构件上严禁站人。(14)吊装第一榀钢架时应搭设临时固定装置等形成空间稳定结构时,才能拆除。(15)移动钢梯均应按现有国家标准验收其质量,梯脚底部坚实,不得垫高使用。梯的上端应有固定措施。立梯工作角度以75度为宜,踏板上下间距以30cm为宜,不得有缺陷。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
(16)钢柱安装登高时应使用钢挂梯或设置在钢柱上的爬梯。(17)登高安装梁时,在两端设置挂篮,在梁上行走时,其一侧的临时护拦可采用钢索,用花兰螺丝拉紧。(18)构件运输时要绑扎牢固,不得超高、超宽。(19)炎夏气温高,高空作业人员易中暑,需加强防暑降温工作,确保人员状态良好。6.2.6消防、治安措施(1)施工现场设安全标志,危险作业区悬挂“危险”或者“禁止通行”、“严禁烟火”等标志,夜间设红灯警示。(2)工地布置要符合防火、防雷击等有关安全规则及环卫要求。仓库、O2、C2H2库等设置遵守国家有关安全规定,并经行业主管部门批准。(3)施工运输车辆必须严格遵守铁路公路交通规则,文明行车,注意安全,遵守厂区有关规定。(4)治安消防工作坚持“预防为主,以消为辅”的指导思想,加强施工现场的物资、器材和机械设备的管理,防止物资被哄抢、盗窃或破坏。(5)开展法制宣传和“四防”教育,项目经理部定期开展以防火防盗为主的安全大检查,堵塞漏洞,防患于未然,健全现场保卫机构,统一领导治安保卫工作。(6)保证施工现场临时排水沟畅通,并积极配合厂方及时疏通工程周围的既有排水系统,做好排水排污工作。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
6.2.7安全技术检查制度建立定期和不定期的现场安全检查制度。定期检查:项目经理部每月一次安全检查;项目队每星期一次安全检查;作业班组随时注意安全检查。每次检查都必须做好记录,发现事故隐患要及时上报,并派专人负责解决,要将事故苗头消灭在萌芽状态。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
第七卷环境保护及文明施工7.1建立“创建文明工地领导小组”,健全分级负责管理网络。各作业区的环保、卫生与现场文明施工由各项目队负责,经理部定期按文明工地标准进行检查评比,奖优罚劣,并服从浦镇车辆厂环保部门的监督和指导,创建文明工地。7.2组织各级干部、职工学习工程建设文明施工的有关文件,开展文明施工的教育活动,提高干部、职工的环保意识和公民的责任意识。自觉维护现场周围业主单位的各项设施、设备。7.3施工场地严格按总平面图布置,场内设施布置做到合理、有序。所有进场的各类机械设备定点摆放、保持整齐干净;材料按施工设计位置离地挂牌堆码整齐,需防雨的材料进库存放,无法进库的材料加盖防雨蓬布或采取其它防雨措施。砂石料堆放场地周围设置围栏。7.4建筑垃圾集中堆放,不乱丢弃;废水排放问题先与浦镇车辆厂环保部门取得联系,集中排放至厂内排水管网中,不得随意排放。创造一个清洁文明的生活、生产环境。7.5现场临时用电按平面布置要求统一规划,严禁乱拉、乱接。临时用水,以管网的形式分配到各用水点搅拌站、预制场及其它供水点,周围均开挖排水沟引入。7.6施工垃圾在现场集中存放,统一外运,装运时车箱板周围做好防护,以免沿途散落。飞扬性垃圾,采取遮盖、洒水等方法,避免扬尘。7.7各施工班组在当班工作结束后,清理作业场地,确保施工环境的整洁。及施工道路的通畅。7.8施工现场四周安装围栏,实行封闭施工。非施工人员未经许可严禁入内。施工现场内,悬挂各类警示牌、标识牌。7.9施工前,主动与业主协调,详细做好厂内地下管线的调查工作,摸清走向以便对地下管线及构筑物进行严格保护。7qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41
.10办公室各类图表上墙,准确反映现场状况及工程进度,办公设施整洁有序。7.11组织文明施工检查小组,在施工现场进行巡回检查,监督保持所有设施完好、整洁,施工人员做到文明礼貌。7.12加强内部治安和夜间保卫,充分发挥公安派出所民警的作用,坚决制止施工人员参与黄、赌、毒等活动,加强精神文明建设。7.13各道工序完工后,应对已完项目采取有效措施进行保护,同时加强巡守,以防成品的丢失及不必要的损坏。各类管道当日收工时对管口进行临时封堵;设备安装后用原包装物进行包扎保护;玻璃等易损物品待竣工交验前最后安装。7.14工程竣工后,及时清理施工现场,归还施工临时占地,做到人走场清。qualified,finishedfixed.(4)thenecessaryconstructionequipmentconfigurationsareinplace,constructionworkersarrivedatthescene,holdingavalidworkpermitandcertificateofthecorrespondingtype.(5)theconstructionplanapproval,constructiontechnologytogivethelow-downtheworkhasbeencompleted.(6)enterthesiteinspectionofpipes,pipefittings,valvesandothercomprehensive.Pipes,pipesurfaceshallbefreeofcracks,scars,porosity,slag,folds,severecorrosionandotherdefects,openingandcloseflexibly,maintenanceofhighpressurevalvesoneatastrengthandtightnesstest,passtheinspection,testpipes,valvescleantheclosedlogo,placedneatlyinthespecifiedlocation.(7)enterthesceneofthepipelinecomponents,preformsaredesignedaccordingtotheirdocumentationrequirements,themodels,specifications,material,quantitycheck.(8)thepipelineofhighpressurepipeprefabricationfactoryintothescene,shouldcontrolone-linediagram,checkbytheirspecifications,sizes,materialsandtrends.1.2....,Itisimportanttoensurecorrectsizeandsurfaceroughness.Nomatterwhichmethodofcutting,withanglegrindercuttingsurfaceoxide,dross,ruggedandBurrBurrandGrind.(2)theincisionqualityshallconformtothefollowingprovisionsofthepipe:cutsurfacesshouldbesmooth,freefromcracks,heavyleather,Burr,bump,necking,dross,ferrousoxide,iron,etc.Cutsideslopedeviationshouldnotexceed1%oftheoutsidediameterofthepipe,andmustnotexceed3mm.1.2.4thepipinginstallation(1)afterinstallingtheorderprincipleisthefirstlarge-caliber,small-bore,highfirst,thentheground,OutdoorIndoor,headafterthefirstpipe,andpipemovingdeviceconnection,preferablyfromthedevicetotheexternalpiping,pipingandpipelineinstallationsynchronization.(2)prefabricatedpiping,pipeline,andthepipelineshould41